182
180
178
176
No. pads missing
174
172
170
168
166
164
Green shift Red shift Yellow shift
Shift
Pad 1 35
Pad 2 30
Pad 3 35
Pad 4 36
Green Pad 5 34
Pad 1 35
Pad 2 35
Pad 3 35
Pad 4 36 45
Red Pad 5 39
Pad 1 30 40
Pad 2 35 35
Pad 3 40
No. pads missing
30
Pad 4 31
Yellow Pad 5 34 25
20
15
10
0
Pad 1 Pad 2 Pad 3
0
Pad 1 Pad 2 Pad 3
Green
Ames 0
Helium 0
Vision 0
Green Final assy 170
Ames 0
Helium 0
Vision 0
Red Final assy 180
Ames 0
Helium 0
Vision 0
Yellow Final assy 170
150
100
50
0 0 0 0 0 0
0
Ames Helium Vision Final Ames Helium Vision
assy
Green Red
Process / Shift
Pad 3 Pad 4 Pad 5 Pad 1 Pad 2 Pad 3 Pad 4 Pad 5 Pad 1 Pad 2 Pad 3 Pad 4
Pad 3 Pad 4 Pad 5 Pad 1 Pad 2 Pad 3 Pad 4 Pad 5 Pad 1 Pad 2 Pad 3 Pad 4
Green Red Yellow
0 0 0
Pad 5
Pad 5
PLAN DO CHECK ACT
OVERALL
MILESTONES
12/1/08 12/1/08 12/1/08 19/1/08 1/1 PPS SCORE: %
PPS Tracking No.:
HONDA CRV WQ FUEL TANK - ALL VARIENTS - STICKY PADS NOT PRESENT ON TANK - FOUND AT END OF LINE & DURING
PROBLEM STATEMENT QA SPOT AUDIT OF FINISHED STILLAGES. 2/2 EU - DEE - 0001
1 PROBLEM DEFINITION
On vehicle On part
Who viewed & when: N/A DEAN HUMPHREY Drawing standard All 5 pads present in indicated position and orientation.
Barcode / Control Plan 5 pads present, fully adhered to tank surface, correct
Part traceability info: Prodn date Operator no.
Serial No. Standard location & orientation.
11-Jan 2223 12345 Other standards Correct specification of sticky pad must be used.
Total no. pads missing at inspection No. pads found missing at each process No. pads 1,2,3,4,5 found missing on each shift INITIAL CONCLUSIONS BASED ON STUDY OF FACTS:
180
Defect characteristics: 200
170 170 45
40 - NO CLEAR TREND PER SHIFT.
6.5/7 - MISSING PADS FOUND ONLY AT FINAL ASSEMBLY.
No. pads missing
150 25
100
20
15
100
50 10
NOTE: NO MISSING PADS ON TANKS ARRIVING AT VISION
5 BENCH, HOWEVER FURTHER INVESTIGATION REQUIRED
50 0 0 0 0 0 0 0 0 0
0
0
Pad 1 Pad 2Pad 3 Pad 4 Pad 5 Pad 1 Pad 2 Pad 3 Pad 4 Pad 5 Pad 1 Pad 2Pad 3 Pad 4 Pad 5
TO CONFIRM WHAT HAPPENS AT AND BETWEEN VISION
Final assy
Final assy
Final assy
Ames
Ames
Ames
Helium
Vision
Vision
Vision
Helium
Helium
0
Green Red Yellow
BENCH AND FINAL INSPECTION.
Green shift Red shift Yellow shift
Point of cause: Shift
Process / Shift Pad no. / Shift
Green Red Yellow
2.5/3
AMES
ASSEMBLY HELIUM LEAK FINAL FINISHED
WELDING LINE VISION BENCH
BENCH TESTER INSPECTION GOODS
(PADS FITTING PROCESS)
POINT OF CAUSE
UNCLEAR - FURTHER
INVESTIGATION
O O O ? REQUIRED.
X X
Other information: ITEMS TO CONFIRM AT VISION BENCH: METHOD OF VISION INSPECTION - RISK TO PADS; MANUAL HANDLING AFTER VISION BENCH TO FINAL INSPECTION. 1/1
4 "SMART" TARGET
1/1 ALL HONDA CRV WQ FUEL TANKS TO HAVE ALL 5 STICKY PADS PRESENT IN CORRECT LOCATION & ORIENTATION. ROOT CAUSE(S) TO BE IDENTIFIED & COUNTERMEASURE(S) IN PLACE WITHIN 10 DAYS (BY 22/1/08). 1/1
5 CAUSE INVESTIGATION
WAREHOUSE DOORS TO BE DOORS BROKEN - MEMBERS HANDS H&S CONCERN - WORKING PFUS - Maintenance to fix doors by
TOO COLD IN PRODUCTION AREA
KEPT CLOSED COLD (NEARLY FORSTBITE!) TEMPERATURE NEEDS IMPROVEMENT 15/1/08
100% AUTO CHECK - ALL PADS 1 DIRECT CAUSE FOR WHY PARTS 'SHIPPED' TO
OPERATION OF VISION BENCH NOT DETECTING MISSING PADS NG
PRESENT FINISHED STILLAGE (IN WAREHOUSE)
TABLE SHOULD ROTATE WITHIN TABLE ROTATE SPEED NEEDS TO PFUS - Maintenance to adjust speed
ROTATIONAL SPEED OF VISION BENCH TABLE ROTATES WITHIN 3 SECS
5 SECONDS BE RETURNED TO SPEC. by 15/1/08
2
PADS SHOULD ADHERE TO
ADHESIVE - NOT 'STICKY' ENOUGH PADS FALLING OFF TANK NG DIRECT CAUSE FOR WHY PARTS 'MADE'
TANK
PPS STATUS
why shipped 6.5/8 why made 7/8
VISON CHECK NOT RECONFIRMING THAT PADS PADS PULL OFF FORCE EVALUATED AT <40Nm -
SEE 5 WHY FOR ADHESIVE 2
ARE STILL PRESENT AFTER BENCH ROTATION. OUT OF DRAWING SPECIFICATION.
CURRENT BENCH SET-UP REQUIRES ONLY ONE ENGINEERING DRAWING STATES 50Nm PULL OFF
VISION CHECK FOR PADS PRESENT BEFORE FORCE; PIS STATES 35Nm PULL OFF FORCE -
ROTATION. DIFFERENCE.
NEW PRODUCT LAUNCH TEAM FMEA DID NOT NO SYSTEMATIC CROSS-CHECK METHOD IN
EVALUATE ALL RISK AREAS FOR PRODUCING PLACE FOR DRAWING x PIS x PROCESS / PARTS
DEFECT PARTS. DURING PRE-PRODUCTION PHASE.
12/
7 COUNTERMEASURE (S)
12
1 1 2
L. KING QA ADHESIVE PULL OFF FORCE FOR
HARRY JONES 3
- TANKS ROTATES TO UNDERSIDE CHECK 1/HOUR UNDER BENCH. SUPPLIER SET AT 60Nm; PARTS MADE TO
- WORK UNDERSIDE WHEN? CONFIRM VISION SYSTEM WITH WHEN? THIS STANDARD. WHEN? WHEN?
- ROTATE TANK POKE YOKE OK / NG TANKS EVERY 13/1/08 INCOMING INSPECTION FOR 3 DELIVERIES 19/1/08
- WORK TOPSIDE (ADD PADS) SHIFT. (ONGOING AUDIT CHECK 1/MONTH).
- VISION CHECK & ON TO NEXT PROCESS
22/1/08 (L.KING)
NO FALLEN PADS FOUND UNDER BENCH (FOR 6 WEEKS). NEW SEQUENCE IN PLACE & RUNNING - NO MISSING PADS FOUND AT FINAL INSPECTION / CONTAINMENT / SPOT AUDIT FOR 6 WEEKS.
1
QA AGREED CONTAINMENT CHECKS CAN BE REMOVED. POKA YOKE OK / NG PARTS CONFIRMED EACH SHIFT ON VISION SYSTEM.
FMEA PROCEDURE COMPLETED. ALL DEPARTMENTS BRIEFED AND TRAINED 12/5/08. LESSONS LEARNT UPDATED WITH HONDA 'STICKY' PADS CONCERN.
SUB-SUPPLIER OF STICKY PADS RECEIVED REVISIED PIS - ADHESIVE LEVELS CHANGED TO MEET 60Nm PULL OFF FORCE. DAILY CHECK OF ADHESIVE LAYER AT SUB -SUPPLIER TO CONFIRM
2 PROCESS PARAMETER SETTINGS.
INCOMING INSPECTION COMPLETED FIRST 3 DELIVERIES OF NEW SPEC. PADS - ALL PADS PASS REVISIED 60Nm PULL OFF FORCE REQUIREMENTS. ONCE PER MONTH AUDIT COMPLETE - PADS
WITHIN SPEC.
NEW PRODUCT LAUNCH PROCEDURE UPDATED WITH SECTION ADDED FOR CROSS CHECK : DRAWING x PIS x ACTUAL PROCESS / PARTS. ALL DEPARTM ENTS BRIEFED AND TRAINED 15/5/08.
FOLLOW UP DATE
6/1/2008
ALL TI DEESIDE VISION BENCHES CHECKED (DURING FEBRUARY) FOR SIMILAR FAILURE MODES; 5 OTHER
BENCHES CHECKED ALL OK.
ALL ADHESIVE 'STICKY' PADS ON OTHER PRODUCTS CROSS CHECK DRAWING x PIS x ACTUAL PROCESS / FMEA PROCEDURE UPDATED FOR RISK ASSESSMENT OF HOW TO MAKE & SHIP DEFECT PARTS -
PARTS - 20 PARTS NUMBERS CONFIRMED ALL OK. COMPLETE 30/5/08.
5 TI EUROPEAN PLANTS INFORMED AT GENERAL MANAGERS MEETING 2/2/08. LESSONS LEARNT SHARED NEW PRODUCT LAUNCH PROCEDURE UPDATED FOR CROSS CHECK DRAWING x PIS x ACTUAL
WITH TI USA HEADOFFICE. PROCESS / PARTS - COMPLETED 28/5/08.
ALL RELATED MEMBERS / DEPARTMENTS BRIEFED AT MORNING MEETING (END JANUARY). SPECIFIC FMEA
TRAINING DURING JUNE PLANNED FOR RELEVANT MEMBERS.