Boiler External Piping Hydro Flow Chart

Is the Vessel Built to Section I (S or M Stamp)

No
No External Piping Hydro Required

Yes

For Electrode and Element Boilers


For Flextube and Firetube type boilers.

Does it have Welding piping, >800 KW input, or > 600 Volts?

Must have External Piping Hydro with AI witness

No to all, DOES NOT REQUIRE AI witness,

Hydro at 1.5 Times MAWP

Hydro at MAWP or Relief Stpt.

Yes to one or more

DOES REQUIRE AI Witness. Hydro at MAWP or Relief Stpt. Unless vessel has welded piping then hydro at 1.5 times MAWP