Вы находитесь на странице: 1из 1

Appendix B EXAMPLE OF WBS (OUTLINE FORMAT) This example is for a project scope consistent with designing and building

components (cryomodules) along with constructing a building to house the completed units and developing a database to store information regarding fabrication and testing. All facilities needed to actually assemble and test the components as well as the hardware for the database already exist and are outside the project scope.

Вам также может понравиться