Вы находитесь на странице: 1из 1

UNITED ARAB EMIRATES UNIVERSITY FACULTY OF SCIENCE DEPARTMENT OF PHYSICS

Physics & Engineering Applications I (PHYS 1110) Spring 2012

Homework 2
Due Date: Tuesday 13/03/2012

Problem 1
The position-time graph of an object moving along the x-axis is as shown in the figure. (1) Find the average velocity between 5 s and 14 s (2) Find the instantaneous velocity at t = 13 s (3) Plot the graphs velocity-time and accelerationtime for the motion.

Problem 2
A car, moving with a constant acceleration of 4 m/s2, reaches a final velocity of 12 m/s during a time interval t. (1) What is the car's displacement if its initial velocity is - 6 m/s? (2) What is the distance it travels during t? (3) What is the value of t?

Problem 3
A ball is thrown vertically upwards from the ground, and reaches a height of 4 m after 1.5 s later. (1) What was the initial velocity of the ball when thrown from the ground? (2) What was the velocity of the ball at the height 4 m? (3) What is the maximum height that the ball reached?

Вам также может понравиться