Вы находитесь на странице: 1из 90

UTTAM SUCROTECH INTERNATIONAL PVT. LTD, INDIA STATUS OF B.O. PROCUREMENT DETAILS Equipme Packa nt No.

ge For 2 X 130 TPH Steam Generation Plant Required Quantity Remarks Order Status 2301 i) B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 ii) B1 B2 iii) a) B1 B2 b) B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 iv) B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 STEAM GENERATION PLANT BOILER Steam Drum & Drum Internal Steam Drum (LBBT 200) Steam Drum (LBBT 201) Drum Internal (LBBT-200, LBT-201) Fabricated steam separator LH & RH side - 60 nos. Baffle plates & fabricated items DWLG RH & LH (8 Nos.) Chevron element separator Water Drum Water Drum (LBBT 200) Water Drum (LBBT 201) Boiler Tubes,Furnace Tubes,Boiler Headers & Feeder Pipes Boiler Bank Tubes Boiler Bank Tubes(LBBT200) Boiler Bank Tubes(LBBT201) Furnace Tubes,Boiler Headers & Feeder Pipes LH Panel (LBBT200) LH Panel (LBBT201) RH Panel (LBBT200) RH Panel (LBBT201) Front Wall Panel (LBBT200) Front Wall Panel (LBBT201) Roof Tubes(LBBT200) (T1-16) Roof Tubes(LBBT201) (T1-16) Front Arch Tubes(LBBT200) (T1-16) Front Arch Tubes(LBBT201) (T1-16) Rear Panel (LBBT200) Rear Panel (LBBT201) Loose Tubes For Rear Panel(LBBT200) (T8-15) Loose Tubes For Rear Panel(LBBT201) (T8-15) Riser Pipes(LBBT200) Riser Pipes(LBBT201) Down Comer Pipes(LBBT200) Down Comer Pipes(LBBT201) Down Comer Headers(LBBT200) Down Comer Headers(LBBT201) Lower Front Headers(LBBT200) Lower Front Headers(LBBT201) S.H. Tubes (Primary & Secondary) & S.H. Headers S.H. Tubes (Primary ) LBBT200 S.H. Tubes (Primary ) LBBT201 S.H. Tubes ( Secondary) LBBT200 S.H. Tubes ( Secondary) LBBT201 Superheater Supporting Lugs (LBBT200) Superheater Supporting Lugs (LBBT201) Steam Collecting Headers(LBBT200) Steam Collecting Headers(LBBT201) Steam Collecting Pipes from Drum to Headers (LBBT 200) Steam Collecting Pipes from Drum to Headers (LBBT 201) Primary outlet Headers (LBBT 200) Primary outlet Headers (LBBT 201) Secondary inlet Headers (LBBT 200) Secondary inlet Headers (LBBT 201) Secondary outlet Headers (LBBT 200) Secondary outlet Headers (LBBT 201) Order Date Vendor Planned Dispatch Mfg. Status Invoice No. Date Location Date Tons Nos/Sets/Lot 2 C C C C In progress C C C LIPI LIPI USL LIPI USL LIPI LIPI Dispatched Dispatched Dispatched In Progress Dispatched Dispatched Dispatched USIPL/EX/10-11/120 08.06.2011 USIPL/EX/11-12/081 24.08.2011 USIPL/EX/11-12/013 22.07.2011 Site Site Site 04.12.2011 15.02.2012 16.12.2011 46.19 46.84 1.4 1 Lot 1 Lot 60 Nos. 8 Nos. 62 Nos. 1 Lot 1 Lot

Description

Procurement Status

Manufacturing Status

Actual Shipment / Dispatch Details

Transit Status

Weight

30.03.2012 30.04.2012

USIPL/EX/11-12/4573.02.2012 2 USIPL/EX/10-11/044 28.03.2011 USIPL/EX/10-11/119 08.06.2011

Mumbai Site Site 20.07.2011 19.12.2011

0.868 21.525 21.525

C C C C C C C C C C C C C C C C C C C C C C C C

LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI

Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Complete Dispatched Dispatched Dispatched Complete Complete Intertek Inspection Complete

USIPL/EX/10-11/026 03.02.2011 USIPL/EX/10-11/026 03.02.2011 USIPL/EX/10-11/045 28.03.2011 USIPL/EX/10-11/118 08.06.2011 USIPL/EX/10-11/045 28.03.2011 USIPL/EX/11-12/242 24.10.2011 USIPL/EX/10-11/066 12.04.2011 USIPL/EX/11-12/007 22.07.2011 USIPL/EX/10-11/046 28.03.2011 USIPL/EX/11-12/009 22.07.2011 USIPL/EX/10-11/046 28.03.2011 USIPL/EX/11-12/009 22.07.2011 USIPL/EX/10-11/137 17.06.2011 USIPL/EX/10-11/046 28.03.2011 USIPL/EX/11-12/009 22.07.2011 USIPL/EX/10-11/143 25.06.2011

Site Site Site Site Site Djibouti Site Djibouti Site Site Site Site Djibouti Site Site Site

21.05.2011 21.05.2011 05.11.2011 24.02.2012 05.11.2011 23.02.2012 10.10.2011 07.11.2011 10.10.2011 07.11.2011

52.45 52.45 29 14.826 29 14.826 16.237 16.151 3.917 3.917 1.628 1.628 17.5 3.729 3.729 5.072

1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot

Less billed

24.03.2012

10.10.2011 07.11.2011 07.11.2011

24.03.2012 24.03.2012 28.03.2012 24.03.2012 28.03.2012 24.03.2012

1.008

Intertek Inspection Dispatched USIPL/EX/10-11/046 28.03.2011 Complete USIPL/EX/11-12/437 15.02.2012

Site

10.10.2011

1.512 1.512

C C C C C C C C C C C C C C C C

LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI

Dispatched Dispatched Dispatched Complete In Progress In Progress Dispatched In Progress Complete Complete In Progress In Progress Dispatched In Progress Dispatched In Progress

USIPL/EX/10-11/0567.04.2011 0 USIPL/EX/1112/436 15.02.2012 USIPL/EX/1112/080 23.08.2011

Site Mumbai Site

18.07.2011

0.615 18.18

1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot

02.02.2012

12.46

28.03.2012 10.04.2012 10.04.2012 20.04.2012 28.03.2012 28.03.2012 15.04.2012 15.04.2012 20.04.2012 20.04.2012

USIPL/EX/11-12/325 14.12.2011

Djibouti

2.166 11.008

USIPL/EX/11-12/325 14.12.2011 USIPL/EX/11-12/325 14.12.2011

Djibouti Djibouti

3.585 3.404

UTTAM SUCROTECH INTERNATIONAL PVT. LTD, INDIA STATUS OF B.O. PROCUREMENT DETAILS Equipme Packa nt No. ge For 2 X 130 TPH Steam Generation Plant Required Quantity Remarks Order Status C C Order Date Vendor LIPI LIPI Planned Dispatch 20.04.2012 Mfg. Status Dispatched In Progress Invoice No. Date USIPL/EX/11-12/325 14.12.2011 Location Djibouti Date Tons 1.414 Nos/Sets/Lot 1 Lot 1 Lot

Description

Procurement Status

Manufacturing Status

Actual Shipment / Dispatch Details

Transit Status

Weight

B1 B2 v) a) B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2

Secondary Outlet Pipes (LBBT 200) Secondary Outlet Pipes (LBBT 201) Economiser (Economiser Headers & Coils) & Casing Economiser (Economiser Headers & Coils) Economiser Coil Part A (LBBT 200) Economiser Coil Part A (LBBT 201) Economiser Coil Part B (LBBT 200) Economiser Coil Part B (LBBT 201) Economiser Coil Part C (LBBT 200) Economiser Coil Part C (LBBT 201) Economiser Coil Part D (LBBT 200) Economiser Coil Part D (LBBT 201) Economiser Upper & Lower Header (LBBT 200) Economiser Upper & Lower Header (LBBT 201) Economiser Casing (LBBT 200) Economiser Casing (LBBT 201) Air Heater Air Heater Tube Plate & Strucure with Casing (LBBT 200) Air Heater Tube Plate & Strucure with Casing (LBBT 201) Air Heater Tubes (LBBT 200) (50%) 40% Material Damaged Material (10%) Corton steel tubes Air Heater Tubes (LBBT 201) (50%) 40% Material Damaged material (10%) Corton steel tubes Supports For Pressure Parts & S.H. Coils rods, spherical washer, spring, structural material, nut & lock nut, every material in the drawing rods, spherical washer, spring, structural material, nut & lock nut, every material in the drawing Spring, SS part, forgings, asssembly, J Hooks, holding arrangement for J hooks, Rods, nuts, SS plates, U calmp Spring, SS part, forgings, asssembly, J Hooks, holding arrangement for J hooks, Rods, nuts, SS plates, U calmp

b)

C C C C C C C C C C C C

LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI USL USL

24.03.2012 30.03.2012 30.03.2012

Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Completed In Progress In Progress

USIPL/EX/10-11/046 28.03.2011 USIPL/EX/11-12/008 22.07.2011 USIPL/EX/10-11/046 28.03.2011 USIPL/EX/11-12/079 23.08.2011 USIPL/EX/10-11/046 28.03.2011 USIPL/EX/11-12/458 24.02.2012 USIPL/EX/10-11/046 28.03.2011 USIPL/EX/11-12/3866.01.2012 1 USIPL/EX/10-11/046 28.03.2011 USIPL/EX/11-12/437 15.02.2012

Site Site Site Site Site Mumbai Site Mumbai Site

10.10.2011 25.11.2011 10.10.2011 19.12.2011 10.10.2011 10.10.2011 10.10.2011

19.443 19.443 21.227 21.227 21.227 21.227 9.297 1.226 1.226

1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot

vi) B1 B2 B1 B1 B1 B1 B2 B2 B2 B2 vii) B1 B2 B1 B2

C C C C C C C C C C

USL USL Pankaj Trading Pankaj Trading Pankaj Trading Pennar Pankaj Trading Pankaj Trading Pankaj Trading Pennar

30.03.2012 30.03.2012 30.03.2012 15.04.2012

Dispatched Dispatched Complete Intertek Inspection Intertek Inspection In Progress Complete Intertek Inspection Intertek Inspection In Progress

USIPL/EX/11-12/3339.12.2011 1 USIPL/EX/11-12/3339.12.2011 1

20.29 20.29 71

1 Lot 1 Lot 1 Lot

100% Material reached at aurangabad works o 71 1 Lot

30.03.2012 30.03.2012 15.04.2012

JPMA call to be given by LIPI with MTCs 21

C C C C

Steel Age India, Pune Steel Age India, Pune Steel Age India, Pune Steel Age India, Pune

10.04.2012 10.04.2012 10.04.2012 10.04.2012

In Progress In Progress In Progress In Progress USIPL/EX/1112/476 USIPL/EX/1112/477

B1 B2 B1 B2 B1 B2 B1 B2

Top side Header Supports Top side Header Supports Roof Tube Supports Roof Tube Supports Rear Valve Nose Stiffening arrangement Rear Valve Nose Stiffening arrangement Riser Pipe Supports Riser Pipe Supports

C C C C C C C C

Steel Age India, Pune Steel Age India, Pune Steel Age India, Pune Steel Age India, Pune Steel Age India, Pune Steel Age India, Pune Steel Age India, Pune Steel Age India, Pune

Dispatched 15.04.2012 20.04.2012 20.04.2012 20.04.2012 20.04.2012 20.04.2012 20.04.2012 In Progress In Progress In Progress In Progress In Progress In Progress In Progress

06.03.2012

Mumbai

1.54

2 Lot

2 Lot

2 Lot 2 Lot 2 Lot 2 Lot

UTTAM SUCROTECH INTERNATIONAL PVT. LTD, INDIA STATUS OF B.O. PROCUREMENT DETAILS Equipme Packa nt No. ge For 2 X 130 TPH Steam Generation Plant Required Quantity Remarks Order Status B1 B2 B1 B2 B1 B2 viii) B1 B2 B1 B2 Down Comer Pipe Supports Down Comer Pipe Supports Super Heater Header Supports Super Heater Header Supports Lower Front Headers supports Lower Front Headers Fixtures,Holders & U clamps for steam drum U Bolt for Steam Drum (LBT-200) U Bolt for Steam Drum (LBT-201) Tile Fixing Arrangement Tile Fixing Arrangement C C C C C C C C C C Order Date Vendor Steel Age India, Pune Steel Age India, Pune Steel Age India, Pune Steel Age India, Pune Steel Age India, Pune Steel Age India, Pune LIPI LIPI LIPI LIPI Planned Dispatch 22.04.2012 22.04.2012 22.04.2012 22.04.2012 22.04.2012 22.04.2012 Mfg. Status In Progress In Progress In Progress In Progress In Progress In Progress Dispatched In Progress In Progress In Progress USIPL/EX/11-12/301 29.11.2011 Mumbai 4.315 Invoice No. Date Location Date Tons Nos/Sets/Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 30 ton in painting stage, inspection call on 20.03.2012

Description

Procurement Status

Manufacturing Status

Actual Shipment / Dispatch Details

Transit Status

Weight

30.03.2012 10.04.2012 10.04.2012

B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2

Buck Stay Arrangement Buck Stay Arrangement Buck Stay Arrangement anchoring Buck Stay Arrangement anchoring Door and Peepholes Fixing Arrangement Door and Peepholes Fixing Arrangement Side Wall Sealing Arrangement Side Wall Sealing Arrangement Spout Fixing Arrangement Spout Fixing Arrangement Burner Fixing Arrangement Burner Fixing Arrangement

C C C C C C C C C C C C

Susheel Engg, Pune Susheel Engg, Pune Susheel Engg, Pune Susheel Engg, Pune LIPI LIPI LIPI LIPI LIPI LIPI LIPI LIPI

30.03.2012 30.04.2012 30.03.2012 30.04.2012 10.04.2012 10.04.2012 10.04.2012 10.04.2012 10.04.2012 10.04.2012 10.04.2012 10.04.2012

In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot

inspection call on 20.03.2012 Beam material awaited 20% material shortage 20% material shortage 20% material shortage 20% material shortage 20% material shortage 20% material shortage drawings awaited drawings awaited order will be placed by 25.03.2012

ix)

B1 B2 Tube Expanders with Grease Gun,Spanners All Hoppers,Air & Gas Ducting B1 All Hoppers

In progress

30.04.2012

In Progress

2 Lot

B1

Economiser hoppers

In progress

Steeldird / Shreyash Steeldird / Shreyash Steeldird / Shreyash Steeldird / Shreyash

30.04.2012

In Progress

2 Lot

B1

Airheater hoppers

In progress

30.04.2012

In Progress

2 Lot

B1

Grit hoppers

In progress

30.04.2012

In Progress

2 Lot

B1 B2

Main Ash Hoppers All Hoppers

In progress

30.04.2012

In Progress

2 Lot

order will be released by 30.03.2012 order will be released by 30.03.2012 order will be released by 30.03.2012 order will be released by 30.03.2012 order will be released by 30.03.2012 order will be released by 30.03.2012 order will be released by 30.03.2012

B2

Economiser hoppers

In progress

Steeldird / Shreyash Steeldird / Shreyash Steeldird / Shreyash

30.04.2012

In Progress

2 Lot

B2

Airheater hoppers

In progress

30.04.2012

In Progress

2 Lot

B2

Grit hoppers

In progress

30.04.2012

In Progress

2 Lot

UTTAM SUCROTECH INTERNATIONAL PVT. LTD, INDIA STATUS OF B.O. PROCUREMENT DETAILS Equipme Packa nt No. ge For 2 X 130 TPH Steam Generation Plant Required Quantity Remarks Order Status Order Date Vendor Steeldird / Shreyash Shreeyash Engineers Steeldird / Shreyash Steeldird / Shreyash Steeldird / Shreyash Steeldird / Shreyash Shreeyash Engineers Shreeyash Engineers Shreeyash Engineers Steeldird / Shreyash Steeldird / Shreyash Steeldird / Shreyash Steeldird / Shreyash Shreeyash Engineers Shreeyash Engineers Planned Dispatch Mfg. Status Invoice No. Date Location Date Tons Nos/Sets/Lot order will be released by 30.03.2012

Description

Procurement Status

Manufacturing Status

Actual Shipment / Dispatch Details

Transit Status

Weight

B2

Main Ash Hoppers

In progress

30.04.2012

In Progress

2 Lot

B1 B1 B1 B1 B1 B1 B1 B1 B2 B2 B2 B2 B2 B2 B2 B2 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 x) B1 B2 B1 B2 B1 B2 B1 B2 B1 B2

Air Ducting FD Fan To Airheater Airheater to Furnace SA Ducting PS Ducting HOT Air Ducting Expansion Bellows and Dampers Fastners and Jointings Air Ducting FD Fan To Airheater Airheater to Furnace SA Ducting PS Ducting HOT Air Ducting Expansion Bellows and Dampers Fastners and Jointings Flue Gas Ducting Boiler To Economiser Economiser to Airheater Economiser to Airheater Airheater To ESP ESP To ID Fan Bypass Duct ID Fan To Chimney Ducting Supports Expansion Bellows and Dampers Fastners and Jointing Flue Gas Ducting Boiler To Economiser Economiser to Airheater Airheater To ESP ESP To ID Fan Bypass Duct ID Fan To Chimney Ducting Supports Expansion Bellows and Dampers Fastners and Jointing Integral Piping Piping Drain Piping Soot Blower Piping Rotary Shoot Blower(Motorised) Retractable soot blower

March/April-12

In Progress 2 Lot clearance awaited from Engg dept. Material availble, work in progress

C C C C C C C

10.04.2012 10.04.2012 15.04.2012 15.04.2012 30.03.2012 March/April-12 March/April-12

In Progress In Progress In Progress In Progress In Progress In Progress In Progress

2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot

2 Lot C C C C C C March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 In Progress In Progress In Progress In Progress In Progress In Progress 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot

clearance awaited from Engg dept.

C C C C C C C C C C C C C C C C C C C C C C C

Steel Bird Engg. Steel Bird Engg. Shreyash Steel Bird Engg. Steel Bird Engg. Steel Bird Engg. Steel Bird Engg. Steel Bird Engg. Steel Bird Engg. Steel Bird Engg. Steel Steel Steel Steel Steel Steel Steel Steel Steel Bird Engg. Bird Engg. Bird Engg. Bird Engg. Bird Engg. Bird Engg. Bird Engg. Bird Engg. Bird Engg.

March/April-12 30.03.2012 10.04.2012 30.03.2012 March/April-12 30.03.2012 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 30.03.2012 March/April-12 30.04.2012 March/April-12 March/April-12 20.04.2012 20.04.2012

In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress

2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot

JPMA floor clearance awaited JPMA floor clearance awaited JPMA floor clearance awaited

Complete, JPMA call to be given by 20.03.201

Vinayak Vinayak Vinayak RR Techno RR Techno

2 Lot 2 Lot 2 Lot 2 Lot

manufacturing drawings awaited from engg. IB manufacturing drawings awaited from engg. IB manufacturing drawings awaited from engg. IB JPMA call to be given on 05.04.201 JPMA call to be given on 05.04.201

UTTAM SUCROTECH INTERNATIONAL PVT. LTD, INDIA STATUS OF B.O. PROCUREMENT DETAILS Equipme Packa nt No. ge For 2 X 130 TPH Steam Generation Plant Required Quantity Remarks Order Status B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 xi) B1 B2 B1 B2 B1 B2 xii) B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 xiii) B1 B2 xiv) B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 IBR/Non IBR Valves for Piping IBR Valves (Part-1) IBR Valves (Part-2) Part-3 (Non IBR Valves) Saftey Valves (IBR) Safety Valves - Deaerator-1 & 2, CBD MBD Pulsatting Grate Pulsating grate Frame (LBBT 200) Pulsating grate Frame (LBBT 201) Grate Bar Casting + End Casting (LBBT 200) Grate Bar Casting + End Casting (LBBT 201) Pulsating Grate Drive (LBBT 200) Pulsating Grate Drive (LBBT 201) Blow down Piping,Valves & Fittings CBD Tank CBD Tank MBD Tank-Non IBR MBD Tank-Non IBR MBD & CBD motorised valves Safety Valves Fittings Rorary Air Lock Valves for MDC Hoppers Attemperator Attemperator(LBBT-200) Attemperator(LBBT-201) Boiler Structure Boiler Structure 60.1 Ton Boiler Structure 153.39 Ton Boiler Structure 40.11 Ton Boiler Structure 62 Ton Boiler Structure 78 Ton Boiler Structure 30 Ton Boiler Structure 42 Ton Boiler Structure 10 Ton Boiler Structure 20 Ton Boiler Structure 76.28 Ton C C In Progress In Progress Order Date KSB KSB 28.04.2012 USIPL/EX/11-12/4723.03.2012 0 28.04.2012 Mumbai 1.404 Order not yet placed, by 30.03.2012 Vendor Planned Dispatch Mfg. Status Dispatched Dispatched Invoice No. Date Location Site Site Date 22.12.2010 29.02.2012 Tons Nos/Sets/Lot

Description

Procurement Status

Manufacturing Status

Actual Shipment / Dispatch Details

Transit Status

Weight

USIPL/EXP/2009-10/033 23.09.2010 USIPL/EX/11-12/0112.07.2011 2

C C C C C C C C C C C C In Progress In Progress

USL USL Delhi Casting Delhi Casting LIPI LIPI LIPI LIPI LIPI LIPI Forbes Marshall Tyco Sanmar

Mar-12 Mar-12 Mar-12 Mar-12

In Progress In Progress In Progress In Progress Dispatched Dispatched In Progress In Progress In Progress In Progress In Progress In Progress

USIPL/EX/11-12/161 30.06.2011 USIPL/EX/11-12/161 30.06.2011

Site Site

05.11.2011 05.11.2011

2.63

1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot shell material shortage dished end pressing send to supplier castings received, top cap awited for supplier

Mar-12 30.04.2012 30.04.2012 30.04.2012 30.04.2012 30.04.2012 30.04.2012 30.04.2012 30.04.2012

In Progress In Progress

30.04.2012

order not yet placed, by 30.03.2012

C C C C C C C C C C C C C C In Progress

UIEL UIEL UIEL UIEL UIEL UIEL UIEL UIEL UIEL UIEL UIEL UIEL Indiana Indiana

Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched

B1 B2 Boiler Structure 8.1 Ton B1 B2 Boiler Structure 45 Ton B1 B2 MS Grill Plate for Boiler B1 B2 MS Grill Plate for FW Tank B1 B2 Handrails B1 B2 Packing Plate & Erection Raw Material Packing Plate B1 B2 Erection Bolt B1 B2 xv) Insulation & Cladding Special,Standard Refractories,Fire Clay,Fire Cement castable B1 B2 etc. B1 B2 Insulation Material B1 B2 Aluminium Sheeting carewool Forced Draft (FD) fan B1 FD Fan (2 Nos.) B1 FD fan Drive B1 FD fan VFD B2 FD Fan (2 Nos.)

USIPL/EXP/2009-10/021 20.07.2010 USIPL/EX/10-11/010 26.11.2010 USIPL/EX/10-11/017 17.12.2010 USIPL/EX/10-11/035 05.08.2011 USIPL/EX/10-11/068 14.04.2011 USIPL/EX/10-11/106 27.05.2011 USIPL/EX/10-11/128 14.06.2011 USIPL/EX/10-11/141 21.06.2011 USIPL/EX/10-11/173 30.06.2011 USIPL/EX/10-11/0879.05.2011 0 USIPL/EX/1112/365 05.01.2012 17.12.2011 USIPL/EX/11-12/327 USIPL/EX/1112/271 14.11.2011 USIPL/EX/1112/271 14.11.2011

Site Site Site Site Site Site Site Site Site Site Mumbai Djibouti Site Site

18.01.2011 12.03.2011 12.03.2011 31.08.2011 28.10.2011 28.10.2011 30.11.2011 29.10.2011 27.12.2011 27.10.2011

60.1 153.39 40.11 62 78 30 42 10 15 76.28 12 20

10.02.2012 10.02.2012

28.154

In Progress In Progress In Progress

30.04.2012 30.04.2012 30.04.2012

oreder by 30.03.2012

2301- 1

C C In Progress C

Batliboi Marathon Batliboi

Apr-12

Dispatched In Progress Dispatched

USIPL/EX/10-11/147 28.06.2011

Site

16.12.2011

15.1

USIPL/EX/10-11/147 28.06.2011

Site

16.12.2011

15.1

UTTAM SUCROTECH INTERNATIONAL PVT. LTD, INDIA STATUS OF B.O. PROCUREMENT DETAILS Equipme Packa nt No. ge For 2 X 130 TPH Steam Generation Plant Required Quantity Remarks Order Status C In Progress C C In Progress C C In Progress C C C C C C C C C C C C Order Date Vendor Marathon Planned Dispatch Apr-12 Mfg. Status In Progress Invoice No. Date Location Date Tons Nos/Sets/Lot

Description

Procurement Status

Manufacturing Status

Actual Shipment / Dispatch Details

Transit Status

Weight

B2 B2 2301- 2 B1 B1 B1 B2 B2 B2 2301-3 B1 B1 B2 B2 B1 B1 B2 B2 2301-4 B1 B2 B1 B2 B1 B2 B1 B2 2301-5

FD fan Drive FD fan VFD Induced Draft (FD) fan ID Fan (2 Nos.) ID fan drive ID fan VFD ID Fan (2 Nos.) ID fan drive ID fan VFD Secondary Air System and fan with Drive SA Fan (2 Nos.) SA Fan Drive SA Fan (2 Nos.) SA Fan Drive PS Fan (1 No.) PS Fan Drive PS Fan (1 No.) PS Fan Drive Bagasse Silos Silo With Supporting Strucure Bagasse Cotrolling Gate with Controlling arrangement Castings, Rack, Pinion & Pulley Chain Bagasse Feeders / extractors

Batliboi Marathon Batliboi Marathon

Apr-12

Dispatched In Progress Dispatched In Progress

USIPL/EX/11-12/3393.12.2011 2

Djibouti

19.29

USIPL/EX/11-12/4755.03.2012 0

Mumbai

19.29

Apr-12

Batliboi Marathon Batliboi Marathon Batliboi Marathon Batliboi Marathon LIPI LIPI Delhi Castings

Apr-12 Apr-12 Apr-12 Apr-12 30.04.2012 30.04.2012 30.04.2012 30.04.2012

Dispatched In Progress Dispatched In Progress Dispatched In Progress Dispatched In Progress In Progress In Progress In Progress In Progress

USIPL/EX/10-11/079 27.04.2011 USIPL/EX/10-11/079 27.04.2011 USIPL/EX/10-11/079 27.04.2011 USIPL/EX/10-11/079 27.04.2011

Site Site Site Site

12.10.2011 12.10.2011 12.10.2011 12.10.2011

7.45 7.45

order by 30.03.2012 USIPL/EX/1112/247 USIPL/EX/1011/142

B1 B1 B1 B2 B2 B2 2301-6

Bagasse Feeder (6 Nos.) Drive VFD Bagasse Feeder (6 Nos.) Drive VFD Screw conveyors

C C In Progress C C In Progress

Kale Krishi Udyog Marathon

Dispatched Apr-12

25.10.2011 21.06.2011

Site

29.12.2011 28.11.2011

Kale Krishi Udyog Marathon

30.03.2012 Apr-12 Dispatched USIPL/EX/11-12/247 25.10.2011 USIPL/EX/1112/247 USIPL/EX/1025.10.2011 11/142 21.06.2011 USIPL/EX/10-11/156 04.06.2011 Site 29.12.2011 12.56

B1 B1 B1 B2 B2 B2 2301-7 B1 B2 B1 B1 B2 B2 B1 B1 B2 B2 2301-8(i)

Screw Conveyor (6 Nos.) Drive Gearbox Screw Conveyor (6 Nos.) Drive Gearbox Pneumatic bagasse spreaders Spreaders (6 Nos.) Spreaders (6 Nos.) Screw to Pneumatic Spreader Chutes Over Fire Air Nozzles Screw to Pneumatic Spreader Chutes Over Fire Air Nozzles

C C C C C C C C In Progress In Progress In Progress In Progress C In Progress C In Progress C C C

Kale Krishi Udyog Marathon Precission Kale Krishi Udyog Marathon Precission LIPI LIPI

Dispatched Apr-12 Dispatched 30.03.2012 Apr-12 Dispatched 20.04.2012 20.04.2012 20.04.2012 20.04.2012 20.04.2012 20.04.2012 Mar-12 Mar-12

Site Site

29.12.2011 28.11.2011 29.12.2011

8.605 2.94

USIPL/EX/10-11/156 04.06.2011

Site

29.12.2011

2.94

drgs awaited

Oil Burner Fan (1 Nos.) Drive Oil Burner Fan (1 Nos.) Drive Auxiliary Fuel System (Oil firing) B1 B2 OPH Unit B1 B2 Oil Burners B1 B2 Oil Day Tank

Batliboi Batliboi

Wesman Wesman Wesman

30.04.2012 30.04.2012 30.04.2012

In Progress In Progress In Progress

1 Set 4 Sets 1

MTC required for the material ready

UTTAM SUCROTECH INTERNATIONAL PVT. LTD, INDIA STATUS OF B.O. PROCUREMENT DETAILS Equipme Packa nt No. ge For 2 X 130 TPH Steam Generation Plant Required Quantity Remarks Order Status B1 B2 Oil Piping Fitting from day tank to OPH Unit,OPH Unit to Burner Steam Piping and Fitting from day tank to OPH uit,OPH Unit to B1 B2 Burner 3 Oil Storage Tank 250 M ,Gear pump & Piping 2301-8(ii) 3 B1 B2 (Common) Oil Storage Tank 250 M B1 B2 Gear Pumps B1 B2 Reduction Gear Box B1 B2 Motor Oil Piping from tank to gear pump,pump to day tank with fitting B1 B2 from day tan 2301-9 a) B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 b) B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 Electrostatic precipitator (ESP) Supply of Support Structure and Casing ESP Strucute & Hardware(19.3Ton) ESP Strucute & Hardware(22.2 Ton) ESP Strucute & Hardware(19.2Ton) ESP Strucute & Hardware(23.8Ton) ESP Strucute & Hardware(43.5Ton) ESP Strucute & Hardware(23.8338Ton) ESP Strucute & Hardware(19.88Ton) ESP Strucute & Hardware(20.27Ton) ESP Strucute & Hardware(21.24Ton) ESP Strucute & Hardware(21.29Ton) ESP Strucute & Hardware(19.83Ton) ESP Strucute & Hardware(19.83Ton) ESP Strucute & Hardware(20.2Ton) ESP Strucute & Hardware(14.94Ton) Supply of ESP Parts & Accessories Collecting Electrodes C C Order Date Vendor Wesman Wesman Planned Dispatch 30.04.2012 30.04.2012 Mfg. Status In Progress In Progress Dispatched In Progress In Progress In Progress In Progress USIPL/EX/11-12/038 06.08.2011 Site 20.12.2011 27.43 Invoice No. Date Location Date Tons Nos/Sets/Lot 2 2 1 2 2 2 Lot

Description

Procurement Status

Manufacturing Status

Actual Shipment / Dispatch Details

Transit Status

Weight

C C C C

Wesman Wesman Wesman Wesman

30.04.2012 30.04.2012 30.04.2012 30.04.2012

drawings under checking will be released by 3

C C C C C C C C C C C C C C

VT Corp VT Corp VT Corp VT Corp VT Corp VT Corp VT Corp VT Corp VT Corp VT Corp VT Corp VT Corp VT Corp VT Corp

Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched

USIPL/EX/10-11/048 28.03.2011 USIPL/EX/10-11/125 09.06.2011 USIPL/EX/10-11/080 27.04.2011 USIPL/EX/10-11/126 09.06.2011 USIPL/EX/10-11/082 28.04.2011 USIPL/EX/10-11/028 05.08.2011 USIPL/EX/11-12/029 05.08.2011 USIPL/EX/11-12/030 05.08.2011 USIPL/EX/11-12/031 05.08.2011 USIPL/EX/11-12/032 05.08.2011 USIPL/EX/11-12/033 05.08.2011 USIPL/EX/11-12/034 05.08.2011 USIPL/EX/11-12/035 05.08.2011 USIPL/EX/11-12/036 05.08.2011

Site Site Site Site Site Site Site Site Site Site Site Site Site Site

06.10.2011 16.10.2011 04.10.2011 16.10.2011 12.10.2011 25.11.2011 27.11.2011 07.12.2011 23.11.2011 10.12.2011 22.11.2011 30.11.2011 09.12.2011 25.11.2011

19.3 22.14 19.2 23.875 43.5 23.83 19.88 20.27 21.24 21.29 19.83 19.83 20.2 15.38 2 Lot

B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 2301-10 2301-11

Hopper Heaters Insulators Level Probes Geared Motors for CERM & GDPRM GD Plate Interlocking Arrangement HT Connection Items Pressurization Blower with Air Heater Discharge Electode Assly Earthing Material & Earthing Rod Collecting Electrode Assly GD Plate Rapping Mechanism CERM DERM Support Insulator Assly Chainpully Block Drive for DERM with Geared Motor Metallic Expansion Joints with Matching Flange,Hardware & Asbestos cord Power & Control cables, Cable glands,Lugs, Conduits,ferules, Cable Clamps at every 150mm, MCC Panel Drawout Type, Jn.Boxes-IP 55, PBS IP 65 Thermal Insulation - LRBMatress Thermal Insulation-Alu Coil. Hopper Vibrators TR Set with Thyristor Panel with Internal Earth switch 2 sets

C C C C C C C C C C C C C C C C C C

VT Corp VT Corp VT Corp VT Corp VT Corp VT Corp VT Corp VT Corp VT Corp VT Corp VT Corp VT Corp VT Corp VT Corp VT Corp VT Corp VT Corp VT Corp

30.03.2012 30.04.2012 30.03.2012 30.03.2012 30.04.2012 30.03.2012 30.03.2012 30.04.2012 30.03.2012 30.04.2012 30.03.2012 30.04.2012 30.04.2012 30.04.2012 30.04.2012 30.04.2012 30.04.2012 30.04.2012

Dispatched Dispatched Inspection In Progress Inspection Inspection In Progress Inspection Inspection In Progress Inspection In Progress Inspection In Progress In Progress In Progress In Progress In Progress In Progress In Progress

USIPL/EX/11-12/3743.01.2012 1 USIPL/EX/11-12/3753.01.2012 1

Mumbai Mumbai

32.087 31.357 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 Lot

C C C C C In Progress

VT Corp VT Corp VT Corp VT Corp VT Corp

30.04.2012 30.04.2012 30.04.2012 30.04.2012 30.04.2012

In Progress In Progress In Progress In Progress In Progress

2 Lot 2 Lot 2 Lot 2 Lot 2 Lot 2 1

B1 B2 Canopy With Supports, Roofing, Sheeting, etc. Chemical Dosing System

UTTAM SUCROTECH INTERNATIONAL PVT. LTD, INDIA STATUS OF B.O. PROCUREMENT DETAILS Equipme Packa nt No. ge For 2 X 130 TPH Steam Generation Plant Required Quantity Remarks Order Status C C C C C Order Date Vendor Metacam Metacam Metacam Planned Dispatch Mar-12 Mar-12 Mar-12 Mfg. Status Invoice No. Date Location Date Tons Nos/Sets/Lot

Description

Procurement Status

Manufacturing Status

Actual Shipment / Dispatch Details

Transit Status

Weight

2301-12 2301-13 2302 2302-1 2302-2 2302-3 2302-4 2302-5 2302-5.1 2302-5.2 2302-6 2302-7 2303

B1 B2 B1 B2 B1 B2

High Pressure Chemical Dosing System High Pressure Chemical Dosing System Low Pressure Chemical Dosing System Instrumantation And Controls

80% material reached at aurangabad works, re pumpa to be ordered stirrer order in final stage remi process bomba 1 1

B1 B2 Electrical Equipments B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 Feed Water System Hot well Feed Water Transfer Pumps Drive Motor for Feed Water Transfer Pumps De-aerator Deaerated feed water storage tank Boiler Feed water pumps Boiler Feed water pumps (Electrically Driven) Motor for Boiler Feed water pumps Start up feed water pumps Drive Motor High pressure feed water heater (2 Nos.) D.M Plant / RO Plant Membrance System,Ro Membrance System,UF ICPW & ACCS(Spares) Ultra Filtration System-1 Ultra Filtration System-2

C C

KSB Marathon

Apr-12

Dispatched Dispatched In Progress Dispatched Dispatched Dispatched Dispatched Dispatched In Progress Inspection

USIPL/EX/11-12/037 06.08.2011 USIPL/EX/11-12/347 27.12.2011 USIPL/EX/11-12/013 22.07.2011 USIPL/EX/11-12/037 06.08.2011 USIPL/EXP/2009-10/034 23.09.2010 USIPL/EXP/2009-10/023 06.08.2010 USIPL/EX/10-11/112 04.06.2011

Site Mumbai Site Site Site Site Site

13.12.2011

37.59 0.41 12 30 15 25.2 1.53

16.12.2011 13.12.2011 04.12.2010 04.12.2010 05.11.2011

1 2 2 2 2 6 6 1 2 CT-1 sent to Godavari

C C C C C C C C C C C C C C C C C

KSB CC Marathon GE Godvi Ion Exchge 10.04.2012 10.04.2012

Mar-12

B1 B2 B1 B2 B1 B2 B1 B2 B1 B2

Dispatched In Progress In Progress Dispatched Dispatched Dispatched

USIPL/EX/10-11/1244.06.2011 1

Mumbai

USIPL/EX/11-12/240 21.10.2011 USIPL/EX/11-12/240 21.10.2011 USIPL/EX/11-12/240 21.10.2011

Works

2.5 2.5 5.15

2 2 1 1 1 1

B1 B2 Reverse Osmosis Unit with Spares B1 B2 Lot-1 B1 B2 MSRL BULK ACID STORAGE TANK 2000 DIA X 3500 LOS B1 B2 B1 B2 B1 B2 B1 B2 MS BULK CAUSTIC STORAGE TANK 2000 DIA X 3500 LOS RT / CIP TANK 5 M3 HDPE UFPWT TANK 10 M3 HDPE I/C P/W & ACCS (PLC PANEL WITH SCADA ) I/C P/W & ACCS (VALVES SET 1) - All Butterfly Valves I/C P/W & ACCS (VALVES SET 2) - All Diaphragm

10.04.2012 10.04.2012 10.04.2012 10.04.2012 10.04.2012 10.04.2012

In Progress In Progress In Progress In Progress In Progress In Progress

B1 B2 both Manual & Auto Valves & Ball Valves in lot

Valves both Manual & Auto valves,Waffer Check


B1 B2 Valves & Swing Check Valves in lot IC PW & ACCS (DOSING TANKS SET2) - Coagulant C 10.04.2012 In Progress

preparation tank,HCL tank,pH Correction Tank each 2 B1 B2 nos


B1 B2 Lot-2 IC PW & ACCS (DOSING PUMPS) - NAOCL

10.04.2012

In Progress

B1 B2

B1 B2

B1 B2

B1 B2

Pump,Coagulant Pump, Polymer Pump,SMBS Pump,Antiscalant Pump,HCl Pump,pH Corr Pump each 2 nos along with accessories IC PW & ACCS (DOSING TANKS SET1) - NAOCl Tank,Coagulant tank,Polymer Tank,SMBS tank,Antiscalant tank each 2nos I/C PIPE WORK & ACCESSORIES (MECH SET 1) - Ist Lot of Interconnecting Pipework along with Accessories / fittings I/C PIPE WORK & ACCESSORIES (MECH SET 2) - IInd Lot of Interconnecting Pipework along with Accessories / fittings

30.04.2012

In Progress

30.04.2012

In Progress

30.04.2012

In Progress

30.04.2012

In Progress

UTTAM SUCROTECH INTERNATIONAL PVT. LTD, INDIA STATUS OF B.O. PROCUREMENT DETAILS Equipme Packa nt No. ge For 2 X 130 TPH Steam Generation Plant Required Quantity Remarks Order Status I/C PIPE WORK & ACCESSORIES (MECH SET 3) - IIIrd Lot Order Date Vendor Planned Dispatch Mfg. Status Invoice No. Date Location Date Tons Nos/Sets/Lot

Description

Procurement Status

Manufacturing Status

Actual Shipment / Dispatch Details

Transit Status

Weight

of Interconnecting Pipework along with Accessories /


B1 B2 fittings and Pipe Supports etc I/C P/W & ACCS (COMMISSIONING SPARES FOR MGF & B1 B2 MB) - As per Commissioning Spares attached in anexure V111 RO CLEANING SYSTEM & ACCESSORIES - Comprising of Cleaning Solution tank,Cartridge Filter and with required Fittings B1 B2 required for Assy I/C P/W & ACCS (INSTRUMENTS SET-1) - Comprising of C 30.04.2012 In Progress

30.04.2012

In Progress

30.04.2012

In Progress

Pressure Gauges,Level Indicators & Flow Indicator


B1 B2 etc I/C P/W & ACCS (INSTRUMENTS SET-2) - Comprising of C 30.04.2012 In Progress

pH Indicator Alarm,Conductivity Alarm,Level Switch &


B1 B2 Differential Pressure Sitch etc I/C P/W & ACCS (SOLENOID VALVE PANEL & ACCS) C 30.04.2012 In Progress

Solenoid Valve Panel with solenoid Valves & Fittings B1 B2 required etc.
I/C P/W & ACCS (ELECTRICAL) - Instrument Cables&trays B1 B2 Reqired ,Junction boxs,Tubing with Fittings etc I/C P/W & ACCS (AGITATORS) - Agitator for Coagulant

C C

30.04.2012 30.04.2012

In Progress In Progress

Dosing tank 1no,Polymer dosing tank 2nos,Coagulant


B1 B2 Preparation tank 2nos. I/C P/W & ACCS (BLOWERS) - Blower for MGF unit C 30.04.2012 In Progress

blower,Degasser Blower,MB Blower with Motors each B1 B2 2 nos


B1 B2 Lot-3

30.04.2012

In Progress

I/C P/W & ACCS (PUMP SET- 1) - Fast Flush Pump Motor Assembly 2nos,Back Flush Pump Motor Assy 2nos,Ro Feed Pump motor Assy 2nos,Cleaning Soln Pump motor Assy 1no,MB Feed Pump motor Assy B1 B2 2nos & required Foundation Bolt Nuts etc I/C P/W & ACCS (PUMP SET 2) - MB Regeneration Pump motor Assy,Acid & Caustic Unloading Pump motor Assy,Effluent trns pump motor Assy each 2nos B1 B2 & Required Foundation Bolt Nuts etc
B1 B2 MSRL MULTI GRADE FILTER 1600 DIA X 2500 HOS B1 B2 B1 B2 B1 B2 B1 B2 FRONTAL PIPE WORK & ACCESSORIES FOR MGF 1600 DIA MSRL DEGASSER TOWER 1000 DIA X 2800 HOS MSRL DEGASSER WATER TANK 2400 DIA X 3500 LOS MSRL MIXED BED 1400 DIA X 2500 HOS

15.05.2012

In Progress

C C C C C C C C C

15.05.2012 15.05.2012 15.05.2012 15.05.2012 15.05.2012 15.05.2012 15.05.2012 15.05.2012 15.05.2012

In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress

B1 B2 FRONTAL PIPE WORK & ACCESSORIES FOR MB 1400 DIA B1 B2 IC PW & ACCS (RESIN 225H) - 1540 LTRS FOR 2 STREAMS B1 B2 IC PW & ACCS (RESIN FFIP) - 1540 LTRS FOR 2 STREAMS 2304 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 DM water and Condensate Storage Tank. DM water Storage Tank. Condensate Storage Tank. Make up water pumps Drive Motor Steam distribution header with Valves.

2305 2306

Marathon

Mar-12

Dispatched Dispatched Disaptched In Progress

USIPL/EX/10-11/162 30.06.2011 USIPL/EX/10-11/162 30.06.2011 USIPL/EX/11-12/393 17.01.2012

Site Site Mumbai

14.12.2011 14.12.2011

48.325 48.325 0.33

1 1 2

UTTAM SUCROTECH INTERNATIONAL PVT. LTD, INDIA STATUS OF B.O. PROCUREMENT DETAILS Equipme Packa nt No. ge For 2 X 130 TPH Steam Generation Plant Required Quantity Remarks Order Status In Progress In Progress Order Date Vendor Planned Dispatch 10.05.2012 Mfg. Status Invoice No. Date Location Date Tons Nos/Sets/Lot

Description

Procurement Status

Manufacturing Status

Actual Shipment / Dispatch Details

Transit Status

Weight

B1 B2 B1 B2 B1 B2 B1 B2 2307 2307-1

Steam distribution header(HP) Steam distribution header(LP) IBR Valves/Non IBR valves for steam distribution header IBR Valves/Non IBR valves for steam distribution header Boiler stack (RCC) Fabricated Items Fabricated Items Fabricated Items TMT Bar 94.37m ton Lightining Arestor Refractory & Bricks Piping HP Steam Piping from both boilers to header,header to TG Set, Header to PRD Station header to other required. Feed water Piping complete system IBR and non IBR Raw Water Piping Drain Water Piping Cooling Water Piping SV Exhaust & Air Vent Piping HP Piping PRDS & HP Heater CS LP Steam Piping for Dearator LP Steam Piping 21 Kg PRD-3.2 MWTG Piping other than above as required IBR/Non IBR Valves for other piping IBR/Non IBR Valves for other piping Ash Handling System Submerged belt type conveyor (SBC-01) Idlers Idler Brackets Pulleys for 900 B.W.Conveyors Plummer Block, Bearing,Sleeve & Locking ring External Scrappers External Scraper 900 B.W. MODULAR TYPE (2 Nos.) Safety Switches Belt Belt Width - 900mm Drives Geared Motor 5.5 KW / 7.3 RPM Sprockets - 1.5"x Simplex x 17 teeth 1.5"x Simplex x 57 teeth Transmision Chain 1.5 " Simplex Hardware Fabricated Items Main belt conveyor (AC-06) Idlers Idler Brackets Pulleys for 650 B.W.Conveyors Plummer Block, Bearing,Sleeve & Locking ring Belt 650 B/W Safety Switches Internal scrapper (02 Nos.) External scrapper (02 Nos.) Drives

End cap & thermomter pocket material awaite Dispatched Dispatched USIPL/EXP/2009-10/033 23.09.2010 USIPL/EX/11-12/011 22.07.2011 Site Site 22.12.2010 29.02.2012

2307-2 2307-3

B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2

C C C C C In Progress

USL

Mar-12 Mar-12 Mar-12 Mar-12

Dispatched Dispatched In Progress Dispatched In Progress

USIPL/EX/11-12/250 31.10.2011 USIPL/EX/11-12/3188.12.2011 0 USIPL/EX/11-12/082 24.08.2011

Site Works Site

28.12.2011

19.335 4.94 95.2 2 2

10.10.2011

2308 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 B1 B2 2309 2309- 1 AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH 2309-2 AH AH AH AH AH AH AH AH AH AH

1 In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress Dispatched Dispatched

C C C C C C C C C C C C Ordered C C C C C C C C C C C C C C C C

Vinayak Vinayak Vinayak Vinayak Vinayak Vinayak Vinayak Vinayak Vinayak Vinayak KSB valves KSB valves Enviiro

30.04.2012 30.04.2012 30.04.2012 30.04.2012 30.04.2012 30.04.2012 30.04.2012 30.04.2012 30.04.2012 30.04.2012

Manufacturing drawings awaited. To be releas

USIPL/EXP/2009-10/033 23.09.2010 USIPL/EX/11-12/011 22.07.2011

Site Site

22.12.2010 29.02.2012

25.675 2.8

2 Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 In Progress In Progress In Progress In Progress In Progress Dispatched In Progress In Progress Dispatched In Progress In Progress In Progress In Progress In Progress In Progress In Progress

24.11.2011 USIPL/EX/11-12/296

Site

29.02.2012

70

24.11.2011 USIPL/EX/11-12/296

Site

29.02.2012

1000

2 C C C C C C C C C Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 In Progress In Progress In Progress In Progress Dispatched In Progress Dispatched Dispatched In Progress

24.11.2011 USIPL/EX/11-12/296 24.11.2011 USIPL/EX/11-12/296 24.11.2011 USIPL/EX/11-12/296

Site Site Site

29.02.2012 29.02.2012 29.02.2012

Apr-12

UTTAM SUCROTECH INTERNATIONAL PVT. LTD, INDIA STATUS OF B.O. PROCUREMENT DETAILS Equipme Packa nt No. ge For 2 X 130 TPH Steam Generation Plant Required Quantity Remarks Order Status C C C C C C C Order Date Vendor Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Planned Dispatch Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Mfg. Status In Progress In Progress Invoice No. Date Location Date Tons Nos/Sets/Lot

Description

Procurement Status

Manufacturing Status

Actual Shipment / Dispatch Details

Transit Status

Weight

AH AH AH AH AH AH AH 2309-7 AH AH AH AH AH AH AH AH AH AH AH AH 2309-4 AH AH AH AH AH AH AH AH AH AH AH 2309-5 AH AH AH AH AH AH AH AH AH AH AH 2309-3 AH AH AH AH

Hardware Fabricated Items

Super structure
Std. Gantry Non std.close gantry Vgt gantry for ac-06 Trestle two pole Belt conveyors below Economiser (AC-02) Idlers Idler Brackets Pulleys for 500 B.W.Conveyors Plummer Block, Bearing,Sleeve & Locking ring Belt 500 B/W Safety Switches Internal scrapper (02 Nos.) External scrapper (02 Nos.) Drives Hardware Fabricated Items Belt conveyors below air heater (AC-03) Idlers Idler Brackets Pulleys for 500 B.W.Conveyors Plummer Block, Bearing,Sleeve & Locking ring Belt 500 B/W Safety Switches Internal scrapper (02 Nos.) External scrapper (02 Nos.) Hardware Fabricated Items Belt conveyors for ESP (AC-03) Idlers Idler Brackets Pulleys for 500 B.W.Conveyors Plummer Block, Bearing,Sleeve & Locking ring Belt 500 B/W Safety Switches Internal scrapper (02 Nos.) External scrapper (02 Nos.) Hardware Fabricated Items Screw conveyors below ESP Screw-Conveyor Assembly Safety Switches -Zero Speed Switches Ash storage bin Pressure Reducing And Desuperheating System Desuperheating water Pumps PRDS-65/7 bar (g) PRDS-65/1.5 bar(g) PRDS-65/22 bar(g)

2 2 2 2

C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro

Apr-12 Apr-12 Apr-12 Apr-12 Apr-12

In Progress In Progress In Progress In Progress Dispatched In Progress Dispatched Dispatched In Progress In Progress In Progress

24.11.2011 USIPL/EX/11-12/296 24.11.2011 USIPL/EX/11-12/296 24.11.2011 USIPL/EX/11-12/296

Site Site Site

29.02.2012 29.02.2012 29.02.2012

Apr-12 Apr-12 Apr-12

2 C C C C C C C C C C Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 In Progress In Progress In Progress In Progress Dispatched In Progress Dispatched Dispatched In Progress In Progress

24.11.2011 USIPL/EX/11-12/296 24.11.2011 USIPL/EX/11-12/296 24.11.2011 USIPL/EX/11-12/296

Site Site Site

29.02.2012 29.02.2012 29.02.2012

Apr-12 Apr-12

2 C C C C C C C C C C C C C C Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 In Progress In Progress In Progress In Progress Dispatched In Progress Dispatched Dispatched In Progress In Progress In Progress In Progress In Progress In Progress

24.11.2011 USIPL/EX/11-12/296 24.11.2011 USIPL/EX/11-12/296 24.11.2011 USIPL/EX/11-12/296

Site Site Site

29.02.2012 29.02.2012 29.02.2012

Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12

4 4 2

2309-6 2310 2310-1 2310-2 2310-3 2310-4

B1 B2 B1 B2 B1 B2 B1 B2

In Progress C C C

Apr-12 Forbes Msl Forbes Msl Forbes Msl Dispatched Dispatched Dispatched USIPL/EX/11-12/281 18.11.2011 USIPL/EX/11-12/281 18.11.2011 USIPL/EX/11-12/281 18.11.2011 Djibouti Djibouti Djibouti 21.549

2 1 2 1

UTTAM SUCROTECH INTERNATIONAL PVT. LTD, INDIA STATUS OF B.O. PROCUREMENT DETAILS Equipme Packa nt No. ge For 2 X 130 TPH Steam Generation Plant Required Quantity Remarks Order Status C C C C Ordered C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C Order Date Vendor Forbes Msl Forbes Msl Forbes Msl Forbes Msl Enviiro 1 Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched In Progress In Progress In Progress In Progress In Progress In Progress Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched In Progress In Progress In Progress In Progress In Progress Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched In Progress In Progress In Progress In Progress In Progress In Progress Dispatched USIPL/EX/10-11/039 14.03.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 Site Site Site Site Site Site 16.07.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 Planned Dispatch Mfg. Status Dispatched Dispatched Dispatched Dispatched Invoice No. Date USIPL/EX/11-12/281 18.11.2011 USIPL/EX/11-12/281 18.11.2011 USIPL/EX/11-12/281 18.11.2011 USIPL/EX/11-12/281 18.11.2011 Location Djibouti Djibouti Djibouti Djibouti Date Tons Nos/Sets/Lot 2 2 1 1 lot

Description

Procurement Status

Manufacturing Status

Actual Shipment / Dispatch Details

Transit Status

Weight

2310-5 2310-6 2310-7 2310-8 2400 2400-1

B1 B2 B1 B2 B1 B2 B1 B2

PRDS-for Dearator (76/16) PRDS-for Soot Blower (1.5/0.35) PRDS-for OPH Unit (76/5.5-9) Instrumantation for PRDS Bagasse Handling System Belt Conveyor No. BC 1A Belt (1400 B/W) Drive Pulley Take-up Pulley Snub Pulley Plummer Block Bearings Carrying Idlers (45 degree) Transition carrying Idlers (15 degree) Transition carrying Idlers (30 degree) Return idlers flat SA carrying idlers (45 degree) SA return idlers flat Drive (5.5 Kw) Gear Box Coupling I/P & O/P Take-up Scrappers (Internal & External) Side Skirt Sealing Skirt borad (3 - mtr long) Discharge Chute Interconnecting chute Discharge hood Hood Cover Deck Plate Short supports Skirting angles Supporting Angle bracket Clamping plate Head Frame Tail frame (A1 & A2) Stringer Saftey Switches Structure (A3 to A11) Ladder & Handrail & Insert Plates Grating Insert Plates (400X400 16 THK, 10 Nos.) Base Plates (400X400) 4 Nos. Base Plate (230X100 6 Nos.) Foundation Bolts Load cells Belt Conveyor No. BC 3 Belt (1800 B/W) Drive Pulley (1 No.) Tail/Take-up Pulley(1 No.) Snub Pulley (1 no.) Plummer Block Bearings Carrying Idlers (45 degree) Transition carrying Idlers (15 degree) Transition carrying Idlers (30 degree) Return idlers flat Return Idlers V Type (10 deg) SA carrying idlers (45 degree) SA return idlers V Type (10 deg)

2400-4

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011

Site Site Site Site Site Site

20.07.2011 20.07.2011 20.07.2011 19.05.2011 19.05.2011 19.05.2011

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011

Site Site Site Site Site Site Site Site

19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

USIPL/EX/10-11/032 12.02.2011

Site

19.05.2011

1 C C C C C C C C C C C C C Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Dispatched Dispatched Dispatched In Progress Dispatched Dispatched Dispatched In Progress In Progress In Progress Dispatched In Progress In Progress USIPL/EX/10-11/039 14.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/049 29.03.2011 Site Site Site Site Site Site 16.07.2011 20.07.2011 19.05.2011 19.05.2011 19.05.2011 20.07.2011

March/April-12

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

USIPL/EX/10-11/049 29.03.2011

Site

20.07.2011

UTTAM SUCROTECH INTERNATIONAL PVT. LTD, INDIA STATUS OF B.O. PROCUREMENT DETAILS Equipme Packa nt No. ge For 2 X 130 TPH Steam Generation Plant Required Quantity Remarks Order Status C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C Order Date Vendor Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Planned Dispatch Mfg. Status Dispatched Dispatched Dispatched Dispatched In Progress Dispatched Dispatched Dispatched In Progress In Progress In Progress In Progress In Progress Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress Dispatched Invoice No. Date USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 Location Site Site Site Site Site Site Site Date 19.05.2011 20.07.2011 20.07.2011 20.07.2011 19.05.2011 19.05.2011 19.05.2011 Tons Nos/Sets/Lot

Description

Procurement Status

Manufacturing Status

Actual Shipment / Dispatch Details

Transit Status

Weight

2400-5

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

45 degree carrying idler bracket Drive (18.5 Kw) Gear Box Coupling I/P & O/P Take-up Scrappers (Internal & External) Side Skirt Sealing Skirt borad (5 - mtr long) Discharge Chute Interconnecting chute Discharge hood Hood Cover Deck Plate Short supports Skirting angles Supporting Angle bracket Clamping plate Head Frame Tail Frame Stringer Saftey Switches Structure (B1 to B32) Structure for take-up Ladder & Handrail & Insert Plates Grating Gantries Walkway Base Plates (500X500) Base Plate (100X230) Base Plate (650X650) Foundation Bolts Bagasse Elevator No. BE 4 Chains Chain guard Side & bottom plate Scrapper (Slat Type) Sprocket Coupling I/P Coupling O/P Bearings Drive (55 Kw) Gear Box Screw take-up Head Frame Tail frame Plummer Block Saftey Switches Bearings Ladder & Handrail & Insert Plates Bagassilo Screening System Discharge Chute Flap Gate (Motorised) Flat Gate Drive Grating Casings Gantries Walkway Structure (C1 & C2) Bracings Transfer Tower TT1

March/April-12

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011

Site Site Site Site Site Site Site

19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

USIPL/EX/10-11/032 12.02.2011

Site

19.05.2011 1

C C C C C C C C C C C C C C C C C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro

March/April-12 March/April-12 March/April-12 March/April-12

March/April-12 March/April-12 March/April-12

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

Dispatched In Progress In Progress Dispatched In Progress Dispatched In Progress Dispatched Dispatched Dispatched In Progress In Progress In Progress Dispatched Dispatched Dispatched In Progress In Progress In Progress In Progress In Progress In Progress In Progress JPMA Inspection In Progress In Progress In Progress In Progress In Progress

USIPL/EX/11-12/391

Djibouti

8.1

USIPL/EX/11-12/416 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011

Mumbai Site Site Site Site 20.07.2011 20.07.2011 20.07.2011 20.07.2011

10

USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/049 29.03.2011

Site Site Site

20.07.2011 19.05.2011 20.07.2011

4.9

UTTAM SUCROTECH INTERNATIONAL PVT. LTD, INDIA STATUS OF B.O. PROCUREMENT DETAILS Equipme Packa nt No. ge For 2 X 130 TPH Steam Generation Plant Required Quantity Remarks Order Status C C C Order Date Vendor Enviiro Enviiro Enviiro Planned Dispatch March/April-12 March/April-12 Mfg. Status In Progress In Progress Dispatched Invoice No. Date Location Date Tons Nos/Sets/Lot

Description

Procurement Status

Manufacturing Status

Actual Shipment / Dispatch Details

Transit Status

Weight

2400-6

2400-8

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Base Plates(750X750) Base Plates(600X600) Foundation Bolts Bagasse/Slat carrier SC 1 Chains Chain guard Side & bottom plate Scrapper (Slat Type) Sprocket Coupling I/P Coupling O/P Bearings Drive (55 Kw) Gear Box Screw take-up Head Frame Tail frame Plummer Block Saftey Switches Bearings Discharge Chute (Head End) Discharge Chute (Tail End) Discharge Chute to feed Boilers (3 Nos.) Grating Casings Gantries Walkway Foundation Bolts Belt Conveyor No. BC 5 Belt (1800 B/W) Drive Pulley Tail Pulley Take-up Pulley Bend Pulley Snub Pulley Carrying idlers (45 degree) 45 degree carrying idler bracket Transition carrying Idlers (15 degree) Transition carrying Idlers (30 degree) Return idlers flat Return Idlers V Type (10 deg) SA carrying idlers (45 degree) SA return idlers V Type (10 deg) Drive (37 Kw) Gear Box Coupling I/P & O/P Scrappers (Internal & External) Skirt borad (5 - mtr long) Discharge Chute Interconnecting chute Discharge hood Hood Cover Deck Plate Short supports Skirting angles Supporting Angle bracket Clamping plate Head Frame Tail Frame Vertical Take-up arrangement

USIPL/EX/10-11/032 12.02.2011

Site

19.05.2011 1

C C C C C C C C C C C C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

March/April-12 March/April-12 March/April-12

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

Dispatched In Progress In Progress In Progress In Progress Dispatched In Progress Dispatched Dispatched Dispatched In Progress In Progress In Progress Dispatched Dispatched Dispatched In Progress In Progress In Progress In Progress In Progress In Progress In Progress Dispatched

USIPL/EX/11-12/391

Djibouti

13.7

USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011

Site Site Site Site

20.07.2011 20.07.2011 20.07.2011 20.07.2011

USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/049 29.03.2011

Site Site Site

20.07.2011 19.05.2011 20.07.2011

USIPL/EX/10-11/032 12.02.2011

Site

19.05.2011 1

C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

March/April-12 March/April-12

Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched In Progress In Progress In Progress Dispatched In Progress In Progress Dispatched Dispatched Dispatched Dispatched Dispatched In Progress In Progress In Progress In Progress In Progress Dispatched Dispatched Dispatched Dispatched Dispatched In Progress In Progress

USIPL/EX/10-11/039 14.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/032 12.02.2011

Site Site Site Site Site Site Site Site

16.07.2011 20.07.2011 20.07.2011 20.07.2011 20.07.2011 19.05.2011 20.07.2011 19.05.2011

USIPL/EX/10-11/049 29.03.2011

Site

20.07.2011

USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011

Site Site Site Site Site

20.07.2011 20.07.2011 20.07.2011 19.05.2011 19.05.2011

USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011

Site Site Site Site Site

19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011

UTTAM SUCROTECH INTERNATIONAL PVT. LTD, INDIA STATUS OF B.O. PROCUREMENT DETAILS Equipme Packa nt No. ge For 2 X 130 TPH Steam Generation Plant Required Quantity Remarks Order Status C C C C C C C C C C C C C C C C C C C C C C C Order Date Vendor Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Planned Dispatch Mfg. Status Dispatched Dispatched Dispatched Dispatched Dispatched In Progress In Progress Dispatched Dispatched Dispatched Intertek In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress Dispatched Invoice No. Date USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 Location Site Site Site Site Site Date 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 Tons Nos/Sets/Lot

Description

Procurement Status

Manufacturing Status

Actual Shipment / Dispatch Details

Transit Status

Weight

2400-9

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Stringer (Tail End) Saftey Switches Side Skirt Sealing Plummer Block Bearings Side seal plate Bottom seal plate Supporting Angle bracket Head Frame Tail Frame Structure (D1 to D4) Structure (D4 to D13) Bracings Gantries Walkway Handrails Gratings Transfer Tower TT2, Monorail Transfer Tower TT3, Monorail Base Plates(600X600) Base Plates(650X650) Base Plates(750X750) Foundation Bolts Belt Conveyor No. BC 6 Belt (1800 B/W) Drive Pulley Tail Pulley Take-up Pulley Bend Pulley Snub Pulley 45 degree carrying idlers 45 degree carrying idler bracket Transition carrying Idlers (15 degree) Transition carrying Idlers (30 degree) Return idlers flat Return Idlers V Type (10 deg) SA carrying idlers (45 degree) SA return idlers V Type (10 deg) Drive (37 Kw) Gear Box Coupling I/P & O/P Vertical Gravity take-up arrangement, mesh guard Scrappers (Internal & External) Skirt borad (5 - mtr long) Discharge Chute Interconnecting chute Discharge hood Hood Cover Deck Plate Short supports Skirting angles Supporting Angle bracket Clamping plate Head Frame Tail Frame Foundation Bolts Saftey Switches Side Skirt Sealing Plummer Block Bearings Skirt borad (3 - mtr long)

March/April-12 March/April-12

USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011

Site Site Site

19.05.2011 19.05.2011 19.05.2011

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

USIPL/EX/10-11/032 12.02.2011

Site

19.05.2011 1

C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

March/April-12

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched In Progress In Progress In Progress Dispatched In Progress In Progress Dispatched Dispatched Dispatched In Progress Dispatched Dispatched In Progress In Progress In Progress In Progress In Progress Dispatched Dispatched Dispatched Dispatched Dispatched In Progress Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched

USIPL/EX/10-11/039 14.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011

Site Site Site Site Site Site Site Site

16.07.2011 20.07.2011 20.07.2011 20.07.2011 20.07.2011 19.05.2011 19.05.2011 19.05.2011

USIPL/EX/10-11/049 29.03.2011

Site

20.07.2011

USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011

Site Site Site Site Site

20.07.2011 20.07.2011 20.07.2011 19.05.2011 19.05.2011

USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011

Site Site Site Site Site Site Site Site Site Site Site

19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011

UTTAM SUCROTECH INTERNATIONAL PVT. LTD, INDIA STATUS OF B.O. PROCUREMENT DETAILS Equipme Packa nt No. ge For 2 X 130 TPH Steam Generation Plant Required Quantity Remarks Order Status C C C C C C C C C C C C C C C C C C Order Date Vendor Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Planned Dispatch Mfg. Status Dispatched Dispatched In Progress Dispatched Dispatched Dispatched Dispatched Dispatched In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress Dispatched Invoice No. Date USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/11-12/349 28.12.2011 USIPL/EX/11-12/366 05.01.2012 USIPL/EX/11-12/3763.01.2012 1 USIPL/EX/11-12/3773.01.2012 1 USIPL/EX/11-12/3873.01.2012 1 Location Site Site Djibouti Djibouti Djibouti Djibouti Djibouti Date 19.05.2011 19.05.2011 Tons Nos/Sets/Lot

Description

Procurement Status

Manufacturing Status

Actual Shipment / Dispatch Details

Transit Status

Weight

2400-10

2400-11

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Stringer (Tail End) Stringer (Head End) Tressel E1 Tressel E2 Tressel E3 Tressel E4 Tressel E5 Tressel E6 Tressel E7 Tranfer Tower TT-4, Bracings, Sheeting, Monorail Bracings Gantries Walkway Handrails Gratings Base Plates(950X950) Base Plates(750X750) Foundation Bolts Belt Conveyor No. BC7 Belt (1800 B/W) Drive Pulley, pulley gaurd Take-up Pulley Tail Pulley 45 degree carrying idlers Picking type 45 degree carrying idler bracket Return Idlers flat Drive (7.5 Kw) Gear Box Coupling I/P & O/P Screw Take-up Scrappers (Internal & External) Side Skirt Sealing Plummer Block Bearings Skirt borad (8.3 - mtr long) Skirting angles Short Supports Supporting Angle bracket Clamping plate Discharge Chute (2 Nos.) Interconnecting chute Discharge hood Hood Cover Deck Plate Stringers Saftey Switches Head Frame Tail Frame Stringer Supporting Structure Belt Conveyor No. BC7A Belt (1800 B/W) Drive Pulley, pulley gaurd Take-up Pulley Tail Pulley 45 degree carrying idlers Picking type 45 degree carrying idler bracket Return Idlers flat Transition carrying Idlers (15 degree) Transition carrying Idlers (30 degree)

March/April-12

16.954 16.954 16.954 16.954 16.954

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

USIPL/EX/10-11/032 12.02.2011

Site

19.05.2011 1

C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro

March/April-12 March/April-12 March/April-12

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

March/April-12

Dispatched Dispatched Dispatched In Progress Dispatched In Progress In Progress Dispatched Dispatched Dispatched In Progress Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched In Progress In Progress In Progress In Progress In Progress In Progress Dispatched Dispatched Dispatched Dispatched In Progress

USIPL/EX/10-11/039 14.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/11-12/2974.11.2011 2

Site Site Site Site

16.07.2011 20.07.2011 19.05.2011 29.02.2012 0.8

USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011

Site Site Site Site Site Site Site Site Site Site Site Site

20.07.2011 20.07.2011 20.07.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011

USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011

Site Site Site Site

19.05.2011 19.05.2011 19.05.2011 19.05.2011

1 C C C C C C C C C Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Dispatched Dispatched Dispatched In Progress In Progress In Progress In Progress In Progress In Progress USIPL/EX/10-11/039 14.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/032 12.02.2011 Site Site Site 16.07.2011 20.07.2011 19.05.2011

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

UTTAM SUCROTECH INTERNATIONAL PVT. LTD, INDIA STATUS OF B.O. PROCUREMENT DETAILS Equipme Packa nt No. ge For 2 X 130 TPH Steam Generation Plant Required Quantity Remarks Order Status C C C C C C C C C C C C C C C C C C C C C C C C Order Date Vendor Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Planned Dispatch Mfg. Status Dispatched Dispatched Dispatched In Progress Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched In Progress In Progress In Progress In Progress In Progress In Progress Dispatched Dispatched Dispatched Dispatched In Progress Invoice No. Date USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 Location Site Site Site Site Site Site Site Site Site Site Site Site Date 20.07.2011 20.07.2011 20.07.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 Tons Nos/Sets/Lot

Description

Procurement Status

Manufacturing Status

Actual Shipment / Dispatch Details

Transit Status

Weight

2400-12

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Drive (7.5 Kw) Gear Box Coupling I/P & O/P Screw Take-up Scrappers (Internal & External) Side Skirt Sealing Plummer Block Bearings Skirt borad (2.5 - mtr long) Skirting angles Short Supports Supporting Angle bracket Clamping plate Discharge Chute Interconnecting chute Discharge hood Hood Cover Deck Plate Stringers Saftey Switches Head Frame Tail Frame Stringer Supporting Structure Belt Conveyor No. BC7B Belt (1800 B/W) Drive Pulley, pulley gaurd Take-up Pulley Tail Pulley 45 degree carrying idlers Picking type 45 degree carrying idler bracket Return Idlers flat Transition carrying Idlers (15 degree) Transition carrying Idlers (30 degree) Drive (7.5 Kw) Gear Box Coupling I/P & O/P Screw Take-up Scrappers (Internal & External) Side Skirt Sealing Plummer Block Bearings Skirt borad (2.5 - mtr long) Skirting angles Short Supports Supporting Angle bracket Clamping plate Discharge Chute Interconnecting chute Discharge hood Hood Cover Deck Plate Stringers Saftey Switches Head Frame Tail Frame Supporting Structure Belt Conveyor No. BC8 Belt (1800 B/W) Drive Pulley, pulley gaurd

March/April-12

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011

Site Site Site Site

19.05.2011 19.05.2011 19.05.2011 19.05.2011

March/April-12

1 C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Dispatched Dispatched Dispatched In Progress In Progress In Progress In Progress In Progress In Progress Dispatched Dispatched Dispatched In Progress Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched In Progress In Progress In Progress In Progress In Progress In Progress Dispatched Dispatched Dispatched In Progress USIPL/EX/10-11/039 14.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/032 12.02.2011 Site Site Site 16.07.2011 20.07.2011 19.05.2011

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011

Site Site Site Site Site Site Site Site Site Site Site Site

20.07.2011 20.07.2011 20.07.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011

March/April-12

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011

Site Site Site

19.05.2011 19.05.2011 19.05.2011

March/April-12

2400-13

1 C C Enviiro Enviiro Dispatched Dispatched USIPL/EX/10-11/039 14.03.2011 USIPL/EX/10-11/049 29.03.2011 Site Site 16.07.2011 20.07.2011 1.3

UTTAM SUCROTECH INTERNATIONAL PVT. LTD, INDIA STATUS OF B.O. PROCUREMENT DETAILS Equipme Packa nt No. ge For 2 X 130 TPH Steam Generation Plant Required Quantity Remarks Order Status C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C Order Date Vendor Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Planned Dispatch Mfg. Status Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched In Progress In Progress In Progress Dispatched Dispatched In Progress Dispatched Dispatched Dispatched Dispatched In Progress Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched In Progress In Progress In Progress In Progress In Progress In Progress Dispatched Dispatched Dispatched Dispatched In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress Dispatched Invoice No. Date USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/11-12/2974.11.2011 2 USIPL/EX/10-11/032 12.02.2011 Location Site Site Site Site Site Site Date 20.07.2011 19.05.2011 20.07.2011 20.07.2011 29.02.2012 19.05.2011 Tons Nos/Sets/Lot

Description

Procurement Status

Manufacturing Status

Actual Shipment / Dispatch Details

Transit Status

Weight

2400-14

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Tail Pulley Snub Pulley Take-up Pulley Bend Pulley 45 degree carrying idlers 45 degree carrying idler bracket Transition carrying Idlers (15 degree) Transition carrying Idlers (30 degree) Return idlers flat Return Idlers V Type (10 deg) SA carrying idlers (45 degree) SA return idlers V Type (10 deg) Drive (37 Kw) Gear Box Foundation Bolts Coupling I/P & O/P VGT arrangements, mesh guard Scrappers (Internal & External) Side Skirt Sealing Plummer Block Bearings Skirt borad (2.5 - mtr long) Skirting angles Short Supports Supporting Angle bracket Clamping plate Discharge Chute Interconnecting chute Discharge hood Hood Cover Deck Plate Stringers Saftey Switches Head Frame Tail Frame Stringer Structure supports (J1 to J49) Bracings Gantries Walkway Handrails Gratings Base Plates(500X500) Base Plates(400X400) Base Plates(230X100) Foundation Bolts Belt Conveyor No. BC 10 Belt (1800 B/W) Drive Pulley, pulley gaurd Tail Pulley Snub Pulley Take-up Pulley Bend Pulley 45 degree carrying idlers 45 degree carrying idler bracket Transition carrying Idlers (15 degree) Transition carrying Idlers (30 degree) Return idlers flat Return Idlers V Type (10 deg) SA carrying idlers (45 degree) SA return idlers V Type (10 deg)

8.2

March/April-12 March/April-12 March/April-12

USIPL/EX/10-11/049 29.03.2011 USIPL/EX/11-12/2974.11.2011 2 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011

Site Site Site Site Site Site Site Site Site Site Site Site Site Site Site

20.07.2011 29.02.2012 20.07.2011 20.07.2011 19.05.2011 20.07.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011

0.8

March/April-12

March/April-12

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011

Site Site Site Site

19.05.2011 19.05.2011 19.05.2011 19.05.2011

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

USIPL/EX/10-11/032 12.02.2011

Site

19.05.2011 1

C C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched In Progress Dispatched In Progress In Progress In Progress Dispatched In Progress In Progress

USIPL/EX/10-11/039 14.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/032 12.02.2011

Site Site Site Site Site Site Site

16.07.2011 20.07.2011 20.07.2011 19.05.2011 20.07.2011 20.07.2011 19.05.2011

1.3

USIPL/EX/10-11/049 29.03.2011

Site

20.07.2011

UTTAM SUCROTECH INTERNATIONAL PVT. LTD, INDIA STATUS OF B.O. PROCUREMENT DETAILS Equipme Packa nt No. ge For 2 X 130 TPH Steam Generation Plant Required Quantity Remarks Order Status C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C Order Date Vendor Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Planned Dispatch Mfg. Status Dispatched Dispatched Dispatched Dispatched In Progress Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched In Progress In Progress In Progress In Progress In Progress In Progress Dispatched Dispatched Dispatched Dispatched In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress Dispatched Invoice No. Date USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 Location Site Site Site Site Site Site Site Site Site Site Site Site Site Date 20.07.2011 20.07.2011 19.05.2011 20.07.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 Tons Nos/Sets/Lot

Description

Procurement Status

Manufacturing Status

Actual Shipment / Dispatch Details

Transit Status

Weight

2400-15

2400-16

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Drive (45 Kw) Gear Box Foundation Bolts Coupling I/P & O/P VGT arrangements, mesh guard Scrappers (Internal & External) Side Skirt Sealing Plummer Block Bearings Skirt borad (5 - mtr long) Skirting angles Short Supports Supporting Angle bracket Clamping plate Discharge Chute Interconnecting chute Discharge hood Hood Cover Deck Plate Stringers Saftey Switches Head Frame Tail Frame Stringer Structure supports (K3 to K7) Bracings Gantries Walkway Handrails Gratings Base Plates(400X400) Base Plates(230X100) Foundation Bolts Scratcher Conveyor SRC-01 Chains Chain guard Side & bottom plate Scrapper (Slat Type) Sprocket Coupling I/P Coupling O/P Bearings Drive (18.5 Kw) 2 nos, Gear Box Screw take-up Plummer Block Saftey Switches Bearings Saftey Switches Scratcher Conveyor SRC-02 Chains Chain guard Side & bottom plate Scrapper (Slat Type) Sprocket Coupling I/P Coupling O/P Bearings Drive (18.5 Kw) 2 nos, Gear Box

March/April-12

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011

Site Site Site Site

19.05.2011 19.05.2011 19.05.2011 19.05.2011

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

USIPL/EX/10-11/032 12.02.2011

Site

19.05.2011 1

C C C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

March/April-12

Dispatched In Progress In Progress In Progress In Progress Dispatched In Progress Dispatched Dispatched Dispatched In Progress Dispatched Dispatched Dispatched Dispatched

USIPL/EX/11-12/391

Djibouti

4.05

USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/032 12.02.2011

Site Site Site Site Site Site Site Site

20.07.2011 20.07.2011 20.07.2011 20.07.2011 20.07.2011 19.05.2011 20.07.2011 19.05.2011 1

C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

Dispatched In Progress In Progress In Progress In Progress Dispatched In Progress Dispatched Dispatched Dispatched

USIPL/EX/11-12/391

Djibouti

4.05

USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011

Site Site Site Site

20.07.2011 20.07.2011 20.07.2011 20.07.2011

UTTAM SUCROTECH INTERNATIONAL PVT. LTD, INDIA STATUS OF B.O. PROCUREMENT DETAILS Equipme Packa nt No. ge For 2 X 130 TPH Steam Generation Plant Required Quantity Remarks Order Status C C C C C Order Date Vendor Enviiro Enviiro Enviiro Enviiro Enviiro Planned Dispatch March/April-12 Mfg. Status In Progress Dispatched Dispatched Dispatched Dispatched Invoice No. Date Location Site Site Site Site Date 20.07.2011 19.05.2011 20.07.2011 19.05.2011 1 C C C C C C C C C C C C C C Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Dispatched Dispatched In Progress In Progress Dispatched In Progress In Progress In Progress In Progress Dispatched Dispatched Dispatched Dispatched In Progress USIPL/EX/10-11/039 14.03.2011 USIPL/EX/10-11/049 29.03.2011 Site Site 16.07.2011 20.07.2011 0.832 1.1 Tons Nos/Sets/Lot

Description

Procurement Status

Manufacturing Status

Actual Shipment / Dispatch Details

Transit Status

Weight

2400-17

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Screw take-up Plummer Block Saftey Switches Bearings Saftey Switches Belt Conveyor No. BC 11 Belt (1800 B/W) Drive Pulley, pulley gaurd Tail Pulley, pulley guard Snub Pulley Take-up Pulley Bend Pulley 45 degree carrying idlers 45 degree carrying idler bracket Return idlers flat Drive (7.5 Kw) Gear Box Foundation Bolts Coupling I/P & O/P VGT arrangements, mesh guard

USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/032 12.02.2011

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

USIPL/EX/10-11/049 29.03.2011

Site

20.07.2011

0.557

USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/049 29.03.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/049 29.03.2011

Site Site Site Site

20.07.2011 20.07.2011 19.05.2011 20.07.2011

0.105 0.3 0.04

March/April-12

UTTAM SUCROTECH INTERNATIONAL PVT. LTD, INDIA STATUS OF B.O. PROCUREMENT DETAILS Equipme Packa nt No. ge For 2 X 130 TPH Steam Generation Plant Required Quantity Remarks Order Status C C C C C C C C C C C C C C C C C C C C Order Date Vendor Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Planned Dispatch Mfg. Status Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched Dispatched In Progress In Progress In Progress In Progress Dispatched In Progress Dispatched In Progress In Progress In Progress In Progress Invoice No. Date USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011 Location Site Site Site Site Site Site Site Site Site Date 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 19.05.2011 Tons 0.24 0.06 Nos/Sets/Lot

Description

Procurement Status

Manufacturing Status

Actual Shipment / Dispatch Details

Transit Status

Weight

2400-18

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Scrappers (Internal & External) Side Skirt Sealing (10 mtrs) Plummer Block (2 Nos.) Bearings (4 Nos.) Skirt borad (5 - mtr long) Skirting angles Short Supports Supporting Angle bracket Clamping plate Discharge Chute Interconnecting chute Discharge hood Hood Cover Deck Plate (4 Nos.) Stringers Saftey Switches (Belt Sway - 2 Nos, Electronic - 1 No.) Head Frame Tail Frame Stringer Structure supports Tripper For BC6 Tripper Pulley Balance Goliath Crane With Supporting Structure Limit Switch (4 Nos.) Structure Telescopic chutes (2 Nos.) Drive for Telescopic chutes (2 Nos.) Lifting arrangement for scrachers Rope drum Gearbox Hoisting motor for winch (9.3 KW, 4 nos.) LT Rail Goliath Crane (7.5 KW, 6 nos.) Drive for pulley Goliath Crane (1.1 kW, 4 Nos.) Winch (4 Nos.) Sill girder Manual Anchoring System Boggie Wheels CR 80 Rails M22X550 Bolt assembly, nut & washer, plate Rail Clamp Base Plate Structure

March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12 March/April-12

USIPL/EX/10-11/032 12.02.2011 USIPL/EX/10-11/032 12.02.2011

Site Site

19.05.2011 19.05.2011

1 C C Enviiro Enviiro March/April-12 Dispatched In Progress USIPL/EX/10-11/049 29.03.2011 Site 20.07.2011

2400-19

C C C C C C C C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro

Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12

Dispatched In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress

USIPL/EX/10-11/032 12.02.2011

Site

19.05.2011

79.23

1 0.01

2400-20 2400-21 2400-22 2500 2600

BH BH BH

Mobile bucket loaders / wheel dozers Fire Fighting System Electrical switch gears and Electrical system Commissioning Spares Miscellaneous Items-3 roller bending machine TOTAL

In progress In progress In progress In progress Dispatched USIPL/EX/11-12/318 08.12.2011 10.5

2 1

UTTAM SUCROTECH INTERNATIONAL PVT. LTD, INDIA STATUS OF B.O. PROCUREMENT DETAILS Equipme Packa nt No. ge For 2 X 130 TPH Steam Generation Plant Required Quantity Remarks Order Status Order Date Vendor Planned Dispatch Mfg. Status Invoice No. Date Location Date Tons Nos/Sets/Lot

Description

Procurement Status

Manufacturing Status

Actual Shipment / Dispatch Details

Transit Status

Weight

Sr.No.

Equip ment No.

Package

Engineer ing Status QAP No. Ordered C

Procurement Status Order Status Order Date Enviiro Enviiro

Manufacturing Status Planned Dispatch Mfg. Status

Actual Shipment / Dispatch Details Invoice No.

Vendor

2309 2309- 1

AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH

Ash Handling System Submerged belt type conveyor (SBC-01) Idlers Carrying Idlers Return Idler Flat Idler Brackets Carrying Idlers (35) Bracket Transition Idler Bracket Return Idler Flat Brackets Pulleys for 900 B.W.Conveyors Drive/ Head Pulley Tail / Take Up Pulley Pressure Pulley Snub Pulley Pressure Wheel Plummer Block, Bearing,Sleeve & Locking ring SNA-517+22217+H317+12.5/200P SNA-513+ 22213 + H313 + 10/120 SNA-511+ 22211 + H311 + 9.5/100 UCT- 210 External Scrappers External Scraper 900 B.W. MODULAR TYPE (2 Nos.) Safety Switches Zero Speed Switches Belt Belt Width - 900mm Drives Geared Motor 5.5 KW / 7.3 RPM Sprockets - 1.5"x Simplex x 17 teeth 1.5"x Simplex x 57 teeth

C C C C C C C C C C C C C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro

Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12

In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress Dispatched USIPL/EX/11-12/296 24.11.2011 In Progress In Progress In Progress Dispatched USIPL/EX/11-12/296 24.11.2011 In Progress In Progress In Progress In Progress

Apr-12 Apr-12 Apr-12

Apr-12 Apr-12 Apr-12 Apr-12

AH AH AH

Transmision Chain 1.5 " Simplex Hardware Fabricated Items Stringer and Short supports For Conveyors 900 B.W. Discharge Chutes. For Conveyors 900 B.W. Take-Up Screw Take Up for SBC-01 Main belt conveyor (AC-06) Idlers Carrying Idlers Return Idler Flat Idler Brackets Carrying Idlers (35) Bracket Transition Idler Bracket Return Idler Flat Brackets Pulleys for 650 B.W.Conveyors Drive/ Head Pulley Tail / Take Up Pulley Pressure Pulley Snub Pulley Pressure Wheel Plummer Block, Bearing,Sleeve & Locking ring Belt 650 B/W Safety Switches Internal scrapper (02 Nos.) External scrapper (02 Nos.) Drives Hardware Fabricated Items

C C C

Enviiro Enviiro Enviiro

Apr-12 Apr-12 Apr-12

In Progress In Progress In Progress

2309-2

AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH

C C C C C C C C C C C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro

Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12

In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress Dispatched USIPL/EX/11-12/296 24.11.2011 In Progress Dispatched USIPL/EX/11-12/296 24.11.2011 Dispatched USIPL/EX/11-12/296 24.11.2011 In Progress In Progress In Progress

Apr-12

Super structure
Std. Gantry

Apr-12 Apr-12 Apr-12 Apr-12 Apr-12

AH AH AH 2309-7 AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH 2309-4 AH AH AH AH AH AH AH AH

Non std.close gantry Vgt gantry for ac-06 Trestle two pole Belt conveyors below Economiser (AC-02) Idlers Carrying Idlers Return Idler Flat Idler Brackets Carrying Idlers (35) Bracket Transition Idler Bracket Return Idler Flat Brackets Pulleys for 500 B.W.Conveyors Drive/ Head Pulley Tail / Take Up Pulley Pressure Pulley Snub Pulley Pressure Wheel Plummer Block, Bearing,Sleeve & Locking ring Belt 500 B/W Safety Switches Internal scrapper (02 Nos.) External scrapper (02 Nos.) Drives Hardware Fabricated Items Belt conveyors below air heater (AC-03) Idlers Carrying Idlers Return Idler Flat Idler Brackets Carrying Idlers (35) Bracket Transition Idler Bracket Return Idler Flat Brackets

C C C

Enviiro Enviiro Enviiro

Apr-12 Apr-12 Apr-12

C C C C C C C C C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro

Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12

In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress Dispatched USIPL/EX/11-12/296 24.11.2011 In Progress Dispatched USIPL/EX/11-12/296 24.11.2011 Dispatched USIPL/EX/11-12/296 24.11.2011 In Progress In Progress In Progress

Apr-12

Apr-12 Apr-12 Apr-12

C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro

Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12

In Progress In Progress In Progress In Progress In Progress In Progress In Progress

AH AH AH AH AH AH AH AH AH AH AH AH AH 2309-5 AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH AH

Pulleys for 500 B.W.Conveyors Drive/ Head Pulley Tail / Take Up Pulley Pressure Pulley Snub Pulley Pressure Wheel Plummer Block, Bearing,Sleeve & Locking ring Belt 500 B/W Safety Switches Internal scrapper (02 Nos.) External scrapper (02 Nos.) Hardware Fabricated Items Belt conveyors for ESP (AC-03) Idlers Carrying Idlers Return Idler Flat Idler Brackets Carrying Idlers (35) Bracket Transition Idler Bracket Return Idler Flat Brackets Pulleys for 500 B.W.Conveyors Drive/ Head Pulley Tail / Take Up Pulley Pressure Pulley Snub Pulley Pressure Wheel Plummer Block, Bearing,Sleeve & Locking ring Belt 500 B/W Safety Switches Internal scrapper (02 Nos.)

C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro

Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12

In Progress In Progress In Progress In Progress In Progress In Progress In Progress Dispatched USIPL/EX/11-12/296 24.11.2011 In Progress Dispatched USIPL/EX/11-12/296 24.11.2011 Dispatched USIPL/EX/11-12/296 24.11.2011 In Progress In Progress

Apr-12

Apr-12 Apr-12

C C C C C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro

Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12

In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress Dispatched USIPL/EX/11-12/296 24.11.2011 In Progress Dispatched USIPL/EX/11-12/296 24.11.2011

Apr-12

AH AH AH 2309-3 AH AH AH AH

External scrapper (02 Nos.) Hardware Fabricated Items Screw conveyors below ESP Screw-Conveyor Assembly Safety Switches -Zero Speed Switches Ash storage bin Pressure Reducing And Desuperheating System

C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12

Dispatched USIPL/EX/11-12/296 24.11.2011 In Progress In Progress In Progress In Progress In Progress In Progress

2309-6 2310 2310-1 2310-2 2310-3 2310-4 2310-5 2310-6 2310-7 2310-8 2400 2400-1

B1 B2 Desuperheating water Pumps B1 B2 PRDS-65/7 bar (g) B1 B2 PRDS-65/1.5 bar(g) B1 B2 PRDS-65/22 bar(g) B1 B2 PRDS-for Dearator (76/16) B1 B2 PRDS-for Soot Blower (1.5/0.35) B1 B2 PRDS-for OPH Unit (76/5.5-9) B1 B2 Instrumantation for PRDS Bagasse Handling System Belt Conveyor No. BC 1A BH BH BH BH Belt (1400 B/W) Drive Pulley Take-up Pulley Snub Pulley

In Progress C C C C C C C Ordered Forbes Msl Forbes Msl Forbes Msl Forbes Msl Forbes Msl Forbes Msl Forbes Msl Enviiro Enviiro Enviiro Enviiro Enviiro

Apr-12 Dispatched USIPL/EX/11-12/281 18.11.2011 Dispatched USIPL/EX/11-12/281 18.11.2011 Dispatched USIPL/EX/11-12/281 18.11.2011 Dispatched USIPL/EX/11-12/281 18.11.2011 Dispatched USIPL/EX/11-12/281 18.11.2011 Dispatched USIPL/EX/11-12/281 18.11.2011 Dispatched USIPL/EX/11-12/281 18.11.2011

C C C C

Dispatched USIPL/EX/10-11/039 14.03.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Plummer Block Bearings Carrying Idlers (45 degree) Transition carrying Idlers (15 degree) Transition carrying Idlers (30 degree) Return idlers flat SA carrying idlers (45 degree) SA return idlers flat Drive (5.5 Kw) Gear Box Coupling I/P & O/P Take-up Scrappers (Internal & External) Side Skirt Sealing Skirt borad (3 - mtr long) Discharge Chute Interconnecting chute Discharge hood Hood Cover Deck Plate

C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12

Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 In Progress In Progress In Progress In Progress In Progress In Progress Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011

C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12

Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 In Progress In Progress In Progress In Progress In Progress

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Short supports Skirting angles Supporting Angle bracket Clamping plate Head Frame Tail frame (A1 & A2) Stringer Saftey Switches Structure (A3 to A11) Ladder & Handrail & Insert Plates Grating Insert Plates (400X400 16 THK, 10 Nos.) Base Plates (400X400) 4 Nos. Base Plate (230X100 6 Nos.) Foundation Bolts Load cells Belt Conveyor No. BC 3 Belt (1800 B/W) Drive Pulley (1 No.) Tail/Take-up Pulley(1 No.)

C C C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12

Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 In Progress In Progress In Progress In Progress In Progress In Progress Dispatched USIPL/EX/10-11/032 12.02.2011

2400-4

C C C

Enviiro Enviiro Enviiro

Dispatched USIPL/EX/10-11/039 14.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/032 12.02.2011

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Snub Pulley (1 no.) Plummer Block Bearings Carrying Idlers (45 degree) Transition carrying Idlers (15 degree) Transition carrying Idlers (30 degree) Return idlers flat Return Idlers V Type (10 deg) SA carrying idlers (45 degree) SA return idlers V Type (10 deg) 45 degree carrying idler bracket Drive (18.5 Kw) Gear Box Coupling I/P & O/P Take-up Scrappers (Internal & External) Side Skirt Sealing Skirt borad (5 - mtr long) Discharge Chute

C C C C C C C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro

March/Ap ril-12 In Progress Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011

Dispatched USIPL/EX/10-11/049 29.03.2011 March/Ap Enviiro ril-12 In Progress March/Ap Enviiro ril-12 In Progress March/Ap Enviiro ril-12 In Progress Enviiro Dispatched USIPL/EX/10-11/049 29.03.2011 March/Ap Enviiro ril-12 In Progress March/Ap Enviiro ril-12 In Progress Enviiro Enviiro Enviiro Enviiro Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011

Dispatched USIPL/EX/10-11/049 29.03.2011 March/Ap Enviiro ril-12 In Progress Enviiro Enviiro Enviiro Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011

Dispatched USIPL/EX/10-11/032 12.02.2011 March/Ap Enviiro ril-12 In Progress

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Interconnecting chute Discharge hood Hood Cover Deck Plate Short supports Skirting angles Supporting Angle bracket Clamping plate Head Frame Tail Frame Stringer Saftey Switches Structure (B1 to B32) Structure for take-up Ladder & Handrail & Insert Plates Grating Gantries Walkway Base Plates (500X500) Base Plate (100X230)

C C C C C C C C C C C C C C C C C C C C

March/Ap ril-12 March/Ap Enviiro ril-12 March/Ap Enviiro ril-12 March/Ap Enviiro ril-12 Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12

In Progress In Progress In Progress In Progress Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Base Plate (650X650) Foundation Bolts Bagasse Elevator No. BE 4 Chains Chain guard Side & bottom plate Scrapper (Slat Type) Sprocket Coupling I/P Coupling O/P Bearings Drive (55 Kw) Gear Box Screw take-up Head Frame Tail frame Plummer Block Saftey Switches Bearings Ladder & Handrail & Insert Plates

C C

Enviiro Enviiro

March/Ap ril-12 In Progress Dispatched USIPL/EX/10-11/032 12.02.2011

2400-5

C C C C C C C C C C C C C C C C C

Dispatched USIPL/EX/11-12/391 March/Ap Enviiro ril-12 In Progress March/Ap Enviiro ril-12 In Progress Dispatched USIPL/EX/11-12/416 Enviiro March/Ap Enviiro ril-12 In Progress Enviiro Enviiro Dispatched USIPL/EX/10-11/049 29.03.2011 March/Ap Enviiro ril-12 In Progress Enviiro Enviiro Enviiro Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011

Dispatched USIPL/EX/10-11/049 29.03.2011 March/Ap Enviiro ril-12 In Progress March/Ap Enviiro ril-12 In Progress March/Ap Enviiro ril-12 In Progress Enviiro Enviiro Enviiro Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/032 12.02.2011

Dispatched USIPL/EX/10-11/049 29.03.2011 March/Ap Enviiro ril-12 In Progress

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Bagassilo Screening System Discharge Chute Flap Gate (Motorised) Flat Gate Drive Grating Casings Gantries Walkway Structure (C1 & C2) Bracings Transfer Tower TT1 Base Plates(750X750) Base Plates(600X600) Foundation Bolts Bagasse/Slat carrier SC 1 Chains Chain guard Side & bottom plate Scrapper (Slat Type)

C C C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro

March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12

In Progress In Progress In Progress In Progress In Progress In Progress JPMA Inspection In Progress In Progress In Progress In Progress In Progress In Progress In Progress Dispatched USIPL/EX/10-11/032 12.02.2011

March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12

2400-6

C C C C

Dispatched USIPL/EX/11-12/391 March/Ap Enviiro ril-12 In Progress March/Ap Enviiro ril-12 In Progress March/Ap Enviiro ril-12 In Progress Enviiro

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Sprocket Coupling I/P Coupling O/P Bearings Drive (55 Kw) Gear Box Screw take-up Head Frame Tail frame Plummer Block Saftey Switches Bearings Discharge Chute (Head End) Discharge Chute (Tail End) Discharge Chute to feed Boilers (3 Nos.) Grating Casings Gantries Walkway

C C C C C C C C C C C C C C C C C C C

Enviiro Enviiro

March/Ap ril-12 In Progress

Dispatched USIPL/EX/10-11/049 29.03.2011 March/Ap Enviiro ril-12 In Progress Enviiro Enviiro Enviiro Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011

Dispatched USIPL/EX/10-11/049 29.03.2011 March/Ap Enviiro ril-12 In Progress March/Ap Enviiro ril-12 In Progress March/Ap Enviiro ril-12 In Progress Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/049 29.03.2011 In Progress In Progress In Progress In Progress In Progress In Progress In Progress

2400-8

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Foundation Bolts Belt Conveyor No. BC 5 Belt (1800 B/W) Drive Pulley Tail Pulley Take-up Pulley Bend Pulley Snub Pulley Carrying idlers (45 degree) 45 degree carrying idler bracket Transition carrying Idlers (15 degree) Transition carrying Idlers (30 degree) Return idlers flat Return Idlers V Type (10 deg) SA carrying idlers (45 degree) SA return idlers V Type (10 deg) Drive (37 Kw) Gear Box Coupling I/P & O/P

Enviiro

Dispatched USIPL/EX/10-11/032 12.02.2011

C C C C C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro

Dispatched USIPL/EX/10-11/039 14.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/049 29.03.2011

Dispatched USIPL/EX/10-11/032 12.02.2011 March/Ap Enviiro ril-12 In Progress March/Ap Enviiro ril-12 In Progress March/Ap Enviiro ril-12 In Progress Enviiro Dispatched USIPL/EX/10-11/049 29.03.2011 March/Ap Enviiro ril-12 In Progress March/Ap Enviiro ril-12 In Progress Enviiro Enviiro Enviiro Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Scrappers (Internal & External) Skirt borad (5 - mtr long) Discharge Chute Interconnecting chute Discharge hood Hood Cover Deck Plate Short supports Skirting angles Supporting Angle bracket Clamping plate Head Frame Tail Frame Vertical Take-up arrangement Stringer (Tail End) Saftey Switches Side Skirt Sealing Plummer Block Bearings

C C C C C C C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12

Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 In Progress In Progress In Progress In Progress In Progress Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011

Dispatched USIPL/EX/10-11/032 12.02.2011 March/Ap Enviiro ril-12 In Progress March/Ap Enviiro ril-12 In Progress Enviiro Enviiro Enviiro Enviiro Enviiro Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Side seal plate Bottom seal plate Supporting Angle bracket Head Frame Tail Frame Structure (D1 to D4) Structure (D4 to D13) Bracings Gantries Walkway Handrails Gratings Transfer Tower TT2, Monorail Transfer Tower TT3, Monorail Base Plates(600X600) Base Plates(650X650) Base Plates(750X750) Foundation Bolts Belt Conveyor No. BC 6 Belt (1800 B/W)

C C C C C C C C C C C C C C C C C C

March/Ap ril-12 In Progress March/Ap Enviiro ril-12 In Progress Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Intertek In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress Dispatched USIPL/EX/10-11/032 12.02.2011

2400-9

Enviiro

Dispatched USIPL/EX/10-11/039 14.03.2011

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Drive Pulley Tail Pulley Take-up Pulley Bend Pulley Snub Pulley 45 degree carrying idlers 45 degree carrying idler bracket Transition carrying Idlers (15 degree) Transition carrying Idlers (30 degree) Return idlers flat Return Idlers V Type (10 deg) SA carrying idlers (45 degree) SA return idlers V Type (10 deg) Drive (37 Kw) Gear Box Coupling I/P & O/P Vertical Gravity take-up arrangement, mesh guard Scrappers (Internal & External) Skirt borad (5 - mtr long)

C C C C C C C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro

Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011

Dispatched USIPL/EX/10-11/032 12.02.2011 March/Ap Enviiro ril-12 In Progress March/Ap Enviiro ril-12 In Progress March/Ap Enviiro ril-12 In Progress Enviiro Dispatched USIPL/EX/10-11/049 29.03.2011 March/Ap Enviiro ril-12 In Progress March/Ap Enviiro ril-12 In Progress Enviiro Enviiro Enviiro Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011

Dispatched USIPL/EX/10-11/049 29.03.2011 March/Ap Enviiro ril-12 In Progress Enviiro Enviiro Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Discharge Chute Interconnecting chute Discharge hood Hood Cover Deck Plate Short supports Skirting angles Supporting Angle bracket Clamping plate Head Frame Tail Frame Foundation Bolts Saftey Switches Side Skirt Sealing Plummer Block Bearings Skirt borad (3 - mtr long) Stringer (Tail End) Stringer (Head End) Tressel E1

C C C C C C C C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro

March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12

In Progress In Progress In Progress In Progress In Progress Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 In Progress Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011

Dispatched USIPL/EX/10-11/032 12.02.2011 March/Ap Enviiro ril-12 In Progress

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Tressel E2 Tressel E3 Tressel E4 Tressel E5 Tressel E6 Tressel E7 Tranfer Tower TT-4, Bracings, Sheeting, Monorail Bracings Gantries Walkway Handrails Gratings Base Plates(950X950) Base Plates(750X750) Foundation Bolts Belt Conveyor No. BC7 Belt (1800 B/W) Drive Pulley, pulley gaurd Take-up Pulley Tail Pulley 45 degree carrying idlers Picking type 45 degree carrying idler bracket

C C C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12

Dispatched Dispatched Dispatched Dispatched Dispatched In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress

USIPL/EX/11-12/349 28.12.2011 USIPL/EX/11-12/366 05.01.2012 USIPL/EX/11-12/376 13.01.2012 USIPL/EX/11-12/377 13.01.2012 USIPL/EX/11-12/387 13.01.2012

Dispatched USIPL/EX/10-11/032 12.02.2011

2400-10

C C C C C C

Enviiro Enviiro Enviiro

Dispatched USIPL/EX/10-11/039 14.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011

Dispatched USIPL/EX/10-11/032 12.02.2011 March/Ap Enviiro ril-12 In Progress Enviiro Dispatched USIPL/EX/11-12/297 24.11.2011 March/Ap Enviiro ril-12 In Progress

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Return Idlers flat Drive (7.5 Kw) Gear Box Coupling I/P & O/P Screw Take-up Scrappers (Internal & External) Side Skirt Sealing Plummer Block Bearings Skirt borad (8.3 - mtr long) Skirting angles Short Supports Supporting Angle bracket Clamping plate Discharge Chute (2 Nos.) Interconnecting chute Discharge hood Hood Cover Deck Plate Stringers

C C C C C C C C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro

March/Ap ril-12 In Progress Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011 In Progress Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 In Progress In Progress In Progress In Progress In Progress In Progress

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Saftey Switches Head Frame Tail Frame Stringer Supporting Structure Belt Conveyor No. BC7A Belt (1800 B/W) Drive Pulley, pulley gaurd Take-up Pulley Tail Pulley 45 degree carrying idlers Picking type 45 degree carrying idler bracket Return Idlers flat Transition carrying Idlers (15 degree) Transition carrying Idlers (30 degree) Drive (7.5 Kw) Gear Box Coupling I/P & O/P Screw Take-up

C C C C C

Enviiro Enviiro Enviiro Enviiro

Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011

Dispatched USIPL/EX/10-11/032 12.02.2011 March/Ap Enviiro ril-12 In Progress

2400-11

C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12

Dispatched USIPL/EX/10-11/039 14.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 In Progress In Progress In Progress In Progress In Progress In Progress Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011

Dispatched USIPL/EX/10-11/049 29.03.2011 March/Ap Enviiro ril-12 In Progress

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Scrappers (Internal & External) Side Skirt Sealing Plummer Block Bearings Skirt borad (2.5 - mtr long) Skirting angles Short Supports Supporting Angle bracket Clamping plate Discharge Chute Interconnecting chute Discharge hood Hood Cover Deck Plate Stringers Saftey Switches Head Frame Tail Frame Stringer

C C C C C C C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12

Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 In Progress In Progress In Progress In Progress In Progress In Progress Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011

2400-12

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Supporting Structure Belt Conveyor No. BC7B Belt (1800 B/W) Drive Pulley, pulley gaurd Take-up Pulley Tail Pulley 45 degree carrying idlers Picking type 45 degree carrying idler bracket Return Idlers flat Transition carrying Idlers (15 degree) Transition carrying Idlers (30 degree) Drive (7.5 Kw) Gear Box Coupling I/P & O/P Screw Take-up Scrappers (Internal & External) Side Skirt Sealing Plummer Block Bearings

Enviiro

March/Ap ril-12 In Progress

C C C C C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12

Dispatched USIPL/EX/10-11/039 14.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 In Progress In Progress In Progress In Progress In Progress In Progress Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011

Dispatched USIPL/EX/10-11/049 29.03.2011 March/Ap Enviiro ril-12 In Progress Enviiro Enviiro Enviiro Enviiro Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH 2400-13 BH BH BH BH

Skirt borad (2.5 - mtr long) Skirting angles Short Supports Supporting Angle bracket Clamping plate Discharge Chute Interconnecting chute Discharge hood Hood Cover Deck Plate Stringers Saftey Switches Head Frame Tail Frame Supporting Structure Belt Conveyor No. BC8 Belt (1800 B/W) Drive Pulley, pulley gaurd Tail Pulley

C C C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12

Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 In Progress In Progress In Progress In Progress In Progress In Progress Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011

Dispatched USIPL/EX/10-11/032 12.02.2011 March/Ap Enviiro ril-12 In Progress

C C C

Enviiro Enviiro Enviiro

Dispatched USIPL/EX/10-11/039 14.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Snub Pulley Take-up Pulley Bend Pulley 45 degree carrying idlers 45 degree carrying idler bracket Transition carrying Idlers (15 degree) Transition carrying Idlers (30 degree) Return idlers flat Return Idlers V Type (10 deg) SA carrying idlers (45 degree) SA return idlers V Type (10 deg) Drive (37 Kw) Gear Box Foundation Bolts Coupling I/P & O/P VGT arrangements, mesh guard Scrappers (Internal & External) Side Skirt Sealing Plummer Block

C C C C C C C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro

Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/11-12/297 24.11.2011

Dispatched USIPL/EX/10-11/032 12.02.2011 March/Ap Enviiro ril-12 In Progress March/Ap Enviiro ril-12 In Progress March/Ap Enviiro ril-12 In Progress Enviiro Enviiro Dispatched USIPL/EX/10-11/049 29.03.2011

Dispatched USIPL/EX/11-12/297 24.11.2011 March/Ap Enviiro ril-12 In Progress Enviiro Enviiro Enviiro Enviiro Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/032 12.02.2011

Dispatched USIPL/EX/10-11/049 29.03.2011 March/Ap Enviiro ril-12 In Progress Enviiro Enviiro Enviiro Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Bearings Skirt borad (2.5 - mtr long) Skirting angles Short Supports Supporting Angle bracket Clamping plate Discharge Chute Interconnecting chute Discharge hood Hood Cover Deck Plate Stringers Saftey Switches Head Frame Tail Frame Stringer Structure supports (J1 to J49) Bracings Gantries

C C C C C C C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12

Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 In Progress In Progress In Progress In Progress In Progress In Progress Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011

Dispatched USIPL/EX/10-11/032 12.02.2011 March/Ap Enviiro ril-12 In Progress March/Ap Enviiro ril-12 In Progress March/Ap Enviiro ril-12 In Progress

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Walkway Handrails Gratings Base Plates(500X500) Base Plates(400X400) Base Plates(230X100) Foundation Bolts Belt Conveyor No. BC 10 Belt (1800 B/W) Drive Pulley, pulley gaurd Tail Pulley Snub Pulley Take-up Pulley Bend Pulley 45 degree carrying idlers 45 degree carrying idler bracket Transition carrying Idlers (15 degree) Transition carrying Idlers (30 degree) Return idlers flat

C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro

March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12

In Progress In Progress In Progress In Progress In Progress In Progress Dispatched USIPL/EX/10-11/032 12.02.2011

2400-14

C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro

Dispatched USIPL/EX/10-11/039 14.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/049 29.03.2011

Dispatched USIPL/EX/10-11/049 29.03.2011 March/Ap Enviiro ril-12 In Progress Enviiro Dispatched USIPL/EX/10-11/032 12.02.2011 March/Ap Enviiro ril-12 In Progress March/Ap Enviiro ril-12 In Progress March/Ap Enviiro ril-12 In Progress

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Return Idlers V Type (10 deg) SA carrying idlers (45 degree) SA return idlers V Type (10 deg) Drive (45 Kw) Gear Box Foundation Bolts Coupling I/P & O/P VGT arrangements, mesh guard Scrappers (Internal & External) Side Skirt Sealing Plummer Block Bearings Skirt borad (5 - mtr long) Skirting angles Short Supports Supporting Angle bracket Clamping plate Discharge Chute Interconnecting chute

C C C C C C C C C C C C C C C C C C C

Enviiro

Dispatched USIPL/EX/10-11/049 29.03.2011 March/Ap Enviiro ril-12 In Progress March/Ap Enviiro ril-12 In Progress Enviiro Enviiro Enviiro Enviiro Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/032 12.02.2011

Dispatched USIPL/EX/10-11/049 29.03.2011 March/Ap Enviiro ril-12 In Progress Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011

Dispatched USIPL/EX/10-11/032 12.02.2011 March/Ap Enviiro ril-12 In Progress March/Ap Enviiro ril-12 In Progress

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Discharge hood Hood Cover Deck Plate Stringers Saftey Switches Head Frame Tail Frame Stringer Structure supports (K3 to K7) Bracings Gantries Walkway Handrails Gratings Base Plates(400X400) Base Plates(230X100) Foundation Bolts Scratcher Conveyor SRC-01 Chains Chain guard

C C C C C C C C C C C C C C C C C

March/Ap ril-12 March/Ap Enviiro ril-12 March/Ap Enviiro ril-12 March/Ap Enviiro ril-12 Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12

In Progress In Progress In Progress In Progress Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress Dispatched USIPL/EX/10-11/032 12.02.2011

2400-15

C C

Dispatched USIPL/EX/11-12/391 March/Ap Enviiro ril-12 In Progress Enviiro

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Side & bottom plate Scrapper (Slat Type) Sprocket Coupling I/P Coupling O/P Bearings Drive (18.5 Kw) 2 nos, Gear Box Screw take-up Plummer Block Saftey Switches Bearings Saftey Switches Scratcher Conveyor SRC-02 Chains Chain guard Side & bottom plate Scrapper (Slat Type) Sprocket Coupling I/P

C C C C C C C C C C C C C

March/Ap ril-12 In Progress March/Ap Enviiro ril-12 In Progress March/Ap Enviiro ril-12 In Progress Enviiro Enviiro Dispatched USIPL/EX/10-11/049 29.03.2011 March/Ap Enviiro ril-12 In Progress Enviiro Enviiro Enviiro Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011

Dispatched USIPL/EX/10-11/049 29.03.2011 March/Ap Enviiro ril-12 In Progress Enviiro Enviiro Enviiro Enviiro Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/032 12.02.2011

2400-16

C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12

Dispatched USIPL/EX/11-12/391 In Progress In Progress In Progress In Progress Dispatched USIPL/EX/10-11/049 29.03.2011

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Coupling O/P Bearings Drive (18.5 Kw) 2 nos, Gear Box Screw take-up Plummer Block Saftey Switches Bearings Saftey Switches Belt Conveyor No. BC 11 Belt (1800 B/W) Drive Pulley, pulley gaurd Tail Pulley, pulley guard Snub Pulley Take-up Pulley Bend Pulley 45 degree carrying idlers 45 degree carrying idler bracket Return idlers flat

C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro

March/Ap ril-12 In Progress Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011

Dispatched USIPL/EX/10-11/049 29.03.2011 March/Ap Enviiro ril-12 In Progress Enviiro Enviiro Enviiro Enviiro Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/032 12.02.2011

2400-17

C C C C C C C C C

Enviiro Enviiro

Dispatched USIPL/EX/10-11/039 14.03.2011

Dispatched USIPL/EX/10-11/049 29.03.2011 March/Ap Enviiro ril-12 In Progress March/Ap Enviiro ril-12 In Progress Enviiro Enviiro Enviiro Enviiro Enviiro March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 Dispatched USIPL/EX/10-11/049 29.03.2011 In Progress In Progress In Progress In Progress

BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Drive (7.5 Kw) Gear Box Foundation Bolts Coupling I/P & O/P VGT arrangements, mesh guard Scrappers (Internal & External) Side Skirt Sealing (10 mtrs) Plummer Block (2 Nos.) Bearings (4 Nos.) Skirt borad (5 - mtr long) Skirting angles Short Supports Supporting Angle bracket Clamping plate Discharge Chute Interconnecting chute Discharge hood Hood Cover Deck Plate (4 Nos.)

C C C C C C C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro

Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/049 29.03.2011 Dispatched USIPL/EX/10-11/032 12.02.2011

Dispatched USIPL/EX/10-11/049 29.03.2011 March/Ap Enviiro ril-12 In Progress Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 Dispatched USIPL/EX/10-11/032 12.02.2011 In Progress In Progress In Progress In Progress Dispatched USIPL/EX/10-11/032 12.02.2011

BH BH BH BH BH BH BH BH BH BH BH 2400-19 BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH BH

Stringers Saftey Switches (Belt Sway - 2 Nos, Electronic - 1 No.) Head Frame Tail Frame Stringer Structure supports Tripper For BC6 Tripper Pulley Balance Goliath Crane With Supporting Structure Limit Switch (4 Nos.) Structure Telescopic chutes (2 Nos.) Drive for Telescopic chutes (2 Nos.) Lifting arrangement for scrachers Rope drum Gearbox Hoisting motor for winch (9.3 KW, 4 nos.) LT Rail Goliath Crane (7.5 KW, 6 nos.) Drive for pulley Goliath Crane (1.1 kW, 4 Nos.) Winch (4 Nos.) Sill girder Manual Anchoring System Boggie Wheels CR 80 Rails M22X550 Bolt assembly, nut & washer, plate Rail Clamp

C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro

March/Ap ril-12 In Progress Dispatched USIPL/EX/10-11/032 12.02.2011 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 March/Ap ril-12 In Progress In Progress In Progress In Progress

2400-18

C C

Enviiro

Dispatched USIPL/EX/10-11/049 29.03.2011 March/Ap Enviiro ril-12 In Progress

C C C C C C C C C C C C C C C C C C

Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Enviiro Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12 Apr-12

Dispatched USIPL/EX/10-11/032 12.02.2011 In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress

BH BH

Base Plate Structure

C C In progress In progress In progress In progress

Enviiro Enviiro

Apr-12 Apr-12

In Progress In Progress

2400-20 2400-21 2400-22 2500 2600

BH BH BH

Mobile bucket loaders / wheel dozers Fire Fighting System Electrical switch gears and Electrical system Commissioning Spares Miscellaneous Items-3 roller bending machine

Dispatched USIPL/EX/11-12/318 08.12.2011

Actual Shipment / Dispatch Details Date

Transit Status

Weight

Required Quantity Nos/Sets/ Lot

Location

Date

Tons 2 30 8 8 2 8 2 2 4 2 8 4 16 12 4

Site

29.02.201 2

70

Site

29.02.201 2

1000

2 2 2 2 30 8 8 2 8 2 2 4 2 8 29.02.201 2 29.02.201 2 29.02.201 2

Site

Site Site

2 2 2

30 8 8 2 8 2 2 4 2 8 29.02.201 2 29.02.201 2 29.02.201 2

Site

Site Site

2 30 8 8 2 8

2 2 4 2 8 29.02.201 2 29.02.201 2 29.02.201 2

Site

Site Site

2 30 8 8 2 8 2 2 4 2 8 29.02.201 2 29.02.201 2

Site

Site

Site

29.02.201 2

4 4 2

2 Djibouti Djibouti Djibouti Djibouti Djibouti Djibouti Djibouti 21.549 1 2 1 2 2 1 1 lot

1 Site Site Site Site 16.07.201 1 19.05.201 1 19.05.201 1 19.05.201 1

Site Site

19.05.201 1 19.05.201 1

Site Site Site

20.07.201 1 20.07.201 1 20.07.201 1 19.05.201 1 19.05.201 1 19.05.201 1

Site Site Site

Site Site Site Site Site Site Site Site

19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1

Site

19.05.201 1

1 Site Site Site 16.07.201 1 20.07.201 1 19.05.201 1

Site Site Site

19.05.201 1 19.05.201 1 20.07.201 1

Site

20.07.201 1

Site Site Site Site

19.05.201 1 20.07.201 1 20.07.201 1 20.07.201 1

Site Site Site

19.05.201 1 19.05.201 1 19.05.201 1

Site Site Site Site Site

19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1

Site Site

Site

19.05.201 1 1

Djibouti

8.1

Mumbai

10

Site

20.07.201 1

Site Site Site

20.07.201 1 20.07.201 1 20.07.201 1

Site Site Site

20.07.201 1 19.05.201 1 20.07.201 1

4.9

Site

19.05.201 1 1

Djibouti

13.7

Site

20.07.201 1

Site Site Site

20.07.201 1 20.07.201 1 20.07.201 1

Site Site Site

20.07.201 1 19.05.201 1 20.07.201 1

Site

19.05.201 1 1

Site Site Site Site Site Site Site Site

16.07.201 1 20.07.201 1 20.07.201 1 20.07.201 1 20.07.201 1 19.05.201 1 20.07.201 1 19.05.201 1

Site

20.07.201 1

Site Site Site

20.07.201 1 20.07.201 1 20.07.201 1

Site Site

19.05.201 1 19.05.201 1

Site Site Site Site Site

19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1

Site Site Site Site Site

19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1

Site Site Site

19.05.201 1 19.05.201 1 19.05.201 1

Site

19.05.201 1 1

Site

16.07.201 1

Site Site Site Site Site Site Site

20.07.201 1 20.07.201 1 20.07.201 1 20.07.201 1 19.05.201 1 19.05.201 1 19.05.201 1

Site

20.07.201 1

Site Site Site

20.07.201 1 20.07.201 1 20.07.201 1

Site Site

19.05.201 1 19.05.201 1

Site Site Site Site Site

19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1

Site Site Site Site Site Site Site Site

Djibouti Djibouti Djibouti Djibouti Djibouti

16.954 16.954 16.954 16.954 16.954

Site

19.05.201 1 1

Site Site Site

16.07.201 1 20.07.201 1 19.05.201 1

Site

29.02.201 2

0.8

Site Site Site

20.07.201 1 20.07.201 1 20.07.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1

Site Site Site Site Site Site Site Site Site

Site Site Site Site

19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1

1 Site Site Site 16.07.201 1 20.07.201 1 19.05.201 1

Site Site Site

20.07.201 1 20.07.201 1 20.07.201 1

Site Site Site Site Site Site Site Site Site

19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1

Site Site Site Site

19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1

1 Site Site Site 16.07.201 1 20.07.201 1 19.05.201 1

Site Site Site

20.07.201 1 20.07.201 1 20.07.201 1

Site Site Site Site

19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1

Site Site Site Site Site

19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1

Site Site Site

19.05.201 1 19.05.201 1 19.05.201 1

1 Site Site Site 16.07.201 1 20.07.201 1 20.07.201 1 1.3

Site Site Site Site Site

19.05.201 1 20.07.201 1 20.07.201 1 29.02.201 2 19.05.201 1

8.2

Site Site

20.07.201 1 29.02.201 2

0.8

Site Site Site Site

20.07.201 1 20.07.201 1 19.05.201 1 20.07.201 1

Site Site Site

19.05.201 1 19.05.201 1 19.05.201 1

Site Site Site Site Site Site

19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1

Site Site Site Site

19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1

Site

19.05.201 1 1

Site Site Site Site Site Site

16.07.201 1 20.07.201 1 20.07.201 1 19.05.201 1 20.07.201 1 20.07.201 1

1.3

Site

19.05.201 1

Site

20.07.201 1

Site Site Site Site

20.07.201 1 20.07.201 1 19.05.201 1 20.07.201 1

Site Site Site Site Site Site Site Site Site

19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1

Site Site Site Site

19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1

Site

19.05.201 1 1

Djibouti

4.05

Site

20.07.201 1

Site Site Site

20.07.201 1 20.07.201 1 20.07.201 1

Site Site Site Site

20.07.201 1 19.05.201 1 20.07.201 1 19.05.201 1 1

Djibouti

4.05

Site

20.07.201 1

Site Site Site

20.07.201 1 20.07.201 1 20.07.201 1

Site Site Site Site

20.07.201 1 19.05.201 1 20.07.201 1 19.05.201 1 1

Site Site

16.07.201 1 20.07.201 1

0.832 1.1

Site

20.07.201 1

0.557

Site Site Site Site

20.07.201 1 20.07.201 1 19.05.201 1 20.07.201 1

0.105 0.3

0.04

Site Site Site Site Site Site Site Site Site

19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1 19.05.201 1

0.24 0.06

Site

19.05.201 1

Site

19.05.201 1

1 Site 20.07.201 1

1 Site 19.05.201 1 79.23 0.01

2 1

10.5