JPL SBIR CERTIFICATE OF PERFORMANCE DATE: 2/10/2008

TO: (NASA Center and Contract Specialist Name) CONTRACT No./CONTRACTOR NAME:
GRC
GSFC
I. FINAL REPORT EVALUATION
1. JPL Technical Monitor™: (Name, Telephone, Mail Stop) 2. SBIR Phase/Project Title:

3. Raw Score (0-20): 4. Principal Investigator: (Name, Telephone)


Acceptable (15-20)
Poor (10-14)
Unacceptable (0-9)
5. Does the technical report indicate that a patentable item was 6. Was an item of new technology developed under the contract?
developed during the period of contract performance? (If Yes, A Signed NASA Form 1679 from SBIR contractor is required)
Yes No Yes No
7. Other Deliverable(s) Required:
No
Yes (Description/Quantity/Sign Item 22 and Attach DD250):
8a. JPL TM Comments: (Technical Achievements – Discussion of whether or not the company achieved all technical objectives, and discuss the extent
to which the company demonstrated the technical feasibility of the proposed innovation. Describe any new technology or patentable items developed
under the contract.)

8b. Please discuss the potential for NASA application of this technology.

Signature: __________________________
JPL Technical Monitor
II. FIELD CENTER SBIR PROGRAM MANAGER
After reviewing the subject contract and final patent I agree with the contractor’s final patent right report
rights report, I have concluded the following: in that:
No “Reportable Items/Subject Inventions”
resulted from the performance of the subject
contract.
The items reported are correct and all
inclusive to the best of my knowledge.
I disagree with the contractor’s final patent rights
Signature: _________________________________
WAYNE SCHOBER, JPL SBIR Program Manager report in that the items listed should have been
reported as invention disclosure.
Date: The contract has been, or in the process of being
extended.
III. NASA COTR CERTIFICATION OF PERFORMANCE
This certifies that the final report under the subject contract has been reviewed and all technical and deliverable requirements is
considered satisfactory and technically complete.

Signature: ______________________________________ Date:


CELESTINO “JUN” ROSCA, NASA Management Office - JPL