Вы находитесь на странице: 1из 248

EARTHWORK

EARTH WORK

SR. NO. 1

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

SITE CLEARING INCLUDING CUTTING TREES AND BUSHES AND DRESSING. FOR CFt. 100 LS

SR. NO. 2

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

EARTH WORK IN EXCAVATING FOUNDATION IN ORDINARY SOIL TO A DEPTH OF 5 FT. AND REMOVING THE EXCAVATED MATERIALS AS DIRECTED WINTHIN 100FT. 100 WORKERS NO. SUNDRIES L.S.

1.5

SR. NO. 3

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

EARTH WORK IN EXCAVATING FOUNDATION IN ORDINARY SOIL TO A DEPTH OF 5 FT. AND REMOVING THE EXCAVATED MATERIALS AS DIRECTED WINTHIN 100FT. 100 WORKERS NO. SUNDRIES L.S.

SR. NO. 4

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

EARTH WORK IN EXCAVATING FOUNDATION IN HARD SOIL TO A DEPTH OF 5 FT. AND REMOVING THE EXCAVATED MATERIALS AS DIRECTED WINTHIN 100FT. 100 WORKERS NO. SUNDRIES L.S.

SR. NO. 5

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

EARTH WORK IN ORDINARY SOIL WITH EXCAVATED EARTH FILLING IN 6" LAYERS WATERING AND RAMMING WITHIN 100 FTS.(CFt.) 100 WORKERS WORKERS FOR CARRING AND RAMMING WORKER FOR WATERING SUNDRIES

NO. NO. NO. L.S.

1.5 0.75 0.25

SR. NO. 6

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

EARTH WORK OVER AREAS IN ORDINARY GROUND IN CUTTING AND LEVELLING SITE INCLUDING CARRYING AWAY SURPLUS SPOILS SPREADING AND LEVELLING WINTHIN 100 FT. (FOR 100 CFt.) 100 WORKERS NO. SUNDRIES L.S.

1.125

Page 1

EARTHWORK

SR. NO. 7

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

EARTH WORK IN EXCAVATI0N OVER AREAS IN CUTTING AND LEVELLING IN HARD SOIL INCLUDING DISPOSAL OF SURPLUS SPOIL NOT EXCEDDING 100FTS. (CFt.) 100 WORKERS NO. SUNDRIES L.S.

2.5

SR. NO. 8

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

EXCAVATING IN MEDIUM SOIL AND FILLING AND EMBANKMENT, 100 FT. LIFT 5 Ft.. FOR- 100 FTS.(CFt.) 100 MAISTRY DIGGER WORKER FOR CARRYING SUNDRIES

NO. NO. NO. L.S.

0.125 1.5 1

SR. NO. $ 8

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

EXCAVATING IN MEDIUM SOIL AND FILLING AND EMBANKMENT, 100 FT. LIFT 5 Ft.. FOR- 100 FTS.(CFt.) 100 MAISTRY DIGGER WORKER FOR CARRYING SUNDRIES

NO. NO. NO. L.S.

0.125 1.5 1

SR. NO. 9

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

EXCAVATING AND FILLING AND FORMING EMBANKMENT AND LEAD 100 FT.,LIFT 10 FT. FOR- 100 FTS.(CFt.) 100 MAISTRY NO. DIGGER NO. WORKER FOR CARRYING NO. SUNDRIES L.S.

0.125 1.5 2

SR. NO. 10

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

EARTH WORK (ITEM 2, 3 & 4 ) EXTRA FOR EVERY ADDITIONAL 5 FT. DEPTH. FOR- 100 FTS.(CFt.) 100 WORKERS

NO.

0.5

SR. NO. 11

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

EARTH WORK (ITEM 2, 3 & 4 ) EXTRA FOR EVERY ADDITIONAL 100 FT. LEAD.. FOR- 100 FTS.(CFt.) 100 WORKERS

NO.

0.5

Page 2

EARTHWORK

SR. NO. 12

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

SAND FILLING ,WATERING AND RAMMING. FOR- 100 FTS.(CFt.) 100 SAND WORKER FOR CARRYING AND RAMMING. WORKER FOR WATERING SUNDRIES CFt. NO. NO. L.S. 125 0.5 0.5

SR. NO. 13

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

DIGGING POST HOLES UNDER 2 FT. SQUARE IN ANY SOIL AVERAGE 2 Ft.. DEPTH. (FOR EACH HOLE ) 1 DIGGER

NO.

0.125

SR. NO. 14

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

DIGGING POST HOLES UNDER 2 FT. SQUARE NOT EXCEDDING 3 Ft. DEPTH IN EACH HOLES IN HARD SOIL PART RETURN AND FILL. (FOR EACH HOLE) 1 DIGGER NO.

0.2

SR. NO. 15

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

DIGGING POST HOLES NOT 'EXCEDDING 12 CFt. IN EACH' HOLES IN MEDIUM SOIL 'PART RETURN AND FILL. (FOR EACH HOLE) 1 DIGGER NO.

0.002

SR. NO. 16

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

DIGGING POST HOLES NOT 'EXCEDDING 12 CFt. IN EACH' HOLES IN ORDINARY SOIL 'PART RETURN AND FILL.' (FOR EACH HOLE) 1 DIGGER

NO.

0.143

SR. NO. 17

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

DIGGING POST HOLES NOT EXCEEDING 10 CFt. IN EACH HOLE IN HARD SOIL. (FOR EACH HOLE) 1

Page 3

EARTHWORK

DIGGER WORKER SUNDRIES

NO. NO. L.S.

0.2 0.125

SR. NO. 18

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

DIGGING DRAIN 1'-6" AT TOP 9" AT BOTTOM AND AVERAGE DEPTH 12" (ORDINARY SOIL). (FOR 100 RFt.) 100 WORKER SUNDRIES NO. L.S. 2

SR. NO. 19

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

DIGGING DRAIN 1'-6" AT TOP 9" AT BOTTOM AND AVERAGE DEPTH 12" (HARD SOIL). (FOR 100 RFt.) 100 WORKER SUNDRIES

NO. L.S.

SR. NO. 20

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

DIGGING LATRINE PIT OF ANY SIZE UP TO 10 Ft. DEPTH IN HARD SOIL. (FOR 100 CFt.) 100 WORKER NO. SUNDRIES L.S.

3.125

SR. NO. 21

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

EARTH WORK IN DIGGING IN SAND OR CLAY OR LATERINE UP TO 10 Ft. INITIAL DEPTH. (FOR 100 CFt.) 100 WORKER SUNDRIES

NO. L.S.

SR. NO. 22

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

EARTH WORK EXTRA FOR EVERY ADDITIONAL 5 FEET LIFT. (FOR 100 CFt.) 100 WORKER SUNDRIES

NO. L.S.

0.5

Page 4

MOTAR

II-^MORTAR

SR. NO. 1

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

CEMENT MORTAR 1:2 (FOR 100 CFt.) 100 CEMENT 46 CFt. SAND WORKERS FOR MIXING LBS. CFt NO. 4140 92 4

SR. NO. 2

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

CEMENT MORTAR 1:3 (FOR 100 CFt.) 100 CEMENT 33 CFt. SAND WORKERS FOR MIXING LBS. CFt NO. 2970 100 4

SR. NO. 3

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

CEMENT MORTAR 1:4 (FOR 100 CFt.) 100 CEMENT25 CFt. SAND WORKERS FOR MIXING LBS. CFt NO. 2250 100 4

SR. NO. 4

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

CEMENT MORTAR FOR PLASTER 1:1:6 (FOR 100 CFt.) 100 CEMENT 12 2/3 CFt. LIME SAND WORKERS FOR MIXING

LBS. CFt CFt. NO.

1500 16.67 100 4

SR. NO. 5

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

DAMP PROOF CEMENT MORTAR 1:2 WITH 5% PUDLO BY WEIGHT OF CEMENT. (FOR 100 CFt.) 100 CEMENT 48 CFt. PUDLO SAND WORKERS FOR MIXING

LBS. CFt CFt. NO.

4320 216.00 100 4

SR. NO. 6

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

CEMENT MORTAR 1:6 . (FOR 100 CFt.) 100 CEMENT 16 2/3 CFt. SAND WORKERS FOR MIXING LBS. CFt. NO. 15000 100 4

Page 1

MOTAR

SR. NO. 7

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

LIME MORTAR 1:2 . (FOR 100 CFt.) 100 LIME SAND WORKERS FOR MIXING CFt. CFt. NO. 46 92 4

SR. NO. 8

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

LIME MORTAR 1:1:1 . (FOR 100 CFt.) 100 LIME SAND SURKHI WORKERS FOR MIXING CFt. CFt. CFt. NO. 50 50 50 7

SR. NO. 9

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

LIME MORTAR 1:1:1FOR SMALL WORK. . (FOR 100 CFt.) 100 LIME SAND SURKHI WORKERS FOR MIXING

CFt. CFt. CFt. NO.

50 50 50 8

SR. NO. 10

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

LIME MORTAR 2:3:1 FOR PLASTER. . (FOR 100 CFt.) 100 LIME SAND SURKHI WORKERS FOR MIXING

CFt. CFt. CFt. NO.

50 75 25 7

SR. NO. 11

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

LIME MORTAR 2:3:1 PLASTER FOR SMALL WORK. . (FOR 100 CFt.) 100 LIME SAND SURKHI WORKERS FOR MIXING

CFt. CFt. CFt. NO.

50 75 25 8

SR. NO. 12

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

COMPOSITE MORTAR FOR PLASTER 1:2:6 . (FOR 100 CFt.) 100 CEMENT 16 CFt. LIME SAND WORKERS FOR MIXING

LBS. CFt. CFt. NO.

1440 32 100 4

Page 2

MOTAR

SR. NO. 13

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

MUD MORTAR. . (FOR 100 CFt.) 100 SELECTED SUITABLE CLAY (MUD) WORKERS FOR MIXING INCLUDING WATER. CFt. NO. 100 2

SR. NO. 14

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

LIME MORTAR. 1:1 . (FOR 100 CFt.) 100 LIME SAND WORKERS CFt. CFt. NO. 75 75 4

SR. PARTICULARS OF MATERIAL AND LABOUR NO. 15 COMPOSITE MORTAR 1: 1/2 : 4 . (FOR 100 CFt.) 100 CEMENT LIME SAND WORKERS

UNIT

QUANTITY

CFt. CFt. CFt. NO.

24.2 12.1 96.8 4

Page 3

CONCRETE(HM)

CONCRETE (HAND MIXED)

SR. NO. 1

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

CEMENT CONCRETE WITH STONE BALLST 1 1/2" GAUGE 1 :3 :6. (FOR 100 CFt.) 100 CEMENT 16 CFt. STONE BALLAST 1 1/2" GAUGE SAND MASON WORKERS

LBS. CFt. CFt. N0. NO.

1440 96 48 1 8

SR. NO. 2

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

CEMENT CONCRETE 1:2:4 WITH 1/4" TO 3/4" STONE CHIPPING OR RIVER SHINGLE AGGREGATE.(FOR CFt.) 100 CEMENT23 CFt. STONE SAND MASON WORKERS

LBS. CFt. CFt. N0. NO.

2070 92 46 1 10

SR. NO. 3

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

MIXING ONLY CEMENT CONCRETE 1: 2 : 4 WITH 1/2" TO 3/4" GAUGE STONE CHIPPING OR RIVER SHINGLE OR RIVER SHNGLE AGGREGATE. FOR CFt. 100 MASON WORKERS N0. NO. 1 5

SR. NO. 4

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

CEMENT CONCRETE WITH 3/4" STONE BALLAST OR RIVER SHINGLE AGGREGATE 1 : 2 1/2 :5 FOR CFt. 100 CEMENT 19 CFt. STONE BALLAST 3/4" GAUGE SAND MASON WORKERS

LBS CFt. CFt. NO. NO.

1710 94 47 1 10

SR. NO. 5

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

CEMENT CONCRETE 1 :1 1/2 : 3 WITH 1/4" TO 3/4" STONE OR 'RIVER SHINGLE AGGREGATE. FOR CFt. 100 LBS CEMENT STONE OR RIVER SHINGLE 1/4" TO 3/4"GAUGE CFt. SAND CFt. MASON NO. WORKERS NO.

2790 92 46 1 10

Page 1

CONCRETE(HM)

SR. NO. 6

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

1 1/2" THICK CEMENT OR 'RIVER SHINGLE AGGREGATE. FOR CFt. 100 CEMENT STONE OR RIVER SHINGLE 1/4" TO 3/4"GAUGE SAND MASON WORKERS

LBS CFt. CFt. NO. NO.

2790 92 46 1 10

SR. NO. 7

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

CEMENT CONCRETE 1:2:4 WITH IRONTIE 10% TO THE WEIGHT OF CEMENT. FOR CFt. 100 CEMENT 21 CFT. IRONITE STONE OR RIVER SHINGLE 1/4" TO 3/4"GAUGE SAND MASON WORKERS

LBS LBS CFt. CFt. NO. NO.

1890 189 92 46 1 10

SR. NO. 8

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

1" THICK CEMENT CONCRETE 1:2:4 WITH 5% PUDLO TO THE WEIGHT OF CEMENT FOR DAMP PROOF COURSE. (FOR ? SFt..) 100 CEMENT 21 CFT. PUDLO STONE CHIPPINGOR RIVER SHINGLE 1/4" TO 3/4"GAUGE SAND MASON WORKERS

LBS LBS CFt. CFt. NO. NO.

173 8.75 8 4 0.75 0.75

SR. NO. 9

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

CEMENT CONCRETE 1:6:12 USING 1/4" TO 3/4" STONE OR RIVER SHINGLE AGGREGATE IN FOUNDATION. (FOR ? CFt..) 100 CEMENT SAND 1/4" TO 3/4" STONE OR RIVER SHINGLE AGGREGATE MASON WORKERS

LBS CFt. CFt. NO. NO.

765 51 102 1 10

Page 2

CONCRETE(HM)

SR. NO. 10

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

CEMENT CONCRETE 1:4:8 WITH 3/4" TO 1 1/2" STONE OR RIVER SHINGLE AGGREGATE (FOR ? CFt..) 100 CEMENT SAND STONE OR RIVER SHINGLE AGGREGATE MASON WORKERS

LBS CFt. CFt. NO. NO.

1170 52 104 1 10

SR. NO. 11

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

LIME CONCRETE (1:1:1:6) WITH GRAVEL AGGREGATE . (FOR ? CFt..) 100 GRAVEL LIME MORTAR 1:1:1 MASON WORKERS SUNDRIES

CFt. CFt. NO. NO. L.S

100 38 0.5 7

SR. NO. 12

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

LIME CONCRETE (1:1:4) IN FOUNDATION USING MEDIUM BRICK AGGREGATE . (FOR ? CFt..) 100 LIME MORTAR 1:1:1 BRICK BAT AGGREGATE MASON WORKERS SUNDRIES

CFt. CFt. NO. NO. L.S

34 100 0.5 7

SR. NO. 13

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

LIME CONCRETE (1:2:6) WITH GRAVEL OR BROKEN BRICK AGGREGATE . (FOR ? CFt..) 100 GRAVEL LIME SANDD MASON WORKERS

CFt. CFt. CFt. NO. NO.

100 17.5 35 0.5 10

Page 3

CONCRETE(HM)

SR. NO. 14

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

LIME CONCRETE (1:1:1:6 ) WITH BROKEN BRICK OR STONE BALLAST. (FOR ? CFt..) 100 STONE OR BRICK BALLAST 1 1/2" GAUGE LIME MORTAR 1:1:1 MASON WORKERS SUNDRIES

CFt. CFt. NO. NO. L.S

100 34 0.5 7

SR. NO. 15

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

COMPOSITE CONCRETE WITH STONE BALLAST, RIVER SHINGLE OR HILL GRAVEL 1:2:5:10 (FOR ? CFt..) 100 CEMENT 9 CFT. STONE BALLAST 3/4" GAUGE, RIVER SHINGLE OR HILL GRAVEL LIME SAND MASON WORKERS

LBS. CFt. CFt. CFt. NO. NO.

810 90 18 45 1 10

SR. NO. 16

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

CEMENT CONCRETE (1:1:5) USING MEDIUM FINE STONE OR RIVER SHINGLE AGGREGATE. (FOR ? CFt..) 100 CEMENT SAND STONE OR RIVER SHINGLE AGGREGATE 3/4" TO 1 1/2" MASON WORKERS

CFt. CFt. CFt. NO. NO.

17.9 53.7 89.5 1 10

SR. NO. 17

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

MIXING ONLY GRANOLITHIC MIX (1: 2 1/2) WITH 1/4" DOWN GRANITE CHIPPINGS WITH ORDINARY CEMENT. (FOR ? CFt..) 100 CEMENT SAND 1/4" GRANITE CHIPPINGS MASON WORKERS

LBS. CFt. CFt. NO. NO.

3568 7.5 104 1 5

SR. NO. 18

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

MIXING ONLY GRANOLITHIC MIX (1: 2 ) WITH 1/4" DOWN GRANITE CHIPPINGS WITH ORDINARY CEMENT. (FOR ? CFt..) 100 CEMENT

LBS.

4320

Page 4

CONCRETE(HM)

SAND 1/4" GRANITE CHIPPINGS MASON WORKERS

CFt. CFt. NO. NO.

9 96 1 5

SR. NO. 19

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

MIXING ONLY TERRAZO MIX (1: 3 ) WITH 1/4" MARBLE CHIPPING IN COLOURED CEMENT. (FOR ? CFt..) 100 COLOUR CRETE 1/4" MARBLE CHIPPINGS MASON WORKERS

LBS. CFt. NO. NO.

3240 108 1 5

SR. NO. 20

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

MIXING ONLY TERRAZO MIX (1: 2 ) WITH 1/4" DOWN MARBLE CHIPPING IN COLOURED CEMENT. (FOR ? CFt..) 100 COLOUR CRETE 1/4" MARBLE CHIPPINGS MASON WORKERS

LBS. CFt. NO. NO.

4320 96 1 5

PARTICULARS OF MATERIALS &LABOURS

UNIT

QUANTITY

21 TIMBER SHUTTERING (FORM WORK) (FOR ? SFt.) 100 TIMBER SCANTLING TIMBER PLANKS 1" NAILS AND SPIKES M.S.BOLTS AND WASHERS IF REQUIRED CARPENTERS WORKERS

CFt. SFt. LBS EACH EACH

15 110 3 6 2

Page 5

REINFORCED(HM)

REINFORCED CONCRETE (HAND MIXED)

SR. NO. 1

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

REINFORCED CONCRETE WORK 1:2:4 (FOR 100 CFt.) 100 CEMENT 23CFt. COARSE AGG:1/4" TO 3/4" GAUGE SAND MASON WORKERS

LBS. CFT. CFt. N0. NO.

2070 92 46 2 15

SR. NO. 2

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

R.C.C 1: 2 1/2: 5, MILE, FURLONG AND BOUNDARY POST FOR 91 POSTS. (FOR 100 CFt.) 100 CEMENT 19 CFt. NO. 6 G.I PLAIN WIRE COAL TAR FOR FILLING IN LETTERS BALLAST 1/4" TO 3/4" GUAGE SAND SHUTTERING LUMP SUM ALLOWING SAME FORM TO BE USED SEVERAL TIMES. MASON WORKERS

LBS. LBS. LBS. CFT. CFT. L.S NO. NO.

1710 255 3 94 47

3 20

SR. NO. 3

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

R.C.C 1: 2:4, INTERMEDIATE FENCE POSTS 6' LONG 6" SQ. BASE, 4" SQ TOP FOR 92 POSTS. (FOR 100 CFt.) 100 CEMENT 23 CFt. 3/8" DIA M.S RODS BINDING WIRE BALLAST 1/4" TO 3/4" GUAGE SAND SHUTTERING LUMP SUM ALLOWING SAME FORM TO BE USED SEVERAL TIMES. MASON WORKERS

LBS. LBS. LBS. CFT. CFT. L.S NO. NO.

2070 872 80 92 46

3 20

SR. NO. 4

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

R.C.C 1: 2:4, GATE AND CORNER POSTS 7' LONG 8" SQ. BASE, 6" SQ TOP FOR 42 POSTS. (FOR 100 CFt.) 100 CEMENT 23 CFt. 3/8" DIA M.S RODS BINDING WIRE BALLAST 1/4" TO 3/4" GUAGE SAND SHUTTERING LUMP SUM ALLOWING SAME FORM TO BE USED SEVERAL TIMES.

LBS. LBS. LBS. CFT. CFT. L.S

2070 464 44 92 46

Page 1

REINFORCED(HM)

MASON WORKERS

NO. NO.

3 20

SR. NO. 5

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

R.C.C 1: 2:4,PIPE CULVERT 12" DIA 2' LONG 2 1/2" THICK , 1:2:4 FOR ONE PIPE. (FOR 1.58 CFt.) 1.58 CEMENT . TRIANGULAR MESH RIF STYLE NO. 245 BINDING WIRE BALLAST 1/4" TO 3/4" GUAGE SAND SPECIAL SHUTTERINGS FOR PIPE MASON WORKERS

LBS. LBS. LBS. CFT. CFT. L.S NO. NO.

32 8 0.2 1.45 0.72 0.125 0.75

SR. NO. 6

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

R.C.C PIPE 24" DIA. 2' LONG, 2 1/2" THICK, 1:2:4 FOR ONE PIPE. (FOR 2.90 CFt.) 2.9 CEMENT .0.68 CFT. TRIANGULAR MESH RIF STYLE NO. 245 BINDING WIRE BALLAST 1/4" TO 3/4" GUAGE SAND SPECIAL SHUTTERINGS FOR PIPE MASON WORKERS

LBS. LBS. LBS. CFT. CFT. L.S NO. NO.

61 14.5 0.2 2.66 1.34 0.25 1.5

SR. NO. 7

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

R.C.C PIPE 36" DIA.24" LONG, 3 1/2" THICK, 1:2:4 FOR ONE PIPE. (FOR 6.30 CFt.) 6.3 CEMENT .0.68 CFT. TRIANGULAR MESH RIF STYLE NO. 245 BINDING WIRE BALLAST 1/4" TO 3/4" GUAGE SAND SPECIAL SHUTTERINGS FOR PIPE MASON WORKERS

LBS. LBS. LBS. CFT. CFT. L.S NO. NO.

130 22 0.2 5.8 2.9 1 2

SR. NO.

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

Page 2

REINFORCED(HM)

R.C.C PIPE 48" DIA.24" LONG, 5" THICK, 1:2:4 FOR ONE PIPE. (FOR 11.66 CFt.) 11.66 CEMENT .0.68 CFT. TRIANGULAR MESH RIF STYLE NO. 245 BINDING WIRE BALLAST 1/4" TO 3/4" GUAGE SAND SPECIAL SHUTTERINGS FOR PIPE MASON WORKERS

LBS. LBS. LBS. CFT. CFT. L.S NO. NO.

244 29 0.2 10.8 5.4 1.5 3

SR. NO. 9

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

3" R.C.C (1:2:4) USING FINE STONE OR RIVER SHINGLE AGGRGATE AND B.R.C NO.10 INCLUDING USE AND WASTWE OF FORMS AND SHUTTERING. (FOR 100 SFT..) 100 R.C.C 1:2:4 CFT. B.R.C NO. 10 FEBRIC FIXED SFT. SHUTTERING FORMWORK (RATE REDUCED TO 1/6 FOR SFT. REASON OF REPEATED USE) MASON NO. WORKERS NO.

25 110 100 0.75 4

Page 3

REINFORCED(MACH)

CNCRETE MIXED BY MACHINE


$ SR. NO. 2 PARTICULARS OF MATERIAL AND LABOUR UNIT QUANTITY

MIXING ONLY CEMENT CONCRETE 1:2:4 WITH 1/2" TO 3/4" GUAGE STONE CHIPPINGS ON RIVER SHINGLE AGG.WHEELED BY HAND IN BARROWS. 100 CEMENT 23 CFt. LBS. STONE CHIPPINGS OR RIVER SHINGLE CFt. SAND CFt. FUEL GAL MASON N0. WORKERS NO. MACHINE DRIVER NO.

2070 92 46 2 1 3 0.5

SR. NO. 1

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

MIXING AND PLASCING CEMENT CONCRETE 1:3:6 WITH STONE BALLAST OR RIVER SHINGLE OR BRICK AGG:1 1/2" GAUGE WHELLED BY HAND IN BARROWS. 100 CEMENT16 CFt. STONE BALLAST, SHINGLE, BRICK AGG: 1 1/2"GAUGE SAND FUEL MASON WORKERS MACHINE DRIVER

LBS. CFt. CFt. GAL N0. NO. NO.

1140 96 48 2 1 6 0.5

SR. NO. 3

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

MIXING AND PLASCING CEMENT CONCRETE 1:4:8 WITH 3/4" TO 1 1/2" STONE BALLAST OR RIVER SHINGLE AGG: WHELLED BY HAND IN BARROWS. 100 CEMENT13CFt. STONE BALLAST, SHINGLE, 3/4" TO 1 1/2" GAUGE SAND FUEL MASON WORKERS MACHINE DRIVER

LBS. CFt. CFt. GAL N0. NO. NO.

2070 104 52 2 1 8 0.5

Page 1

REINFORCED(MACH)

SR. NO. 4

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

MIXING AND PLASCING CEMENT CONCRETE 1:1 1/2":3 WITH STONE BALLAST OR RIVER SHINGLE AGG: 1/4" TO 3/4" GAUGE WHELLED BY HAND IN BARROWS. 100 CEMENT31 CFt. STONE BALLAST, SHINGLE, 1/4" TO 1 3/4" GAUGE SAND FUEL MASON WORKERS MACHINE DRIVER

LBS. CFt. CFt. GAL N0. NO. NO.

2790 92 46 2 1 8 0.5

SR. NO. 5

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

(A)

TRANSPORTING ,PLASING AND CONSOLIDATING CEMENT CONCRETE (NOT REINFORCED) LEAD 100' AND 15' ABOVE OR BELOWMIXER 100 FOUNDATION AND FLOORS MASON WORKERS WALLS MASON WORKERS LEAD 100' AND 30' ABOVE OR BELOWMIXER FOUNDATION AND FLOORS MASON WORKERS WALLS MASON WORKERS

N0. NO.

1 5

(B)

N0. NO.

1 7

(A)

N0. NO.

1 6

(B)

N0. NO.

1 8

SR. NO. 6

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

(A)

TRANSPORTING ,PLASING AND CONSOLIDATING CEMENT CONCRETE ( REINFORCED) LEAD 100' AND 15' ABOVE OR BELOW MIXER 100 FOUNDATION AND FLOORS MASON WORKERS WALLS MASON WORKERS COLUMNS MASON WORKERS

N0. NO.

2 6

(B)

N0. NO.

2 8

(C)

N0. NO.

2 9

(A)

LEAD 100' AND 30' ABOVE OR BELOW MIXER FOUNDATION AND FLOORS MASON WORKERS WALLS MASON WORKERS COLUMNS MASON

N0. NO.

2 7

(B)

N0. NO.

2 9

(C)

N0.

Page 2

REINFORCED(MACH)

WORKERS

NO.

10

Page 3

BRICKWORK

BRICK WORKS

SR. NO. 2

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

BRICK WORK IN CEMENT MORTAR(1:3) (FOR 100 CFt.) 100 CEMENT 8 2/3CFt. 1 St. CLASS BRICKS SAND MASON WORKERS

LBS. NO. CFt. N0. NO.

780 1350 26 4 6

SR. NO. 1

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

BRICK WORK 1st. CLASS IN COMPOSITE MORTAR 1:1:6 (FOR 100 CFt.) 100 CEMENT 1 St. CLASS BRICKS 9" X 4 3/8" X 2 3/4" LIME SAND MASON WORKERS SCAFFOLDING AND SUNDRIES

LBS. NO. CFt. CFt. NO. NO. L.S

372 4.125 24.75 4 6

SR. NO. 3

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

BRICK WORK 1st. CLASS IN ARCHES IN (1:3) CEMENT MORTAR. (FOR ? CFt.) 100 CEMENT 8 2/3 CFT. 1 St. CLASS BRICKS 9" X 4 3/8" X 2 3/4" SAND MASON WORKERS SCAFFOLDING AND CENTERING,ETC.

LBS. NO. CFt. NO. NO. L.S

780 1350 26 5 6

SR. NO. 4

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

BRICK WORK 1st. CLASS IN 1:2 CEMENT MORTAR. (FOR ? CFt.) 100 CEMENT 1 St. CLASS BRICKS 9" X 4 3/8" X 2 3/4" SAND MASON WORKERS

LBS. NO. CFt. NO. NO.

1035 1350 23 4 6

SR. NO. 5

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

BRICK WORK 1st. CLASS IN 1:4 CEMENT MORTAR.

Page 1

BRICKWORK

(FOR ? CFt.) 100 CEMENT 1 St. CLASS BRICKS 9" X 4 3/8" X 2 3/4" SAND MASON WORKERS LBS. NO. CFt. NO. NO. 1350 630 28 4 6

SR. NO. 6

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

BRICK WORK 6" DEEP 1st. CLASS BRICK WORK IN 1:3 CEMENT MORTAR. (FOR ? CFt.) 100 CEMENT 1 St. CLASS BRICKS 9" X 4 3/8" X 2 3/4" SAND MASON LAYING AND CUTTING WORKERS

LBS. NO. CFt. NO. NO.

150 275 5 4 3

SR. NO. 7

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

9" THICK HONEY -COMB BRICK WORK 1st. CLASS IN 1:3 CEMENT MORTAR. (FOR ?SFt.) 100 CEMENT 1 St. CLASS BRICKS 9" X 4 3/8" X 2 3/4" SAND MASON WORKERS

LBS. NO. CFt. NO. NO.

564 700 19 3.5 3.5

SR. NO. 8

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

4 1/2" THICK HONEY -COMB BRICK WORK 1st. CLASS IN 1:3 CEMENT MORTAR. (FOR ? SFt.) 100 CEMENT BRICKS SAND MASON WORKERS

LBS. NO. CFt. NO. NO.

300 350 10 2 2

SR. NO. 9

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

BRICK CURB 4 1/2" X 3" IN CEMENT MORTAR 1:3 AND PLASTERED 1/2" THK. IN THE SAME MORTAR. (FOR ? RFt.) 100 CEMENT MORTAR 1:3

CFT.

Page 2

BRICKWORK

BRICKS 1/2" CEMENT MORTAR PLASTERING MASON WORKERS

NO. SFT. NO. NO.

138 87.5 0.5 0.33

SR. NO. 10

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

BRICK WORK 1st. CLASS IN LIME MORTAR (1:1:1). (FOR ? CFt.) 100 LIME MORTAR 1:1:1 1 St. CLASS BRICKS 9" X 4 3/8" X 2 3/4" MASON WORKERS SCAFFOLDING AND SUNDRIES

CFT. NO. NO. NO. L.S

26 1350 4 5

SR. NO. 11

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

BRICK WORK 1st. CLASS IN ARCHES LIME MORTAR (1:1:1). (FOR ? CFt.) 100 LIME MORTAR 1:1:1 1 St. CLASS BRICKS 9" X 4 3/8" X 2 3/4" MASON WORKERS SCAFFOLDING AND SUNDRIES

CFT. NO. NO. NO. L.S

26 1350 5 5

SR. NO. 12

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

BRICK WORK 1st. CLASS IN LIME MORTAR 1:2 (FOR ? CFt.) 100 LIME 1 St. CLASS BRICKS 9" X 4 3/8" X 2 3/4" SAND MASON WORKERS

CFT. NO. CFT. NO. NO.

12 1350 24 4 6

Page 3

BRICKWORK

SR. NO. 13

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

BRICK WORK 1st. CLASS IN LIME MORTAR 1:1 (FOR ? CFt.) 100 LIME MORTAR 1:1 1 St. CLASS BRICKS MASON WORKERS SCAFFOLDING AND SUNDRIES

CFT. NO. NO. NO. L.S

26 1350 4 5

SR. NO. 14

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

CORNICE 6" DEEP 1st. CLASS BRICK WORK IN LIME MORTAR( 1:1:1) (FOR ? RFt.) 100 LIME MORTAR 1:1:1 1 St. CLASS BRICKS 9" X 4 3/8" X 2 3/4" MASON LAYING AND CUTTING WORKERS

CFT. NO. NO. NO.

5 275 4 3

SR. NO. 15

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

HONEY -COMB WORK WITH BRICK 1st CLASS AND PLASTERED ONE COAT 3/8" LIME MORTAR. (FOR ? SFt.) 100 LIME MORTAR 1:1:1 1 St. CLASS BRICKS 9" X 4 3/8" X 2 3/4" MASON LAYING AND CUTTING WORKERS

CFT. NO. NO. NO.

19 700 9 6

SR. NO. 16

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

BRICK WORK IN MUD WITH SUN BURNT BRICKS. (FOR ? CFt.) 100 SUN BURN BRICKS CLAY MASONS WORKERS SCAFFOLDING AND SUNDRIES

NO. CFT. NO. NO. L.S

1350 30 3 5

Page 4

PLASTER&POINT

PLASTERING AND POINTING

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 1 PLASTERING WITH DEMP PROOF CEMENT MORTAR 3/4" THICK 1:2.(SFt.) 100 CEMENT3.6 CFT. PUDLO (5% BY WEIGHT OF CEMENT) SAND MASON WORKERS SUNDRIES

UNIT

QUANTITY

LBS. LBS. CFT. NO. NO. L.S

324 16.2 7.2 1.5 3

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 2 PLASTERING WITH 1:2 CEMENT MORTAR 1/2" THICK (SFt.) 100 CEMENT SAND MASON WORKERS

UNIT

QUANTITY

LBS. CFT. NO. NO.

225 5 1 2

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 3 PLASTERING WITH 1:3 CEMENT MORTAR 1/2" THICK (SFt.) 100 CEMENT SAND MASON WORKERS

UNIT

QUANTITY

LBS. CFT. NO. NO.

150 5 1 2

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 4 PLASTERING WITH 1:3 CEMENT MORTAR 3/4" THICK (SFt.) 100 CEMENT SAND MASON WORKERS

UNIT

QUANTITY

LBS. CFT. NO. NO.

225 7.5 1.5 3

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 5 PLASTERING WITH 1:4 CEMENT MORTAR1/2" THICK (SFt.) 100 CEMENT SAND MASON WORKERS

UNIT

QUANTITY

LBS. CFT. NO. NO.

112.5 5 1 2

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 6 PLASTERING 1/2" THICK WITH LIME MORTAR 1:1 (SFt.) 100 LIME MORTAR1:1 MASON WORKERS SUNDRIES

UNIT

QUANTITY

CFt. NO. NO. L.S

5 1 2

Page 1

PLASTER&POINT

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 7 PLASTERING 1/2" THICK WITH LIME MORTAR 1:2 (SFt.) 100 LIME SAND MASON WORKERS

UNIT

QUANTITY

CFt. CFt. NO. NO.

2.5 5 1 2

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 8 PLASTERING WITH LIME MORTAR 1/2" THICK (2:3:1) (SFt.) 100 LIME MORTAR FOR PLASTER (2:3:1) MASON WORKERS SUNDRIES

UNIT

QUANTITY

CFt. NO. NO. L.S

5 1 2

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 9 PLASTERING WITH 1:2:6 COMPOSITE MORTAR 1/2" THICK (SFt.) 100 CEMENT 0.8 CFt. LIME SAND MASON WORKERS SUNDRIES

UNIT

QUANTITY

LBS. CFt. CFt. NO. NO. L.S

72 1.6 4.8 1 2

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 10 PLASTERING WITH 1:1:6 COMPOSITE MORTAR 1/2" THICK (SFt.) 100 CEMENT 0.83 CFt. LIME SAND MASON WORKERS SUNDRIES

UNIT

QUANTITY

LBS. CFt. CFt. NO. NO. L.S

75 0.83 5 1 2

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 11 PLASTERING 1/2" THICK CEMENT MORTAR 1:3 WITH 5% PUDLO BY WEIGHT OF CEMENT (SFt.) 100 CEMENT MORTAR 1:3 PUDLO MASON WORKERS SUNDRIES

UNIT

QUANTITY

CFt. LBS. NO. NO. L.S

5 7.5 1 2

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 12 MUD PLASTERING 1/4" THICK. (SFt.) 100 TEMPERED CLAY CHOPPED - STRAW AND

UNIT

QUANTITY

Page 2

PLASTER&POINT

COW DUNG MASON WORKERS

CFt. NO. NO.

2.5 1 1

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 13 POINTING WITH 1:1:6 COMPOSITE MORTAR. (SFt.) 100 CEMENT LIME SAND MASON WORKERS SUNDRIES

UNIT

QUANTITY

LBS. CFt. CFt. NO. NO. L.S

30 0.33 2 1 2

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 14 POINTING WITH 1:2:6 COMPOSITE MORTAR. (SFt.) 100 CEMENT 0.32 CFt. LIME SAND MASON WORKERS SUNDRIES

UNIT

QUANTITY

LBS. CFt. CFt. NO. NO. L.S

29 0.64 1.92 1 2

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 15 POINTING WITH CEMENT MORTAR 1:2 (SFt.) 100 CEMENT SAND MASON WORKERS

UNIT

QUANTITY

LBS. CFT. NO. NO.

83 2 1 2

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 16 POINTING WITH CEMENT MORTAR. 1:3 TO FULL DEPTH OF TILES ,MARBLE TILES,GLASED TIES (SFt.) 100 CEMENT SAND MASON

UNIT

QUANTITY

LBS. CFt. NO.

15 0.5 1

Page 3

PLASTER&POINT

WORKERS COLOURING MATTERS AND SUNDRIES

NO. L.S

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 17 POINTING WITH CEMENT MORTAR. 1:3 (FOR 100 SFT.) 100 CEMENT SAND MASON WORKERS

UNIT

QUANTITY

LBS. CFt. NO. NO.

60 2 1 2

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 18 POINTING WITH 2:3:1 LIME MORTAR (FOR 100 SFT.) 100 LIME MORTAR FOR PLASTER 2:3:1 MASON WORKERS SUNDRIES

UNIT

QUANTITY

CFt. NO. NO. L.S

2 1 2

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 19 POINTING WITH LIME MORTAR (1:1) (FOR 100 SFT.) 100 LIME MORTAR FOR 1:1 MASON WORKERS SUNDRIES

UNIT

QUANTITY

CFt. NO. NO. L.S

2 1 2

Page 4

WOODWORK

VII. WOOD WORK

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 1 THITYA, INGIN, PYINGADO WOOD WROUGH . AND FIXED. (FOR Cft.) 50 Thitya, ingin, pyingado Nail & spikes Carpenters

UNIT

QUANTITY

Cft. Lbs. No.

55 14 12

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 2 JUNGLE WOOD WORK WROUGHT AND FIXED. (For 50 Cft.) 50 Jungle wood scantling Nail & spikes Carpenters

UNIT

QUANTITY

Cft. Lbs. No.

55 14 10

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 3 WOOD WORK WROUGHT AND FIXED IN FENCINE AND BRIDGES.(FOR 50 Cft) 50 Sacntling Nails & spikes Carpenters

UNIT

QUANTITY

Cft. Lbs. No.

55 14 7

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 4 TEAK HAND RAILING 1 ST CLASS PLAIN. (For 8 Rft.) 8 HORIZONTAL TOP 1 X 75/6' X 4" X 3" HORIZONTAL BOTTOM -- DO -HORIZONTAL INTER 2 X 75/6' X 3" X 2" POST, 1 X 3' X 4" X 4" VERTICALS 5 X 2' X 2" X 2" DIAGONALS 10 X 2' X 2" X 2" NAILS CARPENTERS

UNIT

QUANTITY

Cft. Cft. Cft. Cft. Cft. Cft. Lbs. No.

2.61 2.61 2.61 2.61 1.31 1.31 1 2

SR. PARTICULARS OF MATERIAL AND LABOURS UNIT NO. 5 HAND RALLING 2ND CLASS PLAIN (OTHER THAN TEAK). (FOR 8 Rft.) 8 Post, 1 x 3' x 4" x 4" Cft. Horizontal top 1 x 75/6' x 3" x 2" Verticals 3 x 25/6' x 2" x 1" Cft. Diagonals 6 x 4' x 2" x 1" Nails Lbs. Carpenters No.

QUANTITY

1.18 0.78 0.5 1.5

Page 1

WOODWORK

SR. PARTICULARS OF MATERIAL AND LABOURS UNIT NO. 6 TEAK STAIR CASE WITHOUT HAND RALLING FOR 45 Sft. (10' x 4' clear width) 45 Stringers 2 x 10' x 12" x 3" Cft. Treads, 9 x 4' x 1' x 1" Cft. Risers 9x4'x7"x1/2" Nails Lb. Carpenters No.

QUANTITY

5.5 8.22 2 8

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 7 STAIR CASE 2ND CLASS WITHOUT HEAD RALLING (OTHER THEN TEAK). For 30 Sft. (10' x 3') 30 Stringers 2 x 10' x 10" x 3" Treads, 6 x 25/6' x 9" x 1" Risers 6 x 3' x 9" x " Nails Carpenters

UNIT

QUANTITY

Cft. Cft. Lb. No.

4.59 2.47 2 4

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 8 HEAD WOOD STEPS FOR OUT HOUSES WITHOUT HAND RALLING.For 15 Sft. (5' x 3') 15 Stringers 2 x 5' x 10" x 2" Treads, 4 x 3' x 8" x 1" Nails Carpenters

UNIT

QUANTITY

Cft. Cft. Lb. No.

1.53 0.77 0.5 1.5

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 9 PROVIDING WROUGHT JUNGLE WOOD STEPS WITH 10" X 2" STRINGERS AND 9" x 1" TREADS. (For 15 Sft.) 15 Jungle wood,stringers Treads, Nails Carpenters

UNIT

QUANTITY

Cft. Cft. Lb. No.

1.53 1.3 0.5 1.5

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 10 TEAK GATE 1ST CLASS FOR 12' WIDE. 12 W.I. hinges 2 x 4' & 2 x 4' x 2" x " 1" * pintles, 4 No. 1/2" D- BOLTS FOR HINGES AND HASPS 17 50.4" LONG. HEADS & NUTS FOR BOLTS LOCKING HASP 1 X1 3/4' TOP BAR 2 X 6 1/3' X 8 1/2" X3" Bottom & centre rails 4 x 6' x 5" x 3" Diagonals, 2 x 6' x 5" x 3" Outer stanchions,2 x 51/8' x 5" x 3" Inner stanchions, 2 x 4' x 5" x 3" 2" x 1" battens Nails Carpenters

UNIT

QUANTITY

Lbs. Lbs. Lbs. Lbs. NO.

28.9 12.6 3.72 0.29 1

Cft. Cft. Cft. Lbs. No.

8.79 1.3 2 5

Page 2

WOODWORK

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 11 GATE 2ND CLASS (OTHER THAN TEAK) (For 12 Wide) 12 W.I. as above Item 10 Locking hasp 1 x 1' Stanchions, 2 x 4' x 4" x 2" Stanchions, 2 x 4' x 4" x 2" Horizontals 6 x 6' x 4" x 2" Diagonals, 2 x 6' x 4" x 2" 2" x 1" battens Nails Carpenters

UNIT

QUANTITY

Lbs. No. Cft.

45.5 1 4.03

Cft. Lbs. No.

2.04 2 3

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 12 EAVES & FACIA BOARDS 12" x 1" PLANK (For 100 Rft.) 100 Planks 100' x 12" x 1" Nails & screws Carpenters

UNIT

QUANTITY

Cft. Lbs. No.

9.58 2 3.5

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 13 EAVES & FACIA BOARDS 10" x 1" PLANK (For 100 Rft.) 100 PLANKS 100' X 10" X 1" NAILS & SCREWS CARPENTERS

UNIT

QUANTITY

Cft. Lbs. No.

7.98 2 3.5

$ SR. PARTICULARS OF MATERIAL AND LABOURS NO. 14 6" x 1" TEAKS FACIA & EAVES BOARDS. (For 100 Rft) 100 Teak 1" plank Nails & screws Carpenters UNIT QUANTITY

Cft. Lbs. No.

4.8 2 2

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 15 8" x 1" THITYA, INGIN, PYINGADO EAVES BOAD WROUGHT & FIXED INCLUDING EARTH OILING 2 COATS.(For 100 Rft.) 100 Thitya, ingin, pyingado 8"x1" planks Nails & screws Carpenters Earth oiling 2 coats

UNIT

QUANTITY

Cft. Lbs. No. Sft.

6.4 2 3 150

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 16 9"x1" THITYA, INGIN, PYINGADO EAVES BOAD WROUGHT & FIXED INCLUDING EARTH

UNIT

QUANTITY

Page 3

WOODWORK

OILING 2 COATS.(For 100 Rft.) 100 Thitya, ingin, pyingado 9" x 1" planks Nails & screws Carpenters Earth oiling 2 coats

Cft. Lbs. No. Sft.

7.19 2 3.25 167

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 17 6"x 1" PYINGADO EAVE BOADS WROUGHT & FIXED COMPLETE INCLUDING EARTH OILING 2 COATS.(For 100 Rft.) 100 Pyingado 6" x 1" planks Nails & screws Carpenters Earth oiling 2 coats

UNIT

QUANTITY

Cft. Lbs. No. Sft

4.8 2 2 117

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 18 3"x1" FACIA BOARDS PLANED AND EARTH OILING 2 COATS & FIXED COMPLETE.(For 100 Rft.) 100 3"x 1" plank Nails & screws Carpenters Earth oiling 2 coats

UNIT

QUANTITY

Cft. Lbs. No. Sft

1.2 1 1.5 42

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 19 3"x " WROUGHT INN FACIA BOADS FIXED COMPLETE INCLUDING EARTH OILING 2 COATS.(For 100 Rft.) 100 3" x 1" Inn plank Nails & screws Carpenters Earth oiling 2 coats

UNIT

QUANTITY

Cft. Lbs. No. Sft

1.2 1 1.25 33.5

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 20 18" WIDE SHELVES WITH BRACKETS. (For 18 Rft.) 18 Planks 1 x 18' x 18" x 1" Brackets NAILS & SPIKES CARPENTERS

UNIT

QUANTITY

Cft. Cft. Lbs. NO.

2.59 0.45 0.5 0.75

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 21 18" WIDE SHELVES WITH BRACKETS. (For 20 Rft.) 20 Planks 1 x 20' x 12" x 1" Brackets NAILS CARPENTERS

UNIT

QUANTITY

Cft. Cft. Lbs. NO.

1.92 0.22 0.5 0.75

Page 4

DOORS&WINDOWS

DOORS & WINDOWS SR. PARTICULARS OF MATERIAL AND LABOURS NO. 1 1 1/2" THICK TEAK PANELLED DOOR 1st. CLASS FOR 7' X 3 1/2' (DOUBLE LEAF).(For 24.5 Sft) 24.5 STYLES 4X7'X4"X1 1/2" TOP & BOTTOM RAILS 4X1 5/6'X4"X1 1/2" LOCK RAILS 4X1 5/6' X8" X1 1/2" PANELS 6 X 1 5/6' 8" X 1 1/2" NSILS AND GULE CARPENTERS UNIT QUANTITY SR. NO. 9

Cft Cft Cft Cft L.S No.

2.4 1.32

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 2 1 1/2" THICK 1/3 PANELLED DOOR 2/3 GLAZED DOOR , 1st. CLASS FOR 6 1/2' X 3 1/2' (DOUBLE LEAF) .(For 22.75 Sft) 22.75 21 OZ SHEET GLASS PANE STYLES 4X6 1/2'X4"X1 1/2" TOP & BOTTOM RAILS 4X1 5/6'X4"X1 1/2" LOCK RAILS 4X1 5/6' X8" X1 1/2" SASH BARS 2 X 3 1/3' X 1 1/2" X 1 1/2" SASH BARS 6 X 1 1/4' X 1 1/2" X 1 1/2" PANELS 6 X 1 5/6' 8" X 1 1/2" NSILS AND GULE CARPENTERS

UNIT

QUANTITY

SR. NO. 10

SFT. Cft Cft Cft Cft Cft Cft L.S No.

11 1.95

0.25 0.56 0.5 4.75

SR. PARTICULARS OF MATERIAL AND LABOURS NO. 3 1 1/2" THICKTEAK PANELLED DOOR FOR 6'- 9 1/2" X 2' 10" SINGLE LEAF .(For 19.3 Sft) 19.3 STYLES 2X6 7/8'X4 1/2"X1 1/2" TOP & BOTTOM RAILS 2X 2 7/8'X4 1/2"X1 1/2" BOTTOM & LOCK RAILS 2X2 7/8' X9" X1 1/2" VERTICAL RAILS 1 X 2 1/2' X 4" X 1 1/2" PANELS 2 X 2 1/4X' 15/8' X 3/4" PANELS 1 X 2 1/4X' 1" X 1 1/2" NSILS AND GULE CARPENTERS

UNIT

QUANTITY

SR. NO. 11

Cft Cft Cft Cft Cft L.S No.

1.79 1.79 1.79 0.59 0.59 0.59 5

SR. NO. 12

SR. NO.

Page 1

DOORS&WINDOWS

13

SR. NO. 14

SR. NO. 15

SR. NO. 16

SR. NO. 17

Page 2

DOORS&WINDOWS

SR. NO. 18

SR. NO.

SR. NO. 19

SR. NO. 20

SR. NO. 21

Page 3

DOORS&WINDOWS

SR. NO. 22

SR. NO. 23

SR. NO. 24

SR. NO. 24

Page 4

DOORS&WINDOWS

SR. NO. 25

SR. NO. 26

SR. NO. 27

SR. NO. 28

Page 5

DOORS&WINDOWS

SR. NO. 29

SR. NO. 30

SR. NO. 31

Page 6

DOORS&WINDOWS

SR. NO. 32

SR. NO. 33

SR. NO. 34

SR. NO. 35

SR. NO. 36

Page 7

DOORS&WINDOWS

Page 8

DOORS&WINDOWS

DOORS & WINDOWS PARTICULARS OF MATERIAL AND LABOURS 1 1/2" THICK TEAK GLAZED WINDOW, 1ST CLASS 4'x3' (DOUBLE LEAF).(For 12 Sft) 12 21 OZ SHEET WINDOW GLASS PLANES STYLES 4X4'X4"X1 1/2" TOP & BOTTOM RAILS 4X1 1/2'X4"X1 1/2" SASH BARS 6X1'X1 1/2"X1 1/2" NSILS AND GULE CARPENTERS UNIT QUANTITY

Sft Cft Lb. No.

9.05 1.16 0.25 3

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

1 1/2" THICK TEAK GLAZED FANLIGHTS, SUPPLED AND FIXED COMPLETE AND INCLUDING oz. GLASS AND GLAZING 5'-6"x1'-8". (For 9.16 Sft) 9.16 TEAK SCANTLING Cft TEAK PLANKS (SASH) " WOOD SCREW,NAILS AND GLUE L.S. PIVIT HINGES 2 1/4"X7/8" BRASS Pair SAFETY CATCH BRASS SELF CLOSING No. 18 OZ. GLASS SHEET Sft CARPENTERS No

0.69 0.08 2 1 7.72 2

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

'1 1/2" THICK TEAK MOVABLE VENETIAN WINDOW 1ST CLASS DOUBLE LEAF 4'X3'.(For 12 Sft) 12 STYLES 4X4 1/2'X4"X1 1/2" TOP & BOTTOM RAILS 4X1 1/2'X4"X1 1/2" VENETIAN FLAPS, 40X1 1/12'X4"X2" VENETIAN RODS, 4X3 5/12'X2"X1" VENETIAN BEADING, 4X3 7/12'X1"X1" VENETIAN BARS, 6X1 1/6'X1"X1" NAILS AND GLUE CARPENTERS

Cft Cft Cft Lb. No.

1.76 0.22 0.17 0.5 6

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

1 1/2" THICK TEAK PANELLED VENETIANED AND GLAZED DOOR 7'-7 1/2"x3-7" DOUBLE LEAF. (For 27.32 Sft) 27.32 21 OZ. SHEET WINDOW GLASS PLANES STYLES 4X7 2/3'X4"X1 1/2" TOP RAILS 2X1 5/6'X4"X1 1/2" MIDDLE RAILS, 2X1 5/6'X4"X1 1/2" BOTTOM & LOCK RAILS 4X1 5/6'X9"X1 1/2" PANELS 2X1 3/4'X1 2/8'X3/4" SASH BARS 2X(1 5/8'+ 1 3/8')X1 1/2"X1 1/4" SASH BEADS, 22'X1/2"X1/2" VENETIAN FLAPS, 18X1 1/3'X4"X1/2" VENETIAN RODS, 4 1/2'X2"X1" VENETIAN BEADING, 4X2 1/4'X1"X1" NAILS AND GLUE CARPENTERS

Sft

6.6

Cft

2.6

Cft Cft Lb. No.

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

Page 9

DOORS&WINDOWS

1 1/2" THICK TEAK VENETIANED AND GLAZED WINDOW 5'-1"x 4'-1" (DOUBLE LEAF). (For 20.75 Sft) 20.75 21 OZ. SHEET WINDOW GLASS PLANES STYLES 4X5'-2"X3 1/2"X1 1/2" TOP RAIS 2X2'-1"X4 1/2"X1 1/2" BOTTOM RAILS 2X2'-1"X5"X1 1/2" MIDDLE RAILS, 2X2"-1"X4"X1 1/2" SASH BARS 2X3'-1 1/2"X1 1/2"X1 1/4" SASH BEADS, 2X12'X1/2"X1/2" VENETIAN FLAPS, 20X1 5/8'X4"X3/4" VENETIAN RODS, 2X2 1/2'X2"X3/4" VENETIAN BEADS, 4X2 1/2'X1"X1" NAILS AND GLUE CARPENTERS

Sft

6.6

Cft

2.6

L.S. No.

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

PALISADING DOOR PYINGADO OR ENGIN 7'x4'. (For 28 Sft) 28 QUARTERING, 6X2'X5"X3" PALISADING, 8X7'X4"X2" FILLING PIECES FOR BOLTS 1X2'X4"X2" CARPENTERS M.S BOLTS 6"X1/2"

Cft Nos. No.

4.92 1.5 24

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

1" THICK TEAK INN C.G.I. DOORS AND WINDOWS (32 G) FIXED COMPLETE WITH IRON FITTINGS, 3'-6"x7'.(For 24.5 Sft) 24.5 INN 1" PLANKS C.G.I SHEETS 32 G.7' ROOFING NAILS CARPENTERS 4" BUTT HINGS 6" HOOKS AND EYES 6" TOWER BOLTS 6" HASP AND STAPLES

Cft. No. Lb. No. No. " " "

1.34 2 0.5 1 6 2 2 1

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

1" THICK J.WOOD BATTENDS DOORS AND WINDOWS . FIXED COMPLETE WITH IRON FITTINGS (6 1/2'X3')( For 19.5 Sft) 19.5 J.W 1" PLANKS J.W 1/2" T & G NAILS AND GLUE CARPENTERS 4" BUTT HINGS 6" HOOKS AND EYES 6" TOWER BOLTS 6" HASP AND STAPLES

Cft " L.S No. " " " "

1.22 0.61 4 6 2 2 1

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

J.WOOD VEEANDAH GATE WITH 3"x1 1/2" FRAME

Page 10

DOORS&WINDOWS

AND 2"x1/2" BATTEN FIXED COMPLETE (DOUBLE LEAF) 4'x3'.(12 Sft) 12 J.WOOD SCANTLING 1/2" J.WOOD PLANKS 1/16" HOOP IRON CATAH 4" BUTT HINGES NAILS CARPENTERS

Cft " No. " Lb. No.

0.95 0.28 1 4 0.5 1

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

C.I DOOR FOR GARAGE WITH 5"x2" FRAMES AND BRACINES 8'x8' (DOUBLE LEAF)(For 64 Sft) 64 C.G.I. SHEET 8'X10/3 STYLES, 4X8'X5"X2" RAILS, 6X4'X5"X2" DIAGONALS,4X5'-6"X5"X2" NAILS CARPENTERS

No. Cft Lb. No.

4 6.23 1.5 4

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

1 1/2" THICK X.P.M DOOR OR SQ. MESH DOORS 2'-9"x6'-6". (For 17.88 Sft) 17.88 X.P.M OR SQ.MESH, 1X2'-6"X6'-3" STYLES 2X6'X3"X1 1/2" RAILS, 3X2'-9"X3"X1 1/2" BEADINGS, 2X6'-6"X3"X1/2" BEADINGS, 3X2'-9"X3"X1/2" NAILS CARPENTERS

Sft Cft

17.19 1.02

Lb. No.

1 2.5

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

1" THICK PANELLED SWING DOOR (DOUBLE LEAF) 3'x3'-3". (For 9.75 Sft). 9.75 STYLES, 4X3'-9"X3"X1" RAILS, 4X1'-6"X3"X1" PANELS CARPENTERS

Cft Sft No.

0.5 10 2

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

1 1/2" THICK PANELLED SWING DOOR (DOUBLE LEAF) 3'x3'-3".(For 9.75 Sft). 9.75 STYLES ,4X3'-9"X3"X1 1/2" RAILS, 4X1'6" X3"X1 1/2"

Cft

0.75

Page 11

DOORS&WINDOWS

PANELS CARPENTERS

Sft No.

10 2

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

1" THICK TRELLIS DOOR WITH 3"x1" FRAME (SINGLE LEAF) 2'-9"x6'-3".(For 17.19 Sft). 17.19 STYLES, 2X6'-3"X3"X1" RAILS, 3X2'-9"X3"X1" ZALLIES, 2X6'-3"X3"1/2" ZALLIES, 3X2'-9"X3"X1/2" DIAGONALS 17.19/100 X 600'X2"X1/2" NAILS CARPENTERS

Cft Cft

0.5 1.07

Lb. No.

3 2

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

TREELIS DOORS 4"x1 1/2" TEAK sTYLES, RAILS, AND BRACES COVERED WITH INCLUDING 2"x1/2" TEAK BATTENS,FIXED COMPLETE 7'x3' (DOUBLE LEAF).(For 21 Sft) 21 TEAK SCANTLING TEAK 1/2" PLANK SCREWS AND NAILS 4" STEEL BUTT HINGS 6" HOOK AND EYE 6" TOWER BOLTS 9" TOWER BOLTS 4" BRASS BOW HANDLE 6" HASP AND STAPLES CARPENTERS

Cft " Lb. No. " " " " " "

1.92 1.01 0.5 6 2 1 1 1 1 3

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

COLLASPSABLE IRON DOOR WITH 3/4"x3/8" CHANNELS AND 3/4"X1/8" FLATS.(ONE LEAF). (For 4'-3"x6'-9" =28.69 Sft) 28.69 3/4"X3/8" VERTICAL CHANNELS 22X6'-9" @ 0.532 LB./RFT. 2"X1" BOTTON CHANNEL 1X4'-9" @ 6.80 LB./RFT. 3/4"X1/8" FLAT IRON 3X4X1'-0" @ 0.314 LB./RFT 3X18X2'-0" @ 0.314 LB./RFT 2"X1/2" FLAT IRON TOP RAIL 1X4'-9" @ 3.4 LB./RFT 3/4"X1/2" BOTTOM GUIDE RAIL 1X4'-9" @ 1.28 LB./RFT. FLAT IRON FOR LOCK RING 1X3'-0"X2"X1/4" @ 1.70 LB./RFT.

Lb.

185.13

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

COLLASPSABLE IRON DOOR WITH 3/4"x3/8" CHANNELS AND 3/4"X1/8" FLATS.(ONE LEAF). (For 4'-3"x6'-9" =28.69 Sft) 28.69 RIVETS, 3/16" X2 1/2" RIVETS, 3/4" X 2 1/2" RIVETS, 1/4" X2 1/3"

No. " "

44 33 10

Page 12

DOORS&WINDOWS

3/8" STEEL PIPE 1/4" M.S PIN 1 1/2" LONG 3/4" OUTSIDE X1/16" WASHERS DOOR HANDLE ROLLER WITH PIN, 1 3/4" X 1/2" BOTTON ROLLER WITH PIN, 2" X 1/2" TOP SMITH WORKERS

Rft No. " " " " " "

5.5 66 505 2 2 3 6 5

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

1" THICK FLY PROOF DOOR COMPLETE WITH FLY PROOF MESH DOUBLE LEAF (7'x3').(For 21 Sft) 21 TEAK PLANKS 3"X1" TEAK BEADINGS 3"X1/2" FLY PROOF MESH NAILS SCREWS CARPENTERS

Cft " Sft Lb. Groos No.

0.96 0.48 23 0.25 0.75 3

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

1 1/2" TEAK DOOR WITH PLY WOOD ON ONE SIDE OF TEAK STYLES AND RAILS.(For 4'x6'-6" = 26 Sft) 26 TEAK 4"X 1 1/2" STYLES AND RAILS PLY WOOD WOOD SCREW CARPENTERS

Cft sft Gross No.

2.01 30 0.5 3.5

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

PROVIDING TEAK PLYWOOD (3 PLY) FLUSH DOOR WITH 1 1/2" THICK TEAK STYLES AND RAILS INCLUDING COAST OF AND LABOUR FOR FIXING IRON FITTINGS 7'X3'-2 1/2". (For 22.46 Sft) 22.46 TEAK SCANTLING TEAK PLYWOOD (3 PLY) WOOD SCREW AND NAILS 4" BUTT HINGES 6" TOWER BOLTS 6" HOOK & EYE 4" BRASS BOW HANDLE CARPENTERS

Cft. Sft L.S. No. " " " "

2.04 54 3 2 1 1 3.75

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

TEAK DOOR AND WINDOW CHOWRETS PLANED AND ONE SIDE REBATED INCLUDING FIXING HOLD FAST, ETC.(For 100 Rft) 100 (A) 3"X3" NAILS CARPENTERS (B) 4"X2" NAILS CARPENTERS

Cft Lb. No. Cft Lb. No.

7.19 2 4 6.39 2 4

Page 13

DOORS&WINDOWS

(B) 4"X2" NAILS CARPENTERS (C) 4"X3" NAILS CARPENTERS (D) 5"X3" NAILS CARPENTERS (E) 6"X3" NAILS CARPENTERS (F) 5"X2" NAILS CARPENTERS

Cft Lb. No. Cft Lb. No. Cft Lb. No. Cft Lb. No.

9.58 2.5 6 11.98 3 7 14.38 3.5 7 8 2 6

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

1 1/2" THICK TEAK FLUSH DOOR WITH 3"X1" FRAME. AND PLYWOOD ON BOTH SIDES INCLUDING COST OF AND LABOUR FOR FIXING IRON FITTINGS 7'X3' SINGLE LEAF (For 21 Sft) 21 TEAK 3"X1 1/2" 9RAILS AND STYLES) 3"X1" BRACINGS PLYWOOD WOOD SCREWS CARPENTERS

Cft. " Sft. Gross No.

0.72 0.24 42 0.5 4.25

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

C.G.I DOOR WITH 1 1/2"X4" TEAK STYLES AND RAILS AND BRACES COVERED WITH 32 G. C.G.I SHEET SIZE 7'X3 1/2' DOUBLE LEAF.(For 24.5 Sft.) 24.5 CORR. IRON SHEET 32G. 7' TEAK SCANTLING NAILS, ETC. CARPENTERS 4" BUTT HINGES 6" HOOK AND EYE 6" TOWER BOLTS 4" DOOR BOW HANDLES 6" HASP AND STAPLE

No. Cft. L.S. No. " " " " "

2 2.01 ... 2 6 2 2 1 1

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

C.G.I WINDOWS OF 1 1/2"x4" TEAK STYLES RAILS AND BRACES AND COVERED WITH 32 G. C.G.I. SHEET SINGLE LEAF. (For 3 1/2'x 2 1/2'=8.75 Sft.) 8.75 TEAK SCANTLING 32G. C.G.I. SHT.7' SCREW AND NAILS. 3" BUTT HINGES 6" HOOK AND EYE 6" TOWER BOLTS 4" TOWER BOLTS 4" BRASS BOW HANDLES CARPENTER

Cft. No. L.S. " " " " " No.

0.7 0.5 ... 4 2 1 1 1 1

Page 14

DOORS&WINDOWS

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

TEAK SWING DOOR OF 1 1/2" THICK STYLES RAILS AND BRACES INCLUDING 1/2" P.T.G TEAK PLANKS. (For 3 1/2'X3'=10.5 Sft.) 10.5 TEAK SCANTLING TEAK 1/2" P.T.G. NAILS AND SCREWS 4" SPRING HINGES CARPENTERS

Cft. " L.S. No. "

1.1 0.34 ... 4 1.75

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

FIXED LOUVRES OF 1/4" THICK OPAQUE GLASS BLADES SET IN AND INCLUDING 5"x2" WROUGHT TEAK FRAMES AND 1 1/2"x1/2" TEAK BEADINGS, SUPPLIED AND FIXED COMPLETE SIZE 5'x2'-6". (For 12.5 Sft) 12.5 TEAK SCANTLINGS TEAK 1/2" PLANKS 1/4" THICK OPAQUE GLASS NAILS CARPENTERS GLAZIER

Cft. " Sft. L.S. No. "

1.4 0.05 17.5 ... 2 0.5

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

FIXING DOORS AND WINDOWS OF ANY DESCRIPTION INCLUDING EASING (LABOUR ONLY) SIZE OF DOOR 7'x3'. (For 21 Sft) 21 CARPENTERS

No.

0.5

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

PROVIDING TEAK PLYWOOD DOOR INCLUDING COAST OF LABOUR FOR FIXING IRON FITTINGS 7'X3'-2 1/2". (For 22.46 Sft) 22.46 4" BUTT HINGES 6" TOWER BOLTS 6" HOOK & EYE 4" BRASS BOW HANDLE CARPENTERS No. No. No. No. No. 3 2 1 1 3.75

PARTICULARS OF MATERIAL AND LABOURS

UNIT

QUANTITY

PROVIDING TEAK PLYWOOD WINDOWS INCLUDING COAST OF LABOUR FOR FIXING IRON FITTINGS 7'X3'-2 1/2".

Page 15

DOORS&WINDOWS

(For 3 1/2'x 2 1/2'=8.75 Sft.) 8.75 3" BUTT HINGES 6" HOOK AND EYE 6" TOWER BOLTS 4" TOWER BOLTS 4" BRASS BOW HANDLES CARPENTER No. No. No. No. No. No. 4 2 1 1 1 1

Page 16

FLOORING

X. FLOORING

SR. PARTICULARS OF MATERIAL AND LABOUR NO. 1 BRICK ON EDGE FLOORING IN LIME MORTAR AND POINTED WITH CEMENT MORTAR 1:2. (For 100 Sft) 100 1ST CLASS BRICKS 9"X4 3/8"X2 3/4" LIME MORTAR 1:1:1 CEMENT MORTAR 1:2 MASONS WORKERS SUNDRIES

UNIT

QUANTITY

No. Cft. " No. " L.S.

550 12 1 2 4.5 ...

SR. PARTICULARS OF MATERIAL AND LABOUR NO. 2 BRICK ON EDGE FLOORING LAID IN CEMENT MORTAR 1:3 (For 100 Sft) 100 1ST CLASS BRICKS 9"X4 3/8"X2 3/4" CEMENT MORTAR 1:3 MASONS WORKERS SUNDRIES

UNIT

QUANTITY

No. Cft. No. " L.S.

550 12 2 3.5 ...

SR. PARTICULARS OF MATERIAL AND LABOUR NO. 3 BRICK ON EDGE FLOORING LAID IN COMPOSITE MORTAR 1:1:6. (For 100 Sft) 100 1ST CLASS BRICKS CEMENT MORTAR 1:1:6 MASONS WORKERS SUNDRIES

UNIT

QUANTITY

No. Cft. No. " L.S.

550 12 2 3.5 ...

SR. PARTICULARS OF MATERIAL AND LABOUR NO. 4 BRICK LAID FLAT IN FLOORING IN CEMENT MORTAR 1:3 (For 100 Sft) 100 1ST CLASS BRICKS CEMENT MORTAR 1:3 MASONS WORKERS

UNIT

QUANTITY

No. Cft. No. "

345 8 1.5 1.5

SR. PARTICULARS OF MATERIAL AND LABOUR NO. 5 BRICK LAID FLAT IN FLOORING IN COMPOSITE MORTAR 1:1:6. (For 100 Sft) 100 1ST CLASS BRICKS COMPOSITE MORTAR 1:1:6 MASONS WORKERS

UNIT

QUANTITY

No. Cft. No. "

345 8 1.5 1.5

SR.

PARTICULARS OF MATERIAL AND LABOUR

UNIT

QUANTITY

Page 1

FLOORING

NO. 6 6"x6" GLAZED TILES FLOORING LAID IN CEMENT MORTAR 1:3. (For 100 Sft) 100 6"X6" GLAZED TILES CEMENT SAND MASONS WORKERS

No. Lbs. Cft. No. "

420 135 4.5 2.5 2

SR. PARTICULARS OF MATERIAL AND LABOUR NO. 7 18"x18"x1" POLISHED MARBLE FLOORING LAID IN CEMENT MOTAR 1:3. (For 100 Sft) 100 18"X18"X1 MARBLE SLAB CEMENT SAND MASONS WORKERS

UNIT

QUANTITY

No. Lbs. Cft. No. "

47 135 4.5 2.5 2.5

SR. PARTICULARS OF MATERIAL AND LABOUR NO. 8 1 1/2 THICK 1:2:4 CEMENT CONCRETE FLOORING LAID IN SLABS OF 5' SQUARE. (For 100 Sft) 100 CEMENT SAND STONE AGG: 1/4" TO 3/4" MASONS WORKERS

UNIT

QUANTITY

Lbs. Cft. " No. "

259 5.75 11.5 7.5 1.5

SR. PARTICULARS OF MATERIAL AND LABOUR NO. 9 2" THICK CEMENT CONCRETE 1:2:4 FLOORING USING STONE OR RIVER SHINGLE AGGREATE. (For 100 Sft) 100 CEMENT SAND STONE OR RIVER SHINGLE AGGREGATE MASONS WORKERS SUNDRIES

UNIT

QUANTITY

Lbs. Cft. " No. " L.S.

345 7.5 15 7.5 2 ...

SR. PARTICULARS OF MATERIAL AND LABOUR NO. 10 3" THICK CEMENT CONCRETE 1:2:4 WITH RIVER SHINGLE AGGREATE. (For 100 Sft) 100 CEMENT

UNIT

QUANTITY

Lbs.

518

Page 2

FLOORING

SAND RIVER SHINGLE MASONS WORKERS BATTENS & SUNDRIES CARPENTER

Cft. " No. " Cft. No.

11.5 23 7.5 3 1.5 0.166666667

SR. PARTICULARS OF MATERIAL AND LABOUR NO. 11 4 1/2" THICK CEMENT CONCRETE 1:2:4 FLOOR. USING MEDIUM FINE STONE OR RIVER SHINGLE AGGREATE (For 100 Sft) 100 CEMENT SAND STONE OR RIVER SHINGLE AGG: MASONS WORKERS BATTENS & SUNDRIES CARPENTERS

UNIT

QUANTITY

Lbs. Cft. " No. " Cft. No.

777 17.25 34.5 1 4.5 2.25 0.166666667

SR. PARTICULARS OF MATERIAL AND LABOUR NO. 12 1" THICK P.C.C (1:2:4) FLOOR USING FINE STONE OR RIVER SHINGLE AGGREATE. (For 100 Sft) 100 CEMENT CONCRETE STONE SAND MASONS WORKERS BATTENS & SUNDRIES

UNIT

QUANTITY

LBS CFT. CFT. No. " L.S.

172.43 7.66 3.8 8.21 1.83 ...

SR. PARTICULARS OF MATERIAL AND LABOUR NO. 13 3" LIME CONCRETE (1:2:6) FLOOR USING STONE, RIVER SHINGLE OR BRICK AGGREGETE. (For 100 Sft) 100 LIME SAND AGGREGATE MASONS WORKERS

UNIT

QUANTITY

Cft. " " No. "

4.37 8.74 25 0.5 3

SR. PARTICULARS OF MATERIAL AND LABOUR NO. 14 4 1/2" LIME CONCRETE (1:2:6) FLOOR USING STONE,

UNIT

QUANTITY

Page 3

FLOORING

RIVER SHINGLE OR BRICK AGGREGETE. (For 100 Sft) 100 LIME SAND AGGREGATE MASONS WORKERS

Cft. " " No. "

6.56 13.12 37.5 0.5 3

SR. PARTICULARS OF MATERIAL AND LABOUR NO. 15 3" LIME CONCRETE (1:1:4) UNDER LAY FOR FLOORING USING BRICK AGGREGETE. (For 100 Sft) 100 LIME CONCRETE (1:1:4) MASONS WORKERS

UNIT

QUANTITY

Cft. No. "

25 2.5 2

SR. PARTICULARS OF MATERIAL AND LABOUR NO. 16 1/2" THICK MASTIC ASPHALT FLOORING. (For 100 Sft) 100 ASPHALT COAL TAR SAND FIREWOOD MASONS WORKERS

UNIT

QUANTITY

Lbs. " Cft. " No. "

448 14 2.5 6 1 4

SR. PARTICULARS OF MATERIAL AND LABOUR NO. 17 6" GRAVEL FLOORING WELL WATERED AND RAMMED. (For 100 Sft) 100 GRAVEL AT SITE WORKERS

UNIT

QUANTITY

Cft No.

58 1.5

SR. PARTICULARS OF MATERIAL AND LABOUR NO. 18 6" THICK EARTH FLOOR WELL WATERED AND RAMMED. (For 100 Sft) 100 6" EARTH CONSOLIDATED WORKERS FOR CARRYING, LAYING & RAMMING WORKER FOR WATERING

UNIT

QUANTITY

Cft No. "

58 0.625 0.25

SR. PARTICULARS OF MATERIAL AND LABOUR NO. 19 FINISHING AND LAYING SMOOTH 3/8" THICK . TERRAZZO FLOOR 1:2 WITH 1/4" MARBLE CHIPPING ON 3/8" THICK AVERAGE SCREED IN CEMENT MORTAR 1:3 (CAST IN SITU) (For 100 Sft) 100 TERRAZZO 1:2 CEMENT MORTAR 1:3

UNIT

QUANTITY

Cft "

3.5 3.5

Page 4

FLOORING

APPROVED METAL PLASTIC DIVITING STRIP MASON GRINDER USING MACHINE POLISHER USING MACHINE OXALIC ACID DRESSER CARBORANDUM STONE WASH POLISH OXALIC ACID

Rft No. Day " " L.S. " "

50 1 0.5 0.25 0.5 ... ... ...

SR. PARTICULARS OF MATERIAL AND LABOUR NO. 20 FINISHING AND LAYING SMOOTH 1/2" GRANOLITHIC FINISH 1:2 WITH 1/4" GRANITE CHIPPING ON 1" THICK AVERAGE SCREED IN CEMENT MORTAR 1:3 (CAST IN SITU). (For 100 Sft) 100 GRANOLITHIC READY MIXED CEMENT MORTAR 1:3 APPROVED METAL PLASTIC DIVITING STRIP MASON GRINDER USING MACHINE POLISHER USING MACHINE SODIUM SILICATE DRESSER CARBORANDUM STONE SODIUM SILICATE

UNIT

QUANTITY

Cft " Rft No. Day " " L.S. "

4.166666667 8.333333333 50 1 0.25 0.5 0.5 ... ...

SR. PARTICULARS OF MATERIAL AND LABOUR NO. 21 LATERIATE OR KANKAR FILLING IN FLOOR SPREAD AND CONSOLIDATED IN 6" LAYERS TO LINE AND LEVEL SURFACE INCLUDING WATERING AND CONSOLIDATING. (For 100 Sft) 100 LATERIATE OR KANKAR WORKER FOR CARRYING, LAYING & CONSOLIDATING WORKER FOR WATERING

UNIT

QUANTITY

Cft No. "

116 2 0.25

SR. PARTICULARS OF MATERIAL AND LABOUR NO. 22 4" THICK LATERIATE OR KANKAR WELL WATERED AND RAMMED. (For 100 Sft) 100 LATERIATE OR KANKAR WORKER FOR CARRYING, LAYING & RAMMING WORKER FOR WATERING

UNIT

QUANTITY

Cft No. "

38 0.75 0.125

SR. PARTICULARS OF MATERIAL AND LABOUR NO. 23 6" THICK LATERIATE OR KANKAR WELL WATERED AND RAMMED. (For 100 Sft) 100 LATERIATE OR KANKAR WORKER FOR CARRYING, LAYING & RAMMING

UNIT

QUANTITY

Cft No.

58 1.5

Page 5

FLOORING

SR. PARTICULARS OF MATERIAL AND LABOUR UNIT NO. 24 1" TONGUE AND GROOVED PLANK FLOORING WITH 4"x1" P (For 100 Sft) 100 4"X1" T & G PLANKS Cft NAILS Lb. CARPENTERS No. WORKER "

QUANTITY

10.96 2 2 1

SR. PARTICULARS OF MATERIAL AND LABOUR NO. 25 1" BUTT JOINT PLANK FLOORING WITH 4"x1" PLANKS. (For 100 Sft) 100 4"X1" BUTT JOINT PLANK, 345 RFT NAILS CARPENTERS WORKER

UNIT

QUANTITY

Cft Lb. No. "

9.6 2 1.5 1

SR. PARTICULARS OF MATERIAL AND LABOUR NO. 26 PARQUET FLOORING TEAK BLOCKS 9"x3"x1 1/2" wAX POLISHED. (For 100 Sft) 100 COAL TAR ASPHALT TURPENTINE TEAK BLOCKS, 9"X3"X1 1/2" FUEL BEE WAX CARPENTERS WORKERS SUNDRIES

UNIT

QUANTITY

Gal " Pint No. Cft Lb. No. " L.S.

2 7 2 580 4 2 6 8 ...

Page 6

WALLING

WALLING

SR. NO.

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

1 1/2" TEAK OR PYINGADO T & G PLANK WALLING WITHOUT FRAMES. (For ? Sft.) 100 T & G planks 4"x1/2" Nails Carpenters

Cft Lbs. No.

5.29 2 2

SR. NO.

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

2 6"x1/2" WEATHER BOARDED WALLING WITHOUT FRAMES. (For ? Sft.) 100 6"x1/2" planks allowing 1 1/2" lap Vertical strips 1 1/2"x3" Nails Carpenters

Cft Cft Lbs. No.

6.48 0.72 1 2.5

SR. NO.

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

3 1/2" BUTT JOINTED PLANK WALLING WITHOUT FRAMES BUT WITH 2"x1/2" SPLINES. (For ? Sft.) 100 6"x1/2" planks 200' 2"x1/2" planks 200' Nails Carpenters

Cft Cft Lbs. No.

6.39 2 2.5

SR. NO.

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

4 TRELLIS WORK 2" MESH WITH 2"x1/2" BATTENS AND ZALLIES WITHOUT FRAMES. (For ? Sft.) 100 Filling pieces 20'x2"x1/2" Zallies Diagonals 600'x2"x1/2" Nails and spikes Carpenters

Cft Lbs. No.

5.27 6 2

SR. NO.

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

5 GALVANIZED C.I SHEET 8/3 CORRUGATION WALLING 4 1/2" LAP WITHOU FRAMES. (For ? Sft.) 100 Gal. C.I sheet 8/3 corrugation 7' G.i roofing nails with washers Carpenter Worker

No. Lbs. No. "

9 1.5 0.75 0.5

SR. NO.

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

6 GALVANIZED C.I SHEET WALLING 4 1/2" LAP WITHOUT FRAMES.

Page 1

WALLING

(For ? Sft.) 100 Gal. C.I sheet 10/3 corrugation 7' G.i roofing nails with washers Carpenter Worker No. Lbs. No. " 1.5 0.75 0.5

SR. NO.

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

7 3" THICK REINFORCED BRICK WALL IN CEMENT MORTAR 1:3 REINFORCED AT EVERY 3RD COURSE. (For ? Sft.) 100 Reinforcement (X-met 2 1/2" wide) Bricks 9"x4 3/8"x2 3/4" Cement Sand Masons Workers

Rft No. Lbs Cft. No. "

105 350 118 4 1.5 2

SR. NO.

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

8 4 1/2" THICK REINFORCED BRICK WALL IN CEMENT MORTAR 1:3 REINFORCED AT EVERY 4TH COURSE. (For ? Sft.) 100 REINFORCEMENT (X-MET 2 1/2" WIDE) BRICKS 9"X4 3/8"X2 3/4" CEMENT SAND MASONS WORKERS

RFT NO. LBS CFT. NO. NO.

115 550 297 10 2 3

SR. NO. 8 (a)

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

4 1/2" THICK BRICK NOGGED WALLING IN CEMENT MORTAR 1:3 WITH 6"x3" FRAMES. (For ? Sft.) 100 Reinforcement (X-met 2 1/2" wide) Bricks 1st 9"x4 3/8"x2 3/4" Cement Sand Frames Readings 3/4"x3/4",4x4x10'+2x10' Screw Coal tar Nail and spike Masons Carpenters Workers

Rft No. Lbs Cft. " " Gros Lb. " No. " "

115 550 297 10 5.5 0.81 0.75 1 1 2 1.25 3

SR. NO.

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

9 3" THICK REINFORCED BRICK WALL IN CEMENT MORTAR 1:2 REINFORCED AT EVERY 3RD COURSE. (For ? Sft.) 100 Reinforcement Bricks 9"x4 3/8"x2 3/4" Cement mortar Masons Workers

Rft No. Lbs No. "

105 350 4 1.5 2

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 10 4 1/2" THICK REINFORCED BRICK WALL IN

UNITS

QUANTITY

Page 2

WALLING

LIME MORTAR 1:2:1 AND WITH REINFORCEMENT AT EVERY 4TH COURSE SET IN CEMENT MORTAR. (For 100 Sft.) 100 Reinforcement Bricks 9"x4 3/8"x2 3/4" Lime mortar Cement mortar Masons Workers

Rft No. Cft Cft. No. "

115 550 7.3 2.5 2 3

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 11 PALISADING WALLING FOR PRISONERS CAGE INCLUDING RIVETS. (For ? Sft.) 100 3/8" dia rivets 6 1/2" long Frames 4x10'x5"x4" Verticals 20x10'x4"x2" Carpenters

UNITS

QUANTITY

No. Cft No.

88 18.34 3

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 12 1 1/2" THICK EXPANED METAL LATH (NO.26) walling in cement mortar 1:2. (For ? Sft.) 100 Expaned metal lathing (No.26) Cement mortar Masons Workers

UNITS

QUANTITY

Sft Cft. No. "

110 12 2 2

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 13 X.P.M OR SQUARE MESH WALLING WITHOUT FRAMES BUT WITH 2"x1/2" COVERING STRIPS AND SECURED WITH SCREWS. (For ? Sft.) 100 X.P.M or sq. mesh Cover strips 8x10'x2"x1/2" Screw Nails Carpenter

UNITS

QUANTITY

Sft. Cft. Gross Lbs. Nos.

110 0.64 0.5 1 1

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 14 1/4" THICK 2" SQ. MESH WALLING WITH AND INCLUDING 2"X1/2" TEAK WROUGHT BEADING AND INCLUDING 4"x2" TEAK WROUGHT FRAMES. (For ? Sft.) 100 2"sq. mesh 2"x2"x7 S.W.G. 2"x1/2" teak beadings Teak wall frames Nails and woood screws Carpenters

UNITS

QUANTITY

Sft. Cft. " Lbs. No.

110 0.48 3.7 1.5 2

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 15 SQUARE MESH WINDOW QUARD WITH AND INCLUDING 2"X 1/2" THICK TEAK BEADING. (For ? Sft.) 25.18

UNITS

QUANTITY

Page 3

WALLING

2"sq. mesh 2"x2"x3/16 S.W.G. 2"x1/2" teak beads Nails and woood screws Carpenters

Sft. Cft. L.S. No.

27.7 0.2 ... 0.625

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 16 1/2" MESH GALVD IRON WIRE NETTING WITH BATTENS AND ZALLIES. (For 100 Sft.) 100 1/2" mesh galvd. wire netting 3' wide Battens, horizontal 1x80'x2"x1" Battens vertical 24x1 1/4'x2"x1" covering strips 2x80'x2"x1/2" covering strips 24x1 1/4'x2"x1/2" nails Carpenters

UNITS

QUANTITY

Rft. Cft.

42 3.28

Lb. No.

1 1.5

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 17 FLY PROOF MESH FIXED WITH 2"x1' TEAK FILLETS AND 1 1/2"x1/2" TEAK BEADING COMPLETE. (For 100 Sft.) 100 1 1/4x1/2" teak beadings 2"X1" teak fillets Fly proof mesh (wire) Nails Carpenters

UNITS

QUANTITY

Cft. " Sft. Lb. No.

0.72 1.92 110 1 1.5

SR. PARTICULARS OF MATERIALS AND LABOUR UNIT NO. 18 BRID PROOF WIRE MESH FIXED WITH 2"x1" TEAK FILLETS AND 1 1/2"x1/2" TEAK BEADINGS COMPLETE. (For 100 Sft.) 100 1/2" teak plank Cft. 1" teak plank " Bird proof mesh (wire) Sft. Nails Lb. Carpenters No.

QUANTITY

0.72 1.92 110 1 2 1/2

SR. PARTICULARS OF MATERIALS AND LABOUR NO. 19 4"x1/2"FIXED VENTIAN WALLING WITH 4"x2" FRAMES. (For 100 Sft.) 100 Frames, 7x10'x4"x2" Venetians, 74x10'x4"x1/2" Nails Carpenters

UNIT

QUANTITY

Cft. " Lb. No.

4.28 11.82 1 16

Page 4

WALLING

SR. PARTICULARS OF MATERIALS AND LABOUR UNIT NO. 20 4"x1/2" MOVEABLE VENTIAN WALLING WITH 4"x2" FRAMES. (For 100 Sft.) 100 Frames, 7x10'x4"x2" Cft. Venetians flaps, 74x10'x4"x1/2" " Venetians bars " Venetians hooks No. Carpenters "

QUANTITY

4.28 11.82 1.28 150 19

SR. PARTICULARS OF MATERIALS AND LABOUR NO. 21 ASBESTO SHEET WALLING WITHOUT FRAMES BUT WITH 1 1/2"X1/2" MOULDED BEADINGS COMPLETE WITH SCREW ON FRAMES. (For 144 Sft.) 100 Asbesto sheet Beading 1 1/2"x 1/2"x110' nails Screws Carpenter

UNIT

QUANTITY

Sft. Cft. Lb No. "

158 0.66 1/4 104 1

SR. PARTICULARS OF MATERIALS AND LABOUR NO. 22 SINGLE ROUGH BAMBOO MAT WALLING WITHOUT FRAMES BUT WITH 3"X1/2" COVERING STRIPS. (For 100 Sft.) 100 Covering strips, 4x10'x3"x1/2" Bamboo mat Nails Carpenters 15% wastage.

UNIT

QUANTITY

Cft. Sft. Lbs. No.

0.48 115 1 1/2 1

SR. PARTICULARS OF MATERIALS AND LABOUR UNIT NO. 23 DOUBLE BAMBOO MAT WALL(COURSE OUTSIDE AND FINE INSIDE) WITH2"x1/2" ZALLIES BUT WITHOUT FRAMES. (For 100 Sft.) 100 1/2" planks Cft. Mat (coarse bamboo) Sft. Mat (fine bamboo) " Wire nails Lbs. Carpenters No.

QUANTITY

0.23 115 115 1 1/2 1

Page 5

WALLING

15% wastage.

SR. PARTICULARS OF MATERIALS AND LABOUR NO. 24 SINGLE BAMBOO MAT WALLING WITHOUT FRAMES BUT WITH 3"X1/2" COVERING STRIPS. (For 100 Sft.) 100 Covering strips, 4x10'x4"x1/2" 15% wastage.

UNIT

QUANTITY

Cft.

0.64

SR. PARTICULARS OF MATERIALS AND LABOUR NO. 25 DOUBLE BAMBOO MAT WALLING WITHOUT FRAMES BUT WITH COVERING STRIPS. (For 100 Sft.) 100 Covering strips, 4x10'x4"x1/2" Bamboo mat (coarse) Bamboo mat (fine) Wire nails Carpenters

UNIT

QUANTITY

Cft. Sft. " Lbs. No.

0.64 115 115 1 1/2 1

SR. PARTICULARS OF MATERIALS AND LABOUR NO. 26 PROVIDING MOVABLE PLYWOOD PARTITION WALL FIXED ON BOTH SIDES AND INCLUDING 2"'x1 1/2" FRAMES AND RUNNERS. (FOR 100SFt.) 100 Scantlings Planks Plywood 4" brass handle Nails and wood screws Carpenters

UNIT

QUANTITY

Cft. " Sft. No. Lbs. No.

5.5 1.92 230 4 2 10

SR. PARTICULARS OF MATERIALS AND LABOUR NO. 27 PROVIDING OF PLYWOOD WALLING WITHOUT FRAMES. (100 SFt.) 100 Plywood Nails and spikes Carpenters

UNIT

QUANTITY

Sft. Lbs. No.

115 1 1/2 2

SR. PARTICULARS OF MATERIALS AND LABOUR NO. 28 PROVIDING OF PLYWOOD (5 PLY) WALLING WITH AND INCLUDING 4"x2" FRAMES. (For 100 Sft.) 100 Plywood (5 ply) Wall frames Nails and spikes Carpenters

UNIT

QUANTITY

Sft. Cft. Lbs. No.

115 2.44 2 2

SR. PARTICULARS OF MATERIALS AND LABOUR NO. 29 SCAFFOLDING (For 100 Sft.) 100 Bamboo (wahya) 1 1/2"dia; to 2" dia;

UNIT

QUANTITY

No.

48

Page 6

WALLING

Cionyan Carpenters Workers

Viss No. "

2.75 4 4

Page 7

CEILING

XII.CEILING

SR. NO.

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

1 4x1/2" T&G PLANK CEILING WITH 4"x2" JOISTS AT 2' AENTRES. (For ? sft.) 100 4"x1/2" T & G planks 331 Rft Joist 5 1/2x10'x4"x2" Nails and spikes Carpenters

Cft. " Lbs. No.

5.29 3.36 2.5 2.25

SR. NO.

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

2 1/2" THICK T & G CEILLING WITHOUT CEILING JOISTS. (FOR ? SFT.) 100 4"x1/2" T & G planks Nails Carpenters

Cft. Lbs. No.

5.29 1.5 1.5

SR. NO.

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

3 4"x1/2" BUTT JOINT PLANK CEILING WITH 2"x1/2" SPLINES AND 4"x2" JOISTS AT 2' CENTRES. (For 100 Sft.) 100 4"x1/2" Planks, 10'x10'x1/2" Splines, 30x10'x2"x1/2" Joists, 5 1/2x10'x4"x2" Nails and spikes Carpenters

Cft. Cft. Lbs. No.

7.19 3.36 2.5 2.5

SR. NO.

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

4 ASBESTOS CEMENT CEILING WITH 4"x2" JOISTS AT 2' CENTRES FOR (16'x16'). (For 256 Sft) 256 4'x4' asbestos cement sheet Beadings,1 1/2"x1/2" Joists, 4"x2" 1 1/2" wood screws Nails Carpenters

Sft. Cft. " No. Lb. No.

282 0.96 8.8 216 1.5 7

SR. NO.

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

5 ASBESTOS CEMENT CEILING WITH 3"x2" JOISTS AT 2' CENTRES AND 1 1/2"x1/2" BEADINGS FOR (16'x16'). (For ? Sft) 256 A.C. Plain sheets Beadings,1 1/2"x1/2" Joists, 3"x2" 1 1/2" wood screws NAILS CARPENTERS

Sft. Cft. " Gross LBS. NO.

282 0.96 6.6 1.5 1.5 6.5

SR. NO.

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

Page 1

CEILING

6 ASBETOS SHEET CEILING WITH 4" X2" JOIST AT 4' CENTERS AND 2" X2" CROSS JOISTS AT 2' CENTRES COMPLETE WITH 1 1/2" X 1/2" TEAK BEADINGS FOR ( 16' X16') 256 A.C PLAUN SHEETS JOISTS, 4" X2" JOISTS, 2" X2" TEAK BEADING, 1 1/2" X 1/2" 1 1/2" WOOD SCREWS NAILS Carpenters

SFT. CFT. CFT. CFT. Gross Lb. No.

282 4.89 4.6 0.96 1.5 1.5 7.5

SR. NO.

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

7 A.C. PLAIN SHEET CEILING 3"x2" JOISTS AT 4' CENTRES AND 2"x2" CROSS JOISTS AT 2' CENTRES COMPLETE WITH 2"x1/2" TEAK BEADINGS FOR (16'x16'). (For 256 Sft) 256 4'X4' A.C PLAUN SHEETS JOISTS, 3" X2" JOISTS, 2" X2" 2" X1/2" BEADING 1 1/2" WOOD SCREWS NAILS Carpenters

SFT. CFT. CFT. CFT. Gross Lb. No.

282 3.67 4.6 1.28 1.5 1.5 7

SR. NO.

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

8 A.C. PLAIN SHEET CEILING WITH 1 1/2" X /2" TEAK BEADINGS BUT WITHOUT CEILING JOISTS FOR (16' X16') (For ? Sft) 256 4'x4' A.C. Plain sheets Beadings 1 1/2" wood screws Nails Carpenters

Sft. " Gross Lb. No.

282 0.96 1.5 0.5 3.5

SR. NO.

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

9 BAMBOO MAT CEILING WITH COVERING STRIPS BUT WITHOUT JOISTS. (For ? Sft.) 100 MAT, SINGLE LAYER COVERING STRIPS 4" X 1/2" Nails Carpenters

Sft. Cft. Lbs. No.

115 1.28 2 1

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 10 SINGLE FINE BAMBOO MAT CEILING WITH 3" X 2" JOISTS AT 4' CENTERS AND 2" X2 " CROSSJOISTS AT 2' CENTRES WITH 2" X 1/2" BEADING. ( FOR ? SFT.) 100 FINE MAT (BAMBOO) Scantling 3"x2" Scantling 3"x2" Beading 2"x1/2" Nails Carpenter Workers

UNITS

QUANTITY

Sft. Cft. " " Lbs. No. "

295 3.67 4.6 1.28 5 5 1.5

Page 2

CEILING

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 11 X.P.M CELLING WITH 3"x1/2" BEADING WITHOUT CELLING JOISTS. (For ? Sft.) 100 X.P.M. 3"x1/2" baedings Nails Carpenter

UNITS

QUANTITY

Sft Cft Lbs. No.

110 0.96 1.5 2

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 12 X.P.M 3/4" MESH 1/4" THICK CELLING WITH 3"x1/2" BEADINGS. (For ? Sft.) 100 X.P.M. 3/4" mesh 1/4" thick 1/2" baedings Nails Carpenter

UNITS

QUANTITY

Sft Cft Lbs. No.

110 0.96 1.5 2

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 13 SQUARE MESH CELLING WITH 4"x2" JOISTS AT 2' CENTRES AND 2"x1/2" BEADINGS. (For ? Sft) 100 4"x2" scantling 2"x1/2" beadings Sq. mesh Nails Carpenters

UNITS

QUANTITY

Cft " Sft Lbs. No.

3.67 0.48 110 1.5 2.5

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 14 PROVIDING PLYWOOD CELLING WITH 3"x2" CELLING JOISTS AT 2' CENTRES FOR 16'x16'. (FOR ? SFT.) 256 PLYWOOD 3" X 2" SCANTLINGS NAILS WOOD SCREWS CARPENTERS

UNITS

QUANTITY

Sft. Cft Lbs. Gros No.

295 6.6 2 2 6.5

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 15 PROVIDING PLYWOOD COMPLETE WITH 3"x1 1/2" CELLING JOISTS AT 2' CENTRES (BOTH WAYS) AND 2" X 1/2" BEADINGS FOR (16' X 16' ) (FOR ? SFT.)

UNITS

QUANTITY

Page 3

CEILING

256 PLYWOOD (3 PLY) SCANTLINGS 1/2" beadings Nails Wood screws Carpenters Sft. Cft " Lbs. Gros No. 295 10.35 2.3 3 2 7.5

Page 4

ROOFING

XIII.ROOFING

SR. NO.

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

1 DANYINGON (MANGALORE PATTERN) CLAY TILE ROOFING WITH 2"x1" BATTENS AND 4"x2" COMMON RAFTERS. (For ? Sft) 100 Manglore fattern clay tiles 2"x1" battens at 13" centres 4"x2" common rafters 2' centres Wire nails and spikes Binding wire Carpenters Workers

No. Cft " Lb. L.S. No. "

156 1.76 3.42 2 ... 2 2

SR. NO.

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

2 DANYINGON (MANGALORE PATTERN) CLAY TILE ROOFING WITH 2"x1" CLOSE BATTENS AND 4"x2" COMMON RAFTERS. (For ? Sft) 100 Manglore or marseilles tiles 2"x1" close battens 1 1/2"x1" ordinary battens above close above 4"x2" common rafters 2' centres Wire nails and spikes Carpenters Workers

No. Cft " " Lb. No. "

156 9.58 1.32 3.42 5 3 3

SR. NO.

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

3 DANYINGON (MANGALORE PATTERN) CLAY TILE ROOFING WITH 2"x1" BATTENS BUT WITHOUT RAFTERS. (For ? Sft) 100 Manglore or marseilles tiles 2"x1" battens at 13" centres Wire nails Binding wire Carpenters Workers

No. Cft Lbs. " No. "

156 1.76 1.5 0.5 1.5 2

SR. NO.

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

4 DANYINGON (MANGALORE PATTERN) CLAY TILE ROOFING WITHOUT RAFTERS. (For ? Sft) 100 Manglore tiles Wire nails and spikes Binding wire Carpenters Workers

No. Lb. " No. "

156 ... 0.5 1.25 1.5

SR. NO.

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

5 GALVD. C.I. ROOFING 24 OR 30 B.W.G . 7'X10/3. (For ? Sft) 100 Galvd. C.I. sheet 7'-10/3 G.I roofing nails Carpenters

No. Lb. No.

7 1.5 1.5

Page 1

ROOFING

Workers

"

SR. NO.

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

6 GALVD. C.I. ROOFING LAIND ON 1" PLANKING. (For ? Sft) 100 Galvd. C.I. sheet 7'-10/3 G.I roofing nails 1" thick planking Carpenters Workers Nails

No. Lb. Cft No. " Lb.

7 1.5 9.58 3 1 2

SR. NO.

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

7 ROOFING OF 32G. C.G.I. SHEETS SUPPLIED AND FIXED. (For ? Sft) 100 32 G. 7' C.G.I. sheets G.I roofing nails Carpenters Workers

No. Lb. No. "

9 1.5 1.5 1

SR. NO.

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

8 WIND TIES FOR CORRUGATED IRON ROOFING. (For ? Sft) 100 Flat iron 1 1/2"x1/4" with nessary bolt holes 3/8" hook bolts 12" long with heads & nuts Carpenters Smith Worker

Lb. No. No. No. No.

128 25 1 3 1

SR. NO.

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

9 TEAK SHINGLE ROOFING WITH 2"x1" BATTENS AND 3"x2" COMMON RAFTERS AT 2' CENTRES. (For ? Sft) 100 Teak shingles 15"x5" 2"x1" battens at 5" centres 3"x2" common rafters 2' centres Nails and spikes Earth oil Fuel Carpenters Workers

No. Cft " Lb. Gal L.S. No. "

600 4 2.52 5 4 ... 2.5 4

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 10 TEAK SHINGLE ROOFING WITH 2"x1" CLOSE BATTENS. (For 100 Sft) 100 Teak shingles 15"x5" 2"x1" battens Nails Earth oil Fuel

UNITS

QUANTITY

No. Cft Lb. Gal L.S.

600 9.58 9 4 ...

Page 2

ROOFING

Carpenters Workers

No. "

3 4

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 11 TEAK ROOFING WITH BAMBOO RAFTERS AND PURLINS. (For ? Sft) 100 Bamboo rafters 9" centres 10' long Bamboo purlins 18" centres 10' long Bamboo small size for lattice work 10' long Thatch (6 No.to 1') Cane ties Thatch layer Worker

UNITS

QUANTITY

No. " " " L.S No. "

14 7 20 120 ... 1 1

SR. PARTICULARS OF MATERIALS AND LABOURS UNITS NO. 12 WAGATE ROOFING WITH BAMBOO RAFTERS AND DPURLINS. (For ? Sft) 100 Bamboo rafters 2' apart 10' long No. Bamboo purlins 18" centres 10' long " Bamboo small size for lattice work 10' long " Wagate (6 no.to 1') " Cane ties L.S Wagate layer No. Workers " Earth oil Gal Fuel L.S.

QUANTITY

6 7 20 120 ... 1 1.25 1 ...

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 13 WAGATE ROOF WITH BAMBOO COMMON RAFTERS 1'-0" CENTRES AND WHOLE WIND TIES COMPLETE. (For ? Sft) 100 1 1/2" to 2" dia bamboo Hnce (fine bamboo) Wagates (6 nos.to 1') Binding wire Wagate layer Workers Earth oil Fuel

UNITS

QUANTITY

No. Viss No. Lb. No. " Gal L.S.

20 1 120 0.25 1 1.25 1 ...

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 14 WAGATE ROOFING WITH 2"x1" RAFTERS 1'-0" CENTRES AND BAMBOO WIND TIES FIXED AT 2' CENTRESE.COMPLETE INCLUDIN G EARTH OILING 2 COATS TO TIMMER AND IMPREGNATING WAGATE WITH EARTH OIL. (For ? Sft) 100 2"x1" common rafters 1 1/2" to 2" dia bamboo Wagate (6 Nos.to a foot) Nails Binding wire Earth oil Wagate layer Carpenters Workers Fuel

UNITS

QUANTITY

Cft No. " Lb. " Gal No. " " L.S.

1.75 8 120 1 0.25 1.35 1 0.35 1.25 ...

Page 3

ROOFING

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 15 DHANI, THETRE OR THATH ROOFING LAID 6 BYITS TO A FOOT FWIT H6" SIDE LAPS BAMBOO COMMON RAFTERS AT 12" CENTRIES AND INCLUDNG 1 1/2" DIA. A COVERING OF BAMBOO LATTICE FRAMES AND 1 1/2" DIA. WIND TIES AT 4' CENTRIES. (For ? Sft) 100 1 1/2" dia bamboo rafters at 12" centres 1 1/2" dia bamboo for latise and wind ties Dhani, Thetke or Thatch (6 Nos.to a foot) Hace G.I binding wire Dhani or Tatch layer Worker

UNITS

QUANTITY

No. " " Viss Lbs. No. "

11 15 120 1 0.5 1 1

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 16 CORRUGATED A.C SHEET ROOFING WITH 1/4" DIA. HOOK BOLTS AND WASHERS. (For ? Sft) 100 Trafford or Corrugated A.C Sheet 7'-0" long Hook bolts and washers Carpenters Worker

UNITS

QUANTITY

No. Lb. No. "

5 5 2 1

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 17 GALVD IRON RIDGE AND HIP COVERS WITH 6" LAP. (For ? Rft) 7.5 Galvd iron ridge with G.I screws Carpenters

UNITS

QUANTITY

Rft No.

8 0.25

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 18 RIDGING OF G.I PLAIN SHEET 24" GIRTH WITH 9" END LAPS FIXED COMPLETE. (For ? Rft) 100 G.I palin sheet G.I roofing nails with washers Carpenters

UNITS

QUANTITY

Rft Lb. No.

112 1.5 3.5

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 19 NO. 24G. G.I PLAIN SHEET RIDGING 2'-6" GIRTH 3" ROLL 9" ENDS LAPS COMPLETE. (For ? Rft) 100 7' G.I plain sheet 24 G G.I roofing nails with washers Carpenters

UNITS

QUANTITY

Rft Lb. No.

112 1.5 3.5

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 20 DANYINGON (MANGALORE PATTERN) CLAY

UNITS

QUANTITY

Page 4

ROOFING

TILE RIDGE AND HIP COVERING SET IN CEMENT MORTAR 1:2. (For ? Rft) 100 Mangalore or marseilles ridge tiles Cement mortar Masons Workers

No. Cft No. "

90 2 2 2

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 21 WOODEN RIDGE AND HIP COVERS. (For ? Rft) 10 Ridge roll 1x10'x4"x3" Boards 2x10'x9"x1" Nails Carpenters

UNITS

QUANTITY

Cft Cft Lb. No.

0.92 1.44 0.75

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 22 20 B.E.G. ZINC VALLEY GUTTERING 3' WIDE LAID ON 12"x1" PLANKS AND 2"x1" FILITES. (For ? Rft) 22.5 20 B.W.G. 8'x3'zinc sheet 9" lap planks 2x25"x2"x1" Fillets 2x23'x2"x1" Nails Carpenters

UNITS

QUANTITY

Sht Cft " Lb. No.

3 4.79 0.73 0.5 1.5

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 23 G.I VALLEY GUTTERING 3' WIDE WITHOUT PLANKS, (For ? Rft) 22.5 G.I plain sheet Nails Carpenters

UNITS

QUANTITY

Sft Lb. No.

72 2.5 1

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 24 VALLEY GUTTER WITH G.I PLAIN SHEET 36" GIRTH WITH 9" END LAPS SUPPORTED ON 1" VALLEY BOARDS AND 2"x1" FILLETS INCLUDING EARTH OILING 2 COATS. (For ? Rft) 22.5 G.I plain sheet Planks 6"x1" Fillets 2"x1" Earth oil Nails Carpenters Worker

UNITS

QUANTITY

Rft Cft " Gal Lb. No. "

24 6.47 0.73 0.5 0.75 1.75 0.25

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 25 VALLEY GUTTER OF 32G. G.I PLAIN SHEET 24" GIRTH WITH 9" END LAPS SUPPORTED ON 1/2" THICK VALLEY BOARDS FIXED COMPLETE WITH 2"x1" FILLETS INCLUDING EARTH OILING 2 COATS. (For ? Rft) 100 G.I plain sheet

UNITS

QUANTITY

Rft

112

Page 5

ROOFING

Planks 6"x1/2" Fillets 2"x1" Nails Earth oil Carpenters Worker

Cft " Lb. Gal No. "

9.58 3.19 2.5 1.5 5 1.5

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 26 5 Lb. PER SET FLASHING 18" WIDE FOR 150 SET. (For ? Rft) 100 7'x3' lead sheet 5 lb/sft. Composite motar Mason Tin smiths Workers

UNITS

QUANTITY

Sft Cft No. " "

9 2.5 2 2 4

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 27 LEAD FLASHING 18" WIDE. (For ? Rft) 100 7'x3' lead sheet Cement Sand Mason Tin smiths Workers

UNITS

QUANTITY

Sft Lb. Cft No. " "

9 2.5 2 2 4

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 28 5 Lb. PER SET LEAD FLASHING 20" WIDE FOR 167 SET. (For ? Rft) 100 Lead sheet 5 lb/sft. Cement motar 1:3 Masons Tin smiths Workers

UNITS

QUANTITY

Sft Cft No. " "

189 2.5 2 2 4

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 29 G.I PLAIN SHEET FLASHING 18" WIDTH. (For ? Rft) 100 G.I plain sheet 7'x3' Cement Sand Masons Tin smiths Workers

UNITS

QUANTITY

Sft Lb. Cft No. " "

8 75 2.5 2 2 4

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 30 ZINC FLASHING 18" WIDE WITH 6" LAP. (For ? Rft) 13.5 zinc sheet 7'x3' Nails and screws Carpenters

UNITS

QUANTITY

No. Lb. No.

1 1 1

Page 6

ROOFING

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 31 G.I/C.I RAIN WATER PIPE. (For 100 Rft) 100 G.I/C.I pipe Oflaers and bends Pluinber Mate

UNITS

QUANTITY

Rft L.S. No. "

100 ... 3 3

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 32 CORRUGATED A.C. OR TRAFFORED RIDGING WITH 1/4" DIA; HOOK BOLTS AND NUTS AND WASHERS. (For ? Sft.) 100 A.C. ridging tile 1/4" dia; bolts and nuts and washers Carpenters Worker

UNITS

QUANTITY

No. Lb. No. "

66 22 3.33 1

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 33 DIAMOND SHAPE CEMENT TILE ROOFING WITH 2"x1" BATTENS BUT WITHOUT RAFTERS. (For ? Sft.) 100 Diamond shape tile 2"x1" battens at 6" centres Wire nails Carpenters Workers

UNITS

QUANTITY

No. Cft. Lb. No. "

220 3.52 3 2 2

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 34 CEMENT TILE RIDGING FOR DIAMOND SHAPE CEMENT TILE ROOFING, SET IN CEMENT MORTAR 1:2. (For ? Sft.) 100 Cement Tile Ridge Piece Cement mortar Mason Worker

UNITS

QUANTITY

No. Cft. No. "

74 2 2 2

Page 7

PAINTING&WASH

XIV.PAINTING & WASING

SR. NO. 1

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

COAL TARRING ONE COAT (NEW WORK) (For Sft.) 100 Coal tar Worker Sundries including brushes,fuel,etc.

Gal. No. L.S.

0.75 0.375 ----

SR. NO. 2

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

COAL TARRING TWO COATS (NEW WORK). (For Sft.) 100 Coal tar Worker Sundries including brushes,fuel,etc.

Gal. No. L.S.

1.25 0.75 ...

SR. NO. 3

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

OILING WITH BOILED LINSEED OIL TWO COATS. (For Sft.) 100 Linseed oil, boiled Worker Sundries including brushes,etc.

Gal. No. L.S.

0.25 0.25 ...

SR. NO. 4

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

OILING WITH BOILED LINSEED OIL TWO COATS TWO COATS. (For Sft.) 100 Linseed oil, boiled Gal. Worker No. Sundries including brushes L.S.

0.4375 0.5 ...

SR. NO. 5

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

EARTH OILING TO ROOF WITH RED OCHRE. (For Sft.) 100 Red cotire Earth oil Worker Sundries including brushes

Lb. Gal. No. L.S.

1.5 0.5 0.375 ...

SR. NO. 6

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

EARTH OILING TO ROOF WITH RED OCHRE. (For Sft.) 100 Coal tar Earth oil Worker Sundries including brushes, etc.

Lb. Gal. No. L.S.

0.175 0.35 0.375 ...

Page 1

PAINTING&WASH

SR. NO. 7

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

EARTH OILING PLAIN ONE COAT. (For Sft.) 100 Earth oil Worker Sundries

Gal. No. L.S.

0.35 3/8 ...

SR. NO. 8

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

EARTH OILING PLAIN TWO COATS. (For 100 Sft.) 100 Earth oil Worker Sundries

Gal. No. L.S.

0.6 5/8 ...

SR. NO. 9

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

DISTEMPER ONE COAT. (For 100 Sft.) 100 Distemper Painter Worker Sundries, brushes,etc. Lb. No. " L.S. 3 1/4 1/8 ...

SR. NO. 10

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

DISTEMPER TWO COAT. (For 100 Sft.) 100 Distemper Painter Worker Sundries, brushes,etc. Lb. No. " L.S. 5 3/8 1/4 ...

SR. NO. 11

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

DISTEMPER THREE COAT. (For 100 Sft.) 100 Distemper Painter Worker Sundries, brushes,etc. Lb. No. " L.S. 7 1/2 3/8 ...

SR. NO. 12

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

PAINTING WITH SOILGNUM ONE COATS. (For 100 Sft.) 100 Solignum Painter Sundries, brushes,etc. PAINTING WITH SOILGNUM TWO COATS. (For 100 Sft.) Solignum

Gal. No. L.S.

3/8 3/8 ...

13

Gal.

5/8

Page 2

PAINTING&WASH

Painter Sundries, brushes,etc.

No. L.S.

5/8 ...

14

WHITE WASHING ONE COAT (For Sft.) 100 Strained lime Rice* Worker Sundries including brushes PARTICULARS OF MATERIALS AND LABOURS

Cft. Lbs. No. L.S. UNITS

1/2 1/8 1/8 ... QUANTITY

SR. NO. 15

WHITE WASHING TWO COATS. (For 100 Sft.) 100 Strained lime Rice* Worker Sundries including brushes

Cft. Lbs. No. L.S.

3/4 1/4 1/4 ...

SR. NO. 16

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

WHITE WASHING THREE COATS. (For 100 Sft.) 100 Strained lime Rice* Worker Sundries including brushes

Cft. Lbs. No. L.S.

1 3/8 3/8 ...

2239.99 660.8 2900.79

Worker Sundries including brushes

No. L.S.

3/8 ...

SR. NO. 17

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

COLOUR WASHING ONE COAT. (For 100 Sft.) 100 Strained lime Yellow powder Liquid glue Painter

Cft. Lb. " No.

0.5 0.5 0.5 0.5

SR. NO. 18

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

COLOUR WASHING TWO COATS. (For 100 Sft.) 100 Strained lime Yellow powder Liquid glue Painter

Cft. Lb. " No.

3/4 1/4 1/4 1/4

19

COLOUR WASHING THREE COATS. (For 100 Sft.) 100 Strained lime Yellow powder Liquid glue Painter PARTICULARS OF MATERIALS AND LABOURS

Cft. Lb. " No. UNITS

1 1 1 1 QUANTITY

SR. NO. 20

CEMENT WASHING ONE COAT. (For 1000 Sft.) 100 Cement 1.73 Cft. Maistry Workers Sundries including brushes

Lb. No. " L.S.

156 1 2 ...

Page 3

PAINTING&WASH

21

WHITE LEAD PAINTING THREE COATS INCLUDING PRIMING COAT AND PUTTYING. (For 900 Sft.) Priming coat (inside). Red lead Lb. 1 1/2 White lead " 16 Raw linseed oil Pint 6 Turpentine " 1/4 Drier Lb. 1/8 Putty " 2 Second coat. White lead Lb. 15 Raw linseed oil Pint 3 1/2 Turpentine " 1 1/2 Drier Lb. 1/2 Third coat. White lead Lb. 15 Raw linseed oil Pint 3 1/2 Turpentine " 1 1/2 Drier Lb. 1/4 Painter No. 10 Worker " 18 Sundries including brushes L.S. ...

SR. NO. 22

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

PAINTING ONE COAT WITH RED LEAD READY MIXED (NEW WORKS). (For 1,000 Sft) 100 Rcd lead paint (Ready mixed) Putty Painters Workers Sundries including brushes

30 4 2 1/2 2 1/2 ...

SR. NO. 23

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

PAINTING ONE COAT WITH WHITE ZINC IN RENEWAL. (For 100 Sft) 100 White zinc paint Drier Linseed oil Turpentine Putty Painter Worker Sundries including brushes

Lb. " Pint " Lb. No. " L.S.

2 0.015 1/4 0.007 1/2 1 1 ...

24

PAINTING TWO COATS WITH WHITE ZINC IN RENEWAL. (For 100 Sft) White zinc paint Drier Linseed oil Turpentine Putty Painter Worker Sundries including brushes PARTICULARS OF MATERIALS AND LABOURS

Lb. " Pint " Lb. No. " L.S. UNITS

3 1/2 0.03 1/2 0.014 1/2 2 2 ... QUANTITY

SR. NO. 25

PAINTING THREE COATS WITH WHITE ZINC READY MIXED. (For 1,000 Sft) 100 Priming coat red lead Lb. White zinc paint for 2nd & 3rd coat Lb. Putty Lb. Painters No. Workers " Sundries including brushes L.S.

30 45 4 10 10 ...

SR. NO. 26

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

PAINTING TWO COATS WITH WHITE ZINC READY MIXED (RENEWAL). (For 1,000 Sft)

Page 4

PAINTING&WASH

100 White zinc ready mixed for two coat Putty Painters Workers Sundries including brushes

Lb. " No. " L.S.

48 2 2 55 ...

SR. NO. 27

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

PAINTING ONE COATS WITH WHITE ZINC READY MIXED (RENEWAL). (For 1,000 Sft) 100 White zinc ready mixed Lb. Putty " Painters No. Workers " Sundries including brushes L.S.

28 2 2 1/2 2 1/2 ...

SR. NO. 28

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

PAINTING TWO COATS WITH WHITE ZINC (NEW WORKS). (For 1,000 Sft) 100 White zinc ready mixed for two coats Putty Painters Workers

Lb. " No. "

55 2 5 5

SR. NO. 29

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

PAINTING ONE COAT IN RENEWAL ANY PAINT READY MIXED RED OXIDE, CORRUGAL,CHOCOLATE,GREEN,BLACK,ETC. (For 1,000 Sft) 100 Ready mixed print Lb. Putty " Painters No. Workers " Sundries including brushes L.S.

20 2 2 1/2 2 1/2 ...

SR. NO. 30

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

PAINTING TWO COATS IN NEW WORK ANY PAINT READY MIXED RED OXIDE, CORRUGAL,CHOCOLATE,GREEN,BLACK,ETC. (For 1,000 Sft) 100 Ready mixed print Lb. Putty " Painters No. Workers " Sundries including brushes L.S.

50 2 5 5 ...

SR. NO. 31

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

PAINTING RIPOLIN ENAMEL READY MIXED ONE COAT (For 1,000 Sft) 1000 Ripolin enamel print Painters Workers Sundries including brushes

Gal. No. " L.S.

1.67 2.5 2.5 ...

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 32 PAINTING THREE COATS (NEW WORK) WITH READY MIXED PAINT OF ANY APPROVED COLOUR. (For 1,000 Sft) 1000

UNITS

QUANTITY

Page 5

PAINTING&WASH

READY MIXED PAINT PUTTY PAINTERS WORKERS SUNDRIES INCLUDING BRUSHES

Lb. Lb. No. No. L.S.

75 4 10 10 ...

SR. NO. 33

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

PAINTING THREE COATS TP WOOD WORK IN POSTS CHOWKETS,FACIA BOARDS,EAVES BOARDS AND STRINGERS. (For 1,000 Sft) 1000 Ready mixed print Lb. Putty " Painters No. Workers " Sundries including brushes L.S.

75 4 12.5 10 ...

SR. NO. 34

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

PAINTING IRON WORK WITH COLLINS MIXTURE ONE COAT. (For 225 Sft) 225 Coal tar Cement 1/50 Cft Kerosene oil Fire wood Painter Worker Sundries including brushes

Gal. Lb. Gal. L.S. No. " L.S.

1 0.125 0.125 ... 0.5 0.5 ...

SR. NO. 35

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

PAINTING WITH BITUMASTIC SOLUTION ONE COAT. (For 100 Sft) 100 Biltumastic solution ready mixed Worker Sundries including brushes

Gal. No. L.S.

0.25 0.5 ...

SR. NO. 36

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

VARNISHING (COPAL) ONE COAT. (For 100 Sft) 100 Copal varnish Painter Sundries including brushes

Gal No. L.S.

0.25 0.375 ...

SR. NO. 37

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

VARNISHING (COPAL) TWO COAT. (For 100 Sft) 100 Copal varnish Painter Sundries including brushes

Gal No. L.S.

0.5 0.5 ...

SR. NO. 38

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

VARNISHING (COPAL) THREE COAT. (For 100 Sft)

Page 6

PAINTING&WASH

100 Copal varnish Painter Sundries including brushes Gal No. L.S. 0.625 0.75 ...

SR. NO. 39

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

WOOD OILING ONE COAT. (For 100 Sft) 100 Wood oil Workers Sundries including brushes Lb. No. L.S. 2 0.5 ...

SR. NO. 40

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

WOOD OILING TWO COAT. (For 100 Sft) 100 Wood oil Workers Sundries including brushes Lb. No. L.S. 3 0.75 ...

SR. NO. 41

PARTICULARS BEE'S WAXING (For 100 Sft)

OF MATERIALS AND LABOURS

UNITS

QUANTITY

100 Bee wax Turpentine Painter Sundries including labour for wood, sawdust stopping cloth.

Lb. Pint No. L.S.

0.25 0.125 1 ...

SR. NO. 42

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

REMOVING OLD PAINT ENTIRELY WITH CAUSTIC SODA. (For 100 Sft) 100 Caustic soda Paint remover brushes Carpenter Painter Workers

Lb. L.S. No. " "

3 ... 0.25 0.5 0.25

SR. NO. 43

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

SNOWCEM ONE CAOT. (For 100 Sft.) 100 Snowcem Painter Worker Lb. No. " 3.5 0.25 0.125

SR. NO. 44

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

SNOWCEM TWO CAOTS. (For 100 Sft.) 100 Snowcem Painter Worker Lb. No. " 6 0.375 0.25

Page 7

PAINTING&WASH

SR. NO. 45

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

PLASTIC EMULSION PAINT ONE COAT. (For 100 Sft.) 100 Emulsion paint Painter

Gal. No.

0.2 0.25

SR. NO. 46

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

PLASTIC EMULSION PAINT TWO COATS. (For 100 Sft.) 100 Emulsion paint Painter

Gal. No.

0.3333 0.5

SR. NO. 47

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

PLASTIC EMULSION PAINT THREE COAT. (For 100 Sft.) 100 Emulsion paint Painter

Gal. No.

0.5 0.75

SR. NO. 48

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

BENGAL POLISHING THREE COATS TO WOODEN WALLS. (For 100 Sft.) 100 Methylated spirit Shellac Sand paper, cotton waste,etc. Polisher

Gal. Lb. L.S. No.

1.25 1.25 ... 7

SR. NO. 49

PARTICULARS

OF MATERIALS AND LABOURS

UNITS

QUANTITY

BENGAL POLISHING THREE COATS TO WOODEN FURNITURE. (For 100 Sft.) 100 Methylated spirit Gal. Shellac Lb. Sand paper, cotton waste,etc. L.S. Polisher No.

1.375 1.375 ... 10.5

Page 8

IRON&STEEL

IRON AND STEEL WORKS

SR. NO. 5

PARTICULARS 0F MATERIALS LABOURS MILD STEEL BAR REINFORCEMENT 1/2" DIA. CUT, BENT AND FIXED IN FLOORS, ROOF AND BEAMS. (For 1 cwt) 1 1/2" DIA BAR 14 S.W.G. binding wire Smith(steel fixer) Worker

UNIT

QUANTITY

LBS. " No. "

117.6 1 1

SR. NO. 6

PARTICULARS 0F MATERIALS LABOURS MILD STEEL BAR REINFORCEMENT 1/2" DIA. CUT, BENT AND FIXED IN COLUMNS AND BRACES. (For 1 cwt) 1 1/2" dia. bar 14 S.W.G. binding wire Smith fixers Workers

UNIT

QUANTITY

Lbs. " No. "

117.6 1 1.5 1.5

SR. NO. 7

PARTICULARS 0F MATERIALS LABOURS MILD STEEL BAR REINFORCEMENT 5/8" to 1" DIA. CUT, BENT AND FIXED IN FLOORS,ROOFS AND BEAMS. (For 1 cwt) 1 5/8" to 1" dia. bars 14 S.W.G. binding wire Smith fixer Worker

UNIT

QUANTITY

Lbs. " No. "

117.6 1 0.75 0.75

SR. NO. 8

PARTICULARS 0F MATERIALS LABOURS MILD STEEL BAR REINFORCEMENT 5/8" to 1" DIA. CUT, BENT AND FIXED IN COLUMNS AND BRACES. (For 1 cwt) 1 5/8" to 1" dia. bars 14 S.W.G. binding wire Smith fixer Worker

UNIT

QUANTITY

Lbs. " No. "

1.18 1.00 1.00 1.00

SR. NO. 9

PARTICULARS 0F MATERIALS LABOURS MILD STEEL BAR REINFORCEMENT 1/2" DIA. CUT, BENT AND FIXED IN WALLS. (For 1 cwt) 1 1/2" dia. bars 14 S.W.G. binding wire Smith (steel fixer) Worker

UNIT

QUANTITY

Lbs. " No. "

117.6 1 1.25 1.251

SR. NO.

PARTICULARS 0F MATERIALS LABOURS

UNIT

QUANTITY

Page 1

IRON&STEEL

10

MILD STEEL BAR REINFORCEMENT 5/8" to 1" DIA. CUT, BENT AND FIXED IN WALLS. (For 1 cwt) 1 5/8" to 1" dia. bars 14 S.W.G. binding wire Smith (steel fixer) Worker

Lbs. " No. "

117.6 1 1 1

Sr.No Particulars of Materials and Labour 7 MILD STEEL BAR REINFORCEDMENT 5/8" TO 1" DIA CUT, BENT AND FIXED IN FLOORS, ROOFS AND BEAMS. (For one cwt) 1 5/8" TO 1" DIA BARS 14 S.W.G. BINDING WIRE STEEL FIXER WORKER

Unit

Quantity

LBS. LBS. NO. NO.

117.6 1 0.75 0.75

Sr.No Particulars of Materials and Labour 8 MILD STEEL BAR REINFORCEDMENT 5/8" TO 1" DIA CUT, BENT AND FIXED IN COLUMNS, AND BRACES (For one cwt) 1 5/8" TO 1" DIA BARS 14 S.W.G. BINDING WIRE STEEL FIXER WORKER

Unit

Quantity

LBS. LBS. NO. NO.

117.6 1 1 1

SR. NO. 3

PARTICULARS 0F MATERIALS LABOURS W.I. WORKS IN TEES, BARS, ANGLES, ROUND, ETC. (For 1 cwt) 1 Tees,bars,angles,etc. Carriage to site Smiths Workers

UNIT

QUANTITY

Cwt. " No. "

1 1 2 2

SR. NO. 4

PARTICULARS 0F MATERIALS LABOURS W.I. STRAPS FOR TRUSSES,POSTS,ETC. WITH BOLTS AND NUTS, ETC. (For 1 Lb.) 1 Straps, bolts and nuts Carriage to site Smith

UNIT

QUANTITY

Lbs. L.S No.

1 ... 0.03

SR. NO. 11

PARTICULARS 0F MATERIALS LABOURS MILD STEEL BAR REINFORCEMENT 1" TO 1 1/2" DIA. CUT, BENT AND FIXED IN COLUMNS AND BRACES. (For 1 cwt) 1 1" to 1 1/2" dia. rods 14 S.W.G. binding wire Smith(steel fixer) Worker

UNIT

QUANTITY

Lbs. " No. "

117.6 1 1 1

Page 2

IRON&STEEL

SR. NO. 12

PARTICULARS 0F MATERIALS LABOURS

UNIT

QUANTITY

MILD STEEL BAR REINFORCEMENT 1/4" DIA.STIRRUPS AND SPACERS CUT, BENT AND FIXED IN FLOORS,ROOFS AND BEAMS. (For 1 cwt) 1 1/4" dia. rods Lbs. 117.6 14 S.W.G. binding wire " 1 Smith(steel fixer) No. 2 Workers " 2

SR. NO. 13

PARTICULARS 0F MATERIALS LABOURS MILD STEEL BAR REINFORCEMENT 1" to 1 1/2" DIA. CUT, BENT AND FIXED IN FLOORS, ROOFS AND BEAMS. (For 1 cwt) 1 1" to 1 1/2" dia. bars 14 S.W.G. binding wire Smith(steel fixer) Worker

UNIT

QUANTITY

Lbs. " No. "

117.6 1 0.75 0.75

SR. NO. 14

PARTICULARS OF MATERIALS AND LABOURS

UNIT

QUANTITY

FIXING ONLY STEEL FABRIC. FIXING STEEL FABRIC OR MESH REINFORCEMENT IN BEAMS, . FLOORS AND WALLS. B.R.C. EXPANDED METAL OR OTHER TYPE, INCLUDING ALL STRAIGHT CUTTING AND THE SUPPLY OF AND WIRING AS NECESSARY WITH 14 G. WIRE, MEASURED NETT NO ALLOWANCE FOR LAPS (For Sft.) 100 Sheet weighting under 4 lbs. per yard super. Smith or (steel fixer) No. Binding wire (14 G.) L.s. Sheet weighting under 4 lbs. per yard super. Smith or (steel fixer) Binding wire (14 G.) Sheet weighting under 4 lbs. per yard super. Smith or (steel fixer) Binding wire (14 G.)

0.5 ...

No. L.s.

0.57 ...

No. L.s.

1 ...

SR. NO. 15

PARTICULARS OF MATERIALS AND LABOURS FIXING STEEL.

UNIT

QUANTITY

FIXING STEEL FABRIC OR MESH REINFORCEMENT IN BEAMS, FLOORS AND WALLS. B.R.C. EXPANDED METAL OR OTHER TYPE, NECESSARY WITH 14 G. WIRE, MEASURED NETT NO ALLOWANCE FOR LAPS. (For 100 Sft.) 100 Sheet weighting under 4 lbs. per yard super. Smith or (steel fixer) No. Binding wire (14 G.) L.s. Sheet weighting under 4 lbs. per yard super.

0.75 ...

Page 3

IRON&STEEL

Smith or (steel fixer) Binding wire (14 G.) Sheet weighting under 4 lbs. per yard super. Smith or (steel fixer) Binding wire (14 G.)

No. L.s.

0.86 ...

No. L.s.

1.5 ...

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 16 HINGES BUTT STOUT PRESSED STEEL 3" TO 4" FIXED COMPLETE WITH SCREWS. (Each) 1 3" to 4" butt hinge 1" wood screws Carpenters

UNIT

QUANTITY

No. Gross No.

1 0.06 0.04

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 17 HASP AND STAPLE 4" TO 6" FIXED COMPLETE WITH SCREWS. (Each) 1 4" to 6" hasp and staple 3/4" wood screws Carpenter

UNIT

QUANTITY

No. Gross No.

1 0.06 0.02

SR. PARTICULARS OF MATERIALS AND LABOURS UNIT NO. 18 TOWER BOLTS JAPANNED PLATE WITH BRIGHT SHEET 6" TO 9" FIXED COMPLETE WITH WOOD SCREWS. (Each) 1 6" to 9" tower bolt No. 3/4" wood screws Gross Carpenter No.

QUANTITY

1 0.06 0.04

SR. PARTICULARS OF MATERIALS AND LABOURS NO. 19 HOOK AND EYE 6" FIXED COMPLETE. (Each) 1 6" hook and eye Carpenter

UNIT

QUANTITY

No. "

1 0.02

SR. PARTICULARS OF MATERIALS AND LABOURS UNIT NO. 20 PROVIDE 2"x1/4" W.I. HOLD FAST 12" OVER ALL LENGTH AND FIXED TO CHOWKETS WITH BOLTS AND '' NUTS AND WASHERS COMPLETE AND INCULDING TARRING 2 COATS. (Each) 1 M.S. flat iron 2"x1/4"x12" Lbs. Carriage to site L.S. 3/8" dia. 2" long bolts and nuts Lb. Coal tarring 2 caots Sft Smith No. Carpenter " Worker "

QUANTITY

1.7 ... 0.167 0.375 0.02 0.02 0.02

Page 4

IRON&STEEL

Page 5

FENSE , ROAD,BRIDGE

XV.FENCING

SR. NO. 1

PARTICULARS

OF MATERIALS AND LABOURS

WOODEN FENCING WITH POSTS 8 1/3' CENTRES AND TWO LONGITUDINAL RAILS. (For 100 Sft) 100 Coal tar, 2 coats Corner post, 1x6 1/2'x5"x5" Cross feet, 2x2'x5"x3" Interposts, 11x6'x5"x3" Cross feet, 22x1 1/2'x5"x2" Longitudinal rails 2x100'x4"x2" Nails and spikes Carpenters WORKERS

SR. NO. 2

PARTICULARS

OF MATERIALS AND LABOURS

WOODEN FENCING WITH POSTS 8 1/3' CENTRES AND 3 LONGITUDINAL RAILS. (For 100 Sft) 100 Coal tar, 2 coats Corner post, 1x6 1/2'x5"x5" Cross feet, 2x2'x5"x3" Interposts, 11x6'x5"x3" Cross feet, 22x1 1/2'x5"x2" Longitudinal rails 3x100'x4"x2" Nails and spikes Carpenters Workers

SR. NO. 3

PARTICULARS

OF MATERIALS AND LABOURS

5 STRAND WIRE (NO.5 SEVEN PLY) FENCING WITH WODEN POSTS 14' APART. (For 98 Rft) 98 Coal tar, 2 coats No.5 seven ply wire Straning bolts 18"x1/2" Corner post, 7'x5"x5" Cross feet, 2x2'x5"x3" Interposts, 6x6 1/2'x4"x3" Cross feet, 12x1 1/2'x4"x2" Staples Carpenters Workers

SR. NO. 4

PARTICULARS

OF MATERIALS AND LABOURS

5 STRAND WIRE (NO.5 SEVEN PLY) WITH R.C. POSTS 14' A (For 98 Rft) 98 R.C. corner posts at 196' apart R.C. inter-posts and one strut

Page 1

FENSE , ROAD,BRIDGE

No.5 seven ply wire Straning bolts 18"x1/2" Lime concrete foundation for corner posts 1/2x2'x2'x2 1/2'. Binding wire staples Carpenters Workers

SR. NO. 5

PARTICULARS

OF MATERIALS AND LABOURS

AMERICAN WOVEN WIRE FENCING WITH R.C. POSTS 12 1/2' APART.(FOR 100 RFT) 100 AMERIAICAN WOVEN WIRE. R.C. CORNER POST 200 ' APART. R.V INTERPOSTS AND ONE STRUT LIME CONCRETE FOUNDATION FOR CORNE POSTS 1/2 X 2' X2' X 21/2'. STRAINING BOLTS 18" X 1/2" BINDING WIRE STAPLES Carpenters Workers

SR. NO. 6

PARTICULARS

OF MATERIALS AND LABOURS

BAMBOO FANCING WITH WOODEN POSTS 10' APART. (For 100 Rft.) 100 Post corner 1x6 1/2'x5"x5" Cross feet, 2x2'x5"x3" Interposts, 9x6'x5"x3" Cross feet, 18x1 1/2'x5"x3" Bamboo (half split ) for horizontal 10' long Bamboo for split verticals (3" dia.) 10' long Nails carpenters Workers

SR. NO. 7

PARTICULARS

OF MATERIALS AND LABOURS

BARBED WIRE FANCING WITH 4"x4" TIMBER POSTS 8' APART EMBEDDED IN 1:2:6 LIME CONCRETE. (For 96 Rft.) 96 5"x5" corner posts, 1x8'x5"x5" 4"x4" posts, 11x8'x4"x4",struts 8x10'x4"x2" Barbed wire,10x96' Diagonals, 2x12x10' Lime sand Brick aggregate Nails

Page 2

FENSE , ROAD,BRIDGE

Carpenters Workers

SR. NO. 8

PARTICULARS

OF MATERIALS AND LABOURS

CHAIN LINK FANCING WITH 4"x4" TIMBER POSTS 8' APART EMBEDDED IN 1:2:6 LIME CONCRETE. (For 96 Rft.) 96 5"x5" corner posts, 1x8'x5"x5" 4"x4" posts, 11x8'x4"x4" Struts, 9x10'x4"x2" Battens, 13x6'x2"x1/2" Straining wire, 3/8" dia; 3x96' Chain link 6x96' Lime sand Brick aggregate Nails Carpenters Workers

Page 3

FENSE , ROAD,BRIDGE

Page 4

FENSE , ROAD,BRIDGE

Page 5

FENSE , ROAD,BRIDGE

Page 6

FENSE , ROAD,BRIDGE

Page 7

FENSE , ROAD,BRIDGE

Page 8

FENSE , ROAD,BRIDGE

Page 9

FENSE , ROAD,BRIDGE

Page 10

FENSE , ROAD,BRIDGE

XVII. ROAD WORK

UNITS

QUANTITY

Sr.No Particulars of Materials and Labour Gals. 4.25 1

Unit

Quantity

EARTH WORK IN EXCAVATION IN ORDINARY SOIL. EITHER IN EMBANKMENT OR IN CUTTING WITH AN INITIAL LEAD OF 100 FEET AND LIFT OF 5 FEET.

Cft

24 (For 1,000 Cft) Maistry No. " Workers for c L.s. 1/2 7 " ...

Lbs. No. "

7 4 4

Digger Sundries

2 UNITS QUANTITY

EARTH WORK IN EXCAVATION IN SOFT LATERITIC, GRAVELLY OR KANKER SOIL. EITHER IN E OR IN CUTTING WITH AN INITIAL LEAD OF 100 FEET AND LIFT OF 5 FEET. (For 1,000 Cft) Maistry Digger Workers for carrying Sundries

No. " " L.s.

1/2 10 7 ...

Gals.

5.5

Cft

30.11 3

EARTH WORK IN EXCAVATION IN AVERAGE LATERITIC, GRAVELLY OR KANKER SOIL EITHER EMBANKMENT OR IN CUTTING WITH AN INITIAL LEAD OF 100 FEET AND LIFT OF 5 FEET. (For 1,000 Cft) Maistry Digger Workers for carrying Sundries

Lbs. No. "

8 5 4

No. " " L.s.

5/8 14 8 ...

4 UNITS QUANTITY

EARTH WORK IN EXCAVATION IN HARD LATERITIC, GRAVELLY KANKER SOIL EITHER IN EMBANKMENT OR IN CUTTING WITH AN INITIAL LEAD OF 100 FEET AND LIFT OF 5 FEET. (For 1,000 Cft) Maistry Digger No. " 3/4 21

Gals. Lbs. No. Cft

0.98 24.25 5 6.47

Workers for carrying " 10 Sundries L.s. ... EXCAVATION IN SOFT ROCK INCLUDING CARRIAGE OF STONE FOR 50 FEET. (For 100 Cft) Miner No. 1 Workers for carrying " 4 1/2 Smith " 1/4 Bellow boy " 1/4 Sundries L.S. ... EXCAVATION IN HARD ROCK BY BLASTING INCLUDING REMOVING STONES. (For 100 Cft.) Blasting powder Lbs. 3 Charcoal " 10 Miners No. 5 Workers " 5 1/2 Blacksmith " 1/4 Bellow boy " 1/2 Hammer man " 1/2 Sundries L.S. ...

Lb. No. "

0.5 2 1.5

UNITS

QUANTITY

No. "

0.5 7

Page 11

FENSE , ROAD,BRIDGE

Lbs. No. Cft Lb. No. "

49 5 5 1 1 2

UNITS

QUANTITY

Standard Data for Working Out Rates Per Quantity of Items of Work - contd. Sr.No Particulars of Materials and Labour Unit Quantity XVII. ROAD WORK-contd. 7 COLLECTION OF SOLING STONES (LOCAL) AT THE QUARRY SITE. (For 100 Cft.) Hammer man No. 1 Workers (collection and stacking) " 5 Sundries L.S. ... 8 COLLECTION OF SOLING STONES (KANKER) AT THE QUARRY SITE. (For 100 Cft.) Hammer man No. 1 Workers (collection and stacking) " 4 Sundries L.S. ... 9 COLLECTION OF SOLING STONES (LATERIATE BOULDERS) AT THE QUARRY SITE. (For 100 Cft.) Hammer man No. 1 4 ...

RFT. NO. NO. CFt. NO. LB. No. "

100 0.5 8 5 5 1 2 2

10

Workers " Sundries L.S. BREAKING METAL FROM BOULDERS (1 1/2" TO 2") AT QUARRY SITE. (For 100 Cft.) Hammer man No. Workers for getting out boulder " Workers for breaking ' Sundries L.S.

1 2 7 ...

UNITS

QUANTITY

Cft.

9.95

No. " Lbs. No. "

15 75 2 1.5 3

UNITS

QUANTITY

Cft. Rft. Cft. " " Lb. No.

17.17 1200 4.55 9.1 27 1 2

Page 12

FENSE , ROAD,BRIDGE

"

UNITS

QUANTITY

Cft.

18.38

Rft. Sft. Cft. " " Lb. No. "

288 476 4.55 9.1 27 1 2 4

Page 13

FENSE , ROAD,BRIDGE

Page 14

FENSE , ROAD,BRIDGE

Page 15

FENSE , ROAD,BRIDGE

Page 16

FENSE , ROAD,BRIDGE

Page 17

FENSE , ROAD,BRIDGE

Page 18

FENSE , ROAD,BRIDGE

Page 19

FENSE , ROAD,BRIDGE

Page 20

FENSE , ROAD,BRIDGE

ROAD WORK (BY MACHINE)

Unit

Quantity Rate

Per

Amount

Remarks

ManDay Operator Fitter Machine Bull dozer (D 8) P.O.L For Operation H.S.D. " " Hour

1 1 1/3 2/3 5 1/3

(a) For 1

allow 25%

excavatio (b) For 1 allow 25% level exc

Gals Gals Gals Gals Lbs. L.S.

20 1/3 1/3 2/3 1/3 ...

Driller drill helper Worker Tools hand drill Drill bit(10' boring) Hammer (14 lbs.)

ManDsy " " "

1/10 1/2 1/2 1

Hour " "

8 1x1/6 1x1/120

Life-60 R " 120 da

Lbs. Ft. Nos. L.S.

1 1/2 10 2 ...

ManDsy Miner Driller Helper Worker for removing debris For Operation Explosives Safety fuse H.S.D. Engine oil Detonator Tools and Machine Air compressor Pneumatic drill Dill bit(10' boring) Sundires " " " "

1/7 1/10 1/7 1/7 1

Lbs. Ft. Gal. Gal. Nos.

1 1/2 10 1 1/2 2

Hour Hour No. L.S.

8 8 1x1/20

Life-200'

Standard Data for Working Out Rates Per Quantity of Items of Work - contd. Remarks

Sr.No Particulars of Materials and Labour Unit Quantity Rate Per Amount XVIII. ROAD WORK (BY MACHINE)-contd. 4 CRUSHING OF 500 CFT. OF BOULDERS TO DIFFERENT SIZES OF ROAD METALS BY STONE CRUSHER. Labour Head workers Man1

Page 21

FENSE , ROAD,BRIDGE

Workers Operator Night durwan Materials 6" to 9" boulders. Machine Stone crusher (600 Cft.capacity) For Operation H.S.D. Engine oil Grease Rosin Sundries

day " " "

14 1 1

Cft.

500

Hour

Gals. Gal. Lb. Lb. L.S.

3 1/4 1/8 1/4 ...

Note Different size of out turned road metals depends on the size and adjustment of crushing jaws. 5 CONVERSION OF 4" TO 6" BOULDER BY 450 CFT. CAPACITY GRANULATOR PER DAY. Labour Operator Man1 day Workers " 20 Materials Used 4" to 6" boulders. For Operation of Machine H.S.D. Engine oil Grease Machine Granulator Sundries Gals. Gal. Lb. 4 1/8 3/4

Cft.

450

Metal con 2 5/8"=60 1 1/2"=80 Chips=410 Total=550

No. L.S.

1 ...

Standard Data for Working Out Rates Per Quantity of Items of Work - contd. Unit Quantity Rate Per Amount Remarks XVIII. ROAD WORK (BY MACHINE)-contd. 6 COLLECTION OF SAND WITHIN 1 MILE LEAD. (For 1,000 Cft.) Labour Workers for loading and unloading Machine Tipper Sundries 7 CONSOLIDATION OF SAND 4" THICK BY DISEL ROLLER (For 2,500 Cft.) Labour Head worker Workers Roller driver Materials Sand Machine Roller P.O.L. For Operation H.S.D. Engine oil Gear oil Grease Cotton waste for cleaning, etc. Gals. Gal. Gal. Lb. L.S. 6 1/4 1/8 3/4 ... Hour 8 Cft. 2,500 Manday " " 25 1 1 Whenever Hour L.S. 8 ... Monday 8

Sr.No Particulars of Materials and Labour

over nigh

per night

consolida

Page 22

FENSE , ROAD,BRIDGE

Sundries (For 1,000 Cft.) Labour Head worker Workers Roller driver Materials 6" to 9" soling stones Machine Roller P.O.L. For Operation H.S.D. Engine oil Gear oil Grease Cotton waste for cleaning, etc. Sundries

L.S.

...

8 LAYING AND HAND PACKING OF SOLING STONES 6"-9" AND CONSOLIDATED BY ROAD ROLLER.

Manday " "

1 20 1

Whenever

over nigh

per night

consolida

Cft.

1,000

Hour

Gals. Gal. Gal. Lb. L.S. L.S.

4 1/2 1/8 1/2 ... ...

Standard Data for Working Out Rates Per Quantity of Items of Work - contd. Unit Quantity Rate Per Amount Remarks XVIII. ROAD WORK (BY MACHINE)-contd. 9 LAYING OF 2" TO 4" STONE METALS FOR 4" UNCOMPACTED THICKNESS AND CONSOLIDATED BY ROAD ROLLER. (For 1,000 Cft.) Labour Head worker Workers Roller driver Materials 2" TO 4" metals Machine Roller P.O.L. For Operation H.S.D. Engine oil Gear oil Grease Cotton waste for cleaning, etc. Sundries (For 1,000 Cft.) Labour Gals. Gal. Gal. Lb. L.S. L.S. 6 1/4 1/8 3/4 ... ... Hour 8 Cft. 1,000 Manday " " 14 1 1

Sr.No Particulars of Materials and Labour

10 LAYING OF 1 1/2" TO 2" METALS FOR 4 1/2" UNCOMPACTED THICKNESS AND CONSOLIDATED BY ROAD ROLLER.

Head worker Materials 1 1/2" to 2" metals Machine Roller P.O.L. For Operation

Man-

Whenever

Cft.

1,000

Hour

Page 23

FENSE , ROAD,BRIDGE

H.S.D. Engine oil Gear oil Grease Cotton waste for cleaning, etc. Sundries (For 1,000 Cft.) Labour Head worker Workers Roller driver Materials Kanker Machine Roller P.O.L. For Operation H.S.D. Engine oil Gear oil Grease Cotton waste for cleaning, etc. Sundries 12 WORKING EXPENSES OF DIESEL ROLLER PER DAY. Labour Roller driver Night durwan Material and Tools Water cart For Operation H.S.D. Engine oil Gear oil Grease Cotton waste for cleaning, etc. 13 WORKING EXPENSES OF DIESEL ROLLER PER DAY. Labour Driver For Operation H.S.D. Engine oil Gear oil Grease 14 WORKING EXPENSES OF A PETROL TIPPER PER DAY. Labour Driver For Operation H.S.D. Engine oil Gear oil Grease

Gals. Gal. Gal. Lb. L.S. L.S.

6 1/4 1/8 3/4 ... ...

11 LAYING OF KANKER OR LATERIATE FOR 6" UNCOMPACTED THICKNESS AND CONSOLIDATED BY ROAD ROLLER.

Manday " "

1 10 1

Cft.

1,000

Hour

Whenever

over nigh Gals. Gal. Gal. Lb. L.S. L.S. 6 1/4 1/8 3/4 ... ...

per night

consolida

Employmen Manday " 1 1

for maint

equipment

in the ma

No.of day Gals. Gal. Gal. Lb. L.S.

6 1/4 1/8 3/4 ...

Manday Gals. Gal. Gal. Lb.

8 1/4 1/8 1/10

Manday Gals. Gal. Gal. Lb.

Employmen

for maint 10 1/4 1/8 1/10

equipment

in the ma

Standard Data for Working Out Rates Per Quantity of Items of Work - contd. Unit Quantity Rate Per Amount Remarks XVIII. ROAD WORK (BY MACHINE)-contd. 15 WORKING EXPENSES OF A DIESEL WATER BOWZER PER DAY.

Sr.No Particulars of Materials and Labour

Page 24

FENSE , ROAD,BRIDGE

Labour Driver For Operation H.S.D. Engine oil Gear oil Grease Labour Driver For Operation Prtrol Engine oil Gear oil Grease Labour Head worker Workers Boiler Materials Bitumen Chippings Machine Roller Bitumen heater Thermometer For Operation Fire wood H.S.D. Engine oil Gear oil Grease Cotton waste for cleaning, etc. Sundries Labour Head worker Workers Roller driver Materials Bitumen Chippings Machine Rollers Bitumen heater Thermometer For Operation Fire wood H.S.D. Engine oil Gear oil Grease Cotton waste for cleaning, etc. Sundries Ton Gals. Gal. Gal. Lb. L.S. L.S. 6.4 6 1/4 1/8 3/4 ... ... Day " " 15 8x1 1/2 8x1 Ton Cft. 15.82 4,000 Whenever Manday " " 225 15 15 Ton Gals. Gal. Gal. Lb. L.S. L.S. 8.5 6 1/4 1/8 3/4 ... ... Day " " 15 8x1 1/2 8x1 Whenever Ton Cft. 23.96 4,000 Manday " " 225 15 15 Based on Gals. Gal. Gal. Lb. 12 1/2 1/2 1 Manday 1 Gals. Gal. Gal. Lb. 8 1/4 1/8 1/10 Manday 1

Employmen

for maint

equipment

in the ma

16 WORKING EXPENSES OF A PETROL WATER BOWZER PER DAY (RUSSIAN).

Employmen

for maint

equipment

in the ma

17 HOT BITUMEN 1 1/2" DEPTH GROUTING (SEMI GROUT) OVER STONE METAL SURFACE WITH 1/4" TO 3/4" CHIPPIN

13% wasta

over nigh

per night

consolida

18 HOT BITUMEN 1" DEPTH GROUTING (SEMI GROUT) OVER STONE METAL SURFACE WITH 1/4" TO 3/4" CHIPPINGS F

13% wasta

over nigh

per night

consolida

Page 25

FENSE , ROAD,BRIDGE

19 HOT BITUMEN SURFACE Labour Head workers Workers Roller drivers Materials

DRESSING OVER STONE METAL SURFACE WITH 1/4" TO 3/4" CHIPPINGS FOR 1 MILE x 1 Manday " " 200 15 15 Whenever

over nigh

per night

consolida

Bitumen @40 Lbs./ % Sft. Chippings Machines Roller Bitumen heater Thermometer For Operation Fire wood H.S.D. Engine oil Gear oil Grease Cotton waste for cleaning, etc. Sundries 20 HOT BITUMEN SURFACE Labour Head workers Workers Roller driver Materials Bitumen @25 Lbs./ % Sft. Chippings Machines Roller Bitumen heater Thermometer For Operation Fire wood H.S.D. Engine oil Gear oil Grease Cotton waste for cleaning, etc. Sundries

Ton Cft.

12.79 3,600

13% wasta

Days " "

15 8x1 1/2 8x1

Ton Gal. Gal. Gal. Lb. L.S. L.S.

5.12 6 1/4 1/8 3/4 ... ...

DRESSING OVER STONE METAL SURFACE WITH 1/4" TO 3/4" CHIPPINGS FOR 1 MILE x 1 Manday " " 200 15 15

Ton Cft.

8 3,600

13% wasta

Days " "

15 8x1 1/2 8x1

Whenever over nigh per night consolida

Ton Gal. Gal. Gal. Lb. L.S. L.S.

3.2 6 1/4 1/8 3/4 ... ...

Standard Data for Working Out Rates Per Quantity of Items of Work - contd. Sr.No Particulars of Materials and Labour Unit Quantity Rate Per Amount XVIII. ROAD WORK (BY MACHINE)-contd. 21 HOT BITUMEN SEAL COAT WITH CHIPPINGS 1/8" TO 1/2" FOR 1 MILE x 12'=63,360 Sft. Labour Head workers Man12 day Workers for bitumen heating, sparying, " 180 stone spreading, etc. Roller driver " 12 Materials Bitumen Chippings Machines and Tools Roller Bitumen heater Thermometer For Operation Fire wood

Remarks

Ton Cft.

8 2,800

13% wasta

Days " "

12 8x1 1/2 8x1

Whenever over nigh per night consolida

Ton

3.2

Page 26

FENSE , ROAD,BRIDGE

H.S.D. Gal. 6 Engine oil Gal. 1/4 Gear oil Gal. 1/8 Grease Lb. 3/4 Cotton waste for cleaning, etc. L.S. ... Sundries L.S. ... 22 HOT BITUMEN PRIME COAT OR TACK COAT WITH COARSE SANDS FOR FOR 1 MILE x 12'=63,360 Sft. Labour Head workers Man12 day Workers " 80 Materials Bitumen Sand Machines and Tools Bitumen heater Thermometer

Ton Cft.

6.4 1,800

13% wasta

" "

8x1 1/2 8x1

For Operation Fire wood Ton 2.6 Sundries L.S. ... 23 LAYING OF 1 1/2" THICK (CONSOLIDATED) PREMIX CARPET INCLUDING PRIMING COAT (660x12')=7.920 SFT. Labour Head workers Man3 Whenever day over nigh Workers " 54 per night Operators for mixer " 3 consolida Roller driver " 1 Tipper driver " 1 Materials Bitumen 80/100 H.S.D. Chips 1/2" to 3/4"

Ton Gal Cft.

28.3 25 1,000

13% wasta

Machines 4 cft. capacity mixer (miller). 24hrs. 3 Nos. Roller 8 " 1 Nos. 350 gal bitumen heater " 3 Nos. Tipper " 1 Nos. Sundries L.S. ... 24 LAYING ONLY OF HOT MIX ASPHALTS CONE OF 1 1/2" THICKICKNESS. (For 1,200 Cft.) Labour Time keeper Manday 2 Foreman " 2 Taxcavator operator " 2 Paver operator " 2 Mixer operator " 3 Air compressor operator " 1 Head workers For paver For mixer For general works Workers For paver For mixer For general tar boiling and transporting Machines Mixer (Hot) Millers 10 cft. capacity Drier for chips Tar boilers 5 Nos. 12'wide barber green paver 1 No. Taden roller 2 (6 Tons) Tipper 5 Nos. Water bowzer 1 No. Traxcavator or grader 1 No. Air compressor For operation H.S.D. for machines Engine oil Grease Sundries

Whenever over nigh per night consolida

Manday " "

1 1 1

Manday " "

12 14 11

Days " " " " " " " "

1 1 5 1 2 1 1 1 1

Working e Coat of m aggregate and bitum is to be

Gal. Gal. Lb. L.S.

200 4 1 ...

Page 27

FENSE , ROAD,BRIDGE

25 SCARIFYING OLD METAL 2" DEEP 12' WIDE INCLUDING SCREENING, RESTREADING, AND ROLLING WITH A ROAD R Labour Head workers Manday 3 Workers " 30 Wroking expenses of roller Days 3 Sundries L.S. ... 26 DRESSING OF SUBGRADE TO REQUIRED CAMBER BY MANUAL LABOUR FOR LAYING OF SOLING STONES (12'x660')=7 Labour Head workers Manday 3 Workers " 20 Sundries L.S. ...

Standard Data for Working Out Rates Per Quantity of Items of Work - contd. Sr.No Particulars of Materials and Labour Unit Quantity Rate Per Amount Remarks XIX. BRIDGES 1 LABOUR FOR DRIVING 10" DIAMETER TIMBER PILES IN ORDINARY SOIL (WITH 1/2 TON DROP HAMMER FROM PULL Labour Foreman Manday 1/4 Carpenter(1st grade) " 1/2 Carpenter(2nd grade) " 1/2 Workers " 3

Plants Pile driving frame 1 No. Hrs. 4 Sundries L.S. ... 2 LABOUR FOR DRIVING 10" DIAMETER TIMBER PILES IN ORDINARY SOIL (WITH PILE DRIVING MACHINE). PENETR Labour Operators Manday 1/3 Foreman " 1/3 Carpenter(1st grade) " 1/2 Carpenter(2nd grade) " 1/2 Workers " 3 For Operation H.S.D. Grase

Gal Lb.

2/3 1/12

Plants Pile driving frame 1 No. Hrs. 2 2/3 Sundries L.S. ... 3 LABOUR FOR PILE DRIVING REINFORCED CEMENT CONCRETE PILE 14"x14"x40' IN ORDINARY SOIL (WITH 40' DI Labour Foreman Manday 1/4 Pile driving machine operator " 1/4 Pile driving machine asst. " 1/4 Crane operator " 1/4 Workers " 6 Tools required 40' rail line trollies for transport of precast pile One crane for loading, unloading, erecting and pitching of precast pile. Pile driving machine No.1

... Hrs. " 2 2

Cost of R calculate required

For Operation H.S.D. for pile driving machine Gal 1 H.S.D. for crane " 1 1/2 Engine oil " 1 1/2 Sundries L.S. ... 4 LABOUR FOR PILE DRIVING REINFORCED CEMENT CONCRETE PILE 14"x14"x40' IN ORDINARY SOIL (USING DROP Labour Foreman Manday 1/2 Operator " 1/2 Workers " 8 Machine Pile driving machine 1 No.

Hrs.

For Operation Diesel oil Gal 4 Grease oil " 1/4 Sundries L.S. ... 5 LABOUR FOR LAUNCHING OF R.S.JS. OVER BRIDGE SUPPORTS (USING TWO PULLEYS AND WINCH FROM THE OTHER Total 9.3 Tons Labour Bridge foreman Manday 3 Workers " 45 Sundries L.S. ...

Page 28

FENSE , ROAD,BRIDGE

6 LABOUR FOR ASSEMBLING AND LAUNCHING OF BIALEY BRIDGE 100' SPAN.D/S. Total weight=24.9 Tons Tools required Bailey rollers=6 Nos. Bailey jacks=2 Nos. Jumpers 6 Nos. Sleepers or bailey clips 12 Nos. One hammer Labour Bridge foreman Manday 8 Workers " 80 Sundries L.S. ... 7 LABOUR FOR ASSEMBLING OF C.H. BRIDGE (18' ROAD WAY) ON SCAFFOLDING AND FIXING BOLTS AND NUTS FOR Tools required Tool kit one ... One hammer ... Coir rope 1" 200 Rft. ... 25 Ton jacks 2.Nos ... Labour Bridge foreman Workers Sundries

Manday " L.S.

10 80

Standard Data for Working Out Rates Per Quantity of Items of Work - contd. Sr.No Particulars of Materials and Labour Unit Quantity Rate Per Amount Remarks XIX. BRIDGES-contd. 8 LABOUR FOR ASSEMBLING AND LAUNCHING C.H. BRIDGE (22' ROAD WAY) BOLTS AND NUTS FOR ALL STEEL WORKS Total weight=150 Tons Labour Bridge foreman Manday 45 Unskilled workers " 315 Skilled workers " 2,385

Tools required Total kit 1 No. ... ... One hammer ... ... Coir rope 1" 200' ... ... 4 Tons hand winch 2 Nos. ... ... Bailey roller 6 Nos. ... ... Jumpers 10 Nos. ... ... Wire rope 5/8" 750' ... ... One local lip ... ... Double pulley 2 Nos. ... ... Single pulley 1 No. ... ... 50 ton jacks 2 Nos ... ... Sundires L.S. ... 9 LABOUR FOR ASSEMBLING OF GERMAN BRIDGE (11' ROAD WAY) ON SCAFFOLDING AND LOWERING DOWN ON SUPPORT Total weight=17.87 Tons Labour Bridge foreman Manday 8 Workers " 80

Tools required Bailey jacks 2 Nos. ... ... Bailey rollers 6 Nos. ... ... One spanner ... ... One hammer ... ... Sundries L.S. ... 10 LABOUR FOR ASSEMBLING OF R.P.T BRIDGE ON SCAFFOLDING INCLUDING RIVETTING AND LOWERING DOWN ON SUP Total weight=64.2 Tons Labour Bridge foreman Manday 36 Skilled workers " 126 Unskilled workers " 414 Tools required 4 Tons hand winch Wire rope 1/2" =1500' Wire rope 5/8" =750' Coir rope 1"=500' Serviee bolts Double pulley 2 Nos. Single pulley 1 No. One bellow Two dollys Two rivetting guns One compressor with rwo Nos. hose pipe 500'

... ... ... ... ... ... ... ... ... ... ...

... ... ... ... ... ... ... ... ... ... ...

Page 29

FENSE , ROAD,BRIDGE

Local jib one No. ... ... One hammer ... ... 75 Tons jacks 2 Nos. ... ... Sundries L.S. ... 11 LABOUR FOR ASSEMBLING OF R.P.T BRIDGE AFTER RIVETTING COMPLETE Total weight=64.2 Tons Labour Bridge foreman Manday 41 Skilled workers " 138 Unskilled workers " 447 Tools required 4 Tons hand winch Wire rope 1/2" =1500' Wire rope 5/8" =750' Coir rope 1"=500' Serviee bolts Double pulley 2 Nos. Single pulley 1 No. One bellow Dolleys 2 No. Rivetting guns 2 Nos. One compressor with rwo Nos. hose pipe 500' Local jib one No. One hammer Bailey rollers 6 No. Jumpers 10 No. 75 Tons jacks 2 Nos. Sundries

FOR ALL STEEL WORKS 100' FT. SPAN

... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... L.S.

... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...

Page 30

FENSE , ROAD,BRIDGE

Page 31

FENSE , ROAD,BRIDGE

Page 32

FENSE , ROAD,BRIDGE

Page 33

FENSE , ROAD,BRIDGE

Page 34

FENSE , ROAD,BRIDGE

Page 35

FENSE , ROAD,BRIDGE

Page 36

FENSE , ROAD,BRIDGE

Page 37

FENSE , ROAD,BRIDGE

Page 38

FENSE , ROAD,BRIDGE

Page 39

FENSE , ROAD,BRIDGE

Page 40

FENSE , ROAD,BRIDGE

Page 41

FENSE , ROAD,BRIDGE

Page 42

FENSE , ROAD,BRIDGE

Page 43

FENSE , ROAD,BRIDGE

Page 44

FENSE , ROAD,BRIDGE

Page 45

FENSE , ROAD,BRIDGE

Page 46

FENSE , ROAD,BRIDGE

Page 47

FENSE , ROAD,BRIDGE

Page 48

FENSE , ROAD,BRIDGE

Page 49

FENSE , ROAD,BRIDGE

Page 50

FENSE , ROAD,BRIDGE

Page 51

FENSE , ROAD,BRIDGE

Page 52

FENSE , ROAD,BRIDGE

Page 53

FENSE , ROAD,BRIDGE

Page 54

FENSE , ROAD,BRIDGE

Page 55

FENSE , ROAD,BRIDGE

Page 56

FENSE , ROAD,BRIDGE

Page 57

FENSE , ROAD,BRIDGE

Page 58

FENSE , ROAD,BRIDGE

Page 59

FENSE , ROAD,BRIDGE

Page 60

FENSE , ROAD,BRIDGE

Page 61

FENSE , ROAD,BRIDGE

Page 62

FENSE , ROAD,BRIDGE

Page 63

FENSE , ROAD,BRIDGE

Remarks

Page 64

FENSE , ROAD,BRIDGE

Remarks

Amount

Remarks

Page 65

FENSE , ROAD,BRIDGE

Page 66

FENSE , ROAD,BRIDGE

Page 67

FENSE , ROAD,BRIDGE

Page 68

FENSE , ROAD,BRIDGE

Page 69

FENSE , ROAD,BRIDGE

Page 70

FENSE , ROAD,BRIDGE

Page 71

FENSE , ROAD,BRIDGE

Page 72

FENSE , ROAD,BRIDGE

Page 73

FENSE , ROAD,BRIDGE

Page 74

FENSE , ROAD,BRIDGE

Page 75

FENSE , ROAD,BRIDGE

Page 76

FENSE , ROAD,BRIDGE

Page 77

FENSE , ROAD,BRIDGE

Page 78

FENSE , ROAD,BRIDGE

Page 79

FENSE , ROAD,BRIDGE

Page 80

FENSE , ROAD,BRIDGE

Page 81

FENSE , ROAD,BRIDGE

Remarks

Page 82

FENSE , ROAD,BRIDGE

Remarks

Remarks

Page 83

FENSE , ROAD,BRIDGE

To be included only if the ridging is carried out separately.

NOTES-To cover edges the following are available. 1.Horizontal Top Half-Tile. 2.Horizontal Bottom Half-Tile. 3.R.H.S. Half-Tile. 4.L.H.S. Half-Tile.

Page 84

FENSE , ROAD,BRIDGE

NOTES-To cover edges the following are available. 1.R.H.S End Ridge Piece and 2.L.H.S End Ridge Piece.

Page 85

FENSE , ROAD,BRIDGE

Page 86

FENSE , ROAD,BRIDGE

Page 87

FENSE , ROAD,BRIDGE

Page 88

FENSE , ROAD,BRIDGE

Page 89

FENSE , ROAD,BRIDGE

Page 90

FENSE , ROAD,BRIDGE

Page 91

FENSE , ROAD,BRIDGE

Page 92

FENSE , ROAD,BRIDGE

Page 93

FENSE , ROAD,BRIDGE

Page 94

FENSE , ROAD,BRIDGE

Page 95

FENSE , ROAD,BRIDGE

Page 96

FENSE , ROAD,BRIDGE

Page 97

FENSE , ROAD,BRIDGE

Page 98

FENSE , ROAD,BRIDGE

Page 99

FENSE , ROAD,BRIDGE

Page 100

FENSE , ROAD,BRIDGE

Page 101

FENSE , ROAD,BRIDGE

Page 102

FENSE , ROAD,BRIDGE

Page 103

FENSE , ROAD,BRIDGE

Page 104

FENSE , ROAD,BRIDGE

Page 105

FENSE , ROAD,BRIDGE

Page 106

FENSE , ROAD,BRIDGE

Page 107

FENSE , ROAD,BRIDGE

Page 108

FENSE , ROAD,BRIDGE

Page 109

FENSE , ROAD,BRIDGE

Page 110

FENSE , ROAD,BRIDGE

Rate

Page 111

FENSE , ROAD,BRIDGE

Rate

Rate

Page 112

FENSE , ROAD,BRIDGE

Rate

Page 113

FENSE , ROAD,BRIDGE

Rate

Page 114

FENSE , ROAD,BRIDGE

Rate

Rate

Page 115

FENSE , ROAD,BRIDGE

Page 116

FENSE , ROAD,BRIDGE

Page 117

FENSE , ROAD,BRIDGE

Page 118

FENSE , ROAD,BRIDGE

Page 119

FENSE , ROAD,BRIDGE

Page 120

FENSE , ROAD,BRIDGE

Per

Amount

Remarks

Page 121

FENSE , ROAD,BRIDGE

Per

Amount

Remarks

Per

Amount

Page 122

FENSE , ROAD,BRIDGE

Per

Amount

Remarks

Page 123

FENSE , ROAD,BRIDGE

Per

Amount

Remarks

15% WASTAGE

15% WASTAGE

15% WASTAGE

Page 124

FENSE , ROAD,BRIDGE

Page 125

FENSE , ROAD,BRIDGE

5% wastage

Amount

Remarks

Amount

Remarks

Page 126

FENSE , ROAD,BRIDGE

Amount

Remarks

Page 127

FENSE , ROAD,BRIDGE

Amount

Remarks

Page 128

FENSE , ROAD,BRIDGE

Page 129

FENSE , ROAD,BRIDGE

Page 130

FENSE , ROAD,BRIDGE

Page 131

FENSE , ROAD,BRIDGE

Page 132

FENSE , ROAD,BRIDGE

Page 133

FENSE , ROAD,BRIDGE

Page 134

FENSE , ROAD,BRIDGE

Page 135

FENSE , ROAD,BRIDGE

Page 136

FENSE , ROAD,BRIDGE

Page 137

FENSE , ROAD,BRIDGE

Page 138

FENSE , ROAD,BRIDGE

Page 139

FENSE , ROAD,BRIDGE

Page 140

FENSE , ROAD,BRIDGE

Page 141

FENSE , ROAD,BRIDGE

Page 142

FENSE , ROAD,BRIDGE

Page 143

FENSE , ROAD,BRIDGE

Page 144

FENSE , ROAD,BRIDGE

Page 145

FENSE , ROAD,BRIDGE

Page 146

FENSE , ROAD,BRIDGE

Page 147

FENSE , ROAD,BRIDGE

Page 148

FENSE , ROAD,BRIDGE

Page 149

FENSE , ROAD,BRIDGE

Page 150

FENSE , ROAD,BRIDGE

Page 151

FENSE , ROAD,BRIDGE

Page 152

FENSE , ROAD,BRIDGE

Page 153

FENSE , ROAD,BRIDGE

Page 154

FENSE , ROAD,BRIDGE

Page 155

FENSE , ROAD,BRIDGE

Page 156

FENSE , ROAD,BRIDGE

Page 157

FENSE , ROAD,BRIDGE

Page 158

FENSE , ROAD,BRIDGE

Page 159

FENSE , ROAD,BRIDGE

Page 160

FENSE , ROAD,BRIDGE

Page 161

FENSE , ROAD,BRIDGE

Page 162

FENSE , ROAD,BRIDGE

Page 163

FENSE , ROAD,BRIDGE

Page 164

FENSE , ROAD,BRIDGE

Page 165

Вам также может понравиться