DATE

1st R A BILL STATUS

SL NO

PARTICULAR

1ST BILL

EXCAVATION

911.76 CUM

BACK FILL

798.68CUM

PCC

57.47CUM

RCC M25

204.24CUM

STEEL

22594kg

FORMWORK

919.19SQM

RATES

TOTAL AMOUNT

BILLING OF QUANTITIES ,COFEE BOARD LYT SITE


EXCAVATION IN EARTH FOR FOUNDATION SUCH AS FOOTING,RETAINING WALL AND LIFT WELL
SL NO
1
2

PARTICULAR WITH IDENTIFICATION


Mass excavation of whole site
below NGL
excavation for footing as per old
drwg
footing 2/c5
footing 3/c6
footing 8/c18
footing 9/c19
combined footing/c10,c14
excavation for footing as per new
drwg
footing 4/c17
footing1/c1
footing5/c2
footing6/c3
lift well(rf1),F10,F10,F4,F4

SHEAR WALL(RETAINING WALL)


b/w c17 to c15
b/w c11 to c8
b/w c8 to c7
b/w c7 to c1
b/w c1 to c2
b/w c2 to c3
b/w c3 to c6
b/w c6 to c10
b/w c14 to c19
b/w c19 to c18

a
b
c
d
e
f
g
h
i
j

SL NO

EARTH FILLING QUANTITY


PARTICULAR
1 entire site
2

NUM LENGTH WIDTH DEPTH

UNIT

QTY

REMARKS

77

45

cft

20790

9/1/2011

1
1
1
1
1

14
15
15.75
17.5
26

14
8.5
15.25
8.5
8.5

3
2.25
3.25
3.25
3.25

cft
cft
cft
cft
cft

588
286.875
780.609375
483.4375
718.25

9/7/2011

1
1
1
1
1
1
1

9
10
12
10
23
8.5
13

9
8.5
10
10
22
9
5

5
5
5
5
8.5
8.5
8.5

cft
cft
cft
cft
cft
cft
cft

405
425
600
500
4301
650.25
552.5

1
1
1
1
1
1
1
1
1
1

11
3.75 2.75
cft
3
3.82 2.66
cft
3
3.66 2.81
cft
22
3.81 2.91
cft
4.5
3.75 2.91
cft
19
3.75 2.66
cft
7
3.75 2.58
cft
8.5
3.81 2.58
cft
12
3.91 2.91
cft
19.5
3.82 2.75
cft
TOTAL QTY OF EXCAVATION

NO

LENGTHWIDTH DEPTH UNIT


1
77
45
6
cft

add furter excavation in


footings,shear wall ,lift well

113.4375
30.33
30.8538
243.9162
49.10625
189.525
67.725
83.5533
136.5372
204.8475
32230.7536 cft
911.761064 CUM
QTY
20790
11440

deduct concrete qty of footing, pedestal,lift, lift well,and shear wall

ref cncrete CCM25


detail
28233 cft

-3997
total earth filled

PLAIN CEMENT CONCRETE OF 1:4:8


SL NO

PARTICULAR WITH
IDENTIFICATION

NUM LENGTH WIDTH DEPTH

UNIT

QTY

footing 2/c5

14

14

0.41

CFT

80.36

2
3
4
5
6
7
8
9
10

footing 3/c6
footing 8/c18
footing 9/c19
combined footing/c10,c14
Footing 4/c17,c7,c8
footing 10/c9,c13
footing 1/c1
footing 6/C3
footing 5/c2

8.5
15.25
8.5
8.5
7.75
9.75
8.5
8.25
8.5

0.38
0.435
0.41
0.41
0.41
0.41
0.41
0.5
0.41

CFT
CFT
CFT
CFT
CFT
CFT
CFT
CFT
CFT

48.45

1
1
1
3
2
1
1
1

15
15.75
17.5
26
6.6
9.75
10.5
8.25
10.5

104.48156
60.9875
90.61
62.9145
77.95125
36.5925
34.03125
36.5925

11

raft footing/c15,c16,c12,c11(LIFT
WELL)
SHEAR WALL(RETAINING WALL)
b/w c17 to c15
b/w c11 to c8
b/w c8 to c7
b/w c7 to c1
b/w c1 to c2
b/w c2 to c3
b/w c3 to c6
b/w c6 to c10
b/w c14 to c19
b/w c19 to c18
for G Basement Floor

11.5

10.75

0.41

CFT

50.68625

1
1
1
1
1
1
1
1
1
1
1

11
3
3
22
4.5
19
7
8.5
12
19.5
67

3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
40

0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.5

deduct for coloumn


deduct for lift well
deduct for ramp cut out

3
1
1

1.5
6.33
15.66

1.5
6.66
12

0.5
0.5
0.5

CFT
CFT
CFT
CFT
CFT
CFT
CFT
CFT
CFT
CFT
cft
total
cft
cft
cft

12.705
3.465
3.465
25.41
5.1975
21.945
8.085
9.8175
13.86
22.5225
1340
2150.1298
3.375
21.0789
93.96

12
a
b
c
d
e
f
g
h
i
j
13

net qty of pcc

REMARKS

2031.7159 cft

STEEL QTY CALCULATION


SL NO
NOMICULATURE
1 combined footing

AstB
Y

AstL
Y

2 Combined foot beam


top bars
botttom bars
bottom extra
rings(stirrups):master 1
master2
pin rod
3 footing 9

y
y

4 footing 8

5 footing3

6 footing 2

y
y
y
7 footing 6

8 footing 4

y
y
9 footing 1

y
y

10 footing 5

11 footing10

y
y
12 raft footing
bottom mat

dia num
cut length(m) wt/rmt
total wt(kg) REMARKS
12
47
2.7
0.88
111.672
8
16
6.3
0.39
39.312
20
25
25
8
10
25
12
12
12
12
12
16
16
16
10
10
10
10
10
10
10
12
12
12

5
5
5
38
32
4
30
18
30
30
31
13
21
21
22
22
36
30
10
10
28
23
52
52

6.7
6.7
4.5
2.9
2.9
0.78
2.7
3.4
3.4
3.4
2.7
3.55
3.5
3.5
2.5
2.5
1.83
2.3
1.84
1.84
2.54
3.15
2.92
2.92

2.46
3.85
3.85
0.39
0.61
3.85
0.88
0.88
0.88
0.88
0.88
1.58
1.58
1.58
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.88
0.88
0.88

82.41
128.975
86.625
42.978
56.608
12.012
71.28
53.856
89.76
89.76
73.656
72.917
116.13
116.13
33.55
33.55
40.1868
42.09
11.224
11.224
43.3832
63.756
133.6192
133.6192

12

25

3.56

0.88

78.32

3 no

2 no

y
top mat

y
y

chairs
13 pedestal
P5
P6
P10
P14
P18
P19
RINGS
HOOK
P2,P3
RINGS
HOOK
P9,P13
RINGS
HOOKS
P15,P8,P7,P1
RINGS
HOOK:TYPE1
TYPE2
14 SHEAR WALL FOOTING
B/W C17 TO C15
B/W C11 TO C8

y
y
y
y

B/W C8 TO C7

B/W C7 TO C1

y
y
B/W C1 TO C2

y
y

12
12
12
20

23
25
23
5

3.73
3.56
3.73
0.95

0.88
0.88
0.88
2.46

75.4952
78.32
75.4952
11.685

12
12
12
12
12
12
8
8
12
8
8
12
8
8
10
8
8
8
10mm
10mm
10mm
10mm
10mm
10mm
10mm
10mm
10mm
10mm

16
16
16
16
16
16
42
252
32
14
84
32
20
84
64
40
160
80
22
6
7
6
7
6
43
6
10
6

1.85
1.85
1
1
1.85
1.85
2.85
0.65
2.16
2.85
0.65
2.5
2.85
0.65
2.16
2.1
0.43
0.73

0.88
0.88
0.88
0.88
0.88
0.88
0.39
0.39
0.88
0.39
0.39
0.88
0.39
0.39
0.61
0.39
0.39
0.39
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61

26.048
26.048
14.08
14.08
26.048
26.048
46.683
63.882
60.8256
15.561
21.294
70.4
22.23
21.294
84.3264
32.76
26.832
22.776
14.762
12.4074
4.697
3.3672
4.697
3.3672
28.853
24.705
6.71
5.0508

1.1
3.39
1.1
0.92
1.1
0.92
1.1
6.75
1.1
1.38

6 NO
6 NO
2 N0
2 N0
2 N0
2 N0
2N0
2 N0

B/W C2 TO C3

y
y

B/W C3 TO C6

B/W C6 TO C10

y
y
B/W C10 TO C14

B/W C14 TO C19

B/W C19 TO C18

y
y
y
SHEAR WALL
B/W C17 TO C15
B/W C11 TO C8

B/W C8 TO C7

Y
Y
Y
Y

B/W C7 TO C1

B/W C1 TO C2

B/W C2 TO C3

Y
Y
Y
B/W C3 TO C6

B/W C6 TO C10

B/W C10 TO C14

B/W C14 TO C19

B/W C19 TO C18

Y
Y
Y
Y

10mm
10mm
10mm
10mm
10mm
10mm
10mm
10mm
10mm
10mm
10mm
10mm
10 mm
10mm
10mm
10mm
10mm
10mm
10mm
10mm
10mm
10mm
10mm
10mm
10mm
10mm
10mm
10mm
10mm
10mm
10mm
10mm
10mm

38
6
13
6
17
6
35
13
23
6
38
6
64
52
32
48
32
48
96
48
45
48
102
36
62
36
57
36
35
36
76
36
99

1.1
5.8
1.1
2.16
1.1
2.6
1.1
2.9
1.1
3.65
1.1
5.8
4.12
4.6
4.12
2.3
4.12
2.3
4.12
7.7
4.12
3.35
3.1
8
3.1
3.1
3.1
5.1
3.1
2.92
3.1
6.15
3.1

0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61

25.498
21.228
8.723
7.9056
11.407
9.516
23.485
22.997
15.433
13.359
25.498
21.228
160.8448
145.912
80.4224
67.344
80.4224
67.344
241.2672
225.456
113.094
98.088
192.882
175.68
117.242
68.076
107.787
111.996
66.185
64.1232
143.716
135.054
187.209

Y
15 COLOUMN(basement to grond floor)
COLOUMN 5:
Stirrups
hooks
16 coloumn 6
Stirrups
hook
17 coloumn 18
rings
hook
18 coloumn 19
rings
hook
19 coloumn 10
rings
hook
20 coloumn 14
rings
hook
21 coloumn 15
rings
hooks
22 coloumn 11,12,16
rings

10mm
25
20
8
8
25
20
8
8
25
16
8
8
25
16
8
8
25
20
8
8
25
16
8
8
16
12
8
8
16
12
8

36

0.61

175.68

4
8
60
60
4
8
60
60
8
8
60
120
8
8
60
120
4
4
60
60
8
8
60
120
8
2
50
25
12
12
138

6.55
5.65
1.42
0.47
6.55
5.65
1.42
0.47
6.55
5.65
1.42
0.47
6.55
5.65
1.42
0.47
6.55
5.65
1.24
0.47
6.55
5.65
1.42
0.47
6.15
5.75
1.15
0.2
6.15
5.75
0.81

3.85
2.46
0.39
0.39
3.85
2.46
0.39
0.39
3.85
1.58
0.39
0.39
3.85
1.58
0.39
0.39
3.85
2.46
0.39
0.39
3.85
1.58
0.39
0.39
1.58
0.88
0.39
0.39
1.58
0.88
0.39

100.87
111.192
33.228
10.998
100.87
111.192
33.228
10.998
201.74
71.416
33.228
21.996
201.74
71.416
33.228
21.996
100.87
55.596
29.016
10.998
201.74
71.416
33.228
21.996
77.736
10.12
22.425
1.95
116.604
60.72
43.5942

3474.7869

23 coloumn 8

16
16
8
8
16
12
8
8
16
16
8
8
20
20
8
8
25
16
8
8
25
20
8
8
16
12
8

rings
hook
24 coloumn 7
rings
hook
25 coloumn 1
rings
hook
26 coloumn 17
rings
hook
27 coloumn 13
rings
hook
28 coloumn 9,2,3
rings
hook
29 coloumn c4a and c4b
(9"*15)
rings
lift well
inside and out side

y
y

10
8
8
8

5
5
50
25
8
2
48
24
4
4
52
26
4
4
48
24
8
8
44
22
12
12
138
69
8
4
54
72
48
26
56

6.15
5.75
1.15
0.2
6.15
5.75
1.15
0.2
6.15
5.75
1.15
0.2
6.15
5.75
1.3
0.2
6.55
5.65
1.42
0.47
6.55
5.65
1.24
0.47
6.4
5.79
1.06

1.58
1.58
0.39
0.39
1.58
0.88
0.39
0.39
1.58
1.58
0.39
0.39
2.46
2.46
0.39
0.39
3.85
1.58
0.39
0.39
3.85
2.46
0.39
0.39
1.58
0.88
0.39

48.585
45.425
22.425
1.95
77.736
10.12
21.528
1.872
38.868
36.34
23.322
2.028
60.516
56.58
24.336
1.872
201.74
71.416
24.3672
4.0326
302.61
166.788
66.7368
12.6477
80.896
20.3808
22.3236

8.8
1.8
2.1
1.95
total in kg's

0.61
0.39
0.39
0.39

386.496
33.696
21.294
42.588
9830.3949

30 basement floor slab steel


A B/W C18,C2,C3,C19
bottom reinforcement(thru) y
both ends(centre)
y
bottom thru
Y
centre
Y
thru along length
Bottom extra both ends along length
Bottom along length(LHS&RHS)y

c
d

12
10
58
59
57
84
14

9.1
6.04
9.1
6.04
21.45
5.5
21.45

2.46
2.46
1.58
1.58
0.61
0.61
1.58

268.632
near 14"thk
148.584
833.924
near10" thk
563.0488
745.8165
281.82
474.474

16

12

3.35

1.58

63.516

botton extra b/w c5,c9 and c6,c10 y

16

12

3.35

1.58

63.516

Bottom extra b/w c2 ,c5 and


c3,c6 (LHS &RHS)

Y
y

20
20
16
16
10
10
16

bottom extra b/w c13 ,c18 and c14,c19


y
bottom distribtion b/w c18,c19
bottom distribution b/w c2,c3
bottom distribution b/w c2,c18
bottom distribution b/w c3,c19
B/WC1,C2,C9,C8
bottom(along width)
y
bottom(along length)
B/W C12,C13,C9
Bottom alongwidth
bottom along lengt
b/w c13,c12,c16
along length
along width
LHS Side of c15,c16
along length

y
y
y
y

16
10
10
12
12

12
30
30
87
87

4.67
2.7
1.37
1.6
1.6

1.58
0.61
0.61
0.88
0.88

88.5432
49.41
25.071
122.496
122.496

10
10

70
19

4.5
11.1

0.61
0.61

192.15
128.649

8
10

13
9

2.43
2.9

0.39
0.61

12.3201
15.921

8
8

7
18

2.74
2.4

0.39
0.39

7.4802
16.848

1.9

0.39

4.446

near 14"thk

along width

TOP (TENSION ) REINFORCEMENT IN SLAB


A B/W C18,C2,C3,C19
ALONG WIDTH(RHS)NEAR C3 ,C19
Y
ALONG WIDTH(LHS) NEAR ,C18 Y
ALONG WIDTH (LHS) NEAR C2 Y
ALONG WIDTH TO TIE LHS AND RHS(B.END)
Y
Distribution (c18,c19)
y
Distribution (c2,c3)
y
top bar b/w ( c2 toc18)
y
(ONLY LHS)
y
top bar b/w ( c3 TO C19) ONLY RHS
Y
Y
(LHS AND RHS)
Y
extra cut bar
y
(both LHS and RHS)
y
y
B

SLAB B/W C1,C2,C8,C7

Y
Y
Y

Y
LHS Side of c15,c16

Y
Y

B/W C13,C12,C16

Y
Y

12

0.9

0.39

4.212

20
20
20
12
12
12
12
16
12
16
16
16
16
16

41
22
15
30
15
15
64
95
64
95
24
30
24
24

2.9
2.9
3.96
4.6
4.75
2.3
3.96
3.96
2.9
2.9
21.35
4
3.5
7.3

2.46
2.46
2.46
0.88
0.88
0.88
0.88
1.58
0.88
1.58
1.58
1.58
1.58
1.58

292.494
156.948
146.124
121.44
62.7
30.36
223.0272
594.396
163.328
435.29
809.592
189.6
132.72
276.816

10
8
8

90
14
18

1
10.75
3.5

0.61
0.88
0.39

10
10
8
8
8
8

16
9
10
5
8
3

2.4
5.5
1.3
2.2
0.76
1.8

0.61
0.61
0.39
0.39
0.39
0.39

54.9
132.44
24.57
0
23.424
30.195
5.07
4.29
2.3712
2.106

16

4.6

1.58

14.536

B/W C12,C13,C9
Y

ROOF BEAM STEEL


GB1(C1&C2)
TOP THRU

BOTTOM THRU
RINGS
GB2(C8&C9)
TOP THRU
BOTTOM THRU
RINGS
GB3(C12 TO C13)
TOP THRU
BOTTOM THRU
RINGS
GB4 (C15-C16) TOP
BOTTOM
RINGS
GB5
TOP TRU
BOTTOM
RINGS
GB6 (C15&C17)
TOP TRU
TOP EXTRA LHS
BOTTOM
RINGS
GB7 (C15 TO C11)
TOP THRU
BOTTOM
RINGS
GB8(C1 TO C8)
TOP THRU
TOP EXTRA LHS

12
16
8

2
2
22

4.2
4.6
1.2

0.88
1.58
0.39

7.392
14.536
10.296

16
16
8

2
2
22

4.6
4.6
1.2

1.58
1.58
0.39

14.536
14.536
10.296

16
12
16
8

2
2
2
22

4.6
4.2
4.6
1.04

1.58
0.88
1.58
0.39

14.536
7.392
14.536
8.9232

10
10
8

2
2
8

2.75
2.75
1.04

0.61
0.61
0.39

3.355
3.355
3.2448

16
16
8

2
2
22

4.6
4.6
1.1

1.58
1.58
0.39

14.536
14.536
9.438

16
16
16
8

2
2
2
40

6.4
2.5
6.4
1.2

1.58
1.58
1.58
0.39

20.224
7.9
20.224
18.72

12
12
8

2
2
8

2.45
2.45
1.04

0.88
0.88
0.39

16
16

2
2

11.5
2.3

1.58
1.58

4.312
4.312
3.2448
0
36.34
7.268

TOP EXTRA RHS


BOTTOM THRU
BOTTOM EXTRA
LHS
RHS
MIDDLE

16
16

2
2

4.2
11.5

1.58
1.58

13.272
36.34

16
16
16

2
2
2

1.1
1.1
1.9

1.58
1.58
1.58

3.476
3.476
6.004

PIN ROD FOR BEAM

20

20

0.175

2.46

8.61

CHAIRS FOR SLAB

16
10

96
30

1.75
1

1.58
0.61

265.44
18.3

coloumn lapping in ground floor and lift well


COLOUMN 5:
Stirrups
hooks
coloumn 6
Stirrups
hook
coloumn 18
rings
hook
coloumn 19
rings
hook
coloumn 10
rings

25
20
8
8
25
20
8
8
25
16
8
8
25
16
8
8
25
20
8

4
8
60
60
4
8
60
60
8
8
60
120
8
8
60
120
4
4
60

6.55
5.65
1.42
0.47
6.55
5.65
1.42
0.47
6.55
5.65
1.42
0.47
6.55
5.65
1.42
0.47
6.55
5.65
1.24

3.85
2.46
0.39
0.39
3.85
2.46
0.39
0.39
3.85
1.58
0.39
0.39
3.85
1.58
0.39
0.39
3.85
2.46
0.39

100.87
111.192
33.228
10.998
100.87
111.192
33.228
10.998
201.74
71.416
33.228
21.996
201.74
71.416
33.228
21.996
100.87
55.596
29.016

hook
coloumn 14
rings
hook
coloumn 15
rings
hooks
coloumn 11,12,16
rings
coloumn 8
rings
hook
coloumn 7
rings
hook
coloumn 1
rings
hook
coloumn 17
rings
hook
coloumn 13
rings
hook
coloumn 9,2,3

8
25
16
8
8
16
12
8
8
16
12
8
16
16
8
8
16
12
8
8
16
16
8
8
20
20
8
8
25
16
8
8
25

60
8
8
60
120
8
2
50
25
12
12
138
5
5
50
25
8
2
48
24
4
4
52
26
4
4
48
24
8
8
44
22
12

0.47
6.55
5.65
1.42
0.47
6.15
5.75
1.15
0.2
6.15
5.75
0.81
6.15
5.75
1.15
0.2
6.15
5.75
1.15
0.2
6.15
5.75
1.15
0.2
6.15
5.75
1.3
0.2
6.55
5.65
1.42
0.47
6.55

0.39
3.85
1.58
0.39
0.39
1.58
0.88
0.39
0.39
1.58
0.88
0.39
1.58
1.58
0.39
0.39
1.58
0.88
0.39
0.39
1.58
1.58
0.39
0.39
2.46
2.46
0.39
0.39
3.85
1.58
0.39
0.39
3.85

10.998
201.74
71.416
33.228
21.996
77.736
10.12
22.425
1.95
116.604
60.72
43.5942
48.585
45.425
22.425
1.95
77.736
10.12
21.528
1.872
38.868
36.34
23.322
2.028
60.516
56.58
24.336
1.872
201.74
71.416
24.3672
4.0326
302.61

rings
hook
coloumn c4a and c4b
(9"*15)
rings
lift well
inside and out side

20
8
8
16
12
8
y
y

10
8
8
8

12
138
69
8
4
54
72
48
26
56

5.65
1.24
0.47
6.4
5.79
1.06

2.46
0.39
0.39
1.58
0.88
0.39

166.788
66.7368
12.6477
80.896
20.3808
22.3236

8.8
1.8
2.1
1.95

0.61
0.39
0.39
0.39

386.496
33.696
21.294
42.588
22594

total

CEMENT CONCRETE OF GRADE M25 UPTO GROUND FLOOR FFL


SL NO
1
a
b
c
d
e
f
g
h
i
j
2
3
4
a
b
c
d
e
f
g
h
i
j
K
L
m
n
o

PARTICULAR WITH IDENTIFICATION


FOOTINGS
footing 1
footing 2
footing 3
footing 4
footing 5
footing 6
footing 7
footing 8
footing 9
footing 10
combined footing beam
combined footing
raft footing(LIFT WELL)
pedestal
P1
P2
P3
P4
P5
P6
P7
P8
P9
P10
P13
P14
P17
P18
P19

NUM

LENGTH

WIDTH

DEPTH

UNIT

QTY

1
1
1
3
1
1

5.25
10.25
10.5
6.75
9.5
7.25

5.25
10.25
7.5
5.33
7.5
7.25

1.16
2.66
2.66
1.33
2.16
1.5

cft
cft
cft
cft
cft
cft

31.9725
279.4663
209.475
143.5502
153.9
78.84375

1
1
2
1
1
1

10
10
8.75
19.25
19.25
10.5

10
7.5
8.75
3
7.5
9.75

2.5
2.33
2.25
1.25
1.75
1.5

cft
cft
cft
cft
cft
cft

250
174.75
344.5313
72.1875
252.6563
153.5625

1
1
1

2.33
2.58
2.5

1.5
2.58
2.5

3.5
2.5
3.33

cft
cft
cft

1
1
1
1
1
1
1
1
1
1
1

2.5
2.5
2.5
2.35
2.5
2.5
2.5
2.5
3
2.5
2.5

2.5
2.5
1.5
1.66
2.5
2.5
2.5
2.5
1.5
2.41
2.41

2.31
1.5
4.58
3.25
4.09
1.5
4
1.5
4.5
2.33
2.66

cft
cft
cft
cft
cft
cft
cft
cft
cft
cft
cft

12.2325
16.641
20.8125
0
14.4375
9.375
17.175
12.67825
25.5625
9.375
25
9.375
20.25
14.03825
16.0265

REMARKS

2144.895225

222.979

5
a
b
c
d
e
f
g
h
i
j
6

footing of shear wall


b/w c17 to c15
b/w c11 to c8
b/w c8 to c7
b/w c7 to c1
b/w c1 to c2
b/w c2 to c3
b/w c3 to c6
b/w c6 to c10
b/w c14 to c19
b/w c19 to c18
lift well(1st lift)
longer side :C15 TO C16
C11 TO C12
shorter side:C15:C11
C16:C12

1
1
1
1
1
1
1
1
1
1

11
3
3
22
4.5
19
7
8.5
12
19.5

3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25

1.5
1.58
1.5
1.58
1.5
1.5
1.66
1.5
1.5
1.58

cft
cft
cft
cft
cft
cft
cft
cft
cft
cft

53.625
15.405
14.625
112.97
21.9375
92.625
37.765
41.4375
58.5
100.1325

1
1
1
1

7.33
7.33
5
5

0.5
0.5
0.66
0.5

4.25
4.25
4.25
4.25

cft
cft
cft
cft

15.57625
15.57625
14.025
10.625

0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81

11
18
18
18
11
11
11
11
11
11

cft
cft
cft
cft
cft
cft
cft
cft
cft
cft

0.5
0.5

14
14

cft
cft

7
a
b
c
d
e
f
g
h
i
j

Shear wall
b/w c17 to c15
b/w c11 to c8
b/w c8 to c7
b/w c7 to c1
b/w c1 to c2
b/w c2 to c3
b/w c3 to c6
b/w c6 to c10
b/w c14 to c19
b/w c19 to c18

1
1
1
1
1
1
1
1
1
1

lift well(2nd lift) AND (3RD Lift)


longer side :C15 TO C16
C11 TO C12

1
1

13.5
8
5.83
24.66
10.5
25.5
15.5
8
20.5
25.5

7.33
7.33

120.285
116.64
85.0014
359.5428
93.555
227.205
138.105
71.28
182.655
227.205

51.31
51.31

2375.119

2004.0767

shorter side:(C15:C11)
(C16:C12)
COLOUMN CONCRETE
coloumns(18"*18")
c2,c3,c5,c6,c9,c10,c13,c14,c18,c19

5
-

0.66
-

14
-

cft
-

46.2

10

1.5

1.5

8.66

cft

194.85

10

coloumns(9"*21)
c1,c7,c8,

1.75

0.75

7.16

cft

28.1925

11

coloumn:c17(9"*24)
ROOF BEAM CONCRETE QTY
GB1:C1-C2
GB2:c8-c9
GB3:c11-c12
GB4:C15-C16
GB5:Grid1 -grid2
GB6:C17-C15
GB7:C15-C11
GB8:C1-C8
GB9:C16-C12

0.75

7.16

cft

10.74

1
1
1
1
1
1
1
1
1

11.74
11.74
11.74
5.25
11.74
18
5
36.09
8

0.75
0.75
0.5
0.5
0.66
0.75
0.81
0.75
0.6

1.5
1.5
1.5
1.5
1.16
1.5
1.5
1.5
1.16

cft
cft
cft
cft
cft
cft
cft
cft
cft

13.2075
13.2075
8.805
3.9375
8.988144
20.25
6.075
40.60125
5.568

1
-1

67.53
54.7

28.5
19.5

1.16
0.33

CFT
CFT

2232.542
-351.9945

12.43

13

14 SLAB CONCRETE QTY


A B/W C18,C2,C3,C19
DEDUCT FLAT SLAB OF 10"
B B/WC1,C2,C9,C8

36

0.5 CFT
DEDUCT GB1,2,8
4
0.41 CFT

C B/W C9,C12,C13

D B/W C16,C12,C13

5.5

E LHS OF C15 and c16

5.5

2.25

0.41 CFT
0.41 cft
TOTAL QUANTY

223.74
-18.16
13.12
18.04
5.07375
7219.777 CFT

233.7825

120.6399

#NAME?

form work
sl no
particular with identification
1
footings
type 1
longer
shorter
type2
longer
shorter
type3
longer
shorter
type4
longer
shorter
type5
longer
shorter
type6
longer
shorter
type8
longer
shorter
type9
longer
shorter
type10
longer
shorter
combined footing
longer

num

length

depth

unit

qty sft

remarks

2
2

5.25
5.25

1.16 sft
1.16 sft

12.18
12.18

2
2

10.25
10.25

2.66 sft
2.66 sft

54.53
54.53

2
2

10.5
7.5

2.66 sft
2.66 sft

55.86
39.9

8
8

6.75
5.5

1.33 sft
1.33 sft

71.82
58.52

2
2

9.5
7.5

2.16 sft
2.16 sft

41.04
32.4

2
2

7.25
7.25

2.16 sft
2.16 sft

31.32
31.32

2
2

10
10

2.5 sft
2.5 sft

50
50

2
2

10
7.5

2.33 sft
2.33 sft

46.6
34.95

4
4

8.75
8.75

2.25 sft
2.25 sft

78.75
78.75

19.25

1.75 sft

67.375

1373.15

4no

2 no

shorter
com foot beam
longer
shorter
RAFT FOOTING(LIFT WELL)
longer
shorter
RETAINING WALL FOOTING

7.5

1.75 sft

26.25

2
2

19.25
3

1.25 sft
1.25 sft

48.125
7.5

2
2

10.5
9.75

1.5 sft
1.5 sft

31.5
29.25

alround

109.5

1.5 sft

328.5

2
2

2.33
2.33

3.5 sft
3.5 sft

16.31
16.31

2
2

2.5
2.5

2.5 sft
2.5 sft

12.5
12.5

2
2

2.5
2.5

3.33 sft
3.33 sft

16.65
16.65

2
2

2.5
2.5

2.31 sft
2.31 sft

11.55
11.55

2
2

2.5
2.5

1.5 sft
1.5 sft

7.5
7.5

2
2

2.33
1.5

4.58 sft
4.58 sft

21.3428
13.74

pedestal
P1
longer
shorter
P2
longer
shorter
P3
longer
shorter
P4
longer
shorter
P5
longer
shorter
P6
longer
shorter
P7
longer
shorter

except RW B/W
c17-c18(RAMP)

23.3

P8
longer
shorter
P9
P10
P13
P14
P17
longer
shorter
P18,P19
longer
shorter
4
LIFT WELL(1ST LIFT)
Inside
longer
shorter
outside
longer
shorter
LIFT WELL(2ND& 3RD LIFT)
Inside
longer
shorter
outside
longer
shorter(C16:C12)
5 RETAINING WALL
Inside,outside
b/w c17 to c15
b/w c11 to c8
b/w c8 to c7
b/w c7 to c1

2
2
4
4
4
4

2.33
1.5
2.5
2.5
2.5
2.5

2
2

3.25
3.25
4.09
1.5
4
1.5

sft
sft
sft
sft
sft
sft

15.145
9.75
40.9
15
40
15

3
1.5

4.5 sft
4.5 sft

27
13.5

4
4

2.5
2.5

2.33 sft
2.33 sft

23.3
23.3

2
2

6
5

2.75 sft
2.75 sft

33
27.5

2
2

7.33
6.5

2.75 sft
2.75 sft

40.315
35.75

2
2

6
5

14 sft
14 sft

168
140

2
2

7.33
6.5

14 sft
1.5 sft

205.24
19.5

2
2
2
2

13.5
8
5.83
24.66

sft
sft
sft
sft

297
288
209.88
887.76

11
18
18
18

386.9978

b/w c1 to c2
b/w c2 to c3
b/w c3 to c6
b/w c6 to c10
b/w c14 to c19
b/w c19 to c18

2
2
2
2
2
2

10.5
25.5
15.5
8
20.5
25.5

11
11
11
11
11
11

sft
sft
sft
sft
sft
sft

231
561
341
176
451
561

40

1.5

8.66

sft

519.6

b coloumns(9"*21) c1,c7,c8,
sorter side
longer side

6
6

0.75
1.75

7.16 sft
7.16 sft

32.22
75.18

c coloumn:c17(9"*24")
sorter side
longer side

2
2

0.75
2

7.16 sft
7.16 sft

10.74
28.64

7 ROOF BEAMS
GB1:C1-C2,GB2:C8-C9,GB3:C11-C12
INSIDE
OUTSIDE

3
3

10.25
11.74

1 SFT
1.5 SFT

30.75
52.83

1
1

4.25
5.6

1.09 SFT
1.5 SFT

4.6325
8.4

1
1
2
2

10.25
11.74
18
5

0.75
1.5
1.5
1.5

7.6875
17.61
54
15

6 coloumns(18"*18")
a c2,c3,c5,c6,c9,c10,c13,c14,c18,c19
(four side per coloumn)

GB4:C15-C16
INSIDE
OUTSIDE
GB5:Grid1 -grid2
INSIDE
OUTSIDE
GB6:C17-C15
GB7:C11-C15

4003.64

291.545

SFT
SFT
SFT
SFT

#NAME?

GB8:C1-C8
INSIDE
OUTSIDE
GB9:C16-C12

1
1
2

34.5
36.09
8

1 SFT
1.5 SFT
0.75 SFT

34.5
54.135
12

1
1
-10

67.53
192.06
1.5

28.5 SFT
0.33 SFT
0.75 sft

1924.605
63.3798
-11.25

b B/WC1,C2,C9,C8

36

11.81 sft

425.16

C B/W C9,C12,C13

4 sft

32

D B/W C16,C12,C13

5.5 sft

44

E LHS OF C15 and c16

5.5

8 BASEMENT SLAB
a B/W C2,C3,C19,C18
FLAT SLAB SIDE 4"
deduct for coloumn

2490.2698

2.25 sft
NET TOTAL

12.375
9881.2876 SFT