Introduction

MODEL

MAIN UNIT

PACKAGE

CASH
PRICE

SHW-118E
12,499

Without the Pump

SHW-118EP
With the Booster
Pump

19,499

Model with the booster pump can be recommended when the available
water pressure is insufficient or when the customer requires a higher
pressure. Model without the pump can be recommended when the
available water pressure is sufficient. The pump model must never be
connected to a direct main water supply.

( )

(

) .
HRD/EFT/WT/0920

-1-

Components

.

1.

Front Cover (

)
)

2.

Face Window (

3.

Indicator Lamps (

4.

Pump Knob (

5.

Temperature Control Knob (

6.

ELCB Test Knob (ELCB

7.

ELCB Reset Knob (ELCB

8.

Filter Valve (

9.

Stop Valve (

)
)
)

)
)
)
)

)
)
)
)

)
)
)
)

10.Flow Regulator Valve ( )


)

There are two filters located at the stop valve,


one is mesh filter, other one is the built in filter
as shown in figure. Clean the mesh filter
regularly to prevent blockage. Built in filter can
also be removed as shown for cleaning

2 .
(Mesh)

.

.
.
HRD/EFT/WT/0920

-2-

Features

Product Features
The hand shower consists of 5 spray patterns as shown below.

5 .

These patterns can be selected by moving


the pattern selector as shown in this figure.

,

.

Adjustable Temperature Control

HRD/EFT/WT/0920

-3-

Safety Features

This Instant Hot Water Shower comes with a built in Triple Safety Systems
1. Auto Flow Switch
The Auto Flow Switch will detect the incoming water flow rate and
automatically disconnect the heater if the water flow is less than 2l/m.
This prevents over heating due to blockage.
2. Anti-Scalding Automatic Thermal Cutoff
The thermostat will automatically cut off the power supply if it has
sensed an abnormal rise in showering water temperature.
3. Built in ELCB
The Built in ELCB (Earth Leakage Circuit Breaker) will automatically
cut off the power supply in case there is a current leakage as low as
15mA.

3
.
1. Flow
,
,
2
.
.
2.


.
.
3. ELCB
ELCB 15
.
.
HRD/EFT/WT/0920

-4-

Safety Features (2)

ELCB Test
Turn on the electricity and water supply, the Green ELCB lamp will light
up. If the temperature control knob is in ON position, the red HEATER
lamp will light up also. Press the ELCB Test Button; The ELCB and
HEATER lamp should go off. That means the ELCB is working properly.
Press the Rest Switch to resume back the Electricity Supply.
If not the ELCB is not working properly. In such case a service agent
should be contacted in order to get this repaired.
Carrying out this test frequently ensures the correct functionality of this
safety feature

ELCB
.
ELCB
"ON"
"HEATER" . ELCB Test ,

ELCB HEATER .
ELCB .
"Reset"
"Reset" .
ELCB
.
.

.

HRD/EFT/WT/0920

-5-

Important Points

 Installation should be carried out by a professional plumbing/electrical


technician according to the instruction given in the instruction manual.
If not, customer will not be eligible for the warranty.
 For the pump model, it must never be connected to a direct main water
supply. Otherwise it will cause damage to the pump motor.
 The appliance must be earthed.
 For direct connections to the water tank, the heater must have a
minimum of 1 m below the water tank.


, /
/



.

(Earth) .
.

HRD/EFT/WT/0920

-6-

Electricity Consumption

Electricity Consumption
Wattage of the Heater = 3.6 kW (3600W)
Average time to take a shower = 10mins = 1/6 hours = 0.167 Hrs
Power Consumption for to take a shower = 3.6 kW X 0.167 Hrs
= 0.6 kWh = 0.6 Units
If we assume that the customers average consumption is between 90 to
180 units, then the unit cost will be Rs.16/=
Cost to take one shower

= Rs.16/= X 0.6 = Rs. 9.60

If you use shower once daily for a month = Rs. 9.60 = X 30 = Rs. 288/=

= 3.6 kW


= 10 = 1/6 = 0.167

= 3.6 kWh X 0.167Hrs
0.167Hrs = 0.6
0.6 kWh = 0.6
( 90 180

.16/= .)


= . 16 X 0.6 = .9.60


,
= .9.60 X 30 = .288/=
.288/=