Errata for Supply Chain Management: Strategy, Planning, and Operation by Sunil Chopra and

Peter Meindl
Chapter 4
Page 87Equation (4.20) is repeated here (another equation is numbered 4.20 on page 85. Increase
all equation numbers starting with (4.20) on page 87 by 1. Equation 4.20 should
be numbered 4.21, 4.21 should be numbered 4.22 etc.
Page 93The equations for F14, F15, F16 should be adjusted to
F14 = L12 + 2 T12 = 30,443 + 2 1,541 = 33,525
F15 = L12 + 3 T12 = 30,443 + 3 1,541 = 35,066
F16 = L12 + 4 T12 = 30,443 + 4 1,541 = 36,607
Page 94The equations for F15, F16 should be adjusted to
F15 = L12 + 3 T12 = (24,791 + 3 532) 1.17 = 30,873
F16 = L12 + 4 T12 = (24,791 + 4 532) 1.67 = 44,954
Chapter 5
Page 110 Change equation (5.6) to be
Average flow time =

,
_

'

1
]
1

+ +

T
D
T
I I I
T
t
t
T
t
t T
1
1
1
0
2 / ) (
Chapter 6
Page 134 In Table 6.15, the Hiring and training cost should be $3000/worker instead of
$000/worker
Chapter 7
Page 154 Change line 4 to read
Is thus optimal to order a lot size of qi units.
Chapter 8
Page 196 Change part of equation (8.12) to read
+
> j i
k
i
i
C
j i
R
) , cov( 2

) var(
1
2
Page 196 Change part of equation (8.14) to read
+
> j i
k
i
i
C
j i
R
) , cov( 2

) var(
1
2
=

>
+
j i
j i
k
i
i

2
1
2

Page 216 On line 9 of the first column change 14 days to 5 days.


Page 220 Change expression in the first column, line 2 from the bottom to be

L
ss z
L
dz
e
z
ss z ESC
2
2
2
1
) (
Currently the integral has x = ss/ L
Chapter 9
Page 227 In the expression for Expected profits in Example 9.1 (12 lines from the bottom
of the page), the formula should read
Expected profits = (p-s) NORMDIST((O*- )/ ,0,1,1) -
instead of
Expected profits = (p-s) NORMDIST((O*- )/ ,0,1,0) -