HOJA DE METRADOS
DESCRIPCIN
N DE
VECES
LARGO
MEDIDAS
ANCHO
PARCIAL
ALTO
METRADO
TOTAL
UN
1.00
UN
87.00
M2
598.72
M2
689,656
KG
1.00
GLB
ESTRUCTURAS
01.00
OBRAS PROVISIONALES
01.01
CONSTRUCCIONES PROVISIONALES
01.01.01
01.01.02
01.01.03
1.00
1.00
2.50
3.00
7.50
Almacen
1.00
6.00
12.00
72.00
Guardiania
1.00
2.50
3.00
7.50
1.00
299.36
7,289
42.50
309,783
40,626
1.00
40,626
3,652
1.00
3,652
39,922
5.00
199,612
4,347
10.00
43,470
9,865
2.50
24,663
9,542
2.70
25,763
3,544
2.00
7,088
CERAMICA (M2)
OTROS MATERIALES Y EQUIPO
1,250
12.00
15,000
20,000
1.00
20,000
01.01.04
1.00
2.00
598.72
01.02
INSTALACIONES PROVISIONALES
01.02.01
1.00
1.00
01.02.02
1.00
1.00
1.00
GLB
01.02.03
ENERGIA ELECTRICA
1.00
1.00
1.00
GLB
02
TRABAJOS PRELIMINARES
02.06
02.06.01
02.06.02
MURO PERIMETRICO
1.00
299.36
BLOQUE A,B,C
1.00
AREA=
608.26
608.26
1.00
AREA=
10513.18
10513.18
MURO PERIMETRICO
1.00
1.00
1.00
1.00
BLOQUE A,B,C
1.00
AREA=
608.26
608.26
1.00
AREA=
10513.18
10513.18
MOVIMIENTO DE TIERRAS
03.01
03.01.01
1.00
11,420.80
M2
11,122.44
M2
24,096.66
M3
299.36
03.00
03.01.02
1.00
24096.66
03.02
EXCAVACIONES
03.02.01
1.00
11122.44
176.85
M3
BLOQUE A
CC-1, EJE 1
1.00
8.84
0.50
1.00
4.42
CC-1, EJE 2
1.00
7.35
0.50
1.00
3.68
1.00
4.74
0.50
1.00
2.37
CC-1, EJE 3
1.00
6.65
0.50
1.00
3.33
CC-1, EJE 4
1.00
7.80
0.50
1.00
3.90
________________________________________________________________________________________________________
METRADOS
195
HOJA DE METRADOS
DESCRIPCIN
N DE
VECES
LARGO
MEDIDAS
ANCHO
PARCIAL
CC-1, EJE 5
1.00
3.80
0.50
1.00
CC-1, EJE 6
1.00
7.95
0.50
1.00
3.98
CC-1, EJE A
1.00
20.84
0.50
1.00
10.42
1.00
2.33
0.50
1.00
1.17
CC-1, EJE B
1.00
19.69
0.50
1.00
9.85
CC-1, EJE C
1.00
7.84
0.50
1.00
3.92
CC-1, EJE D
1.00
15.81
0.50
1.00
7.91
CC-1, EJE E
1.00
3.30
0.50
1.00
1.65
CC-1, EJE 1
1.00
2.64
0.50
1.00
1.32
1.00
4.65
0.50
1.00
2.33
CC-1, EJE 3
1.00
3.80
0.50
1.00
1.90
CC-1, EJE A
1.00
5.80
0.50
1.00
2.90
CC-1, EJE B
1.00
3.19
0.50
1.00
1.60
CC-1, EJE C
1.00
17.08
0.50
1.00
8.54
CC-1, EJE D
1.00
5.65
0.50
1.00
2.83
CC-1, EJE 1
1.00
2.50
0.50
1.00
1.25
CC-1, EJE 3
1.00
2.50
0.50
1.00
1.25
CC-1, EJE A
1.00
3.50
0.50
1.00
1.75
CC-1, EJE B
1.00
3.50
0.50
1.00
1.75
Z-1
6.00
1.40
1.10
1.70
15.71
Z-2
35.00
1.15
1.10
1.70
75.27
1.00
176.85
176.85
ALTO
METRADO
TOTAL
UN
46.92
M3
31494.57
M3
234.60
M2
111.51
M3
1.90
BLOQUE B
BLOQUE C
03.03
RELLENOS
03.03.01
03.03.02
03.03.03
1.00
CIMIENTOS CORRIDOS
-1.00
97.33
-97.33
ZAPATA
-1.00
33.60
-33.60
1.00
24096.66
1.30
31325.66
VOLUMEN DE CIMENTACIONES
1.00
129.93
1.30
168.91
1.00
234.60
1.00
04.00
04.01
CIMIENTOS CORRIDOS
04.01.01
234.60
BLOQUE A
CC-1, EJE 1
1.00
8.84
0.50
0.80
3.54
CC-1, EJE 2
1.00
7.35
0.50
0.80
2.94
1.00
4.74
0.50
0.80
1.90
CC-1, EJE 3
1.00
6.65
0.50
0.80
2.66
CC-1, EJE 4
1.00
7.80
0.50
0.80
3.12
CC-1, EJE 5
1.00
3.80
0.50
0.80
1.52
CC-1, EJE 6
1.00
7.95
0.50
0.80
3.18
CC-1, EJE A
1.00
20.84
0.50
0.80
8.34
1.00
2.33
0.50
0.80
0.93
CC-1, EJE B
1.00
19.69
0.50
0.80
7.88
CC-1, EJE C
1.00
7.84
0.50
0.80
3.14
CC-1, EJE D
1.00
15.81
0.50
0.80
6.32
CC-1, EJE E
1.00
3.30
0.50
0.80
1.32
CC-1, EJE 1
1.00
2.64
0.50
0.80
1.06
1.00
4.65
0.50
0.80
1.86
CC-1, EJE 3
1.00
3.80
0.50
0.80
1.52
BLOQUE B
________________________________________________________________________________________________________
METRADOS
196
HOJA DE METRADOS
DESCRIPCIN
N DE
VECES
LARGO
MEDIDAS
ANCHO
PARCIAL
CC-1, EJE A
1.00
5.80
0.50
0.80
2.32
CC-1, EJE B
1.00
3.19
0.50
0.80
1.28
CC-1, EJE C
1.00
17.08
0.50
0.80
6.83
CC-1, EJE D
1.00
5.65
0.50
0.80
2.26
CC-1, EJE 1
1.00
2.50
0.50
0.80
1.00
CC-1, EJE 3
1.00
2.50
0.50
0.80
1.00
CC-1, EJE A
1.00
3.50
0.50
0.80
1.40
CC-1, EJE B
1.00
3.50
0.50
0.80
1.40
Z-1
6.00
1.40
1.10
0.80
7.39
Z-2
35.00
1.15
1.10
0.80
35.42
ALTO
METRADO
TOTAL
UN
53.52
M2
7.73
M3
103.05
M2
BLOQUE C
04.02
04.02.01
6.00
1.40
1.10
9.24
Z-2
35.00
1.15
1.10
44.28
04.03
SOBRECIMIENTOS
04.03.01
1.00
8.84
0.15
0.30
0.40
CC-1, EJE 2
1.00
7.35
0.15
0.30
0.33
1.00
4.74
0.15
0.30
0.21
CC-1, EJE 3
1.00
6.65
0.15
0.30
0.30
CC-1, EJE 4
1.00
7.80
0.15
0.30
0.35
CC-1, EJE 5
1.00
3.80
0.15
0.30
0.17
CC-1, EJE 6
1.00
7.95
0.15
0.30
0.36
CC-1, EJE A
1.00
20.84
0.15
0.30
0.94
1.00
2.33
0.15
0.30
0.10
CC-1, EJE B
1.00
19.69
0.15
0.30
0.89
CC-1, EJE C
1.00
7.84
0.15
0.30
0.35
CC-1, EJE D
1.00
15.81
0.15
0.30
0.71
CC-1, EJE E
1.00
3.30
0.15
0.30
0.15
CC-1, EJE 1
1.00
2.64
0.15
0.30
0.12
1.00
4.65
0.15
0.30
0.21
CC-1, EJE 3
1.00
3.80
0.15
0.30
0.17
CC-1, EJE A
1.00
5.80
0.15
0.30
0.26
CC-1, EJE B
1.00
3.19
0.15
0.30
0.14
CC-1, EJE C
1.00
17.08
0.15
0.30
0.77
CC-1, EJE D
1.00
5.65
0.15
0.30
0.25
CC-1, EJE 1
1.00
2.50
0.15
0.30
0.11
CC-1, EJE 3
1.00
2.50
0.15
0.30
0.11
CC-1, EJE A
1.00
3.50
0.15
0.30
0.16
CC-1, EJE B
1.00
3.50
0.15
0.30
0.16
BLOQUE B
BLOQUE C
04.03.02
2.00
8.84
0.30
5.30
CC-1, EJE 2
2.00
7.35
0.30
4.41
2.00
4.74
0.30
2.84
CC-1, EJE 3
2.00
6.65
0.30
3.99
CC-1, EJE 4
2.00
7.80
0.30
4.68
CC-1, EJE 5
2.00
3.80
0.30
2.28
CC-1, EJE 6
2.00
7.95
0.30
4.77
CC-1, EJE A
2.00
20.84
0.30
12.50
2.00
2.33
0.30
1.40
CC-1, EJE B
2.00
19.69
0.30
11.81
CC-1, EJE C
2.00
7.84
0.30
4.70
________________________________________________________________________________________________________
METRADOS
197
HOJA DE METRADOS
DESCRIPCIN
N DE
VECES
LARGO
MEDIDAS
ANCHO
PARCIAL
CC-1, EJE D
2.00
15.81
0.30
9.49
CC-1, EJE E
2.00
3.30
0.30
1.98
CC-1, EJE 1
2.00
2.64
0.30
1.58
2.00
4.65
0.30
2.79
CC-1, EJE 3
2.00
3.80
0.30
2.28
CC-1, EJE A
2.00
5.80
0.30
3.48
CC-1, EJE B
2.00
3.19
0.30
1.91
CC-1, EJE C
2.00
17.08
0.30
10.25
CC-1, EJE D
2.00
5.65
0.30
3.39
CC-1, EJE 1
2.00
2.50
0.30
1.50
CC-1, EJE 3
2.00
2.50
0.30
1.50
CC-1, EJE A
2.00
3.50
0.30
2.10
CC-1, EJE B
2.00
3.50
0.30
2.10
ALTO
METRADO
TOTAL
UN
26.76
M3
830.31
KG
2.84
M3
22.72
M2
19.07
M3
285.45
M2
4703.81
KG
22.06
M3
BLOQUE B
BLOQUE C
05.00
05.01
ZAPATAS
05.01.01
6.00
1.40
1.10
0.50
4.62
Z-2
35.00
1.15
1.10
0.50
22.14
05.01.02
05.02
VIGAS DE CIMENTACION
05.02.01
05.02.02
EJE B
1.00
4.80
0.25
0.40
0.48
EJE 5
1.00
4.80
0.25
0.40
0.48
EJE 6,7
2.00
9.40
0.25
0.40
1.88
EJE B
2.00
4.80
0.40
3.84
EJE 5
2.00
4.80
0.40
3.84
EJE 6,7
4.00
9.40
0.40
15.04
C-1
34.00
0.35
0.25
3.30
9.82
C-2
6.00
0.60
0.25
3.30
2.97
C-3
1.00
0.65
0.15
3.30
0.32
C-4
21.00
0.30
0.15
3.30
3.12
C-5
23.00
0.25
0.15
3.30
2.85
C-1
34.00
1.10
3.30
123.42
C-2
6.00
1.70
3.30
33.66
C-3
1.00
1.60
3.30
5.28
C-4
21.00
0.90
3.30
62.37
C-5
23.00
0.80
3.30
60.72
05.03
COLUMNAS
05.03.01
05.03.02
05.03.03
05.04
VIGAS
05.04.01
2.00
12.49
0.25
0.40
2.50
EJE 3,4,5,6,7,8
6.00
10.45
0.25
0.40
6.27
________________________________________________________________________________________________________
METRADOS
198
HOJA DE METRADOS
DESCRIPCIN
N DE
VECES
LARGO
MEDIDAS
ANCHO
PARCIAL
EJE A (1-8)
1.00
27.76
0.25
0.40
2.78
EJE B (1-8)
1.00
29.66
0.25
0.40
2.97
EJE C (1-3)
1.00
3.54
0.25
0.40
0.35
EJE D (3-8)
1.00
20.38
0.25
0.40
2.04
EJE E (1-2)
1.00
4.10
0.25
0.40
0.41
3.00
4.80
0.25
0.40
1.44
2.00
7.54
0.25
0.40
1.51
2.00
5.50
0.25
0.40
1.10
2.00
3.50
0.25
0.40
0.70
ALTO
METRADO
TOTAL
UN
176.48
M2
3409.90
KG
25.98
M3
VP-02 (0.25x0.40)
BLOQUE B
VP-01 (0.25x0.40)
EJE 1,2,3(A-C)
VP-01 (0.25x0.40)
EJE A,C (1-3)
BLOQUE C
EJE A,B(1-2)
VP-01 (0.25x0.40)
EJE 1,2 (A-B)
05.04.02
4.00
12.49
0.40
19.98
EJE 3,4,5,6,7,8
12.00
10.45
0.40
50.16
EJE A (1-8)
2.00
27.76
0.40
22.21
EJE B (1-8)
2.00
29.66
0.40
23.73
EJE C (1-3)
2.00
3.54
0.40
2.83
EJE D (3-8)
2.00
20.38
0.40
16.30
EJE E (1-2)
2.00
4.10
0.40
3.28
6.00
4.80
0.40
11.52
4.00
7.54
0.40
12.06
4.00
5.50
0.40
8.80
4.00
3.50
0.40
5.60
VP-02 (0.25x0.40)
BLOQUE B
VP-01 (0.25x0.40)
EJE 1,2,3(A-C)
VP-01 (0.25x0.40)
EJE A,C (1-3)
BLOQUE C
EJE A,B(1-2)
VP-01 (0.25x0.40)
EJE 1,2 (A-B)
05.04.03
05.05
LOSAS ALIGERADAS
05.05.01
1.00
4.90
4.80
0.05
1.18
12.00
4.80
0.10
0.10
0.58
1.00
2.39
4.80
0.05
0.57
6.00
4.80
0.10
0.10
0.29
1.00
4.02
4.80
0.05
0.96
10.00
4.80
0.10
0.10
0.48
1.00
4.90
2.58
0.05
0.63
12.00
2.58
0.10
0.10
0.31
1.00
4.73
2.39
0.05
0.57
3.00
4.73
0.10
0.10
0.14
1.00
4.20
4.90
0.05
1.03
12.00
4.20
0.10
0.10
0.50
1.00
4.20
4.90
0.05
1.03
12.00
4.20
0.10
0.10
0.50
1.00
4.20
4.80
0.05
1.01
12.00
4.20
0.10
0.10
0.50
1.00
4.90
4.90
0.05
1.20
12.00
4.90
0.10
0.10
0.59
1.00
4.90
4.80
0.05
1.18
12.00
4.90
0.10
0.10
0.59
________________________________________________________________________________________________________
METRADOS
199
HOJA DE METRADOS
DESCRIPCIN
EJE 5,6,7 (A-B)
EJE 5,6,7 (B-D)
EJE 7,8 (A-B)
EJE 7,8 (B-D)
N DE
VECES
LARGO
MEDIDAS
ANCHO
PARCIAL
ALTO
2.00
3.93
4.90
0.05
1.93
24.00
3.93
0.10
0.10
0.94
2.00
3.93
4.80
0.05
1.89
24.00
3.93
0.10
0.10
0.94
1.00
3.42
4.90
0.05
0.84
12.00
3.42
0.10
0.10
0.41
1.00
3.42
4.80
0.05
0.82
12.00
3.42
0.10
0.10
0.41
METRADO
TOTAL
UN
351.99
M2
BLOQUE B
EJE 1,2 (A-C)
EJE 2,3 (A-C)
1.00
4.17
4.80
0.05
1.00
12.00
4.17
0.10
0.10
0.50
1.00
3.38
4.80
0.05
0.81
12.00
3.38
0.10
0.10
0.41
1.00
3.50
5.50
0.05
0.96
8.00
3.50
0.10
0.10
0.28
BLOQUE C
EJE A,B (1-2)
05.05.02
1.00
4.90
4.80
23.52
1.00
2.39
4.80
11.47
1.00
4.02
4.80
19.30
1.00
4.90
2.58
12.64
1.00
4.73
2.39
11.30
1.00
4.20
4.90
20.58
1.00
4.20
4.90
20.58
1.00
4.20
4.80
20.16
1.00
4.90
4.90
24.01
1.00
4.90
4.80
23.52
2.00
3.93
4.90
38.51
2.00
3.93
4.80
37.73
1.00
3.42
4.90
16.76
1.00
3.42
4.80
16.42
1.00
4.17
4.80
20.02
1.00
3.38
4.80
16.22
1.00
3.50
5.50
19.25
BLOQUE B
BLOQUE C
EJE A,B (1-2)
05.05.03
2202.72
KG
05.05.04
3167.92
UN
109.92
M2
109.92
M2
460.16
M2
BLOQUE A,B,C
06.00
06.01.00
06.02.00
3168
3167.92
COBERTURA EN CORRALES
1.00
8.08
5.00
40.40
1.00
12.49
3.50
43.72
1.00
5.00
2.43
12.15
1.00
5.00
2.73
13.65
COBERTURA EN CORRALES
1.00
8.08
5.00
40.40
1.00
12.49
3.50
43.72
1.00
5.00
2.43
12.15
1.00
5.00
2.73
13.65
07.00
07.01.00
1.00
19.85
3.20
63.52
1.00
4.41
0.90
3.97
________________________________________________________________________________________________________
METRADOS
200
HOJA DE METRADOS
DESCRIPCIN
N DE
VECES
LARGO
MEDIDAS
ANCHO
PARCIAL
ALTO
EJE B
1.00
2.38
3.20
7.62
EJE C
1.00
22.14
3.20
70.85
1.00
1.00
2.00
2.00
1.00
6.54
3.20
20.93
EJE D
1.00
1.00
2.00
2.00
EJE 1
1.00
7.53
3.20
24.10
EJE 2
1.00
7.53
3.20
24.10
EJE 3
1.00
2.64
3.20
8.45
1.00
2.00
2.70
5.40
1.00
3.81
3.20
12.19
EJE 4
1.00
1.60
2.00
3.20
EJE 5
1.00
5.40
3.20
17.28
EJE 6
1.00
2.63
3.20
8.42
EJE 7
1.00
3.20
3.20
10.24
1.00
6.40
2.00
12.80
EJE A
1.00
7.45
3.20
23.84
EJE B
1.00
3.10
2.20
6.82
EJE C
1.00
16.23
3.20
51.94
EJE 1
1.00
4.25
3.20
13.60
EJE 2
1.00
4.01
3.20
12.83
EJE 3
1.00
2.60
3.20
8.32
2.00
5.15
3.20
32.96
EJE 1
1.00
2.15
3.20
6.88
EJE 3
1.00
1.85
3.20
5.92
SS.HH. DAMAS
1.00
11.76
1.60
18.82
SS.HH. VARONES
1.00
7.59
1.60
12.14
VESTUARIO VARONES
1.00
9.90
1.60
15.84
VESTUARIO DAMAS
1.00
9.87
1.60
15.79
METRADO
TOTAL
UN
BLOQUE B
BLOQUE C
ARQUITECTURA
08.00
08.01.00
08.02.00
62.59
623.98
M2
BLOQUE A
EJE A
1.00
19.85
3.20
1.00
4.41
0.90
3.97
EJE B
2.00
2.38
3.20
15.23
EJE C
2.00
22.14
3.20
141.70
2.00
1.00
2.00
4.00
2.00
2.80
3.20
17.92
1.00
3.74
4.20
15.71
1.00
1.00
2.00
2.00
EJE E
1.00
4.10
3.20
13.12
EJE 1
1.00
7.53
3.20
24.10
EJE 2
1.00
7.53
3.20
24.10
EJE 3
1.00
2.64
3.20
8.45
1.00
2.00
2.70
5.40
2.00
3.81
3.20
24.38
EJE D
EJE 4
63.52
1.00
1.60
2.00
3.20
EJE 5
2.00
5.40
3.20
34.56
EJE 6
2.00
2.63
3.20
16.83
EJE 7
1.00
3.20
3.20
10.24
1.00
6.40
2.00
12.80
EJE A
1.00
7.45
3.20
23.84
EJE B
2.00
3.10
2.20
13.64
BLOQUE B
________________________________________________________________________________________________________
METRADOS
201
HOJA DE METRADOS
DESCRIPCIN
N DE
VECES
LARGO
MEDIDAS
ANCHO
PARCIAL
EJE C
1.00
16.23
3.20
51.94
EJE 1
1.00
4.25
3.20
13.60
EJE 2
2.00
4.01
3.20
25.66
EJE 3
1.00
2.60
3.20
8.32
2.00
5.15
3.20
32.96
EJE 1
1.00
2.15
3.20
6.88
EJE 3
1.00
1.85
3.20
5.92
ALTO
METRADO
TOTAL
UN
490.23
M2
196.35
M2
143.39
M2
BLOQUE C
08.03.00
1.00
23.25
3.60
1.00
4.41
0.90
3.97
2.00
2.80
3.60
20.16
1.00
3.74
3.60
13.46
1.00
1.00
2.00
2.00
EJE E
1.00
17.18
3.60
61.85
EJE F
1.00
5.30
3.50
18.55
EJE 1
1.00
8.73
3.60
31.43
EJE 2
1.00
7.53
3.60
27.11
EJE 3
1.00
2.64
3.60
9.50
1.00
2.00
2.70
5.40
EJE 4
1.00
1.60
2.00
3.20
EJE 7
1.00
3.20
3.60
11.52
1.00
6.40
2.00
12.80
EJE D
83.70
BLOQUE B
EJE A
1.00
8.67
3.60
31.21
EJE C
1.00
17.08
3.60
61.49
EJE 1
1.00
5.30
3.60
19.08
EJE 3
1.00
3.30
3.60
11.88
2.00
6.00
3.60
43.20
EJE 1
1.00
2.85
3.60
10.26
EJE 3
1.00
2.35
3.60
8.46
34.00
1.00
3.30
112.20
3.30
27.72
3.30
56.43
BLOQUE C
08.04.00
08.05.00
6.00
19.00
1.40
0.90
2.00
12.49
0.65
16.24
EJE 3,4,5,6,7,8
6.00
10.45
0.65
40.76
EJE A (1-8)
1.00
27.76
0.65
18.04
EJE B (1-8)
1.00
29.66
0.65
19.28
EJE C (1-3)
1.00
3.54
0.65
2.30
EJE D (3-8)
1.00
20.38
0.65
13.25
EJE E (1-2)
1.00
4.10
0.65
2.67
3.00
4.80
0.65
9.36
2.00
7.54
0.65
9.80
2.00
5.50
0.65
7.15
2.00
3.50
0.65
4.55
VP-02 (0.25x0.40)
BLOQUE B
VP-01 (0.25x0.40)
EJE 1,2,3(A-C)
VP-01 (0.25x0.40)
EJE A,C (1-3)
BLOQUE C
EJE A,B(1-2)
VP-01 (0.25x0.40)
EJE 1,2 (A-B)
________________________________________________________________________________________________________
METRADOS
202
HOJA DE METRADOS
DESCRIPCIN
08.06.00
N DE
VECES
LARGO
MEDIDAS
ANCHO
PARCIAL
V-01
2.00
7.20
14.40
V-02
2.00
4.40
8.80
V-03
1.00
4.60
4.60
V-04
1.00
4.60
4.60
V-05
2.00
3.00
6.00
P-1
1.00
6.00
6.00
P-2
1.00
6.00
6.00
ALTO
09.00
CIELORASOS
09.01.00
METRADO
TOTAL
UN
50.40
351.99
M2
351.99
M2
96.12
M2
BLOQUE A
EJE A,B (1-2)
1.00
4.90
4.80
23.52
1.00
2.39
4.80
11.47
1.00
4.02
4.80
19.30
1.00
4.90
2.58
12.64
1.00
4.73
2.39
11.30
1.00
4.20
4.90
20.58
1.00
4.20
4.90
20.58
1.00
4.20
4.80
20.16
1.00
4.90
4.90
24.01
1.00
4.90
4.80
23.52
2.00
3.93
4.90
38.51
2.00
3.93
4.80
37.73
1.00
3.42
4.90
16.76
1.00
3.42
4.80
16.42
1.00
4.17
4.80
20.02
1.00
3.38
4.80
16.22
1.00
3.50
5.50
19.25
BLOQUE B
BLOQUE C
EJE A,B (1-2)
10.00
PISOS Y PAVIMENTOS
10.01
PISOS DE CERAMICA
10.01.01
1.00
4.90
4.80
23.52
1.00
2.39
4.80
11.47
1.00
4.02
4.80
19.30
1.00
4.90
2.58
12.64
1.00
4.73
2.39
11.30
1.00
4.20
4.90
20.58
1.00
4.20
4.90
20.58
1.00
4.20
4.80
20.16
1.00
4.90
4.90
24.01
1.00
4.90
4.80
23.52
2.00
3.93
4.90
38.51
2.00
3.93
4.80
37.73
1.00
3.42
4.90
16.76
1.00
3.42
4.80
16.42
1.00
4.17
4.80
20.02
1.00
3.38
4.80
16.22
1.00
3.50
5.50
19.25
1.00
13.20
2.40
31.68
1.00
7.96
2.56
20.38
BLOQUE B
BLOQUE C
EJE A,B (1-2)
10.02
PISOS DE CONCRETO
10.02.01
________________________________________________________________________________________________________
METRADOS
203
HOJA DE METRADOS
DESCRIPCIN
TRANSPORTE DEL PRODUCTO FINAL
10.02.02
N DE
VECES
LARGO
1.00
12.59
MEDIDAS
ANCHO
PARCIAL
ALTO
3.50
METRADO
TOTAL
UN
448.11
M2
44.23
127.90
103.35
62.59
M2
15.66
M2
10.50
M2
44.07
1.00
4.90
4.80
23.52
1.00
2.39
4.80
11.47
1.00
4.02
4.80
19.30
1.00
4.90
2.58
12.64
1.00
4.73
2.39
11.30
1.00
4.20
4.90
20.58
1.00
4.20
4.90
20.58
1.00
4.20
4.80
20.16
1.00
4.90
4.90
24.01
1.00
4.90
4.80
23.52
2.00
3.93
4.90
38.51
2.00
3.93
4.80
37.73
1.00
3.42
4.90
16.76
1.00
3.42
4.80
16.42
1.00
4.17
4.80
20.02
1.00
3.38
4.80
16.22
BLOQUE B
BLOQUE C
EJE A,B (1-2)
1.00
3.50
5.50
19.25
PASILLOS
1.00
13.20
2.40
31.68
1.00
7.96
2.56
20.38
1.00
12.59
3.50
44.07
1.00
19.58
1.00
5.00
5.00
1.00
19.65
19.65
1.00
127.90
127.90
1.00
40.30
40.30
1.00
44.25
44.25
REFRIGERACION
1.00
18.80
18.80
SS.HH. DAMAS
1.00
11.76
1.60
18.82
SS.HH. VARONES
1.00
7.59
1.60
12.14
VESTUARIO VARONES
1.00
9.90
1.60
15.84
VESTUARIO DAMAS
1.00
9.87
1.60
15.79
SS.HH. DAMAS
1.00
2.52
2.00
5.04
SS.HH. VARONES
1.00
0.75
2.00
1.50
VESTUARIO DAMAS
1.00
2.31
2.00
4.62
VESTUARIO VARONES
1.00
2.25
2.00
4.50
2.00
0.75
2.00
3.00
BLOQUE B
11.00
JUNTAS FLEXIBLES
11.01.00
12.00
CONTRAZOCALOS
12.01.00
13.00
ZOCALOS
13.01.00
14.00
TABIQUES DE MELAMINE
14.01.00
14.02.00
19.58
________________________________________________________________________________________________________
METRADOS
204
HOJA DE METRADOS
DESCRIPCIN
N DE
VECES
LARGO
1.00
0.75
2.00
1.50
2.00
0.75
2.00
3.00
2.00
0.75
2.00
3.00
15.00
CARPINTERIA DE MADERA
15.01
PUERTAS
15.01.01
2.00
2.60
5.20
P-02
8.00
2.00
2.80
44.80
P-03
1.00
1.20
2.50
3.00
16.01.00
16.03.00
2.00
3.10
0.60
3.72
V-02
8.00
1.60
0.60
7.68
V-03
1.00
1.70
0.60
1.02
V-04
3.00
1.00
1.30
3.90
V-05
4.00
1.00
0.50
2.00
16.04.00
9.00
9.00
9.00
9.00
54.00
54.00
P-04
24.00
24.00
P-05
6.00
6.00
14.00
14.00
9.00
9.00
1.00
1.00
1.00
4.00
6.00
6.00
17.00
CERRAJERIA
17.01
BISAGRAS
17.01.01
17.01.02
17.01.03
17.02
CERRADURAS
17.02.01
17.02.02
17.02.03
17.03
ACCESORIOS DE CIERRE
17.03.01
18.00
18.01.00
18.02.00
PARCIAL
ALTO
1.00
16.00
16.02.00
MEDIDAS
ANCHO
V-01
2.00
3.00
10.80
0.60
38.88
V-02
8.00
1.60
10.80
0.60
82.94
V-04
3.00
1.00
10.80
1.70
55.08
V-05
4.00
1.00
10.80
0.50
21.60
1.00
1.70
10.80
0.60
11.02
METRADO
TOTAL
UN
5.20
M2
47.80
M2
18.32
M2
9.00
UN
9.00
UN
54.00
UN
30.00
UN
14.00
UN
9.00
UN
1.00
UN
4.00
UN
6.00
UN
198.50
P2
11.02
P2
________________________________________________________________________________________________________
METRADOS
205
HOJA DE METRADOS
DESCRIPCIN
19.00
PINTURA
19.01
19.01.01
N DE
VECES
LARGO
MEDIDAS
ANCHO
PARCIAL
ALTO
METRADO
TOTAL
UN
351.99
M2
623.98
M2
490.23
M2
BLOQUE A
EJE A,B (1-2)
1.00
4.90
4.80
23.52
1.00
2.39
4.80
11.47
1.00
4.02
4.80
19.30
1.00
4.90
2.58
12.64
1.00
4.73
2.39
11.30
1.00
4.20
4.90
20.58
1.00
4.20
4.90
20.58
1.00
4.20
4.80
20.16
1.00
4.90
4.90
24.01
1.00
4.90
4.80
23.52
2.00
3.93
4.90
38.51
2.00
3.93
4.80
37.73
1.00
3.42
4.90
16.76
1.00
3.42
4.80
16.42
1.00
4.17
4.80
20.02
1.00
3.38
4.80
16.22
1.00
3.50
5.50
19.25
BLOQUE B
BLOQUE C
EJE A,B (1-2)
19.01.02
1.00
19.85
3.20
1.00
4.41
0.90
3.97
EJE B
2.00
2.38
3.20
15.23
EJE C
2.00
22.14
3.20
141.70
2.00
1.00
2.00
4.00
2.00
2.80
3.20
17.92
1.00
3.74
4.20
15.71
1.00
1.00
2.00
2.00
EJE E
1.00
4.10
3.20
13.12
EJE 1
1.00
7.53
3.20
24.10
EJE 2
1.00
7.53
3.20
24.10
EJE 3
1.00
2.64
3.20
8.45
1.00
2.00
2.70
5.40
2.00
3.81
3.20
24.38
EJE D
EJE 4
63.52
1.00
1.60
2.00
3.20
EJE 5
2.00
5.40
3.20
34.56
EJE 6
2.00
2.63
3.20
16.83
EJE 7
1.00
3.20
3.20
10.24
1.00
6.40
2.00
12.80
EJE A
1.00
7.45
3.20
23.84
EJE B
2.00
3.10
2.20
13.64
EJE C
1.00
16.23
3.20
51.94
EJE 1
1.00
4.25
3.20
13.60
EJE 2
2.00
4.01
3.20
25.66
EJE 3
1.00
2.60
3.20
8.32
2.00
5.15
3.20
32.96
EJE 1
1.00
2.15
3.20
6.88
EJE 3
1.00
1.85
3.20
5.92
BLOQUE B
BLOQUE C
19.01.03
1.00
23.25
3.60
83.70
________________________________________________________________________________________________________
METRADOS
206
HOJA DE METRADOS
DESCRIPCIN
N DE
VECES
LARGO
1.00
4.41
0.90
3.97
2.00
2.80
3.60
20.16
1.00
3.74
3.60
13.46
1.00
1.00
2.00
2.00
EJE E
1.00
17.18
3.60
61.85
EJE F
1.00
5.30
3.50
18.55
EJE 1
1.00
8.73
3.60
31.43
EJE 2
1.00
7.53
3.60
27.11
EJE 3
1.00
2.64
3.60
9.50
1.00
2.00
2.70
5.40
EJE 4
1.00
1.60
2.00
3.20
EJE 7
1.00
3.20
3.60
11.52
1.00
6.40
2.00
12.80
EJE D
MEDIDAS
ANCHO
PARCIAL
ALTO
METRADO
TOTAL
UN
47.80
M2
18.32
M2
109.92
M2
6.00
M2
26.16
M2
BLOQUE B
EJE A
1.00
8.67
3.60
31.21
EJE C
1.00
17.08
3.60
61.49
EJE 1
1.00
5.30
3.60
19.08
EJE 3
1.00
3.30
3.60
11.88
2.00
6.00
3.60
43.20
EJE 1
1.00
2.85
3.60
10.26
EJE 3
1.00
2.35
3.60
8.46
BLOQUE C
19.02
19.02.01
19.02.02
22.02.04
P-02
8.00
2.00
2.80
44.80
P-03
1.00
1.20
2.50
3.00
2.00
3.10
0.60
3.72
V-02
8.00
1.60
0.60
7.68
V-03
1.00
1.70
0.60
1.02
V-04
3.00
1.00
1.30
3.90
V-05
4.00
1.00
0.50
2.00
COBERTURA EN CORRALES
1.00
8.08
5.00
40.40
1.00
12.49
3.50
43.72
1.00
5.00
2.43
12.15
1.00
5.00
2.73
13.65
1.00
2.00
3.00
6.00
SS.HH. DAMAS
1.00
2.52
2.00
5.04
SS.HH. VARONES
1.00
0.75
2.00
1.50
VESTUARIO DAMAS
1.00
2.31
2.00
4.62
VESTUARIO VARONES
1.00
2.25
2.00
4.50
2.00
0.75
2.00
3.00
1.00
0.75
2.00
1.50
2.00
0.75
2.00
3.00
2.00
0.75
2.00
3.00
MURO PERIMETRICO
1.00
1.60
BLOQUE A,B,C
1.00
AREA=
608.26
608.26
1.00
AREA=
10513.18
10513.18
19.03
PINTURA DE PUERTAS
19.03.01
19.03.02
20.00
20.01.00
11,123.04
1.00
M2
1.60
________________________________________________________________________________________________________
METRADOS
207
HOJA DE METRADOS
DESCRIPCIN
N DE
VECES
LARGO
MEDIDAS
ANCHO
PARCIAL
ALTO
METRADO
TOTAL
UN
2.00
UN
3.00
UN
2.00
UN
4.00
UN
2.00
UN
5.00
UN
2.00
UN
2.00
UN
4.00
UN
9.00
UN
12.00
UN
9.00
PTO
3.00
PTO
2.00
PTO
35.65
M3
INST. SANITARIAS
21.00
21.01.00
21.03.00
21.03.00
SS.HH. DAMAS
1.00
1.00
SS.HH. VARONES
1.00
1.00
SS.HH. DAMAS
2.00
2.00
SS.HH. VARONES
1.00
1.00
2.00
2.00
PRIMER LAVADO
2.00
2.00
SEGUNDO LAVADO
2.00
2.00
2.00
2.00
SS.HH. DAMAS
2.00
2.00
SS.HH. VARONES
1.00
1.00
VESTIDORES
2.00
2.00
2.00
2.00
SS.HH. DAMAS
1.00
1.00
SS.HH. VARONES
1.00
1.00
SS.HH. DAMAS
1.00
1.00
SS.HH. VARONES
1.00
1.00
VESTIDORES
2.00
2.00
SS.HH.
5.00
5.00
PRIMER LAVADO
2.00
2.00
SEGUNDO LAVADO
2.00
2.00
12.00
12.00
9.00
9.00
3.00
3.00
2.00
2.00
21.04.00
21.05.00
DUCHA EMPOTRADA
VESTIDORES
21.06.00
21.06.00
TOALLERAS DE LOSA
VESTIDORES
21.07.00
21.08.00
21.09.00
21.10.00
PAPELERAS DE LOSA
ESPEJOS
COLOCACION DE APARATOS
ACOLOCACION DE ACCESORIOS
SS.HH.
22.00
INSTALACION SANITARIA
22.01
SALIDA DE DESAGUE
22.01.01
22.01.02
22.01.03
22.02
REDES COLECTORAS
22.02.01
1.00
10.60
0.40
0.80
3.39
AREA DE CAMAL
1.00
100.80
0.40
0.80
32.26
________________________________________________________________________________________________________
METRADOS
208
HOJA DE METRADOS
DESCRIPCIN
22.02.02
22.02.03
22.02.04
22.02.05
N DE
VECES
LARGO
OFICINA
1.00
10.60
0.40
0.80
3.39
AREA DE CAMAL
1.00
100.80
0.40
0.80
32.26
OFICINA
1.00
10.60
10.60
AREA DE CAMAL
1.00
100.80
100.80
de caja a caja
1.00
98.50
98.50
SS.HH
1.00
25.00
25.00
1.00
22.54
22.54
22.03
ACCESORIOS DE REDES
22.03.01
8.00
8.00
AREA DE CAMAL
22.00
22.00
26.00
26.00
SS.HH.
2.00
2.00
AREA DE CAMAL
4.00
4.00
4.00
4.00
3.00
3.00
4.00
4.00
OFICINA
2.00
2.00
AREA DE CAMAL
11.00
11.00
5.00
5.00
22.00
22.00
1.00
1.00
22.03.03
22.04
ADITAMENTOS VARIOS
22.04.01
22.04.02
22.04.03
22.04.04
22.05
CAMARAS DE INSPECCION
22.05.01
23.00
23.01
23.01.01
23.01.02
23.02
REDES DE DISTRIBUCION
23.02.01
23.02.02
PARCIAL
ALTO
REDES EXTERIORES
22.03.02
MEDIDAS
ANCHO
1.00
44.66
44.66
1.00
60.80
60.80
23.03
ACCESORIOS DE REDES
23.03.01
METRADO
TOTAL
UN
35.65
M3
111.40
123.50
22.54
30.00
UN
26.00
UN
6.00
UN
4.00
UN
3.00
UN
4.00
UN
13.00
UN
5.00
UN
22.00
PTO
1.00
PTO
44.66
60.80
3.00
UN
________________________________________________________________________________________________________
METRADOS
209
HOJA DE METRADOS
DESCRIPCIN
23.03.02
N DE
VECES
PARCIAL
ALTO
1.00
1.00
AREA CAMAL
2.00
2.00
SS.HH.
8.00
8.00
AREA CAMAL
24.00
24.00
2.00
2.00
15.00
15.00
2.00
2.00
LLAVES Y VALVULAS
23.04.01
23.04.03
MEDIDAS
ANCHO
SS.HH.
23.04
23.04.02
LARGO
23.05
PIEZAS VARIAS
23.05.01
24.00
INSTALACION ELECTRICA
24.01.00
METRADO
TOTAL
UN
32.00
UN
2.00
UN
15.00
UN
2.00
UN
#REF!
UN
23.00
PTO
10.00
PTO
2.00
PTO
47.00
PTO
INST. ELECTRICAS
24.02.00
OFICINA
3.00
3.00
SS.HH.
2.00
2.00
2.00
2.00
REFRIGERACION
2.00
2.00
EMPAQUE
3.00
3.00
VESTURARIOS
2.00
2.00
PESADO
1.00
1.00
DESINFECCION
1.00
1.00
CORTE APENDICE
1.00
1.00
LAVADO 2
1.00
1.00
ESVICERADO
1.00
1.00
ATURDIMIENTO
1.00
1.00
CORTE DE CUELLO
1.00
1.00
ESCALDADO
1.00
1.00
LAVADO 1
1.00
1.00
10.00
10.00
2.00
2.00
OFICINA
5.00
5.00
HALL
1.00
1.00
6.00
6.00
REFRIGERACION
3.00
3.00
EMPAQUE
5.00
5.00
VESTURARIOS
4.00
4.00
PESADO
3.00
3.00
DESINFECCION
2.00
2.00
CORTE APENDICE
4.00
4.00
LAVADO 2
2.00
2.00
ESVICERADO
1.00
1.00
ATURDIMIENTO
2.00
2.00
CORTE DE CUELLO
4.00
4.00
ESCALDADO
2.00
2.00
24.03.00
24.04.00
________________________________________________________________________________________________________
METRADOS
210
HOJA DE METRADOS
DESCRIPCIN
24.05.00
N DE
VECES
1.00
1.00
2.00
2.00
9.00
9.00
7.00
7.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
24.08.00
25.00
25.01.00
25.02.00
25.03.00
25.04.00
25.05.00
26.00
CANALIZACIONES Y TUBERIAS
26.01.00
26.02.00
C-2
1.00
165.12
165.12
C-3
1.00
35.85
35.85
fluoresente 2x36 w.
1.00
114.55
114.55
interruptor simple
1.00
59.98
59.98
interruptor doble
1.00
30.19
30.19
1.00
10.76
10.76
interruptor simple
1.00
8.16
8.16
1.00
42.84
42.84
interruptor simple
1.00
18.36
18.36
fluoresente 2x36 w.
2.00
112.30
224.60
interruptor simple
2.00
58.80
117.60
interruptor doble
2.00
29.60
59.20
2.00
10.55
21.10
interruptor simple
2.00
8.00
16.00
2.00
42.00
84.00
interruptor simple
2.00
18.00
36.00
C-2
3.00
165.12
495.36
C-3
2.00
35.85
71.70
27.00
27.01
CONDUCTORES EN TUBERIAS
27.01.01
27.01.02
27.01.03
PARCIAL
ALTO
ESPERA
MEDIDAS
ANCHO
LAVADO 1
LARGO
METRADO
TOTAL
UN
9.00
PTO
7.00
PTO
2.00
PTO
2.00
UN
1.00
PTO
1.00
PTO
2.00
PTO
1.00
PTO
1.00
PTO
200.97
284.84
558.50
567.06
15.00
________________________________________________________________________________________________________
METRADOS
211
HOJA DE METRADOS
DESCRIPCIN
POZO A TIERRA
27.01.04
27.02
TABLEROS Y LLAVES
27.02.01
27.03
27.03.01
28.00
ARTEFACTOS DE ILUMINACION
28.01.00
15.00
1.00
38.00
38.00
1.00
1.00
4.00
4.00
4.00
4.00
1.00
1.00
1.00
1.00
23.00
23.00
2.00
2.00
3.00
3.00
2.00
2.00
LAMPARA DE BRAQUETE
BLOQUE A
28.00.05
15.00
28.00.04
1.00
POZO A TIERRA
POZO A TIERRA
28.02.00
PARCIAL
ALTO
27.02.04
MEDIDAS
ANCHO
27.02.03
LARGO
27.02.02
N DE
VECES
SPOT LIGHT
INGRESO
METRADO
TOTAL
UN
38.00
1.00
UN
4.00
UN
4.00
UN
1.00
UN
1.00
UN
23.00
UN
2.00
UN
3.00
UN
2.00
UN
________________________________________________________________________________________________________
METRADOS
212
Metrados - Acero
DESCRIPCION
N DE
ELEM.
N DE
PZAS
LONG. /
EL (m)
ZAPATAS
BLOQUE A
ZAPATA 1.40X1.10
ZAPATA 1.15X1.10
LONGITUD x DIAMETRO
1/4" (2)
3/8" (3)
1/2" (4)
5/8" (5)
3/4" (6)
1" (8)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
46.20
0.00
0.00
6.00
1.10
6.00
1.40
34.00
1.10
0.00
0.00
0.00
187.00
0.00
0.00
34.00
1.15
0.00
0.00
0.00
195.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Longitud (m)
0.00
0.00
0.00
470.70
0.00
0.00
Peso (Kg/m)
0.27
0.57
1.02
1.60
2.24
3.97
Peso (Kg)
0.00
0.00
0.00
753.12
0.00
0.00
0.00
0.00
37.66
790.776
0.00
0.00
42.00
TOTAL (Kg)
830.315
TOTAL (Kg)
DESCRIPCION
N DE
ELEM.
N DE
PZAS
LONG. /
EL (m)
VIGAS DE CIMENTACION
LONGITUD x DIAMETRO
1/4" (2)
3/8" (3)
1/2" (4)
5/8" (5)
3/4" (6)
1" (8)
0.00
0.00
0.00
0.00
0.00
0.00
EN CIMIENTO CORRIDO
BLOQUE A
0.00
0.00
0.00
0.00
0.00
0.00
1.00
5.70
0.00
0.00
0.00
22.80
0.00
0.00
1.00
5.70
0.00
0.00
11.40
0.00
0.00
0.00
ESTRIVOS
1.00
26
1.30
33.80
0.00
0.00
0.00
0.00
0.00
EJE 5
1.00
5.90
0.00
0.00
0.00
23.60
0.00
0.00
1.00
5.90
0.00
0.00
11.80
0.00
0.00
0.00
ESTRIVOS
1.00
28
1.30
36.40
0.00
0.00
0.00
0.00
0.00
EJE 6,7
2.00
11.40
0.00
0.00
0.00
91.20
0.00
0.00
2.00
11.40
0.00
45.60
0.00
0.00
0.00
0.00
2.00
114
1.30
0.00
0.00
296.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Longitud (m)
70.20
45.60
319.60
137.60
0.00
0.00
Peso (Kg/m)
0.27
0.57
1.02
1.60
2.24
3.97
Peso (Kg)
18.95
25.99
325.99
220.16
0.00
0.00
1.30
0.00
0.00
TOTAL (Kg)
16.30
11.01
620.653
TOTAL (Kg)
651.686
EJE B
ESTRIVOS
DESCRIPCION
N DE
ELEM.
N DE
PZAS
LONG. /
EL (m)
COLUMNAS
C-1
LONGITUD x DIAMETRO
1/4" (2)
3/8" (3)
1/2" (4)
5/8" (5)
3/4" (6)
1" (8)
0.00
0.00
0.00
0.00
0.00
0.00
34
5.20
0.00
0.00
0.00
707.20
0.00
0.00
34
5.20
0.00
0.00
707.20
0.00
0.00
0.00
ESTRIVOS
34
24
1.10
0.00
897.60
0.00
0.00
0.00
0.00
C-2
5.20
0.00
0.00
0.00
124.80
0.00
0.00
5.20
0.00
0.00
187.20
0.00
0.00
0.00
ESTRIVOS
24
1.70
0.00
244.80
0.00
0.00
0.00
0.00
C-3
5.20
0.00
0.00
41.60
0.00
0.00
0.00
ESTRIVOS
24
1.60
38.40
0.00
0.00
0.00
0.00
0.00
C-4
21
5.20
0.00
0.00
655.20
0.00
0.00
0.00
ESTRIVOS
21
24
0.90
453.60
0.00
0.00
0.00
0.00
0.00
C-5
23
5.20
0.00
717.60
0.00
0.00
0.00
0.00
ESTRIVOS
23
24
0.80
441.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Longitud (m)
933.60
1860.00
1591.20
832.00
0.00
0.00
Peso (Kg/m)
0.27
0.57
1.02
1.60
2.24
3.97
252.07
1060.20
1623.02 1331.20
0.00
0.00
53.01
0.00
0.00
TOTAL (Kg)
81.15
66.56
4479.821
TOTAL (Kg)
4703.812
Peso (Kg)
_________________________________________________________________________________
METRADOS ACERO
51
Metrados - Acero
LONGITUD x DIAMETRO
DESCRIPCION
N DE
ELEM.
N DE
PZAS
LONG. /
EL (m)
1/4" (2)
1" (8)
DESCRIPCION
N DE
ELEM.
N DE
PZAS
LONG. /
EL (m)
1/4" (2)
3/8" (3)
1/2" (4)
5/8" (5)
3/4" (6)
1" (8)
VIGAS
0.00
0.00
0.00
0.00
0.00
0.00
BLOQUE A
0.00
0.00
0.00
0.00
0.00
0.00
VP-01 (0.25x0.40)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.80
0.00
0.00
0.00
102.40
0.00
2.80
0.00
0.00
0.00
5.60
0.00
0.00
3.20
0.00
0.00
0.00
6.40
Estrivos
73
1.40
0.00
204.40
0.00
0.00
EJE 3,4,5,6,7,8
10.90
0.00
0.00
0.00
261.60
2.80
0.00
0.00
0.00
100.80
2.60
Estrivos
57
1.40
0.00
478.80
0.00
0.00
5.60
0.00
0.00
0.00
22.40
2.80
0.00
0.00
0.00
5.60
29
1.40
0.00
40.60
0.00
0.00
0.00
0.00
0.00
Estrivos
VP-02 (0.25x0.40)
93.60
0.00
0.00
0.00
EJE A (1-2)
5.80
0.00
0.00
0.00
23.20
0.00
0.00
Estrivos
27
1.40
0.00
37.80
0.00
0.00
EJE A (3-8)
24.71
0.00
0.00
0.00
98.84
0.00
0.00
Estrivos
147
1.40
0.00
205.80
0.00
0.00
EJE B (1-8)
32.12
0.00
0.00
0.00
Estrivos
152
1.40
EJE C (1-3)
10.59
0.00
0.00
Estrivos
38
1.40
EJE D (3-8)
22.38
0.00
0.00
Estrivos
128
1.40
EJE E (1-2)
5.50
Estrivos
19
1.40
0.00
128.48
0.00
0.00
0.00
0.00
42.36
53.20
0.00
0.00
0.00
0.00
0.00
89.52
0.00
179.20
0.00
0.00
0.00
0.00
0.00
22.00
0.00
0.00
0.00
26.60
0.00
BLOQUE B
0.00
0.00
0.00
0.00
0.00
0.00
VP-01 (0.25x0.40)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EJE 1,2,3(A-C)
Estrivos
0.00
0.00
212.80
5.30
0.00
0.00
0.00
63.60
2.80
0.00
0.00
0.00
33.60
29
1.40
0.00
121.80
0.00
0.00
0.00
0.00
0.00
VP-02 (0.25x0.40)
0.00
0.00
0.00
8.70
0.00
0.00
0.00
69.60
0.00
0.00
Estrivos
48
1.40
0.00
134.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
BLOQUE C
VP-01 (0.25x0.40)
EJE A,B(1-2)
Estrivos
6.40
0.00
0.00
0.00
51.20
0.00
2.40
0.00
0.00
0.00
19.20
0.00
32
1.40
0.00
89.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
VP-02 (0.25x0.40)
0.00
0.00
4.40
0.00
0.00
0.00
35.20
0.00
0.00
Estrivos
22
1.40
0.00
61.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Longitud (m)
0.00
1846.60
0.00
1275.20
0.00
0.00
Peso (Kg/m)
0.27
0.57
1.02
1.60
2.24
3.97
Peso (Kg)
0.00
1052.56
0.00
2040.32
0.00
0.00
0.00
102.02
3247.526
0.00
0.00
52.63
TOTAL (Kg)
3409.902
TOTAL (Kg)
DESCRIPCION
N DE
ELEM.
N DE
PZAS
LONG. /
EL (m)
LONGITUD x DIAMETRO
1/4" (2)
3/8" (3)
1/2" (4)
5/8" (5)
3/4" (6)
1" (8)
LOSAS ALIGERADAS
0.00
0.00
0.00
0.00
0.00
0.00
BLOQUE A
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
67.20
0.00
0.00
0.00
0.00
0.00
0.00
12
5.60
BASTONES
12
1.45
5.60
34.80
0.00
0.00
33.60
_________________________________________________________________________________
METRADOS ACERO
52
Metrados - Acero
LONGITUD x DIAMETRO
N DE
ELEM.
N DE
PZAS
LONG. /
EL (m)
1/4" (2)
3/8" (3)
1/2" (4)
5/8" (5)
BASTONES
1.45
0.00
0.00
8.70
0.00
VALANCINES
2.35
0.00
0.00
14.10
0.00
10
5.60
0.00
0.00
56.00
0.00
BASTONES
10
1.45
0.00
0.00
29.00
0.00
12
3.13
0.00
0.00
37.56
0.00
BASTONES
12
1.25
0.00
0.00
15.00
0.00
5.00
0.00
0.00
30.00
0.00
BASTONES
1.20
0.00
0.00
7.20
0.00
24
22.03
0.00
0.00
528.72
0.00
VALANCINES
24
11.40
0.00
0.00
547.20
0.00
BASTONES
24
1.55
0.00
0.00
74.40
0.00
0.00
0.00
0.00
0.00
DESCRIPCION
BLOQUE B
EJE 1,3 (A-C)
12
8.64
0.00
0.00
103.68
0.00
VALANCINES
12
1.35
0.00
0.00
16.20
0.00
BASTONES
12
3.00
0.00
0.00
72.00
0.00
0.00
0.00
0.00
0.00
BLOQUE C
EJE A,B (1-2)
13
13.00
0.00
0.00
169.00
0.00
BASTONES
13
4.40
0.00
0.00
114.40
0.00
DESCRIPCION
N DE
ELEM.
N DE
PZAS
BASE DE TANQUE
PARTE CENTRAL
DESCRIPCION
1" (8)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Longitud (m)
0.00
0.00
1958.76
0.00
0.00
0.00
Peso (Kg/m)
0.27
0.57
1.02
1.60
2.24
3.97
Peso (Kg)
0.00
0.00
1997.94
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL (Kg)
99.90
0.00
2097.832
TOTAL (Kg)
2202.724
LONG. /
EL (m)
CISTERNA CIMENTACION
BASE DE TANQUE
3/4" (6)
LONGITUD x DIAMETRO
1/4" (2)
3/8" (3)
1/2" (4)
5/8" (5)
3/4" (6)
1" (8)
0.00
0.00
0.00
0.00
0.00
0.00
27
0.95
0.00
0.00
51.30
0.00
0.00
0.00
5.50
0.00
0.00
44.00
0.00
0.00
0.00
0.95
0.00
0.00
7.60
0.00
0.00
0.00
0.90
0.00
0.00
7.20
0.00
0.00
0.00
12
3.38
0.00
0.00
40.56
0.00
0.00
0.00
1.50
0.00
0.00
12.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Longitud (m)
0.00
0.00
162.66
0.00
0.00
0.00
Peso (Kg/m)
0.27
0.57
1.02
1.60
2.24
3.97
Peso (Kg)
0.00
0.00
165.91
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL (Kg)
8.30
0.00
174.209
TOTAL (Kg)
182.919
N DE
ELEM.
N DE
PZAS
LONG. /
EL (m)
CISTERNA
LONGITUD x DIAMETRO
1/4" (2)
3/8" (3)
1/2" (4)
5/8" (5)
3/4" (6)
1" (8)
0.00
0.00
0.00
0.00
0.00
0.00
BASE DE TANQUE
11
4.30
0.00
47.30
0.00
0.00
0.00
0.00
BASE DE TANQUE
20
2.65
0.00
53.00
0.00
0.00
0.00
0.00
MURO DE TANQUE
10
12.10
0.00
121.00
0.00
0.00
0.00
0.00
MURO DE TANQUE
60
2.70
0.00
162.00
0.00
0.00
0.00
0.00
TECHO
11
4.30
0.00
47.30
0.00
0.00
0.00
0.00
TECHO
20
2.65
0.00
53.00
0.00
0.00
0.00
0.00
3.50
0.00
14.00
0.00
0.00
0.00
0.00
14
0.65
0.00
9.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Longitud (m)
0.00
506.70
0.00
0.00
0.00
0.00
Peso (Kg/m)
0.27
0.57
1.02
1.60
2.24
3.97
Peso (Kg)
0.00
288.82
0.00
0.00
0.00
0.00
14.44
0.00
0.00
TOTAL (Kg)
0.00
0.00
303.260
TOTAL (Kg)
318.423
_________________________________________________________________________________
METRADOS ACERO
53
Metrados - Acero
DESCRIPCION
N DE
ELEM.
N DE
PZAS
LONG. /
EL (m)
RESUMEN DE ACERO
LONGITUD x DIAMETRO
1/4" (2)
3/8" (3)
1/2" (4)
5/8" (5)
3/4" (6)
1" (8)
1/4
Kg
285
3/8
Var.
438
1/2
Var.
470
5/8
Var.
317
3/4
Var.
0
1
Var.
0
_________________________________________________________________________________
METRADOS ACERO
54
28
29
57
114
_________________________________________________________________________________
METRADOS ACERO
55
_________________________________________________________________________________
METRADOS ACERO
56
1.52
1.27
0.2
2.99
8.24
8.64
_________________________________________________________________________________
METRADOS ACERO
57
_________________________________________________________________________________
METRADOS ACERO
58
HOJA DE METRADOS
PROYECTO
REGION
: MOQUEGUA
PROVINCIA
: MCAL. NIETO
DISTTRITO
: MOQUEGUA
MOD. DE EJECUCION
: ADMINISTRACION DIRECTA
SUB COMPON.
N
29.00.00
29.01.00
Unidad
Medida
N de
Veces
Dimensiones
largo
Ancho
Alto
Metrado
Parcial
Metrado
Final
OBRAS PRELIMINARES
TRAZOS Y NIVELES Y REPLANTEO PRELIMINAR
EJE A,B (1-2)
M2
1.00
5.40
2.70
14.58
M2
1.00
5.40
2.70
14.58
MOVIMIENTO DE TIERRAS
EXCAVACION MASIVA A MAQUINA EN TERRENO NORMAL
CAJA DE CISTERNA
EJE A,B (1-4)
EJE 1,,4 (A-B)
EJE 2' (A-B)
M3
M3
M3
M3
M3
5.40
5.40
0.90
0.90
2.70
0.60
0.60
1.00
1.70
0.50
0.50
0.35
24.79
3.24
0.54
0.32
30.02.00
M3
1.00
5.50
2.70
0.20
2.97
2.97
30.03.00
M3
Esponj=
1.30
V=
28.88
37.55
37.55
OBRAS DE C SIMPLE
SOLADOS CONCRETO f'c=100 kg/cm2 E= 10 CM
EJE A,B (1-2)
M2
1.00
5.40
2.70
14.58
14.58
5.50
0.90
0.90
2.20
1.10
1.10
1.00
1.90
29.02.00
30.00.00
30.01.00
31.00.00
31.01.00
32.00.00
32.01.00
32.01.01
14.58
28.88
1.00
2.00
2.00
1.00
OBRAS DE C ARMADO
CISTERNA CIMENTACION Y LOSA
C EN CISTERNA FC=210 KG/CM2 CIMENTACION Y LOSA DE FONDO M3
EJE A,B (1-4)
EJE 1,,4 (A-B)
EJE 2' (A-B)
Plataforma
32.01.02
32.02.00
32.02.01
CISTERNA MUROS
CONCRETO FC=210 KG/CM2 MURO
EJE A,B (1-4)
EJE 1,4 (A-B)
32.02.02
14.58
KG
8.12
2.00
2.00
1.00
1.00
308.53
M3
308.53
4.76
2.00 5.50
2.00 1.50
0.20
0.20
M2
32.02.03
KG
32.03.00
32.03.01
M3
2.00
1.00
2.25
0.90
1.90
0.80
M3
1.00
5.00
1.90
32.03.03
KG
32.04.00
32.04.01
COLUMNAS
CONCRETO Fc=210KG/CM2 EN COLUMNAS
C FC=210KG/CM PARA CASETA
COLUMNA 01
M3
4.00
4.00
4.00
4.00
0.30
0.30
0.30
0.30
M3
4.00
4.00
4.00
4.00
1.20
1.20
1.20
1.20
32.04.03
KG
198.85
32.05.00
32.05.01
VIGAS
CONCRETO Fc=210KG/CM2 EN VIGAS
32.04.02
6.05
0.99
0.45
0.63
308.53
32.03.02
0.50
0.50
0.50
0.15
1.70
1.70
3.74
1.02
1.70
1.70
18.70
5.10
23.80
2.00 5.50
2.00 1.50
612.84
612.84
612.84
1.39
0.15
0.15
1.28
0.11
9.50
9.50
123.70
123.70
123.70
2.59
0.30
0.30
0.30
0.30
1.70
2.10
1.70
1.70
0.61
0.76
0.61
0.61
1.70
2.10
1.70
1.70
8.16
10.08
8.16
8.16
26.40
198.85
198.85
HOJA DE METRADOS
PROYECTO
REGION
: MOQUEGUA
PROVINCIA
: MCAL. NIETO
DISTTRITO
: MOQUEGUA
MOD. DE EJECUCION
: ADMINISTRACION DIRECTA
SUB COMPON.
VIGAS EN NIVEL 02 Y 03
VIGA (CORTE 5) VER DETALLE
32.05.02
Unidad
Medida
N de
Veces
Dimensiones
largo
Ancho
4.00
4.00
1.90
1.90
0.25
0.25
M3
M3
4.00
4.00
1.90
1.90
141.12
32.06.00
32.06.01
TANQUE ELEVADO
CONCRETO Fc=210KG/CM2 TANQUE ELEVADO
FONDO DE TANQUE ELEVADO
TECHO DE TANQUE ELEVADO
M3
M3
1.00
1.00
2.70
2.70
2.70
2.70
M3
M3
1.00
1.00
2.70
2.70
2.70
2.70
32.06.03
KG
105.58
33.00.00
33.01.00
34.03.00
34.04.00
34.05.00
34.06.00
0.40
0.40
0.76
0.76
1.05
1.05
KG
34.02.00
7.98
7.98
141.12
0.20
0.13
1.46
0.91
14.58
7.29
7.29
105.58
M2
M2
M2
1.00
2.00
1.00
1.20
1.90
5.00
2.15
2.15
2.15
2.58
8.17
10.75
39.44
2.00
2.00
5.30
1.90
1.70
1.70
18.02
6.46
M2
4.00
2.20
1.70
14.96
M2
M2
M2
1.00
2.00
1.00
1.20
1.90
5.00
2.15
2.15
2.15
2.58
8.17
10.75
M2
M2
M2
1.00
2.00
1.00
1.20
1.90
5.00
2.15
2.15
2.15
2.58
8.17
10.75
21.50
21.50
26.40
M3
4.00
4.00
4.00
1.20
1.20
1.20
1.70
2.10
1.70
8.16
10.08
8.16
12.96
M2
4.00
2.70
1.20
12.96
ML
ML
1.00
2.00
3.50
1.80
M2
2.00
3.45
1.90
13.11
35.00.00
35.01.00
PISOS
PISO DE CEMENTO PULIDO SIN COLOREAR H=10CM
M2
2.00
3.45
1.90
13.11
36.00.00
36.01.00
36.02.00
CARPINTERIA METALICA
PUERTA METALICA
VENTANA METALICA
M2
M2
1.00
1.00
0.80
0.40
38.00.00
38.01.00
CERRADURAS
CERRADURA EXTERIOR FORTE 2 GOLPES
UND
1.00
34.07.00
105.58
21.50
M2
M2
141.12
2.37
REVOQUES Y ENLUCIDOS
TARRAJEO IMPERMEABILIZADO CISTERNA Y TANQUE
CISTERNA
EJE A,B
EJE 1,2
TANQUE ELEVADO
TODOS LOS EJES
Metrado
Final
15.96
34.00.00
34.01.00
Metrado
Parcial
1.52
M3
M3
32.05.03
32.06.02
Alto
7.10
3.50
3.60
13.11
13.11
2.10
1.80
1.68
0.72
1.68
0.72
1.00
1.00
HOJA DE METRADOS
PROYECTO
REGION
: MOQUEGUA
PROVINCIA
: MCAL. NIETO
DISTTRITO
: MOQUEGUA
MOD. DE EJECUCION
: ADMINISTRACION DIRECTA
SUB COMPON.
Unidad
Medida
Dimensiones
N de
Veces
largo
Ancho
Alto
Metrado
Parcial
39.00.00
39.01.00
VIDRIOS
VIDRIOS SEMIDOBLES
P2
2.00
0.40
40.00.00
40.01.00
PINTURAS
PINTURA LATEX EN MURO EXTERIOR E INTERIOR
EJE A (1-2)
EJE 1,2 (A-B)
EJE B
M2
M2
M2
1.00
2.00
1.00
1.20
1.90
5.00
2.15
2.15
2.15
2.58
8.17
10.75
M2
M2
2.00
2.00
5.30
1.90
1.70
1.70
18.02
6.46
M2
4.00
2.20
1.70
14.96
M2
2.00
3.45
1.80
1.44
Metrado
Final
1.44
45.98
13.11
41.00.00
41.01.00
41.02.00
41.03.00
41.04.00
41.05.00
41.06.00
INSTALACIONES SANITARIAS
SUMINISTRO E INSTALACION DE ELECTROBOMBAS
und
2.00
TAPA DE FIERRO FUNDIDO CISTERNA
und
1.00
SUMINISTRO E INSTALACION DE TUBERIA DE AGUA DE FG 1 1/4"
m
12.50
SUMINISTRO E INSTALACION DE TUBERIA PVC ISO C-10 DIAM. 2" PARA IMPULSION,
m
11.65
REBOSE Y LIMPIA
SUMINISTRO E INSTALACION DE VALVULA CHECK HORIZONTAL 1 1/2" und
1.00
SUMINISTRO E INSTALACION DE VALVULA FLOTADORA 1"
und
1.00
42.00.00
42.01
OTROS
ESCALERA TIPO GATO PARA TANQUE ELEV. INC. COLOCADO Y PINTADO
pza
1.90
13.11
2.00
1.00
12.50
11.65
1.00
1.00
2.00
1.00
12.50
11.65
1.00
1.00
1.00
1.00
HOJA DE METRADOS
PROYECTO
REGION
: MOQUEGUA
PROVINCIA
: MCAL. NIETO
DISTTRITO
: MOQUEGUA
MOD. DE EJECUCION
: ADMINISTRACION DIRECTA
SUB COMPON.
Unidad
Medida
N de
Veces
Dimensiones
largo
Ancho
Alto
Metrado
Parcial
Metrado
Final
PROYECTO
COMPONENTE
REGION
PROVINCIA
DISTRITO
MOD. DE EJECUCION
OBRA
DESCRIPCION
N DE
ELEM.
N DE PZAS
LONG. / EL (m)
CISTERNA CIMENTACION
BASE DE TANQUE
BASE DE TANQUE
PARTE CENTRAL
LOSA
DESCRIPCION
LONGITUD x DIAMETRO
1/4" (2)
3/8" (3)
1/2" (4)
5/8" (5)
3/4" (6)
1" (8)
0.00
0.00
0.00
0.00
0.00
0.00
27
0.95
0.00
0.00
51.30
0.00
0.00
0.00
5.50
0.00
0.00
44.00
0.00
0.00
0.00
0.95
0.00
0.00
7.60
0.00
0.00
0.00
0.90
0.00
0.00
7.20
0.00
0.00
0.00
12
3.38
0.00
0.00
40.56
0.00
0.00
0.00
1.50
0.00
0.00
12.00
0.00
0.00
0.00
10
5.50
0.00
0.00
55.00
0.00
0.00
0.00
27
2.10
0.00
0.00
56.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Longitud (m)
0.00
0.00
274.36
0.00
0.00
0.00
Peso (Kg/m)
0.27
0.57
1.02
1.60
2.24
3.97
Peso (Kg)
0.00
0.00
279.85
0.00
0.00
0.00
Desperdicios (5%)
0.00
0.00
13.99
0.00
0.00
0.00
N DE
ELEM.
N DE PZAS
TOTAL (Kg)
293.840
TOTAL (Kg)
308.532
LONG. / EL (m)
MUROS
LONGITUD x DIAMETRO
1/4" (2)
3/8" (3)
1/2" (4)
5/8" (5)
3/4" (6)
1" (8)
0.00
0.00
0.00
0.00
0.00
0.00
100
2.86
0.00
572.00
0.00
0.00
0.00
0.00
14
14.40
0.00
403.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Longitud (m)
0.00
975.20
0.00
0.00
0.00
0.00
Peso (Kg/m)
0.27
0.57
1.02
1.60
2.24
3.97
Peso (Kg)
0.00
555.86
0.00
0.00
0.00
0.00
Desperdicios (5%)
0.00
27.79
0.00
0.00
0.00
0.00
DESCRIPCION
N DE
ELEM.
N DE PZAS
TOTAL (Kg)
583.657
TOTAL (Kg)
612.840
LONG. / EL (m)
28
2.00
10
5.40
DESCRIPCION
N DE
ELEM.
N DE PZAS
ESTRIVOS
DESCRIPCION
3/8" (3)
1/2" (4)
5/8" (5)
3/4" (6)
1" (8)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
56.00
0.00
0.00
0.00
0.00
54.00
0.00
0.00
0.00
0.00
0.00
0.00
Longitud (m)
0.00
0.00
110.00
0.00
0.00
0.00
Peso (Kg/m)
0.27
0.57
1.02
1.60
2.24
3.97
Peso (Kg)
0.00
0.00
112.20
0.00
0.00
0.00
Desperdicios (5%)
0.00
0.00
5.61
0.00
0.00
0.00
TOTAL (Kg)
117.810
TOTAL (Kg)
123.701
LONG. / EL (m)
COLUMNAS
C-1
LONGITUD x DIAMETRO
1/4" (2)
LONGITUD x DIAMETRO
1/4" (2)
3/8" (3)
1/2" (4)
5/8" (5)
3/4" (6)
1" (8)
0.00
0.00
0.00
0.00
0.00
0.00
14.40
0.00
0.00
0.00
57.60
0.00
0.00
14.40
0.00
0.00
28.80
0.00
0.00
0.00
60
1.72
N DE
ELEM.
N DE PZAS
103.20
0.00
0.00
0.00
0.00
0.00
0.00
Longitud (m)
0.00
103.20
28.80
57.60
0.00
0.00
Peso (Kg/m)
0.27
0.57
1.02
1.60
2.24
3.97
Peso (Kg)
0.00
58.82
29.38
92.16
0.00
0.00
Desperdicios (5%)
0.00
2.94
1.47
4.61
0.00
0.00
TOTAL (Kg)
189.378
TOTAL (Kg)
198.847
LONG. / EL (m)
LONGITUD x DIAMETRO
1/4" (2)
3/8" (3)
1/2" (4)
5/8" (5)
3/4" (6)
1" (8)
0.00
0.00
0.00
0.00
0.00
0.00
28
2.00
0.00
0.00
56.00
0.00
0.00
0.00
10
5.40
0.00
0.00
54.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Longitud (m)
0.00
0.00
110.00
0.00
0.00
0.00
Peso (Kg/m)
0.27
0.57
1.02
1.60
2.24
3.97
DESCRIPCION
N DE
ELEM.
N DE PZAS
Peso (Kg)
0.00
0.00
112.20
0.00
0.00
0.00
Desperdicios (5%)
0.00
0.00
5.61
0.00
0.00
0.00
TOTAL (Kg)
117.810
TOTAL (Kg)
123.701
LONG. / EL (m)
VIGAS
LONGITUD x DIAMETRO
1/4" (2)
3/8" (3)
1/2" (4)
5/8" (5)
3/4" (6)
1" (8)
0.00
0.00
0.00
0.00
0.00
0.00
2.50
0.00
0.00
0.00
40.00
0.00
0.00
2.50
0.00
0.00
0.00
40.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Longitud (m)
0.00
0.00
0.00
80.00
0.00
0.00
Peso (Kg/m)
0.27
0.57
1.02
1.60
2.24
3.97
Peso (Kg)
0.00
0.00
0.00
128.00
0.00
0.00
Desperdicios (5%)
0.00
0.00
0.00
6.40
0.00
0.00
DESCRIPCION
N DE
ELEM.
N DE PZAS
TOTAL (Kg)
134.400
TOTAL (Kg)
141.120
LONG. / EL (m)
3/8" (3)
1/2" (4)
5/8" (5)
3/4" (6)
1" (8)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
84.00
0.00
0.00
0.00
0.00
0.00
84.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Longitud (m)
0.00
168.00
0.00
0.00
0.00
0.00
Peso (Kg/m)
0.27
0.57
1.02
1.60
2.24
3.97
Peso (Kg)
0.00
95.76
0.00
0.00
0.00
0.00
Desperdicios (5%)
0.00
4.79
0.00
0.00
0.00
0.00
LONGITUD x DIAMETRO
1/4" (2)
14
3.00
14
3.00
14
3.00
14
3.00
TOTAL (Kg)
100.548
TOTAL (Kg)
105.575