Вы находитесь на странице: 1из 68

COSTRUZON DOND S.p.A.

Process Operation Manual WWTP Pitesti


Rif: 1.761 - WWTP of Pitesti 25.11.2010 1

CONTENTS
1. INTRODUCTION_____________________________________________________________________________3
2. REFERENCES ______________________________________________________________________________3
2.1. GENERAL DESCRIPTION OF PROCESS ___________________________________________________4
2.2. WASTEWATER TREATMENT_____________________________________________________________4
2.3. SLUDGE TREATMENT __________________________________________________________________5
2.4. DESIGN DATA _________________________________________________________________________5
2.5. DISCHARGE GUARANTEE_______________________________________________________________6
3. WASTEWATER LINE _________________________________________________________________________7
3.1. D101 - INLET CHAMBER ________________________________________________________________7
3.1.1. MONTORNG FUNCTON AND ALARMS OPERATED ______________________________________8
3.2. D102A/B - STORM WATER RETENTION TANKS _____________________________________________9
3.2.1. MONTORNG FUNCTON AND ALARMS OPERATED ______________________________________9
3.3. D103- COARSE SCREENING ____________________________________________________________13
3.4. D103- FINE SCREENING________________________________________________________________14
3.4.1. MONTORNG FUNCTON AND ALARMS OPERATED _____________________________________14
3.5. D103- ODOUR TREATMENT_____________________________________________________________16
3.5.1. MONTORNG FUNCTON AND ALARMS OPERATED _____________________________________17
3.6. D104 - AERATED GRIT AND GREASE REMOVAL CHANNEL__________________________________18
3.6.1. MONTORNG FUNCTON AND ALARMS OPERATED _____________________________________19
3.7. D105 - PRIMARY SETTLEMENT TANKS ___________________________________________________21
3.7.1. MONTORNG FUNCTON AND ALARMS OPERATED _____________________________________21
3.8. D106 - HIGH FLOW PS _________________________________________________________________22
3.8.1. MONTORNG FUNCTON AND ALARMS OPERATED _____________________________________22
3.9. FLOW SPLITTING & FLOW METERING BEFORE BIOLOGICAL TREATMENT ____________________23
3.9.1. MONTORNG FUNCTON AND ALARMS OPERATED _____________________________________24
3.10. D107 - BIOLOGICAL TREATMENT________________________________________________________25
3.10.1. MONTORNG FUNCTON AND ALARMS OPERATED _____________________________________27
3.11. D111 - PHOSPHATE REMOVAL EQUIPMENT_______________________________________________29
3.11.1. MONTORNG FUNCTON AND ALARMS OPERATED _____________________________________30
3.12. D108 - SECONDARY SEDIMENTATION TANKS_____________________________________________31
3.12.1. MONTORNG FUNCTON AND ALARMS OPERATED _____________________________________31
3.13. D109 - EXIT CHAMBER_________________________________________________________________33
3.13.1. MONTORNG FUNCTON AND ALARMS OPERATED _____________________________________33
3.14. D110 - WASHWATER PS _______________________________________________________________34
3.14.1. MONTORNG FUNCTON AND ALARMS OPERATED _____________________________________34
4. SLUDGE LINE______________________________________________________________________________35
4.1. D112 - PRIMARY SLUDGE P.S. __________________________________________________________35
4.1.1. MONTORNG FUNCTON AND ALARMS OPERATED _____________________________________36
4.2. D113 - RETURN ACTIVATED SLUDGE (R.A.S.) _____________________________________________38
4.2.1. MONTORNG FUNCTON AND ALARMS OPERATED _____________________________________38
4.3. D114 - SURPLUS ACTIVATED SLUDGE (S.A.S.) ____________________________________________39
4.3.1. MONTORNG FUNCTON AND ALARMS OPERATED _____________________________________39
4.4. D115 - PRIMARY SLUDGE THICKENING __________________________________________________40
4.4.1. MONTORNG FUNCTON AND ALARMS OPERATED _____________________________________41
4.5. D116 - DYNAMIC THICKENER ___________________________________________________________42
4.5.1. MONTORNG FUNCTON AND ALARMS OPERATED _____________________________________43
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 2
4.6. D117 - THICKENED SLUDGE MIXING TANK________________________________________________44
4.6.1. MONTORNG FUNCTON AND ALARMS OPERATED _____________________________________45
4.7. D118 - ANAEROBIC SLUDGE DIGESTION _________________________________________________46
4.7.1. MONTORNG FUNCTON AND ALARMS OPERATED _____________________________________47
4.8. D119 - DIGESTED SLUDGE STORAGE TANKS _____________________________________________48
4.8.1. MONTORNG FUNCTON AND ALARMS OPERATED _____________________________________49
4.9. PLANT FOR THE ADSORBITION OF H2S FROM BIOGAS ____________________________________52
4.9.1. MONTORNG FUNCTON AND ALARMS OPERATED _____________________________________52
4.10. D121 - COMBINED HEAT & POWER ______________________________________________________53
4.10.1. POWER UNIT (chp) _________________________________________________________________53
4.10.2. HEAT UNITS_______________________________________________________________________54
4.10.3. Pump for sIudge heating group (Room D122) ___________________________________________55
4.10.4. MONTORNG FUNCTON AND ALARMS OPERATED _____________________________________56
4.11. D123 - GASHOLDERS__________________________________________________________________59
4.11.1. MONTORNG FUNCTON AND ALARMS OPERATED _____________________________________60
4.12. D125 - MECHANICAL SLUDGE DEWATERING______________________________________________61
4.12.1. MONTORNG FUNCTON AND ALARMS OPERATED _____________________________________63
4.13. D127 - SLUDGE CAKE STORAGE ________________________________________________________66
4.14. D126 - RETURN LIQUOR STORAGE TANK_________________________________________________66
4.14.1. MONTORNG FUNCTON AND ALARMS OPERATED _____________________________________67

COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 3
PROCESS OPERATION MANUAL FOR WWTP PITESTI
1. INTRODUCTION

This report explains in detail the wastewater treatment process for Pitesti City wastewater
treatment plant.

2. REFERENCES

Rehabilitation of the Wastewater Treatment Plant (WWTP) - PTEST,
Contract No.: 2003/RO/16/P/PE/026-04/ EuropeAid/ 122899/D/WKS/RO
Final Beneficiary: Apa Canal 2000 S.A., 24A, .C. Bratianu blvd. Pitesti, Arges County,
Romania, CF no. RO13009001
Process Description : Process Design Description REV 5 11/02/09 - Rif: 1.761 - WWTP
of Pitesti
Drawings :
- WATER LNE P& Piping and nstrumentation - BD.4.WL- Rev02 - 29-07-2010
- SLUDGE LNE_ P& Piping and nstrumentation - BD.4.SL- Rev02 - 29-07-2010




COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 4


2.1. GENERAL DESCRIPTION OF PROCESS

The Pitesty City WWTP is an activated sludge plant and will achieve the standards set by
the EU Urban Wastewater Directive 91/271/EEC for discharge to a "sensitive water body.
n order to meet these process requirements, the works has been based on a maximum re-
use of the existing assets with a complete replacement of the electrical, mechanical and
SCADA equipment as appropriate.

2.2. WASTEWATER TREATMENT

The general treatment process is an aeration activated sludge plant.
The design flow to the wastewater plant shall be twice the hourly maximum dry weather
flow Q
max
.
The incoming flow to the wastewater treatment plant (WWTP) shall be continuously
measured downstream of the overflow weir.

All flows above 2 Q
max
, after overcoming the overflow weir, shall be automatically diverted
to the retention tanks, using a flow controlled automated penstock. All diverted flows to the
retention tanks shall be screened by n1 automatic coarse screen (15 mm).

The retention tanks will work in sequential (from tank 17B to 17A or from 17A to 17B) or
parallel way. f either retention tank is out of service, then provision shall be made for the
storm water to flow directly from the overflow weir to the tank in service and then overflow
into the existing storm drain.
Each tank is equipped with two mixers that shall operate continuously whilst stormwater
remains in the tanks. When the incoming flow is below 900 litres/sec the Stormwater tank
shall be automatically pumped back to the inlet works, upstream of the flow measurement
chamber.

All flows less than 2 Q
max
shall be normally screened to 20 and 6 mm, de-gritted de-
greased, before primary settlement.
All flows less than Q
max
shall go forward to be treated biologically , to remove BOD and
ammonia and shall include a denitrification stage to comply with the required water quality
of 10 mg/l nitrogen. These flows shall also be dosed with Ferric Chloride to achieve a final
effluent phosphorus concentration of 1 mg/l.

The biological treatment stage shall be two separate biological treatment lines (anoxic and
aeration tanks), designed such that either can be isolated for emptying whilst the other
continues to treat incoming wastewater.
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 5
Each tank shall have a separate anoxic zone equipped with two mixers to ensure the
internal recycle is well mixed with the return sludge and settled wastewater from the primary
tanks, at all flows.

2.3. SLUDGE TREATMENT
The primary and biological excess sludge (SAS) shall be thickened separately in the
existing gravity thickeners and new mechanical thickeners respectively.
The SAS and primary thickened sludge are pumped in two circular storage tanks complete
with stirrer to ensure complete mixing.

The thickened sludge is pumped to the anaerobic digesters.
The digested sludge is sent by gravity into two new covered storage tanks and after is
pumped to the dewatering treatment with centrifugal extractors to remove a part of the
sludge water; before dewatering the sludge is conditioned with polyelectrolyte.
Reject water returns to the inlet pumping station via new internal sewerage.

2.4. DESIGN DATA

The design load for the plant is based on a 320.000 population equivalent (PE) in the year
2022. The design flows and loads are summarised on table 3.1

Table 3.1. Summary of flows and loads.


Parameter Unit Present 2022
Population loading total No 254.500 320.000
Population loading domestic No 194.000 208.000
Maximum hourly flow , Q
max
m
3
/h 5.460 4.100
Average daily flow m
3
/d 91.388 58.651
Maximum daily flow m
3
/d 106.955 72.100
Minimum hourly flow , Q
min
m
3
/h 1.365 740
BOD
5
kg/day 15.300 17.800
COD kg/day 38.800 37.100
TSS kg/day 17.800 20.800
Total- N kg/day 3.100 3.600
Total- P kg/day 900 1.000



Referring to the TSS, in order to consider all the condition of loads of the WWTP, the
following medium quantities have been added:


COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 6

InIet point Parameter FIow [m
3
/d]
Load
[kgTSS/day]
nlet chamber
Flow from the storm water tanks 9.331 6.583
After grit-grease
removal cannel
Medium daily return flow from the liquor
storage tank
1.800 5.880
After grit-grease
removal cannel
Extraordinary flow from the washout of the
sludge storage area
2.328 3.800


The quantities have been calculated making the following assumptions:

For the flow of the storm water tank it's been considered a dilution coefficient of 3,5.
For the liquor flow, a medium literature concentration of 3.270 mg/l has been
considered.
For the flow from the sludge storage area, it's been supposed a washout of 20% of
the sludge dewatered in 1 day.

2.5. DISCHARGE GUARANTEE
The effluent is discharged into River Arges through two concrete outlet pipes. The effluent
from the upgraded plant shall achieve the standards of the EU Urban Wastewater
Treatment Directive 91/271/EEC for "Sensitive Areas as set out on table below:

Table 4.1. Effluent standards.

Unit Limit values for WWTP discharge to "Sensitive area"
Parameter
Value Processed as
BOD
5
mg/l 25

COD mg/l 125

SS mg/l 35

Total Nitrogen mg/l 10
Total Phosphorus mg/l 1
Refer to Performance Guarantee in this
Contract


COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 7

3. WASTEWATER LINE
3.1. D101 - INLET CHAMBER

The incoming flow to the wastewater treatment works (WWTW) is continuously measured
downstream of the inlet chamber D101. All flows above 8.200 m/h (2,280 litres/sec) shall
be automatically diverted to the retention tanks, using a automated penstock 101-MP-101
and a overflow weir located at the entrance of the channel of the storm water.
The supply pipes of the two storm water tanks have interception valve so that when a tank
is under maintenance it gets closed and the sewage fills the other one. It is necessary that
at Ieast the suppIy tube of one of the tanks shouId aIways remain open, so that in
case of rainstorm, the wastewater could always fill a storm water tank and, if the rainstorm
continues, through the overload level weir placed inside the tank, they move towards the
discharge end of the plant through the general by-pass pipe
All diverted flows to the storm tanks are subjected to 12 mm by self cleaning screenings.
The time cleaning of the grid is normally set by the operator. A differential level sensor
(upstream-downstream) starts the automatic cleaning of the grid. When the cleaning of the
grid starts, automatically activates also the screened material compactor, that compacts
and removes the screened material pouring it in an appropriate container bag
The operator shall select control of the penstock in auto or manual at the SCADA.
The inlet chamber equipments and instruments is shown on table 3.1.

Table 3.1 D.101-nlet Chamber.
101-MP-101
nlet Control penstok
Auto/Manual
On/off

On

Switch
101-AS-101 coarse screen On/off

On

Switch
101-DP-101
differential screen's level
meter
On/off

On

Switch
101-WT-101 dewatering hydraulic press On/off

On

Switch
101-SP-101 automatic sampler On/off

On

Switch
101-PT-101 total phosphorus control On/off

On

Switch
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 8
101-FT-101
flow meter with ultrasonic
sensor
On/off

On

Switch


3.1.1. MONTORNG FUNCTON AND ALARMS OPERATED

1 - SENSORS
The inlet chamber is provided of the following sensors which provide continuous
monitoring of
Ph and Temperature (101-PHT-101)
Phosphorus Control (101-PT-101)
Automatic sampler (101-SP-101)

Those measures are continuously recorded by the Supervisor and available for
historical trends.

2 - ELECTRICAL PENSTOCKS
Electrical penstocks are equipped with AUMATC drives and local command panel for
manual mode operation.
When not in manual mode the Penstocks will be operated from the SCADA System.

Automatic IocaI controI
The local control commands the penstock to regulate the incoming total flow, in order to
limit it so that no more then 8200 m
3
/h are allowed.
The incoming flow is measured by the ultrasonic flow meter 101-FT-101.
The automation is carried out by an ON/OFF control, which commands the opening of
the penstock in case of measured incoming flow below the lower threshold of 8200 m
3
/h
value, and the closing of the device in case of flow exceeding 8200 + F m
3
/h, where
F is a range defined to avoid chattering fenomenous of the drive command. This range
is set to be 5% of the maximum flow by default, but it can be modified by the operator
as well as the lower threshold value.

Monitoring Functions
The SCADA System enables continuous monitoring of
Operational State of the Penstocks (full open, full closed, fault status).
Circuit breaker ON/OFF position on the TD

AIarms operated
Penstock Malfunctioning alarm
ncoming flow Maximum Limit Overflow alarm
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 9


3.2. D102A/B - STORM WATER RETENTION TANKS

From the inlet chamber, downstream of the storm overflow, flows above 8.200 m/h (2.300
l/sec = 2 Q
max
) will screened by n1 automatic coarse screen and, after, stored in the
retention tanks. f either retention tanks are insufficient the storm water can flow directly into
the existing storm drain to the river.
When the incoming flow is below 3.240 m/h ( 900 l/s ), storm water tank shall be
automatically pumped back to the inlet works, upstream of the flow measurement chamber.
f the flow to the works exceeds, whilst any storm water is being returned, then both return
pumps shall be switched off until the measured flow is less than 3.2040 m/h.
Every tank will be provided with n 3 submersible mixers to maintain solids in suspension.
The storm water tank equipments is shown on table 3.2.

Table 3.2 D102 A,B Storm water tank.
102A/B-LT-101
Ultrasonic level indicator and
transmitter
On/off

On

Switch
102-MX-101C / D / E
Submersible mixers (tank
D102.A)
On/off

On

Switch
102-MX-101A / B
Submersible mixers (tank
D102.B)
On/off

On

Switch
102-MX-102
Submersible mixers (tank
D102.B)
On/off

On

Switch
102-HCP-101A / B / R Horizontal centrifugal pump On/off

On

Switch

102-EF-101

Air exchange fans

On/off

On

Switch


3.2.1. MONTORNG FUNCTON AND ALARMS OPERATED

1 - COARSE SCREEN
Coarse Screens are equipped with local command panel for manual mode operation.
When not in manual mode the Screens will be operated from the SCADA System.

COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti


Rif: 1.761 - WWTP of Pitesti 25.11.2010 10
Automatic IocaI controI
The local control activates the system when the minimum sewage level is reached and
according to the specific planned times.

Setting and Remote controI functions


The operator can modify the minimum sewage level needed to operate the plant
straightly from the display and the operating module of the related differential
screens level meter (101-AP-101).

Monitoring Functions
The SCADA System enables continuous monitoring of
Running State of the Screens
Sewage levels
Operating hours of activated devices
Operational State
Circuit breaker ON/OFF position on the TD

AIarms operated
Screen Malfunctioning alarm

2 - DEWATERING HYDRAULIC PRESS
Dewatering Hydraulic Press is equipped with local command panel for manual mode
operation.
When not in manual mode the Dewatering Hydraulic Press will be operated from the
SCADA System.

Monitoring Functions
The SCADA System enables continuous monitoring of
Running State of the Dewatering Hydraulic Press
Operating hours of activated devices
Circuit breaker ON/OFF position on the TD

AIarms operated
Dewatering Hydraulic Press Malfunctioning alarm


3 - TANKS LEVEL SENSOR
The retention basins are provided of the following sensor which locally control the
activation of the tanks mixers according to the measured tank level:
Ultrasonic level indicator (102A-LT-101), to control mixers 102-MX-101A, 102-MX-
101B, 102-MX-102.
Ultrasonic level indicator (102B-LT-101), to control mixers 102-MX-101C, 102-MX-
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 11
101D / 102-MX-101E.

AIarms operated
Low level in the retention tanks.
A warning alarm will be rised if both manual penstocks located at the entrance of the
retention tanks are closed.

4 - SUBMERSIBLE MIXERS
Submersible Mixers are equipped with local command panel for manual mode
operation. When not in manual mode the Submersible Mixers will be operated from the
SCADA System.

Monitoring Functions
The SCADA System enables continuous monitoring of
Running State of the Submersible Mixers
Operational State
Operating hours of activated devices
Circuit breaker ON/OFF position on the TD

AIarms operated
State of Thermal Protection
Leak sensor alarm

5 - HORIZONTAL CENTRIFUGAL PUMPS
Horizontal Centrifugal Pumps are equipped with local command panel for manual mode
operation. When not in manual mode the Horizontal Centrifugal Pumps will be operated
from the SCADA System.

Automatic IocaI controI


The retention tanks emptying pumps can be remotely operated.
The local control allows the pumps to be activated if the following conditions are
verified:
The stormwater retention tanks are not empty
The incoming flow to the inlet channel is below 3240 m3/h.
On the other hand, the local control will stop the pumps if the retention tanks level is
too low or if the incoming flow to the inlet chamber is too high.

Monitoring Functions
The SCADA System enables continuous monitoring of
Running State of the Pump (Off, Low Speed, High Speed)
Operating hours of activated devices
Operational State
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 12
Circuit breaker ON/OFF position on the TD

AIarms operated
State of Thermal Protection
Horizontal Centrifugal Pumps Malfunctioning alarm

6 - AIR EXCHANGE FAN

Air Exchange Fan is equipped with a local control switch on TD for manual mode
operation. ts state is monitored by the SCADA System.

Monitoring Functions
The SCADA system enables continuous monitoring of
Circuit breaker ON/OFF position on the TD


COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 13

3.3. D103- COARSE SCREENING

The coarse screening is constructed with three channels each capable of receiving the
maximum design flow of 8.200 m/h (2 Q
max
).
The central line is the by-pass screening and the coarse screen (i=20 mm) installed will be
manually cleaned.
Each line have a clear spacing between bars of 20 mm and is provided with a mechanical
penstock.
The two automatically raked coarse screens will operate on differential level controlled by
ultrasonic level sensors upstream and downstream of the same.
An adjustable timer over-ride will provide to maintain regular screen operation at low flows.
The automatic coarse screen equipments is shown on table 3.3.

Table 3.3 D103 - Automatic coarse screen
103-MP-101,102,103
Motorized channel penstock
Auto/Manual
On/off

On

Switch
103-UPS-101 Small power generator On/off

On

Switch
103-AS-101,102
Coarse screen i=20 mm

On/off

On

Switch
103-DP-101,102
Differential screen's level
meter
On/off

On

Switch
103-WY-101A
Screw conveyor for coarse
screens
On/off

On

Switch
103-WT-101A Belt conveyor rotation device On/off

On

Switch
103-BY-101A
Belt conveyor of corase
screen
On/off

On

Switch

n case of absence of electricity, the power generator 103-UPS-101 opens the 2 penstocks
(the one of entry and the one of exit) of the emergency central channel in order to guaranty
a coarse screening. This generator gives power to the interception penstock D101-MP-101,
in case of emergency. When the power returns, the operation which took place before blak
out must be manually reset.

COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 14

3.4. D103- FINE SCREENING

Each line will be divided in two channels everyone equipped with a fine screen clear
spacing between bars of 6 mm.
The self-cleaning belt type screens will operate on differential level controlled by ultrasonic
level sensors upstream and downstream of the same. An adjustable timer over-ride will
provide to maintain regular screen operation at low flows.
The screenings washing and dewatering unit will stop at an adjustable period after
cessation of the screen operation and the screenings will be discharged to a skip.
The automatic fine screen equipments is shown on table 3.4.

Table 3.4 D103 - Automatic fine screen
101-DP-103,104
differential screen's level
meter
On/off

On

Switch
103-AS-103,104,105,106 Fine screens On/off

On

Switch
103-MP-104,105,106
Motorized channel penstock
Auto/Manual
On/off

On

Switch
103-WY-101B
screw conveyor for fine
screens
On/off

On

Switch
103-WT-101A / B screw compactor On/off

On

Switch
103-BY-101A / B belt conveyor rotation device On/off

On

Switch
103-BY-101A / B belt conveyor On/off

On

Switch


3.4.1. MONTORNG FUNCTON AND ALARMS OPERATED

1 - PENSTOCKS
Electrical penstocks are equipped with AUTOMATC drives and local command panel for
manual mode operation.
n case of absence of electricity, the power generator 103-UPS-101 will provide the power
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 15
to open the 2 penstocks of the emergency central channel (the one of entry, 103-MP-102,
and the one of exit, 103-MP-105) in order to guaranty a coarse screening.

Monitoring Functions
The SCADA enables continuous monitoring of
Operational State of the Penstocks (full open, full closed, fault status).
Circuit Circuit breaker ON/OFF position on the TD

AIarms operated
Penstock Malfunctioning alarm

2 - COARSE AND FINE SCREENS
Coarse and Fine Screens are equipped with local command panel for manual mode
operation.

Automatic IocaI controI
The local control activates the system when the minimum sewage level is reached and
according to the specific planned times.

Setting and Remote controI functions


The operator can modify the minimum sewage level needed to operate the plant
straightly from the display and the operating module of the related differential screens
level meter (103-AP-101 for 103-AS-101; 103-AP-102 for 103-AS-102; 103-AP-103 for
103-AS-103 and 103-AS-104; 103-AP-104 for 103-AS-105 and 103-AS-106)

Monitoring Functions
The SCADA enables continuous monitoring of
Running State of the Screens
Sewage levels
Operating hours of activated devices
Circuit breaker ON/OFF position on the TD

AIarms operated
Screen Malfunctioning alarm

n case of absence of electricity, the power generator 103-UPS-101 will provide the power
to open the 2 penstocks of the emergency central channel (the one of entry, 103-MP-102,
and the one of exit, 103-MP-105) in order to guaranty a coarse screening.
t will also provide the power to the penstock 101-MP-101, the incoming flow meter 101-
FT-101 and the DO1, which operates the local automation of the penstock.
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 16

Monitoring Functions
The SCADA enables continuous monitoring of
Operational State of the Generator 103-UPS-101

AIarms operated
Device cumulative alarm

3 - CONVEYORS
Conveyors are equipped with local command panel for manual mode operation.
When not in manual mode the Conveyors will be operated from the SCADA System.

Monitoring Functions
The SCADA enables continuous monitoring of
Running State of the Conveyor
Operating hours of activated devices
Circuit breaker ON/OFF position on the TD

AIarms operated
Conveyor Malfunctioning alarm

4 - SCREW COMPACTORS
Screw Compactors are equipped with local command panel for manual mode operation.
When not in manual mode the Screw Compactors will be operated from the SCADA
System.

Monitoring Functions
The SCADA enables continuous monitoring of
Running State of the Screw Compactor
Operating hours of activated devices
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Screw Compactor Malfunctioning alarm

3.5. D103- ODOUR TREATMENT

The exhausted air extracted from:
the building which will contain coarse and fine screening channels and the 4
containers dedicated to the storage of the material kept from the screens
the grease pumping station of the great and grease removal compartment,
will be subject to a forced ventilation and to the odour treatment.
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 17

The scrubber capacity will be able to guaranty an air renewal rate of 67 volumes per hour.
Pollutants in the exhausted air treated by the scrubber are absorbed by chemical reaction
through washing with reducing reagents. Air is pushed through the scrubber by a standard
fan and once treated is released into the atmosphere.

The Odour treatment air equipments is shown on table 3.5 .

Table 3.5 D103 Odour treatment air
D103 Exhausted air treatment system On/off

On

Switch
103-SCP-101A / R
Submersible pumps for drainage
water
On/off

On

Switch

The internal air of the screening room is changed through a suction system connected to a
scrubber that cleans through washing with acidic solutions the foul-smelling air and expels
it through a fan connected to an expulsion chimney.
The system of air treatment is provided with its own automatic package.

3.5.1. MONTORNG FUNCTON AND ALARMS OPERATED

1 - EXHAUSTED AIR TREATMENT SYSTEM


The screening room is provided of an horizontal scrubber which cleans the air with acid
solutions before expelling it outside. The system of air treatment is provided with its own
automatic package, connected to the SCADA system by MODBUS RTU communication
protocol. A proper PLC routine will be implemented in the PLC program to andle the
MODBUS communication, since the scrubber is designed to communicate as slave.

Monitoring Functions
The SCADA System enables continuous monitoring of
Circuit breaker ON/OFF position on the TD panel
Operational State f the scrubber
Running Status of the scrubber
Level of the reagent in the tank
Reagent pressure


2 - SUBMERSIBLE PUMPS OF DRAINAGE
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 18
Drainage Submersible Pumps are equipped with local command panel for manual
mode operation. When not in manual mode the Drainage Submersible Pumps will be
operated from the SCADA System.

Monitoring Functions
The SCADA System enables continuous monitoring of
Running State of the Drainage Submersible Pump
State of Thermal Protection
Operating hours of activated devices
Operational State
Circuit breaker ON/OFF position on the TD panel

AIarms operated
State of Thermal Protection
Leak sensor alarm

AIarms operated
Pump Malfunctioning alarm



3.6. D104 - AERATED GRIT AND GREASE REMOVAL CHANNEL

The aerated channel for grit and grease removal are equipped with two "to and from bridge
to the collecting the sands to the hoppers, set in head of the tank.
The sands is extracted with submersible pumps and sent to proper sectors of sand
separation to facilitate the disposal. The functioning of the sand pumps is set manually by
the operator.
The floated material collected in the lateral calm zone of every line, is sent to a pumping
station (D104B ) equipped with submersible pumps, controlled by 3 float switches (1=stop,
2=start, 3=alarm). Foams are pumped to the sludge thickening station D115A,B.
After an event of interruption of electricity, the restart of the two "to and from scraper, is
automatic.
The Grit and Grease removal equipments is shown on table 3.6 .

Table 3.6 D104 Grit and Grease removal
104-SB-101A/B
"To and fro" grease/grit
scrapper:
On/off

On

Switch
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 19
104-SCP-101A/B/C/D
submersibles pumps for grit
removal
On/off On Switch
104-GS-101A/B sand separator On/off On Switch
104-AB/101A/R air blower On/off On Switch
104-SCP-102A / R
submersibles pumps for grease
removal
On/off On Switch
104-L-101
floating level regulator for pumps
grease removal
0-100 100 %


The each scraper bridges have a panel package for the control of all functions



3.6.1. MONTORNG FUNCTON AND ALARMS OPERATED

1 - "TO AND FROM" GREASE GRIT SCRAPER
The two grit and grease removal bridges are equipped with local command panel for
manual mode operation.
When not in manual mode the Scraper will be operated from the SCADA System.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Scrapers
Operating hours of activated devices
Operational State
Circuit Breaker ON/OFF position on the TD panel

AIarms operated
Termic alarm for translator motors
Termic alarm for hydraulic motor system
Scraper Malfunctioning alarm

2 - SUBMERSIBLE GRIT AND GREASE PUMPS
Submersible Grit and Grease Pumps are equipped with local command panel for
manual mode operation. When not in manual mode the Submersible Grit and Grease
Pumps will be operated from the SCADA System.

Automatic IocaI controI


The local control operates the system when the minimum sewage level is reached.
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 20

Monitoring Functions
The SCADA System enables continuous monitoring of

Running State of the Pump (Off, Low Speed, High Speed)
Operational State
Operating hours of activated devices
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Leak sensor alarm
State of Thermal Protection
Pump Malfunctioning alarm

3 - SAND SEPARATORS
Sand Separators are equipped with local command panel for manual mode operation.
When not in manual mode the Sand Separator will be operated from the SCADA
System.

Monitoring Functions
The SCADA System enables continuous monitoring of
Running State
Operational State
Operating hours of activated devices
Circuit breaker ON/OFF position on the TD panel


AIarms operated
General alarm of the plant

4 - AIR BLOWER
Air treatment equipment shall be operated with latest generation soft starters and local
command panel for manual mode operation.

Monitoring Functions
Running State of the Air Blower
Operating hours of blowers
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Air Blower Malfunctioning alarm
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 21


3.7. D105 - PRIMARY SETTLEMENT TANKS

The three primary settlement tanks were refurbished with new scraper arms, surface
scrapers, scum collection box, bridge, adjustable castellated weirs and automatic
desludging. The auto-desludge pumps were connected directly to the sludge outlet pipe
from each tank. Each primary tank has one scum box directly connected to the primary
sludge PS .
The primary tanks are desludged automatically, an operator controlled time setting in the
SCADA system. All primary sludge are pumped directly to the gravity thickeners in the
sludge plant. The three primary settlement tanks working separately and in parallel.
The primary settlement tanks equipments is shown on table 3.7

Table 3.7 D105 Primary settlement tanks
105-SB-101,102,103
scrapper bridge with peripheral
traction
On/off

On

Switch
105 A/B/C-L-101 switch level transmitter 0-100 100 %

Each bridges have a panel package for the control of all functions.

3.7.1. MONTORNG FUNCTON AND ALARMS OPERATED

1 - SCRAPER BRIDGE
The Scraper Bridge will be operated from the command section's door for manual mode
operation. The Scraper bridge is equipped with a local Emergency Stop button.
When not in manual mode the Scraper Bridges will be operated from the SCADA
System.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Scraper Bridge
Operating hours of activated devices
Operational State
Emergency Stop of the Scraper Bridge
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Scraper Bridge Malfunctioning alarm.
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 22


2 - SENSOR
The tank is provided of a switch level sensor (105A/C-L-101) which provide continuous
monitoring of the level of the tanks and rise a Low level warning alarm.


3.8. D106 - HIGH FLOW PS

After primary settlement tanks flows greater than 2.100 m/h (1,140 litres/sec) shall be
diverted to a pumping station for return to the storm retention tanks. f both tanks are full,
the pumps shall be stopped and the flows envoy directly to the exit chamber through the
overflow weir.
The High flow PS equipments is shown on table 3.8

Table 3.8 D106 High flow PS
106-SCP-101A/B/C/R submersibles pumps On/off

On

Switch
106-SCP-102
submersibles pumps for
drainage
On/off

On

Switch
106-LT-101
ultrasonic level indicator and
transmitter
0-100 100 %

3.8.1. MONTORNG FUNCTON AND ALARMS OPERATED

1 - SUBMERSIBLE PUMPS
The pumps shall be operated with latest generation soft starters and local command
panels for manual mode operation.
When not in manual mode the Pumps will be operated from the SCADA System.

Automatic IocaI controI


The local control will allow the pump to be activated only if the following conditions are
verified:
the tank where the pump are located is not empty
at least one of the penstock 102-MnP-102 and 102-MnP-103 are open, which
means at least one of the two stormwater retention tanks are available (the tanks
are not full)
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 23

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Pumps
Operating hours of pumps
Fluid Level in the pumping station tank (by 106-LT-101 level measurer)
Operational State
Circuit breaker ON/OFF position on the TD panel

AIarms operated
State of Thermal Protection
Leak sensor alarm


2 - SUBMERSIBLE PUMPS FOR DRAINAGE
Drainage Submersible Pump is equipped with local command panels for manual mode
operation.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Drainage Submersible Pump
Operating hours of activated devices
Operational State
Circuit breaker ON/OFF position on the TD panel

AIarms operated
State of Thermal Protection
Drainage Submersible Pump Malfunctioning



3.9. FLOW SPLITTING & FLOW METERING BEFORE BIOLOGICAL TREATMENT

The biological treatment is composed by two lines, D107A and D107B. Two weirs of the
same length located at the entrance of the two tanks equally divide the water flow arriving
from the primary clarifiers in two parts. The maximum flow that can be sent to the biological
treatment is 4.100 m/h (2.050 m/h for every line). The exceeding flow overflow and it is
pumped back to the retention tanks by the High Flow pumping station D106.
The position of the penstocks 107-MP-101A and 107-MP-101B will be regulated by the
PLC local control in order to ensure that the incoming flow to the biological tanks is equally
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 24
divided in two, balancing possible asymmetry of the flows in the biological tanks inlet
channels.
Every penstock is controlled by a feedback control, regulated by a pre-defined PD block.
The set-point for the two loop control will be defined in the following way:
-. f the actual WWTP incoming flow exceed 4.100 m
3
/h, then the set-point for the two
loop will be 2.050 m
3
/h, allowing the tanks to receive the maximum flow possible, optimizing
the quantity of sludge treated, and assuring that the flow is equally divided in two.
- if the actual WWTP incoming flow is lower than 4.100 m
3
/h, then the set-point of the
two loops will be half the value of the measured incominc flow.
- if one of the two tanks is not operative (for maintenance) than te set-point of the
control loop regulating the penstock of the other thank, will be 4.100 m
3
/h (in case of
incoming flow to the WWTP exceeding 4.100 m
3
/h, and exactly equal to the actual
measured incoming flow, if this is lower than 4.100 m
3
/h.

The instantaneous and cumulative flow are continuously be recorded on the SCADA
system to automatically control the ferric dosing, internal recycle flow (for denitrification)
and the returned activated sludge (RAS) flow. The combined flow is split equally between
aeration tank D107A and D107B at all flows.

The equipments for flow splitting is shown on table 3.9

Table 3.9 Flow splitting & flow metering
107-MP-101A/B motorized channel penstock On/off

On

Switch
(1) 107-LT-101A/B
ultrasonic level indicator and
transmitter
0-100 100 %
(2) 107-LT-102A/B
ultrasonic level indicator and
transmitter
0-100 100 %

(1) to measure the flow at the entrance of the biological tanks and to regulate the penstock
(2) to measure the RAS flow at the entrance of the biological tanks


3.9.1. MONTORNG FUNCTON AND ALARMS OPERATED

1 - MOTORIZED CHANNEL PENSTOCK
Electrical penstocks are equipped with AUTOMATC drives and local command panels
for manual mode operation.
When not in manual mode the Penstocks will be operated from the SCADA System.

Automatic IocaI controI


The local control commands the penstocks to regulate the flow and to divide it into the
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 25
two biological tanks, based on the total incoming flow, tanks levels and internal recycled
sludge flow.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Penstock
Actual Position of the penstock
Operational State of the Penstocks (full open, full closed, fault status).
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Penstock Malfunctioning alarm


3.10. D107 - BIOLOGICAL TREATMENT

The biological treatment lines is composed of two separate biological treatment stage (
anoxic and aeration tanks) designed such that either can be isolated for emptying whilst the
other continues to treat incoming wastewater. Each tank shall have a separate anoxic zone
equipped with a minimum of two mixers to ensure the internal recycle is well mixed with
the return sludge and settled wastewater from the primary tanks, at all flows. The anoxic
zone is separated from the aeration tank by a complete partition wall to ensure no back-
mixing between the aerobic section and the anoxic section.

The return activated sludge (RAS) and the internal recycle for denitrification shall be
controlled automatically using variable speed pump motors.

n the oxidation-nitrification phase, the air necessary to the biological treatment is provided
by volumetric air blowers and is diffused in the tanks by membrane disk diffusers set in the
bottom of the tanks.
The oxygen is given in accordance to the real need of the biological process through the
use of sensors of dissolved oxygen (2 for each tank through which is calculated the
average value, 107-OT-101A/B/C/D).
The operator sets the standard of dissolved oxygen to be kept in the tank (on average 2
mg/l), when this level falls the blowers are asked to produce more air, that through inverter
increases the number of engine speed.

A part of the aerated mixture, at the end of each tank of oxidation-nitrification, is sent again
to the entrance of the biological tanks with an intubated pump (D107A3-B3). An
electromagnetic flow meter, installed on the delivery pipe DN900 due to the recirculation of
the nitrates, allows to measure the actual recirculated nitrates flow.
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 26
The engine of the pumps has an inverter so the operator, can choose the range which is
most proper to the process, with a variability range from 2700 m/h to 4000 m/h depending
on the instantaneous flow value, measured before the biological treatment, recorded in a
cumulative manner by the SCADA.

All the flow from both aeration tanks (other than internal recycle flow) shall be split
proportionately to each of the three secondary tanks (DS2, DS3 and DS4) at all flows.
The recycle pumping station are fitted with a minimum of 1+1 R e 2+1R variable speed
pumps and controlled automatically by the SCADA system as a function of solids
concentration measured in the oxidation tanks with MLSS measurement tool
This internal recycle is measured and the total flow recorded continuously. This internal
recycle is returned to the anoxic tanks

At the entrance of each tank of oxidation is also installed a sensor of Ph control, and at the
ending a suspended solids sensor (MLSS), for measuring the actual sludge concentration
in the tank. Another level meter is installed on each channel of alimentation of the two
biological lines and checks the actual value of the flow pumped to the line.
The main features of each line are:
Volume of denitrification = 5.050 m
Volume oxidation-nitrification = 10.100 m

The equipments for Biological treatment is shown on table 3.10

Table 3.10 D107 A,B Biological treatment
107-L-101A/B
floating level regulator in
denitrification
0-100 100 %
107-LT-101A/B
ultrasonic level indicator and
transmitter
0-100 100 %
107-MX-101A/B/C/D
submersible mixer for the anoxic
zone
On/off

On

Switch
107-AB-
101A/B/C/D/R1/R2
air blowers On/off

On

Switch

107-EF-101A/B/C

air exchange fans

On/off

On

Switch
107-OT-101A/B/C/D dissolved oxygen measurement 0-100 100 %
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 27
107-SST-101A/B MLSS measurement 0-100 100 %
107-PHT-101A/B PH control 0-100 100 %
107-SCP-101A/B
internal recycle submersible
pumps
On/off

On

Switch
107-FT-101A/B
internal Recycle Electromagnetic
Flow meter ND 800
0-100 100 %


3.10.1. MONTORNG FUNCTON AND ALARMS OPERATED

1 - SENSORS
The biological treatment is provided of the following sensors for the continuous
monitoring of
Dissolved Oxygen and temperature (107-OT-101A/B/C/D)
pH and temperature (107-PHT-101A/B)
Suspended solid concentration (107-SST-101A/B)

Those measures are continuously recorded by the Supervisor and available for
historical trends and for local automations.

2 - SUBMERSIBLE MIXER
Submersible Mixers are equipped with local command panels for manual mode
operation. When not in manual mode the Submersible Mixers will be operated from the
SCADA System.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Submersible Mixers
Operating hours of activated devices
Operational State
Circuit breaker ON/OFF position on the TD panel

AIarms operated
State of Thermal Protection
Leak sensor alarm


3 - INTERNAL RECIRCULATION SUBMERSIBLE PUMPS
nternal Recirculation Pumps are operated with latest generation Frequency Converters
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 28
and local command panels for manual mode operation.
When not in manual mode the Pumps will be operated from the SCADA System.

Automatic IocaI controI


The local control activates the system when the minimum sewage level is reached and
interrupts the pumps when the level falls below the minimum threshold.
The internal recycling pumps will be regulated by the local automation according to the
running speed set-point set by the operator on the basis of the measured concentration
of suspended solids in the biological tanks.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Pumps
Operating hours of pumps
Power consumption
Level of the fluid to be pumped
Operational State
Circuit breaker ON/OFF position on the TD panel

AIarms operated
State of Thermal Protection
Leak sensor alarm


4 - BLOWER FOR AERATION TANKS
The Blowers motors will be operated through frequency converters of the latest
generation and will provide manual and automatic operation. When in manual mode the
Blowers will be operated from the command panel located on the door of the TD3B
distribution Panel.

Automatic IocaI controI
The aeration of the biological tanks through the blowers will be automatically controlled
on the basis of the dissolved oxygen (DO) measured by the DO measurers 107-OT-
101A/B/C/D. The actual DO concentration will be set by the operator on the basis on
the DO readed and the running speed of the blowers automatically controlled to provide
the requested DO concentration.
The blowers are divided in two groups, one for each biological tank, in order to operate
the two tanks independently, allowing one to run if the other is off for maintenance.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the blowers
Operational state of the blowers
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 29
Power consumption
Operating hours of blowers
Number of activations of the blowers
Circuit breaker ON/OFF position on the TD

AIarms operated
Blowers Malfunctioning alarm
Warning for partial blower life-cycle limits reached

5 - AIR EXCHANGE FANS
The Air Exchange Fans are equipped with a local control switch on TD for manual
mode operation. Their state is monitored by the SCADA System.

Monitoring Functions
The system SCADA enables continuous monitoring of
Running State of the Air Exchange Fans
Operating hours of activated devices
Operational State
Circuit breaker ON/OFF position on the TD

AIarms operated
Air Exchange Fans Malfunctioning alarm


3.11. D111 - PHOSPHATE REMOVAL EQUIPMENT

The solution of ferric chloride( FeCl3) used for to delete the phosphorus , is stocked into
two tanks in the local D111. A level switch bar indicates the reaching of minimum level
inside the tank and with a light signal indicates the state of empty tank. When both tanks
are empty the dosing pumps of the solution stop working.
The three points of dosage, each with two pump (1+1R), are: at the end of the grit chamber
D104, at the inlet of biological treatment D17A,B, and in to tank flow splitting from both
aeration tanks to the three secondary tanks (DS2, DS3 and DS4).
At the entry and at the exit of the WWTP (position D101 and D109), are installed
phosphorus measuring probes (P).
f the measure of phosphorus in exit is higher than the limit fixed by the law, the remote
control warns the operator by SCADA to increase the quantity of ferric chloride to be dosed.
The process is set by the operator who decides the quantity in the position (before
primaries, before aeration tanks and before final settlement tanks ), of solution to set, in
order to be able to regulate the value of the needed flow depending on the instantaneous
flow value.
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 30
The flow value is recorded in a cumulative manner by the SCADA The equipments for
Phosphate removal is shown on table 3.11

Table 3.11 D111 Phosphate removal
111-DP-
101A/B/C/R1/R2/R3
Ferric chloride dosing pumps On/off

On

Switch
111-L-101A/B
switch level transmitter for
pumps control
0-100 100 %

3.11.1. MONTORNG FUNCTON AND ALARMS OPERATED

1 - CHEMICAL DOSING PUMPS
Ferric Chloride Dosing Pumps are equipped with local command panels for manual
mode operation. When not in manual mode the Pumps will be operated from the
SCADA System.

Automatic IocaI controI


The dosing of the Ferric Cloride will be controlled by the operator, who will select the
dose required to achieve the required P in the final effluent. The operator will choose
the proper set-point on the basis of the inlet and outlet P concentration as well as the
incoming and outgoing flows. A summary mimic page will display those measures to
assist the operator in the dosing regulation. This mimic page will be displayed on the
local touch screen operator panel, located in the PLC4 control section, as well as on the
Supervisor application.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the dosing pumps
Operational State of the pumps
Level of Ferric Chloride in the tanks (by switch level sensors 111-L-101A/B).
Operating hours of activated devices
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Pump Malfunctioning alarm.
Ferric Chloride low level
High level P concentration in the final effluent


COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 31
3.12. D108 - SECONDARY SEDIMENTATION TANKS

All three of the existing final settlement (DS2, DS3 and DS4) tanks are refurbished with new
bridges, sludge scraper arms and scum boards and valves. The scrapers shall be designed
to operate during periods with frost must not have a restrictive impact on the operation of
this equipment.

The bottom sludge shall automatically be withdrawn from each tank separately and new
manual valves provided.
The equipments for Secondary sedimentation tanks is shown on table 3.12


Table 3.12 D108 Secondary sedimentation tanks
108-SB101
double scrapper bridge with
peripheral traction
On/off

On

Switch
108-SB102-103 aspirated type bridges On/off

On

Switch
108A/B/C-L-101 switch level transmitter 0-100 100 %
108-SCP-108A / R
submersibles pumps for scum
removal
On/off

On

Switch
108-RB-101A/R,101B/R,
101C/R
Vacuum pumps on the bridge On/off

On

Switch


Biological sludge deposited on the bottom of the final sedimentation tanks are withdrawn by
the blade of the bridge ad sent to the central collecting tank by two siphons.
These ones are started with a vacuum pump. The vacuum pump is needed only for making
the process start, then it is turned off. A floating level sensor, set inside the central tank,
reports to the SCADA if the collecting system of the sludge is working or not (= alarm).

3.12.1. MONTORNG FUNCTON AND ALARMS OPERATED

1 - SCRAPER BRIDGE
The Scraper Bridge will be operated from the command section's door for manual mode
operation. When not in manual mode the Scraper Bridge will be operated from the
SCADA System.
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 32

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Scraper Bridge
Operating hours of activated devices
Operational State of the Scraper Bridge
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Scraper Bridge Malfunctioning alarm.


2 - VACUUM PUMPS
Vacuum Pumps are equipped with local command panels for manual mode operation.
When not in manual mode the Vacuum Pumps will be operated from the SCADA
System.
The tank is provided of a switch level sensor (108A-L-101) which provide continuous
monitoring of the level of the tanks and rise High/Low level alarm.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Vacuum Pumps
Operating hours of activated devices
Operational state of the Vacuum Pumps
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Vacuum Pump Malfunctioning alarm

3 - SCUM PUMPING STATION
Submersible Scum Pumps are equipped with local command panels for manual mode
operation. When not in manual mode the Submersible Scum Pumps will be operated
from the SCADA System.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Submersible Scum Pump
Operating hours of activated devices
Operational State
Circuit breaker ON/OFF position on the TD panel
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 33

AIarms operated
State of Thermal Protection
Leak sensor alarm



3.13. D109 - EXIT CHAMBER

Flows arriving from secondary sedimentations will pass through an area velocity type flow
measurement on the open channel.

The flow measurement system will be complete with a refrigerated 24-hour programmable
composite sampler, which will operate on a flow proportional basis.
The sampler will be complete with weatherproof/lockable enclosure and composite bottles
(duty/stand-by).
The equipments for the exit chamber is shown on table 3.13

Table 3.13 D109 Exit chamber
109-SP-101 automatic sampler On/off

On

Switch
109-PT-101 total phosphorus control 0-100 100 %


3.13.1. MONTORNG FUNCTON AND ALARMS OPERATED

1 - OUTGOING FLOW SENSOR
The exit chamber is provided of the following sensors which provide continuous monitoring
of
Phosphorus control (109-PT-101)
Automatic Sampler (109-SP-101)
Outlet flow (existing flow meter)

Those measures are continuously recorded by the Supervisor and available for historical
trends.

AIarms operated
High Level of the P concentration in the final effluent


COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 34

3.14. D110 - WASHWATER PS

On the discharge tube of the clarifiers D108B-C, is connected a proper pumping station
D110 for service water use.
The pumps start/stop regulated by a level sensor.
The washwater pumps to provide water to:

Screening camber
Grit/grease chamber
Storm water tanks
All sludge pumping stations
Digester heat exchanger houses
All the sludge thickeners
Sludge dewatering station
CHP building

The equipments for the Washwater PS is shown on table 3.14

Table 5.14 D110 Washwater PS
110-HCP-101A/B/C horizontal pump electronic On/off

On

Switch
110-L-101 Float switches for level indicator 0-100 100 %


3.14.1. MONTORNG FUNCTON AND ALARMS OPERATED

1 - WASHWATER PS
Horizontal Centrifugal Pumps motors will be operated through frequency converters of the
latest generation with local command panels for manual mode operation. When not in
manual mode the Horizontal Centrifugal Pumps will be operated from the SCADA System.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Horizontal Centrifugal Pump
Operating hours of activated devices
Operational State of the Horizontal Centrifugal Pump
Circuit breaker ON/OFF position on the TD panel
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 35

AIarms operated
Horizontal Centrifugal Pump Malfunctioning alarm
110-L-101 Level control in the tank water supply


4. SLUDGE LINE
4.1. D112 - PRIMARY SLUDGE P.S.

The primary sludge extracted periodically by primary clarifiers (D105A,B,C) by 2 pumping
stations are sent to the mechanized pre-thickening (D115A,B).
One pumping station (D112B) is made with 1+1R submersible pumps and the other
(D112A) with 2+1R submersible pumps. Each pumping station is controlled by 3 floating
switches (1=stop, 2=start, 3=alarm).
Each pumping station is equipped with a submersibles pumps for drainage.
The timed extraction of primary sludge is done by setting by remote control (SCADA) the
opening up of the extraction valve (112-A,B-eV-101) installed on the tube that connects the
central hopper of the primary clarifiers.
The Primary sludge flow is measured and recorded on SCADA.
The equipments for Primary Sludge PS is shown on table 4.1

Table 4.1 D112 Primary Sludge PS
112A / B / C -EV-101 motorized valves ND 200 On/off

On

Switch
112A-SCP-101A / B / R
112B-SCP-101A / R
submersibles pumps On/off

On

Switch
112-A/B-L-101
switch level transmitter for
pumps control
0-100 100 %
112A / B-SCP-102
submersibles pumps for
drainage
On/off

On

Switch
112-FT-101
primary sludge electromagnetic
flow meter ND 200
0-100 100 %
112A / B-EF-101 air exchange fans On/off

On

Switch



COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 36
4.1.1. MONTORNG FUNCTON AND ALARMS OPERATED

1 - ELECTRICAL VALVE
Electrical valves will be fitted with motors and command panels mounted on
equipments with AUTOMATC type drive. The valves will be operated from the
command panel for manual mode operation. When not in manual mode the Electrical
valves will be operated from the SCADA System. The operator will have the possibility
to remotely command the Electrical Valves.

Setting and Remote controI functions


When in "remote mode the operator can:
Open/Close the Electrical valves
Set the duration of the desludging (after that time the valve will be automatically
closed)
Set the time of the day on which the desludging starts.

Monitoring Functions
The SCADA system enables continuous monitoring of
State of the Electrical valves
Operational State of the Electrical valves
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Electrical Valves malfunctioning alarm
nconsistency Status alarm: alarms rised if the operator command the opening of the
valve and the valve status remains "Closed, or if the operator command the closing
of the valve and the valve status remains "Open.

2 - SUBMERSIBLES PUMPS
Primary Sludge Submersible Pumps are equipped with local command panels for
manual mode operation. When not in manual mode the Primary Sludge Submersible
Pumps will be operated from the SCADA System.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Pump (High Speed, Low Speed)
Sewage level (by ultrasonic level indicator 112A-L-101)
Total Sludge Flow pumped to Primary Sludge Thickeners by Pumping Station A and
B, measured by electromagnetic flow meter 112-FT-101.
Operating hours of activated devices
Operational State of the system
Circuit breaker ON/OFF position on the TD panel
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 37

AIarms operated
Maximum sewage level overflow
State of Thermal Protection
Pump Malfunctioning alarm

3 - DRAINAGE SUBMERSIBLE PUMPS
Drainage Submersible Pumps are equipped with local command panels for manual
mode operation. When not in manual mode the Drainage Submersible Pumps will be
operated from the SCADA System.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Drainage Submersible Pump (On/Off)
Operational State of the Drainage Submersible Pump
Operating hours of activated devices
Circuit breaker ON/OFF position on the TD panel

AIarms operated
State of Thermal Protection
Drainage Submersible Pump Malfunctioning alarm

4 - AIR EXCHANGE FAN
The Air Exchange Fan is equipped with a local control switch on TD for manual mode
operation. ts state is monitored by the SCADA System.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Air Exchange Fan
Operating hours of activated devices
Operational State
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Air Exchange Fan Malfunctioning alarm

COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 38

4.2. D113 - RETURN ACTIVATED SLUDGE (R.A.S.)

Sludge collected by the bridges of the secondary clarifiers are sent by gravity to the two
load tanks of the return activated sludge pumping station. One (D113A) is made with 1+1R
pumps with horizontal axis and the other (D113B) with 2+1R pumps with horizontal axis.
Each pumping station is controlled by 3 floating switches (1=stop, 2=start, 3=alarm).
The pumping stations are equipped with changeable speed motors, in order to be able to
regulate the value of the needed flow depending on the instantaneous flow value,
measured before the biological treatment.
The RAS flow from each pumping station is continuously measured (and recorded on
SCADA) and split equally between each aeration tank.
The equipments for Return Activated Sludge is shown on table 4.2

Table 4.2 D113 RAS PS (Return Activated Sludge Pumping Stations)
113A/B -L-101 Float switches for level indicator 0-100 100 %
113A-HCP-101A / R
113B-HCP-101A / B / R
RAS Horizontal centrifugal pump On/off

On

Switch
113A / B-FT-101
RAS Electromagnetic Flow
Meter ND 600
0-100 100 %


4.2.1. MONTORNG FUNCTON AND ALARMS OPERATED

1 - RAS PUMPING STATION
Horizontal Centrifugal Pumps (station A, B) motors will be operated through frequency
converters of the latest generation with local command panels for manual mode operation.
When not in manual mode the Horizontal Centrifugal Pumps will be operated from the
SCADA System.

Automatic IocaI controI
The local control activates the system when the minimum sewage level is reached and
interrupts the pumps when the level falls below the minimum threshold.
The return activated sludge pumps will be regulated by the local automation according to
the running speed set-point set by the operator on the basis of the measured concentration
of suspended solids in the biological tanks.

Monitoring Functions
The SCADA system enables continuous monitoring of
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 39

Running State of the Horizontal Centrifugal Pump
Operating hours of activated devices
RAS Flow pumped by Primary RAS Pumping Station A, measured by
electromagnetic flow meter 113A-FT-101, that will be summed to RAS flow from
RAS Pumping Station B to measure the Total RAS flow.
Power consumption
Operational State of the Horizontal Centrifugal Pump
Circuit breaker ON/OFF position on the TD panel

AIarms operated
State of Thermal Protection


4.3. D114 - SURPLUS ACTIVATED SLUDGE (S.A.S.)

The collection of surplus activated sludge is on the DN800 pipe of return activated sludge,
which are pumped by 2+1R submersible pumps to the dynamic pre-thickening sludge
(D116). The SAS flow from the pumping station is continuously measured, and recorded on
SCADA, in the building D116 SAS Dynamic thickening and chemical conditioning
The equipments for Surplus Activated Sludge is shown on table 4.3

Table 4.3 D114 SAS PS (Surplus Activated Sludge Pumping Stations)
114-HCP-101A / B / R
SAS Horizontal centrifugal
pump:
On/off

On

Switch
114A/B-FT-101
SAS electromagnetic flow meter
ND 125
0-100 100 %


4.3.1. MONTORNG FUNCTON AND ALARMS OPERATED

1 - SAS HORIZONTAL PUMPS
Horizontal Sludge Pumps are equipped with local command panels for manual mode
operation. When not in manual mode the Horizontal Centrifugal Pumps will be operated
from the SCADA System.

Setting and Remote controI functions
When in "remote mode the operator can:
Operate the pumps to extract the surplus sludge
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 40
Set the duration of the extraction (after that time the pumps will be automatically
stopped)
Set the time of the day on which the SAS pumping starts.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Horizontal Centrifugal Pumps
Operating hours of activated devices
Operational State
Circuit breaker ON/OFF position on the TD panel

AIarms operated
State of Thermal Protection
Horizontal Centrifugal Pumps Malfunctioning alarm

4.4. D115 - PRIMARY SLUDGE THICKENING

The primary sludge is pumped directly to the two gravity thickeners D115A, D115B.
n the two thickeners is dosed a mixture of polyelectrolyte.
A polymer dosing point is provided to each thickener to reach a thickened sludge dry
concentration value of 5%, prepared by a local unit of preparation in the building D116.
nside each thickener a mechanical sludge thickener bridge that runs slowly allows the
separation of water from sludge.
Each thickener has a level transmitter to transmit to the SCADA the filling of the tank
(empty / full).
The thickened sludge is pumped with eccentric screw pumps (2+1R) to mixing tanks
D117A,B .
Liquors from the thickener will be collected into the internal sewerage and returned by
gravity to the rejected liquor storage tank D126.
An electromagnetic flow meter, installed on the output pipe DN200, allows to measure the
liquor and recorded in a cumulative manner by the SCADA.

The equipments for Primary Sludge Thickening is shown on table 4.4

Table 4.4 D115 Primary Sludge Thickening
115A / B-SB-101 mechanical scrapper thickener: On/off

On

Switch
115A / B -L-101 switch level transmitter 0-100 100 %
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 41
115-ESP-101A / B / R eccentric screw pumps On/off

On

Switch
115-FT-101
return liquor electromagnetic
flow meter ND 200
0-100 100 %



4.4.1. MONTORNG FUNCTON AND ALARMS OPERATED

1 - PRIMARY SLUDGE GRAVITATIONAL THICKENER
Mechanical Thickeners are equipped with local command panels for manual mode
operation. When not in manual mode the thickeners will be operated from the SCADA
System.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the mechanical thickeners.
Sewage levels in the thickeners, measured by switch level sensors (115A/B-L-101)
Return Liquor Flow from primary thickeners to Rejected Water Pumping Station,
measured by flow measurer 115-FT-101.
Operating hours of activated devices
Operational State of thickeners
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Mechanical thickener Malfunctioning alarm.
Low/High Level alarm

2 - ECCENTRIC SCREW PUMPS PRIMARY SLUDGE GRAVITATIONAL THICKENER
Screw Sludge Pumps are equipped with local command panels for manual mode
operation. When not in manual mode the pumps will be operated from the SCADA
System.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Screw sludge pumps.
Operational State of pumps
Operating hours of activated devices
Circuit breaker ON/OFF position on the TD

COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 42
AIarms operated
Pump Malfunctioning alarm.


4.5. D116 - DYNAMIC THICKENER

This system is composed by n.2 drum thickeners completed of the flocculation reactor
installed in the dewatering building D125.
The dry concentration of the sludge after the dynamic thickening has a value of 6%,
Liquors from the thickener will be collected into the internal sewerage and returned by
gravity to the new return liquor storage tank.
Every mechanical thickener has his own eccentric screw pump to transfer the thickened
sludge to mixing tank D117.
For the production and dosing of polyelectrolyte will be installed n 2 automatic plant with a
capacity of 2.800 l/h each.
Liquors from the dynamic thickener will be collected into the internal sewerage and returned
by gravity to the rejected liquor storage tank D126.
An electromagnetic flow meter, installed on the output pipe DN200, allows to measure the
liquor and recorded in a cumulative manner by the SCADA.
The equipments for Dynamic Thickener is shown on table 6.5

Table 6.5 D116 Dynamic Thickener
116-DT-101A / B screw thickener On/off

On

Switch
116-TK-101
automatic plant for preparation
of polyelectrolyte solution
On/off

On

Switch
116-A/B-L-101
sludge level transmitter inside
the hopper
On/off

On

Switch
116-ESP-101 A-B-C
eccentric screw pumps for
polyelectrolyte solution dosing
On/off

On

Switch
116-ESP-102A / B
eccentric screw pumps for
sludge:
On/off

On

Switch
116-FT-101A-B-C
polyelectrolyte electromagnetic
flow meter ND 25
0-100 100 %
116-FT-102
return liquor electromagnetic
flow meter ND200
0-100 100 %


COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 43

4.5.1. MONTORNG FUNCTON AND ALARMS OPERATED

1 - SCREW THICKENERS
Equipements are provided with individual command panels.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the screw thickeners.
Sewage levels in the thickeners (measured by level sensor 116A/B-L-101)
RAS flow treated by the thickeners (measured by the return liquor electromagnetic
flow meter 114A/B-FT-101)
Return Liquor Flow from screw thickeners to Rejected Water Pumping Station,
measured by flow measurer 116-FT-102.
Operating hours of activated devices
Operational State of thickeners
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Screw thickener Collective Fault alarm.
High Tank Level

2 - POLIELECTROLITE PREPARATION INSTALLATION
Equipements are provided with individual command panels.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Polieletrolite preparation installation (On, Off, Ready)
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Polieletrolite preparation installation Malfunctioning alarm
Power not available alarm


3 - POLIELECTROLITE DOSING SCREW PUMP
Polielectrolite Dosing Pumps are equipped with local command panels for manual
mode operation. When not in manual mode the pumps will be operated from the
SCADA System.

COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 44
Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the dosing pumps
Operational State of the pumps
Polyeclectrolite flow measured by electromagnetic flow meter 116-FT-101A/B/C
Operating hours of pumps
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Pumps Malfunctioning alarm.

4 - SLUDGE SCREW PUMPS
Sludge Screw Pumps are equipped with local command panels for manual mode
operation. When not in manual mode the pumps will be operated from the SCADA
System.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Sludge screw pumps.
Operational State of pumps
Operating hours of activated devices
Level of the sludge
Circuit breaker ON/OFF position on the TD panel


AIarms operated
Pump Malfunctioning alarm.

4.6. D117 - THICKENED SLUDGE MIXING TANK

n order to make homogeneous primary and surplus thickened sludge, the sludge is
pumped in two circular tanks covered D117A, D117B.
Each tank is equipped with mixer to ensure complete and continuous mixing of the sludge.
The mixed thickened sludge is pumped to three of the existing digesters with the eccentric
screw pumps.
An electromagnetic flow meter, installed on the output pipe DN200, allows to measure the
sludge pumped to digesters and recorded in a cumulative manner by the SCADA.
The motorized valve ensures to not exceed the height of the overflow of the tank.
The level of sludge is controlled by a ultrasonic level indicator.
Surplus liquors will be collected into the internal sewerage and returned by gravity to the
liquor storage tank D126.
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 45
The equipments for Thickened Sludge mixing tank is shown on table 6.6 .

Table 6.6 D117 Thickened Sludge mixing tank
117A-MX-101A / B
117B-MX-101A / B
submersible mixers On/off

On

Switch
117-ESP-101A / B/ R
eccentric screw pumps for
sludge
On/off

On

Switch
117A / B -LT-101
ultrasonic level indicator and
transmitter
0-100 100 %
117-FT-101 A-B-C
sludge electromagnetic flow
meter ND 200
0-100 100 %
117A / B-EV-101 motorized valves ND 200 On/off

On

Switch


4.6.1. MONTORNG FUNCTON AND ALARMS OPERATED

1 - SUBMERSIBLE MIXERS
Submersible Mixers are equipped with local command panels for manual mode
operation. When not in manual mode the pumps will be operated from the SCADA
System.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Submersible Mixers
Operating hours of activated devices
Operational State
Circuit breaker ON/OFF position on the TD panel

AIarms operated
State of Thermal Protection
Leak sensor alarm

2 - SLUDGE SCREW PUMPS
Sludge Screw Pumps are equipped with local command panels for manual mode
operation. When not in manual mode the pumps will be operated from the SCADA
System.

COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 46
Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Sludge screw pumps.
Operational State of pumps
Operating hours of pumps
Level of the sludge
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Pump Malfunctioning alarm.

3 - MOTORIZED VALVES
The motorized valves ND200 will be operated from the command panel for manual
mode operation. When not in manual mode the valves will be operated from the
SCADA System.

Monitoring Functions
The SCADA system enables continuous monitoring of
State of the Actuated valves
Operational State of the Actuated valves
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Actuated Valves malfunctioning alarm


4 - SENSORS
The tanks are provided of the following sensors:
switch level sensors (117A/B-L-101) which provide continuous monitoring of the
level of the tanks allowing the local automation to start/stop the mixers (117A/B-MX-
101A/B), to start/stop the pumps filling the tanks (115-ESP-101A/B/R) and to
open/close the electrovalve of the filling pipe (117A/B-EV-101).
sludge electromagnetic flow meters (117-FT-101 A/B/R) measuring the sludge
extracted from the mixing tanks and sended to digesters.


4.7. D118 - ANAEROBIC SLUDGE DIGESTION

The sludge stabilization is made with an three anaerobic digesters each 3.600 m/h using
vertical mixing system with double propeller.
The anaerobic digesters have a process temperature of 35C.
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 47
To monitor the level of sludge within the digester is used a pressure transducer mounted on
the outflow pipe of the sludge.
Near the digesters are installed to the heat exchangers of sludge.
The sludge extraction is done using horizontal centrifugal pump for heated sludge.
The temperature of the heated sludge is controlled by SCADA from a temperature sensor
mounted at the end of the heat exchanger
The equipments for Sludge Digesters is shown on table 4.7.

Table 4.7 D118 Sludge Digesters
118-MX-101A / B / C double propeller agitators On/off

On

Switch
118A / B / C-L-101 pressure transducer 0-100 100 %
118A-HCP-101A/R
118B-HCP-101A/R
118C-HCP-101A/R
horizontal centrifugal pump for
heated sludge
On/off

On

Switch
118A-TC-101A / R
118B-TC-101A / R
118C-TC-101A / R
temperature measurement 0-100 100 %

4.7.1. MONTORNG FUNCTON AND ALARMS OPERATED

1 - DOUBLE PROPELLER AGITATOR
Double Agitator is operated from the SCADA System.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Double agitator.
Operating hours of activated devices
Operational State of agitator
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Agitator Malfunctioning alarm.

2 - HORIZONTAL CENTRIFUGAL PUMP FOR HEATED SLUDGE
Horizontal Sludge Pumps are equipped with local command panels for manual mode
operation. When not in manual mode the Horizontal Sludge Pumps will be operated
from the SCADA System.

Monitoring Functions
The SCADA system enables continuous monitoring of
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 48
Running State of the Horizontal Sludge Pumps
Operating hours of activated devices
Operational State
Circuit breaker ON/OFF position on the TD panel

AIarms operated
State of Thermal Protection
Horizontal Sludge Pumps Malfunctioning alarm

3 - HORIZONTAL CENTRIFUGAL PUMP FOR HEATED WATER
Horizontal Water Pumps are equipped with local command panels for manual mode
operation. When not in manual mode the Horizontal Sludge Pumps will be operated
from the SCADA System.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Horizontal Sludge Pumps
Operating hours of activated devices
Operational State
Circuit breaker ON/OFF position on the TD panel

AIarms operated
State of Thermal Protection
Horizontal Water Pumps Malfunctioning alarm

4 - DIGESTER SENSOR
The digesters are provided of the following sensors:
preassure transducers (118A/B/C-L-101), which provide continuous monitoring of
the preassure of the tanks and rise High level alarm.
temperature measurer (118A/B/C-TC-101A/R), which have Profibus PA interface
and communicates with the Supervisor through Profibus PA/DP Coupler.

4.8. D119 - DIGESTED SLUDGE STORAGE TANKS

The digested sludge is stored in two circular covered thickeners.
This compartment allow the accumulation and the blending of the digested sludge before
the following sludge dewatering and it is equipped with mixers to ensure a continuous
mixing of the sludge.
Liquors from the thickener will be collected into the internal sewerage and returned by
gravity to the new return liquor storage tank.
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 49
The blower for biogas start when the pressure transducer indicates a pressure inside the
tank above a certain setpoint (100 mbar).
The equipments for Digested sludge storage tanks is show table 4.8.

Table 4.8 D119 Digested sludge storage tanks
119A / B-EV-101 motorized valves ND 150 On/off

On

Switch
119A-MX-101A / B
119B-MX-101A / B
submersible mixers On/off

On

Switch
119A / B-LT-101
ultrasonic level indicator and
transmitter
0-100 100 %
119-ESP-101A / B / R
eccentric screw pumps for
sludge feeding dewaterin
On/off

On

Switch
119-RB-101A / R side channel blower for biogas On/off

On

Switch
119A / B-DP-101 differential pressure measure 0-100 100 %

4.8.1. MONTORNG FUNCTON AND ALARMS OPERATED

1 - MOTORIZED VALVES ND 150
The Actuated valves will be operated from the command panel for manual mode
operation. When not in manual mode the valves will be operated from the SCADA
System.

Monitoring Functions
The SCADA system enables continuous monitoring of
State of the Actuated valves
Operational State of the Actuated valves
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Actuated Valves malfunctioning alarm

2 - SUBMERSIBLE MIXERS
Submersible Mixers are equipped with local command panels for manual mode
operation. When not in manual mode the pumps will be operated from the SCADA
System.

COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 50
Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Submersible Mixers
Operating hours of activated devices
Operational State
Circuit breaker ON/OFF position on the TD panel

AIarms operated
State of Thermal Protection
Submersible Mixers Malfunctioning alarm

3 - SLUDGE SCREW PUMPS
Sludge Screw Pumps are equipped with local command panels for manual mode
operation. When not in manual mode the pumps will be operated from the SCADA
System.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Sludge screw pumps.
Operational State of pumps
Operating hours of pumps
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Pump Malfunctioning alarm.

4 - BIOGAS BLOWERS
Biogas Blowers are equipped with local command panels for manual mode operation.
When not in manual mode the blowers will be operated from the SCADA System.

Monitoring Functions
Running State of the Biogas Blowers
Operating hours of pumps
Operational State
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Biogas Blowers Malfunctioning alarm

5 - SENSOR
The tanks are provided of the following sensors:
switch level sensors (119A/B-L-101) which provide continuous monitoring of the
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 51
level of the tanks allowing the local automation to start/stop the mixers (119A/B-MX-
101A/B), to start/stop the pumps empting the Thickened Sludge Mixing Tanks (117-
ESP-101A/B/R) and to open/close the electro valve of the filling pipe (119A/B-EV-
101).
Biogas differential pressure measurers (119A/B-AP-101), wich allow the local
automation to control the activation of the side channel blowers 119-RB-101A/R.

COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 52

4.9. PLANT FOR THE ADSORBITION OF H2S FROM BIOGAS

n anaerobic fermentation of waste for biogas production, the methane produced contains
high levels of hydrogen sulphide which is highly corrosive to the energy production unit.
Desolf equipment reduces the quantities of hydrogen sulphide with a 90% efficiency and
through careful chemical cleaning of the biogas.
Venturi stage: n the Venturi stage, the biogas is sucked in under dynamic high pressure,
caused by the strong turbulence in the high velocity throat, and is forced into contact with
the wash solution for optimal pre-filtering.
First Tower Stage: n the first tower, the biogas from the Venturi is backwashed at low
velocity over an ample static contact surface (biogas - wash solution) obtained through
alveolar exchange packs with a high specific surface area.
Second Tower Stage: n the second tower, the biogas is scrubbed in the same way as in
the first tower and then passes through a demister: alveolar packs to separate droplets
which prevent the reagent solution carry-over.

Type of equipment : Tower for biogas
Material : AS 316
Flow max Biogas : 500 cm/h
Reagent killing : NaOH

4.9.1. MONTORNG FUNCTON AND ALARMS OPERATED

1 - PLANT FOR H2S ABSORPTION FROM BIOGAS
H2S absorption plant is equipped with its own command panel for manual mode
operation.
When not in manual mode the Air Treatment equipments will be operated from the
SCADA System.

Monitoring Functions
The SCADA system enables continuous monitoring of
Circuit breaker ON/OFF position on the TD panel
Operational State f the scrubber
Running Status of the scrubber
Level of the reagent in the tank
Reagent preassure

AIarms operated
Air treatment equipments Malfunctioning alarm
Biogas leak alarm
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 53
Smoke presence alarm

2 - BIOGAS BLOWERS
Biogas Blowers are equipped with local command panels for manual mode
operation. When not in manual mode the blowers will be operated from the SCADA
System.

Monitoring Functions
Running State of the Biogas Blowers
Operating hours of pumps
Operational State
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Biogas Blowers Malfunctioning alarm


4.10. D121 - COMBINED HEAT & POWER
4.10.1. POWER UNIT (CHP)
n order to produce electric energy from the biogas product from the digestion process, N 2
CHP engines is installed in a technological building.

Every engine can recuperate a quantity of thermal energy 300 kW and has a max
consumption of biogas 130 Nm3/h.

Every engine has production of electric energy of 260 kW/h.

The whole CHP group can give a recovery of electric energy of 520 kW/h.

The equipments for Power Units CHP is show table 4.10.

Table 4.10 D121 Cogeneration group
D121 Cogeneration group On/off

On

Switch
121A-OCP-101A/R
121B-OCP-101A / R
Horizontal centrifugal pump for
heated water
On/off

On

Switch
121-SS-101 smoke sensor 0-100 100 %
121-BS-101 biogas sensor 0-100 100 %
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 54
121-FT-101 biogas flow meter ND 80 0-100 100 %
121-A/B-EV-101 Three-way electrical valve 0-100 100 %


4.10.2. HEAT UNITS
The heats units station is made of 2 boilers (1+1 for reserve). Each boiler is equipped with
a control panel mounted beside the machine that manages the operation of each single
boiler. Both the boilers during the winter are switched on and in stand-by. The boiler of
reserve may enter into operation when the electronic controller - mounted on the general
panel of the system which supervises the operation of the system - signals to the control
panel of the reserve boiler to enter in function.
The main purpose of the boilers is to maintain the sludge within the digesters at a
temperature of 35C. For this purpose have been included, on all the delivery and return
flow circuits for hot water, some temperature probes that send the signal to the control
junction box. When (for example) a temperature probe on the pipe of coming back water
from the heat exchanger of the digester refers a value of lower temperature of a certain
prefixed value, it means that it is necessary to send heat to the digester; consequently the
boiler increases its operation in order to supply the necessary heat.
The operation of each group of pumps (1+1 of reserve for each line) is set in action
manually.
n case of maintenance of a line, the group is turned off manually too.
The internal recirculation pumps of hot water, for each boiler, are instead managed from the
control panel of each boiler.
A part of the heat produced by the boilers is used to heat the local of mechanical
dewatering (D116-D125). n the cold season, the circulation pumps of warm water are
switched on, and they send it to le local.
At the same time are switched on: all the pumps of the substation, the two pumps of the
circuits of aerothermals and the one of the UTA circuit (unit of air treatment).
The internal fan of the UTA, which exchanges the air within the local of dewatering, works
all the year, while the pump for sending the warm water to the heat exchanger, works only
in wintertime.
Each aerothermal is equipped with a thermostat that, once reached the prefixed ambient
temperature, switches it off.
n this case the remote control has only the task of monitoring and supervise the operation
of each machine (start/stop/alarm).
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 55
Both within the boiler room that in the room of cogeneration, two sensors are mounted (one
for the gas and the other for the smoke) and in danger case they close the valve of
interception of the methane and of the biogas both of cogenerators and boilers.


The equipments for Heats Units is show table 4.10.

Table 4.10 D122 Power Units
122-FB-101A/R Fired boilers biogas/natural gas On/off

On

Switch
122-BB-101 A / B boiler burner On/off

On

Switch
122-SS-101 smoke sensor 0-100 100 %
122-SS-101 biogas sensor 0-100 100 %
122A/B-FT-101 biogas flow meter ND 80 0-100 100 %
122-OCP-101 A/R On line centrifugal pump On/off

On

Switch

4.10.3. PUMP FOR SLUDGE HEATING GROUP (ROOM D122)
The pumps 118A, B, C installed in the boiler room D122 heated sludge digester through
heat exchangers
When the process of digestion is started, the biogas produced fills the membrane
gasometers. The indication of the degree of filling of gasometers is indicated by a internal
probe of position. At this point you can manually select the functioning of the boiler by
biogas. When the process is fully launched you can turn cogenerators (using biogas). The
pumps 121A,B move hot water from cogenerators to the main collector of thermal station,
recovering heat from the cooling of the engines and from exhaust fumes of cogenerators.
The pumps 122 (1 1R) move the water produced by the boiler to the main collector.
The pump 125 moves hot water to the dewatering building D125-D116 for the heating of
environment. n the mechanical dewatering building the hot water coming from the thermal
station is recirculated by 125-OCP-102 to the UTA (Air Treatment Unit), that makes a
replacement of the internal air of the local. n addition there are two other circuits served by
pumps 125-OCP-103 and 125-OCP-104, one sends the hot water to the 6 aerothermic of
the mechanical dehydration, and the other one sends it to the 2 aerothermic of the local
due to the storing and dosing of ferric chloride.
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 56
Each aerothermic is equipped with a local control panel with thermometer. n case of
reaching of the set temperature, the aerothermic stops.
The UTA (Air Treatment Unit) always works (summer-winter). n the summer time the
recirculating pump of hot water is stopped.


4.10.4. MONTORNG FUNCTON AND ALARMS OPERATED

1 - CENTRIFUGAL PUMP FOR HEATED WATER
Centrifugal Pumps for Heated are equipped with local command panels for manual
mode operation. When not in manual mode the Warm water Pumps will be operated
from the SCADA System.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Warm water pumps.
Operational State of pumps
Operating hours of pumps
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Pump Malfunctioning alarm.

2 - ON LINE CENTRIFUGAL PUMP
On Line Centrifugal Pumps are equipped with local command panels for manual
mode operation. When not in manual mode the On Line Centrifugal Pumps will be
operated from the SCADA System.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the On Line Centrifugal Pumps
Operating hours of activated devices
Operational State of the On Line Centrifugal Pumps
Circuit breaker ON/OFF position on the TD panel

AIarms operated
State of Thermal Protection
On Line Centrifugal Pumps Malfunctioning alarm

3 - COGENERATION GROUP (CHP)
Cogenerators are provided with individual control panels and local automation
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 57
unit (PLC Telemecanique).
Communication is allowed by Profibus DP connection, where the
aforementioned PLC is the master and the DO4 is the slave.

Setting and Remote controI functions
When in "remote mode the operator can
Define the set points of the cogenerators.

Monitoring Functions
The system's MM enables continuous monitoring of
General State of the Cogenerator (Start, Stop, Stand-by, Starting, Failure,
Sincronization, etc.)
State of power supply
the values of the set point of the cogenerators
the instant power production
partial working hours
total worging hours
the state of the fans and the pumps of the installations
water temperatures
oil temperatures
oil pressures
primary and secondary water temperature
cabin temperature
input/output water temperature
input and output exhaust gas temperature
RST phases current and voltage
Frequency
Active and reactive power
Circuit breaker ON/OFF position on the TD panel

AIarms operated
All the aforementioned quantities can be used to raise individual or cumulative
alarms

4 - FIRED BOILERS BIOGAS/NATURAL GAS
Each provided with burners and individual command panels.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Boiler.
Operating hours of activated devices
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 58
Burned Biogas Flow, measured by biogas flow meters 122A-FT-101 and
122B-FT-101.
Operational State of the Boiler.
Circuit breaker ON/OFF position on the TD

AIarms operated
Boiler Malfunctioning alarm.

5 - BOILER BURNER
Boiler burners are delivered with their own command panels.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Burners.
Operating hours of activated devices
Operational State of the Burners
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Burners Malfunctioning alarm

6 - ELECTRICAL THREE WAY VALVE
Electrical valves will be fitted with local command panels. The valves will be
operated from the command panel for manual mode operation. When not in
manual mode the Electrical valves will be operated from the SCADA System.

Monitoring Functions
The SCADA system enables continuous monitoring of
State of the Electrical valves
Operational State of the Electrical valves
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Electrical Valves malfunctioning alarm






COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 59

4.11. D123 - GASHOLDERS

The biogas produced by the 3 digesters is sent through an appropriate piping to 3
membrane gasometers each with a volume of 1.000 m. An ultrasonic level allows you to
measure the movement of the membrane and therefore to determine the quantity of stored
gas.
The console of control of each gasometer allows the control of the signal with the
monitoring of the state of the gasometer (it remains to decide what to send to TLC, empty,
full, etc.).
n case of need, for the disposal of the exceeding biogas it is provided an appropriate torch
of emergency (D124).
The biogas goes out of the gasometers with a maximum pressure of 25 mbar and goes
through a division of desulfurization and dehumidification, for the cleaning of the biogas
from the H
2
S (hydrogen sulphide) and for its dehumidification (essentially making it more
dry). First the biogas passes through a scrubber tower that through a washing with a
solution of soda (sodium carbonate), it comes reduced by the component H
2
S. The
scrubber is equipped with a switchgear, mounted beside the machine, that controls and
gives power to the fan, the pumps, the tools and all the devices of process control.
At the exit of the vertical scrubber, the biogas goes through a dehumidifier, made by a
condenser powered by a water chiller.
Within the desulphurisation local (D120) two sensors are installed, one for the gas and one
for the smoke, in case of alarm they intervene on the interception valve of biogas on the
transport piping and they exclude the biogas feed to the scrubber.
At the exit from the process of desulfurization and dehumidification, having the biogas a
little pressure, it is pumped to the using devices (cogenerators and boilers) through 1+1
reserve blower in order to increase the pressure to a maximum of 150 mbar.

The equipments for the Gasholders is show on table 4.11.

Table 4.11 D123 Gasholders
D123 A / B/ C blowers for gasholders On/off

On

Switch
123A/B/C-LT-101 level measurement to ultrasonic 0-100 100 %
123A/B/C-FT-101 biogas Flow Meter ND 80 0-100 100 %

COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 60


The equipments for the Flare stack is show on table 6.12.

Table 6.12 D124 Flare stak
D124 flare stack On/off

On

Switch
124-FT-101 biogas Flow Meter ND 80 0-100 100 %


4.11.1. MONTORNG FUNCTON AND ALARMS OPERATED

1 - BOWERS FOR GASHOLDERS
Blowers are equipped with local command panels for manual mode operation.
When not in manual mode the Blowers will be operated from the SCADA System.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the blowers.
Operating hours of activated devices
Operational State of the blowers
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Blower Malfunctioning alarm

2 - GASHOLDERS CONTROL CABINETS
Each gasholder is provided with a individual control panel wich drives 2 fans
through micro PLC SEMENS S7-200. Communication is allowed by Profibus DP
connection, where the aforementioned PLC is the slave and the DO4 is the master.

Monitoring Functions
The SCAD system enables continuous monitoring of
Running State of the fans.
Level of methane.
Operational State of the blowers

AIarms operated
Low level methane
Very low pressure
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 61
Fan Malfunctioning alarm

3 - GASHOLDERS SENSORS
The Gas Holders are provided of the following sensors:
Ultrasonic level measurers (123A/B/C-LT-101) which provide continuous
monitoring of the gas level in the gas holders and allows the local automation
to control the activation of the air blowers.
Biogas flow meters (123A/B/C-FT-101), wich provide continuous measuring of
the gas stored in the Gas Holders.

4 - FLARE STACK
Flare stack is delivered with their own command panels.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Flare stack.
Biogas flow burned by the Flare, measured by the flow meters 124-FT-101.
Operational State of the Flare stack
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Gas holders High Level biogas
Gas holders Low Level biogas



4.12. D125 - MECHANICAL SLUDGE DEWATERING

The dewatering unit consist of N. 2+1 stand-by centrifuges installed with a single
maximum capacity of 650 kg TSS/h.
They is arranged in the existing dewatering building, including n 2 polymer preparation
stations, with a single capacity of 3.500 l/h (total 7.000 l/h) , with a adjustable dosing pump.

The centrifuge feed pumps are with the inverter driven variable speed progressive type:
they are adjustable to optimise the performance of the centrifugal extractor and will operate
until the signal indicating low level in the sludge storage tank causes them to stop or until
the preset time is reached.

The centrifuge feed sludge are pre-conditioned with polyelectrolyte. The polymer
preparation plant are located and arranged in a way that it will give no obstructions for filling
with polymer, service and maintenance.
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 62

The polymer solution dose rate (10 g poly/ kg SST) will be set manually and the centrifuge
feed pumps will control the dosing pumps operation.
The unit will be capable of using technical water as water source for all purposes and will
provide polymer to the centrifugal extractor through n 2+1 stand-by dosing pumps.

The feeder is of the screw type while the feeder outlet is designed for effectively preventing
moisture from reaching the polymer powder.

The polymer dosing unit are provided with own local controls and instrumentation to provide
a working installation. The unit will work automatically together with the centrifuge and
sludge feed pumps.

The extractor centrifuge will operate on a daily basis at a preset time for 6 days per week,
16 hours per day.
The centrifuges are equipped with a local automatic control panel for all internal centrifuge
control as well as for auxiliary equipment.

The centrifuges are mounted on steel frames with vibration dampers and will be equipped
with all necessary auxiliary equipment to ensure trouble free operation. An automatic torque
control system will ensure optimum control of differential speed.

The required sludge cake concentration is equal to 25%.
Liquors from this sludge treatment will be collected into the internal sewerage and returned
by gravity to the new return liquor storage tank.

The equipments for the Mechanical Sludge dewatering is show on table 4.12.

Table 4.12 D125 Mechanical Sludge dewatering
125-CS-101A / B / R Sludge thickening centrifuge: On/off

On

Switch
125-TK-101A / B
Automatic plant for preparation
of polyelectrolyte solution
On/off

On

Switch
125-ESP-101A / B / R Polymer dosing pumps On/off

On

Switch
125-WY-101A / B / R Sludge cake conveyor: On/off

On

Switch
125-FT-101 A / B / R
Sludge electromagnetic flow
meter ND 100
0-100 100 %
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 63
125-FT-102 A / B / R
Polyelectrolyte electromagnetic
flow meter ND 25
0-100 100 %
125-FT-103
Return liquor ultrasonic flow
meter
0-100 100 %
125-OCP-101 A/R
Hot water recirculation pump to
boiler burner
On/off

On

Switch
125-OCP-102 A/R
Hot water recirculation pump to
UTA
On/off

On

Switch
125-OCP-103 A/R
Hot water recirculation pump to
heating fans
On/off

On

Switch
125-OCP-103 B/R
Hot water recirculation pump to
heating fans
On/off

On

Switch
125-HF-103
A/B/C/D/E/F/G/H
Heating fans On/off

On

Switch
125-AUT-101 Air Unit Treatment input On/off

On

Switch
125-AUT-102 Air Unit Treatment output On/off

On

Switch


4.12.1. MONTORNG FUNCTON AND ALARMS OPERATED

1 - DEWATERING CENTRIFUGES
Local command panels are provided for manual mode operation.
When not in manual mode the centrifuges will be operated from the SCADA
System.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the screw thickeners.
Operating hours of activated devices
Digested sludge flow treated by the centrifuges, measured by electromagnetic
flow meter 125-FT-101A/B/C
Return Liquor Flow from the centrifuges to the Rejected Water Pumping Station,
measured by flow measurer 125-FT-103.
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 64
Operational State of thickeners
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Screw thickener Malfunctioning alarm.

2 - POLYMER PREPARATION UNITS
Equipements are provided with individual command panels.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Polieletrolite preparation installation (On, Off, Ready)
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Polyeletrolite preparation installation Malfunctioning alarm
Power not available alarm

3 - POLYMER DOSING PUMPS
Polielectrolite Dosing Pumps are equipped with local command panels for manual
mode operation. When not in manual mode the pumps will be operated from the
SCADA System.

Monitoring Functions
The system's MM enables continuous monitoring of
Running State of the dosing pumps
Operational State of the pumps
Polyeclectrolite flow measured by electromagnetic flow meter 125-FT-102A/B/C
Operating hours of pumps
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Pumps Malfunctioning alarm.

4 - SLUDGE CONVEYORS
Sludge Conveyors are equipped with local command panels for manual mode
operation.
When not in manual mode the Sludge Conveyors will be operated from the SCADA
System.

Monitoring Functions
The SCADA system enables continuous monitoring of
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 65
Running State of the Sludge Conveyors
Operating hours of activated devices
Operational State
Circuit breaker ON/OFF position on the TD panel
AIarms operated
Sludge Conveyors Malfunctioning alarm

5 - RECIRCULATION PUMPS
Recirculation Pumps are equipped with local command panels for manual mode
operation.
When not in manual mode the Recirculation Pumps will be operated from the SCADA
System.

Monitoring Functions
The SCADA system MM enables continuous monitoring of
Running State of the Recirculation pumps.
Operational State of pumps
Operating hours of pumps
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Pump Malfunctioning alarm.

6 - AIR TREATMENT EQUIPEMENTS
Air Treatment equipments are equipped with local command panels for manual mode
operation.
When not in manual mode the Air Treatment aquipments will be operated from the
SCADA System.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Air treatment equipments.
Operating hours of activated devices
Operational State
Circuit breaker ON/OFF position on the TD panel

AIarms operated
Air treatment equipments Malfunctioning alarm




COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 66

4.13. D127 - SLUDGE CAKE STORAGE

The dewatered sludge are stored in one new cake storage area of about 108.080 m.
This whole area is made with a concrete floor designed with slopes for water drainage and
for road vehicles.
All the drainage liquors from this cake store will be collected to the collection tank.


4.14. D126 - RETURN LIQUOR STORAGE TANK

The tank is covered concrete storage tank with an useable volume > 1000 m3 , to receive
all the drainage liquors from thickeners, dewatering building, CHP building, digester plant
rooms and the cake store.

The mixing system will guarantee complete mixing to ensure the considerable solids in this
liquor remain in suspension at all times and be on guide rails.

There is a pumping station to transfer the return liquor to the feed channels to all the
primary tanks.
The pumps will be controlled by the SCADA system and be sized to empty the full tank in
six hours into the flow upstream of the primary tanks

The equipments for the Return Liquor Storage Tank is show on table 6.14 .

Table 6.14 D126 Return Liquor Storage Tank
126-MX-101A / B Submersible mixers On/off

On

Switch
126-SCP-101A / R Submersibles pumps On/off

On

Switch
126-L-101
Floating level regulator for mixers
control
0-100 100 %
126-L-102
Level measurement for control
pumps
0-100 100 %
126-FT-101
Return liquor electromagnetic flow
meter ND 200
0-100 100 %



COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 67
4.14.1. MONTORNG FUNCTON AND ALARMS OPERATED

1 - SUBMERSIBLE MIXERS
Submersible Mixers are equipped with local command panels for manual mode
operation. When not in manual mode the pumps will be operated from the SCADA
System.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Submersible Mixers
Operating hours of activated devices
Operational State
Circuit breaker ON/OFF position on the TD panel

AIarms operated
State of Thermal Protection
Submersible Mixers Malfunctioning alarm


2 - SUBMERSIBLE PUMPS
Submersible Pumps are equipped with local command panels for manual mode
operation and controlled by frequency converter. When not in manual mode the
Submersible Pumps will be operated from the SCADA System.

Monitoring Functions
The SCADA system enables continuous monitoring of
Running State of the Submersible Pump
Operating hours of activated devices
Power consumption
State of Thermal Protection
Operational State
Circuit breaker ON/OFF position on the TD panel

AIarms operated
State of Thermal Protection
Submersible Pump Malfunctioning alarm

3 - REJECTED WATER PUMPING STATION SENSORS
The tanks are provided of the following sensors:
return liquor electromagnetic flow meter (126-FT-103) which provide continuous
monitoring of the total return liquor pumped back to the Grit and Grease System.
ultrasonic level indicator (126-LT-101), wich allow the local automation to
COSTRUZON DOND S.p.A. Process Operation Manual WWTP Pitesti
Rif: 1.761 - WWTP of Pitesti 25.11.2010 68
control the activation of the mixers and the pumps if the pumping station.