MECHANICAL COMMISSIONING STANDARD CHECKLIST SHEET 01 1 X 500 MW PIPEWORK - CONST. LOAD SUPPORT(HANGERS) UNIT NO: 7 STATUS YES/NO
OF 01
ACTIVITY
REMARK
2 3 4
General conditions satisfy the site Standing instructions as listed in the "Plant Item Comissioning Essential Pre-requisites". ( SCL MS1/1 ). Access for adjustments maintenance and repairs is satisfactory. Check that suport setting details can be easily read . Check Marinite rings are correctly fitted and undamaged (where appropriate). Check hanger adjusted to cold setting according to manufacturer's figures. Cold setting ........................ Note for later check ...................... Cold position datum ...................... All locknuts tightned. All locknuts tightned. Check hanger settings when system hot. Setting Hot ...................... Steam Pipe Temp ......................... C Steam pipe Press ............................ bar Note for following check .......................... Position when hot.
6 7 8
10 11
Check cold to hot travel is uniform about centre setting. All supports shall have adequate thread engagements & the amount of thread engaged and that available for further adjustment, shall be clearly visible, by providing slight holes, if necessary.
NTPC Erec.
Name
Signature
Date