BACnet Interface Testing & Commissioning Report Project : chiller Type : Chiller No.

:
Object Type
AIP

Address:
Object ID
NoteBk 00 00 00 00 00 00 00 00 00 00 00 00 03 03 03 03 03 03 -00-00-00-00-00-00-00-00-00-00-00-00-00-00-00-00-00-00-00-00-00-00-00-00-00-00-00-00-00-00-00-00-00-00-00-0001 02 03 04 05 06 07 08 09 0a 0b 0c 01 02 03 04 05 06

Sequential Number
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6

Generic Data Name


Ch1 Leaving Chilled Water Temperature Ch1Return Chilled Water Temperature Ch1 Leaving Condenser Water Temperature Ch1 Return Condenser Water Temperature Ch1 Percent RLA Ch1 Evaporator Refrigerant Pressure Ch1 Condenser Refrigerant Pressure Ch1 Compressor Discharge Refrigerant Temperature Ch1 Evaporator Refrigerant Temperature Ch1 Condenser Refrigerant Temperature Ch1 Oil Temperature Ch1 Oil Pressure Differential Ch1 Chiller Status Ch1 Condenser Water Flow Ch1 Chilled Water Flow Ch1 Manual Reset Alarm Ch1 Auto-Reset Alarm Ch1 UCP2 Communications

Value
Chiller Panel

Remark

BIP

BOP

Ch1 Chiller Enable/Disable

04 -00-00- 01

AOP

1 2

Ch1 Chilled Water Setpoint Ch1 Demand Limit Setpoint

01 -00-00- 01 01 -00-00- 02

Testing & Commissioning By Engr's Name : Sign : Date :

Customer's Witness By Engr's Name : Sing : Date :