June , 2012
C1,C2 & C3 bldg column above terrace floor level for parapet wall in progress
10th floor slab completed and column above 10th floor slab in progress
OHT and column above terrace floor slab for parapet wall in progress
Block work at 8th floor level completed 9th and 10th floor level in progress
6th floor slab completed and column above 6th floor slab in progress
Block work up to 3rd floor level completed and 4th floor level in progress
Plinth Completed