Вы находитесь на странице: 1из 1

24.

80

Indoor stulz

Indoor stulz

Indoor stulz

Indoor stulz Indoor stulz

Indoor stulz
2.64

0.30

1.80

USSD + MCA

Sat Cab.

0.90

Bulk SMS cab.

4.80
0.60 0.60

MGW MGW MGW


0.60

Alu cabs.
CBC&DDS

1.60

1.00

2.25 2.22

5.70

0.84

DDF
0.72

DDF

DDF
Astellia rack T&A Server

Alu cabs. OSR Traffica


0.84

DDF DDF DDF DDF

XCDR XCDR XCDR


0.52

DDF DDF DDF DDF DDF DDF


3.00

Traf.
0.60

6.60

2.00 12.40

Alu cabs.

4.56

4.56
1.06

XCDR XCDR XCDR XCDR


0.52 2.96

XCDR XCDR

BTS
3.70

XCDR XCDR

0.60

0.60

0.70

CMD rack

0.31 1.50

0.31
Wiring Space

IN7 Node 2 Expansion

8.40
V node rack IDU rack

UPS 2 Rack

IN 7 Node 2

IN7 Node 1 Expansion

IN 7 Node 1

UPS 1 Rack

LAN Rack7

1.05

B & R5

0.90

Topup cabinet -1-

Topup cabinet -2-

MPS MPS 500 1000


0.61

DDF DDF DDF DDF

0.70

Power ware 9155 8 KVA

IN Testbed IN Testbed 2 1

Power ware 9155 8 KVA

LAN Rack

1.00

2.00

DDF
0.50
0.70

Front

0.60

0.61

0.61

0.60

0.70

0.70

0.60 1.30

0.60

0.60

0.31

0.60 0.60 0.60 0.60 0.70 0.60 0.60

M2000

Router

SGSN

SGSN

1.00

BSC 6900

BTS Huawei
0.45 0.95

2.78

Cab.
1.20 0.60

Switch
1.00 2.45

STP
0.78

DDF
3.00 1.20 0.98

Location of bulk SMS cabinet

DDF DDF
rectifier rectifier

0.60
rectifier

0.60

1.10

Site name

1.56

MSC 05 Camp Sara

1.20

Survey by Eng. Ammar Fadhel A.

Drawing for plan of MSC 05 (Switch room) (1st floor)

Drawn by Eng. Ammar Fadhel A. Scale


1:1 Scale to fix

Вам также может понравиться