Академический Документы
Профессиональный Документы
Культура Документы
MC070400829
NOORDIN CHARANIA
PROPOSAL
ONLINE WADROBE RETAILERS
www.mywadrobes.com.pk
TABLE OF CONTENT
1. Abstract: (In paragraph form)
e. Potential benefits that you would drive from this kind of business.
a. Problem description
b. Solution
3. Feasibility Study
a. Budget
b. Resources
4. Cost of project
a. Direct Cost
v. Maintenance Cost
b. Indirect Cost
6. Payback Period
9. Time Frame
1. ABSTRACT (paragraph)
MY WARDROBES Ltd (www.mywardrobes.com.pk) is a dedicated Internet-
based retailer, offering you printed T-shirts, shirts, hoodies, trousers, sweats and
shalwar suits, featuring a growing range of new and novel designs by contributors
from all around the cities. We also supply plain garments and accessories in a wide
variety of colours and styles.
Our Web site is product base and is designed for easy and fast access by the
widest possible number of customers. So, whether you are shopping from home or
work, you won't be frustrated by unnecessary, time wasting features.
We offer you an online services. We print garments on receipt of your order, so
we are able to respond to your particular needs. In design, order processing,
manufacture, and dispatch, we are committed to providing you with a high quality
service at reasonable prices that’s why we use internet as our portal.
We are always happy to hear from talented artists, illustrators and copywriters
interested in seeing their work on T-shirts and other garments. We provide royalties as
well as we will give you credit by labeling your name on your design. Secondly, we
have referral system if you refer a friend we’ll award you with a wardrobe of your
choice, colour and style. That’s how we get your trust and everlasting confidence in
our website.
The first challenge is to determine in the most general sense of issues .The purpose
of the preliminary problem and solution is to ensure that the project is appropriate to
the course goals; that it can be reasonably completed within the time frame of the
course; and that you have the resources available to pursue your chosen topic. Such
problems and their brief solutions as:
3. FEASIBILITY STUDY
Feasibility is the measure of how beneficial or practical the development of an
information system will be to an organization. The process by which the feasibility of a
system is measured is called feasibility analysis.
Operational feasibility is a measure of how well the solution will work on the
organization. It is also a measure of how people feel about the system/project.
OPERATIONAL FEASIBILITY
Operational feasibility criteria measure the urgency of the problem (survey and study
phases) or the acceptability of the solution. There are two aspects of operational
feasibility to be considered:
Will the solution to the problem work?
How do the customer and organization feel about the solution?
E - Economy. Does the system offer adequate service level and capacity to reduce
the costs of the business or increase the profits of the business?
C - Control. Does the system offer adequate controls to protect against fraud and
embezzlement and to guarantee the accuracy and security of data and
information?
S - Services. Does the system provide desirable and reliable service to those who
need it? Is the system flexible and expandable?
TECHNICAL FEASIBILITY
Technical feasibility can be evaluated only after those phases during which technical
issues are resolved- namely after the evaluation and design phase of our life cycle
have been completed. Today very little is technically impossible. Consequently
technical feasibility looks at what is practical and reasonable. Technical feasibility
addresses three major issues:
Software Cost 2 6 10
One time with unlimited updates
Secure and Up dated
Design Cost 3 2 10
To catch customers attention
To provide visual representation of product
Creating interest /good perception
Customer satisfaction
Development Cost 4 4 9
Once, than annual releases
Consistent prototype to follow
Maintenance Cost 5 7 9
Necessary for working of hardware devices
Like Service, Installation and
6. PAYBACK PERIOD
Payback analysis is a simple and popular method for determining if and when an
investment will pay for itself. Payback period is the period of time that will lapse before
accrued benefits overtake accrued and continuing costs. As it is said..the dollar today
is not equal to the dollar tomorrow .
Where ‘n’ is the number of years and ‘k’ is the discount rate.
7. HUMAN RESOURCES
The most important factor for any organization to keep abreast their project is to build
a good employee management relationship. Working on the internal and external
environment needs heavy amount of work to be performed in this sector.
Impact of business is entirely depend on its internal and external factors. It is the aim
of the organization to cover all their weaknesses with strength and take available
opportunities and remove threats. Once the project completed it the entirely the
Strategist to work on the factor will help improvising necessary terminologies /
technologies in order to be effective.
The following points illustrate the data we used to collect information in the system
analysis phase.
Learn all we can from existing documents, forms, reports and databases.
If appropriate we will observe the system in action. We agree not to ask questions
but just take notes and draw pictures. We must make sure that the workers know we
are not evaluating individuals. Otherwise they may tend to work more efficiently than
they usually do.
Given all the facts we have already collected. We will design and distribute
questionnaires to clear things up we don’t fully understand. This is also a good time to
solicit opinions on problems and limitations. We understand that questionnaires do
take much of the end-user time but they must know when its best to make that
sacrifice.
Conduct our interviews to verify and clarify the most important and difficult issues
and problems.
Follow up. We will use appropriate fact-finding techniques to verify facts, usually
through interviews and observation.
9. TIME FRAME
Describe the research team’s relevant skills and experience that will ensure
success.
The activities which are involved in this stage includes must match with the term of
reference (TOR). Activities mentioned below should be well considered:
1. Planning
2. Site preparation
3. Equipment
4. Training
Duration: 6 weeks
Starting Date 15-NOV-2008
Ending Date 31-DEC-2008
10. SUPPORT SERVICE / DEPENDENCIES
Internet Connection Type : PTCL Business VPN – 2048 kbps
Salient Features Bandwidth: Dedicated as per chosen Package with Static IP
Upload + Download: No restriction, unlimited data
CPE Warranty (Limited): 12 Months by Manufacturer
Time and Usage Limit: No time limit within 30 days of validity
period
Free Static IP
All Staff should be Minimum graduate and having 2 year experience in their field.
Certification according to their field CCNA, CCNP, MCSE, MCP, MCDB,MCSE, MCPSIT etc
necessary
11. CONCLUSION
All wells end well