Вы находитесь на странице: 1из 1

CHECKLIST FOR STATOR CAPSULE INSPECTION

SL.N O. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

CHECK-POINTS SL.NO. IS PUNCHED CORRECTLY. OVERHANG COIL SEPERATOR PIECES ARE NOT LOOSE. SPACINGS BETWEEN ADJACENT COILS ARE PROPER AND UNIFORM. SPACINGS BETN CONNECTION RINGS, SPECIALLY AT JOINTS ARE OK. BRACING RING IS TIGHTLY SECURING THE OVERHANG COILS. WEDGES ARE INSERTED PROPERLY. WEDGES ARE NOT CLOSING VENTILATION DUCTS. WEDGES ARE NOT BROKEN. MAGNETIC WEDGES ARE TRAPEZOIDAL IN SHAPE. INSULATION TAPE IS NOT DAMAGED. WEDGES ARE TIGHTENED WITH COILS AT THE ENDS IN CWP MOTOR. BRACING RING SUPPORT BRACKETS ARE TIGHTLY FASTENED IN THE FRAME WITH PACKING. NO FOREIGN MATERIAL IS TRAPED IN THE COIL CAGE OF STATOR. PUNCHING IS NOT BENT, ESPECIALLY IN TOOTH AREA. LEVEL OF COIL AT OVERHANG AREA IS BELOW THE CORE LEVEL. RTDS ARE AWAY FROM COIL OVERHANG PORTION. PUTTY IS UNIFORMLY SPREADED. PUTTY LEVEL IS NOT ABOVE STATOR CORE LEVEL.

YES

NO

AMIT VIJAYVARGI NTPC-BHOPAL

Вам также может понравиться