COFFOR USA INC.


INNOVATION IN CONSTRUCTION

THE COFFOR SYSTEM


DESCRIPTION APPLICATIONS TESTS PERFORMED CERTIFICATIONS ADVANTAGES OVER OTHER SYSTEMS

DESCRIPTION
INTEGRATED FORMWORK SYSTEM TWO GRIDS (RIBLATHE) HORIZONTAL LINKS CONNECT THE TWO SIDES TOGETHERE VERTICAL STIFFENERS EVERY 8 INCHES STRENGTHEN THE PANEL HOT DIP GALVANIZED STEEL WITH OR WITHOUT THERMAL INSULATION

01/03/2011

DESCRIPTION (II)
CONCRETE POURED BETWEEN THE TWO GRIDS EXCESS WATER IS ELIMINATED BY GRAVITY AIR IS ALSO ELIMINATED CONCRETE PRESSURE IS GREATLY REDUCED COFFOR REMAINS IN THE WALL AFTER POURING

CONCRETING

LESS THAN 2% OF CONCRETE GO TROUGH THE GRIDS

CONCRETING

CONCRETE CAN BE POURED FROM THE SLAB FORMWORK OF THE UPPER FLOOR

01/03/2011

THE COFFOR SYSTEM


FAST EASY TO USE EXTREMLY COST EFFECTIVE ENVIRONMENTALY FRIENDLY

COFFOR CAN BUILD:


FOUNDATIONS, CRAWL SPACES, COLUMNS, BEAMS, WALLS, RADIUS WALLS, SLABS, ROOFS BUILDINGS: PRIVATE, RESIDENTIAL, COMMERCIAL, INDUSTRIAL, HIGH RISE HOSPITALS, SCHOOLS, UNIVERSITIES, SWIMMING POOLS TUNNELS, DYKES, SUSTAINING WALLS, ADJOINING WALLS, SUPPORTING WALLS

UNDER WATER ! ! !

COFFOR BASICS

01/03/2011

COFFOR BASICS

COFFOR BASICS

COFFOR BASICS

01/03/2011

COFFOR BASICS

COFFOR BASICS

COFFOR BASICS

01/03/2011

COFFOR BASICS

COFFOR BASICS

COFFOR HOUSES

01/03/2011

COFFOR HOUSES

COFFOR HOUSES

COFFOR HOUSES

01/03/2011

COFFOR RESIDENTIAL

COFFOR RESIDENTIAL

COFFOR RESIDENTIAL

52 VILLAS DEVELOPMENT

25 WORKERS COMPLETED IN 28 DAYS

01/03/2011

COFFOR RESIDENTIAL

10 STORY Building 320.000 ft COMPLETED IN 58 DAYS

COFFOR RESIDENTIAL

FOUR 9 STORY AND ONE 12 STORY BUILDING TOTAL: 430.000 ft 3 MONTH FOR CONCRETE SHELL 5 MONTH FOR SECOND WORK COMPLETED IN 8 MONTH

COFFOR COMMERCIAL

WAREHOUSE WITH 40 FEET HIGH WALLS

01/03/2011

COFFOR COMMERCIAL

HOTEL WITH
34 STORIES

COFFOR COMMERCIAL

COFFOR COMMERCIAL

10

01/03/2011

INNOVATION COFFOR
ALL THE COMPONENTS OF COFFOR ARE ALREADY USED IN CONSTRUCTION: RIBLATHE, C CHANNELS, REBARS THE PARTICULAR OF COFFOR IS TO ASSEMBLE THEM TOGETHER

COFFOR IS A SYSTEM

CERTIFICATIONS
THE FIRST CONSTRUCTION WAS DONE IN 1996 FOR THE PILES OF THE HOSPITAL GEORGE POMPIDOU IN PARIS MORE THAN 21.530.000 ft2 OF CONSTRUCTION WERE DONE IN 2005 AND 2006 COFFOR IS CERTIFIED: CSTB (France), CNERIB (Algeria), ITB (Poland), Switzerland, China, Russia, Thailand, Turkey, Saudi Arabia, UAE, Egypt . . . TEN YEAR GUARANTEE ISO 9001

LABORATORY TESTS
SEVERAL TESTS WERE PERFORMED IN FRANCE,SWITZERLAND, EGYPT, CHINA & ALGERIA TO MEASURE:
RESISTANCE UNDER COMPRESSION RESISTANCE UNDER DEFLEXION BONDING OF THE C PROFILE TO CONCRETE IMMEDIATE SHRINKAGE OF CONCRETE CONCRETE QUALITY

11

01/03/2011

COFFOR ADVANTAGES:
VERY LIGHT (23 lb/11ft), COFFOR CAN BE CARRIED BY HAND NO CRANE NECESSARY INCREASED SITE SECURITY EASY TO USE NO QUALIFIED PERSONNAL IS NECESSARY NO NEED FOR ACCESSORIES (WIRES & TUBES ARE SUFFICIENT) CONSTRUCTION TIME IS REDUCED BY AT LEAST 50% ! ! !

COFFOR ADVANTAGES:
EASY INSERTION OF REBAR (IF NECESSARY) NO NEED TO ADD REBAR IN CURRENT PORTION OF WALLS ELIMINATION OF ANTI-CRACK WELDED WIRE VISUAL CONTROL OF THE POUR (NO SEGREGATION) EASY INSERTION OF RESERVES FOR PLUMBING & ELECTICITY

COFFOR ADVANTAGES:
OTHER FILLING MATERIAL POSSIBLE EASY APPLICATION OF ANY TYPE OF FINISHING COFFOR CAN EASILY BE CUT W A CIRCULAR SAW EXTREMLY COST EFFECTIVE

12

01/03/2011

INNOVATION COFFOR
COFFOR ALLOWS ALL ARCHITECTURAL FREEDOM LAST MINUTE CHANGES ARE EASILY POSSIBLE INSULATED COFFOR OFFERS AN EXTERIOR INSULATION THAT ELLIMINATES THERMAL BRIDGES AND REDUCES HEATING COSTS

INNOVATION COFFOR
COFFOR IS ENVIRONMENTALY FIENDLY (NO WOOD BURNT ON SIDE & NO NEED FOR CLEAINING OIL) AND PRESERVES NATURAL RESOURCES (WOOD USE VASTLY
REDUCED & USE OF BRICKS ELIMINATED)

COFFOR vs SHUTTERS DISADVANTAGES :


A FINISHING IS NECESSARY COFFOR CAN NOT BE USED AGAIN NECESSITY TO WEAR GLOVES

13

01/03/2011

COFFOR vs SHUTTERS DISADVANTAGES :


NO DISMENTALING NECESSARY NO NEED FOR QUALIFIED WORKERS NO ACCESSORIES ELIMINATION OF ALL PROBLEMS RELATED TO SHUTTERS: INVESTMENT, AVAILABILITY, TRANSPORT, CLEANING, MAINTENANCE, ROTATION, STORING

COFFOR vs SHUTTERS DISADVANTAGES :


NO CRANE NECESSARY INCREASED SITE SECURITY EASY CONTROL OF THE RERBAR POSITION EASY CONTROL OF THE POUR POSSIBILITY TO POOR ONE ENTIRE STORY IN ONE PASS EASY INTEGRATION OF SECOND WORK RESERVES (ELECTRICITY & PLUMBING)