Вы находитесь на странице: 1из 18

N

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Main tunnel Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn. Mean low water Mean low water

Key:
Local authority boundary

Order limits

Tunnel

Shaft

London Borough of London Borough of Richmond upon Thames Hammersmith & Fulham

Barn Elms Playing Fields

Barn Elms Schools Sports Centre

West Putney connection tunnel

Barn Elms
m E m k n a b t n e

London Borough of Wandsworth


100m 0 100m

Scale 1:2500 at A1 1:5000 if reproduced at A3

FOR INFORMATION

Location

Barn Elms London Borough of Richmond Upon Thames


Document Information

Section 48 publicity Location plan Book of plans - section 5


S48-PP-04X-BAREL-000027 Barnes July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

+ 104.07m Scout Hut

Rv r h m s i Ta e e
This drawing

+ 105.98m

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
4 3 . 0 0 1

Limits of land to be acquired or used (LLAU) + 105.40m Existing levels (shown in metres above tunnel datum) Approximate position of CSO outlet
R ( )

High pressure gas main

Barn Elms Schools Sports Centre


+ 106.09m
West Putney storm relief CSO B e v e r l e y B r o o k T i d e B a r r i e r

Existing trees within surveyed area


M e a n

m a h T s e h t a P

l o w
w a t e r

Notes :
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and the topographic

North Elev.

r s ny ma o o ig Sl p n

survey base, both of which have been used in the preparation of this drawing. Mud

B e v e r ly e

Bo k ro
+ 103.69m

+ 103.85m

104.31

Chain link fence encloses playing field

Mud + 104.63m
h t o a o p f t ok ro e B ry e el Bv

Mud

South Elev.

e e el Bo k B v r y ro
H on re Wa y

Ln ac at s e r H os ue

Mud

10m

40m

J yH a o s u e

Scale 1:500 at A1 1:1000 if reproduced at A3

e n r o H

y a

FOR INFORMATION

Location

Barn Elms London Borough of Richmond Upon Thames


Document Information

Section 48 publicity As existing site features plan Book of plans - section 5


S48-PP-04X-BAREL-000028 July 2012

c Thames Water Utilities Ltd 2008

3 3

o 2 t 1 7

3 1 3

4 2

4 7

Blakes Wharves

17

Day Nursery
A D
D I R D A

2 1 5

N
4 8

L SHO MIL

7
4 5

8 2

Wharf
1 1 3

4 9

NR EO W A PD O R T
2 2

6 0 1

0 1 1

4 1

9 9

E OS CL

EM PAL

EAD

Wharf

El

Stone

0 9

Sub Sta

2 9

o 1t

7 o 7 t

1 8

5 1

O D DR A A ME S N O R A B

o 1t

Authorised channel
London Wetland

Recreation Centre
0 t2 1o

2 0 4 1 0 1 6 0 1

2 5

Wharf

CASTE L AU N

56

t o

79

2 t 9 o

5 5

Posts

t2 1o 2

l og Em L d e
4 1

Alder Lodge

0 5 1

Playground

1 3

o t

8 2

L o d g e

14

Stevenage
1

k l h t Wa ae zb Ei n l ue Q e

Wharves

i l l o w

t o

Sluice

2
Spencer House

k l h z u e Ei b t Q e n la e Wa
TCB
1

Barn Elms School Sports Centre


Hall
u o t Sc ate Sen r Ce
TCB

1 5 7

19 6

Garage
6

Garage
15 5

Red Lion Hotel (PH)


Bn ak
1 7 4
2

N E E U Q

H T E B IA LZ E

K L WA
Sluice

Lakeside
Lighting Tower

Tennis Courts

Pa rd a e

1 5 4

15 4a
a 1

3 15

e hr o t Lw

El Sub Sta

Pond

2 15

BARNES
LB

Tennis Courts
d Mu

Tennis Courts Lodge


0 12

Ba n k

Bank

AD

Shelter
5

RO

Barn Elms Playing Fields


e l n ig d Sh n da n Sa

G RO

VE

EL M

Pavilion
0 1

Works

Barn Elms Playing Fields


RTn g u i n n rc a k

1 2

0 2

8 1

4 2

1 2

3 2

6 3

Barn Elms Playing Fields


1 3

9 2

8 4

5 4

3 3

5 3

0 6

1 4

7 3

2 7

Barn Elms Playing Fields

RTa k un rc ni n g

7 4

9 2

4 8

7 2

5 o5 8t 4

Pavilion

6 9

FB

B vr e el e Bo y ro k
0 0 1

8 9

5 1

1 o7 6t 5

3 1

0 1 1

a t bS u S l E
1 1 1

2 2 1

2
5

1
Pavilion

CF

Wad rB y d

d Mu

El Sub Sta
0 1

3 1

PCs TCB

14
18

Bowling Green
n t GL r Bo o Co s ,

L B

B d y

MLW T i d e B a r r i e r

M H W

Mud

ha r f M

R C

Putting Green
RO

LB

B o r o C o n s t , G L A s l y C o n s t &

LW

10a

E H V G A A EA R N L

k o o r B y e l r e v e B

L W

D Fn

N E E U A EA H V R N LG A

Rock Lane Recreation Ground


Tennis Courts

House

h a Pt
h a Pt

Bo k ro

ASH L ONE RO AD

Posts

Old Barnes Cemetery

Pearson House
o 1t 4 3

Huntingford House
HO RN

De f

Posts
o 1t

6 1 t o

6 4

4 0

3 9

Bowling Green
3 6

9 5

7 5

1 to 6

Hewett House
Church
El Sub Sta

48
Augusta House

Posts

5 5

5 1

Brooklyn Lodge

Barnes Common
h t a P

COM M ONDAL E

9 3

E RO AD

4 0
4 2
8

F E S T I N

Lodge Mill Hill

T E T L S F O SS R E

A D

El Sub Sta
Hedley House

WATERS PLACE
5 0

Bracken View

Putney Lower Common Cemetery

5 8

3 4

Putney Hospital
(general) Putney Lower Common
2 4

Mulberry Lodge

n r cs o s Pi e H u e

K S

LA N

2 a 6

The Coach House The Mill Hill

3 9

6 4

Mill Hill House

3 2

D N A E M R E E SR T E E T

ASH L ON

4 1

1 3

Mill Hill Cottage

3 2

2 4

2 b 6

3 3

MI L LH IL L R O A D
1 9

5 2

5 7

7 2

2 0

ROA D

5 3

The Mill Hill

9 1

4 8

Trocks Mill Cottage Putney Lower Common


M L HL I L I L

Ga rg a e

2 5

L NE O

1 2

Cemetery
5 1

1 1

ON ROAD

1t 1 o 2

MI L H L IL L R O A D

Chapels

ASH

3 6

The Gate House

COM M

3 9

Path

St b e a l Ya d r

1t 2 o

DANEM ERE STRE ET

RO AD

a 3

Barn Elms Park


2

2 4

D RO

Te c rso D nm r a e ee Lde og
Eastry House Elm House

AD

Hospital

Cricket Club

Putney

1 3

Putney Lower Common

FESTI NG

b 1

BS

Lodge

El Sub Sta

ROT HE RW

OO

Danemere House

Pa t h

ASH L ON

L WE O RR IH C M O N DR O D A

P at h

1 2

Norman Court

E RO AD

2 5

TCB Sadlers
162 to

152 Lodge 160

16 4

Gate
1

164
176

14 4

Mews

De f

e als Sd r

14 3

MS

os H ue

178

t3 1o

1 3

TCB

Su g re r y 2 a

D O D N R A IH O RRC M O L WE
12 3

(PH)
1

4o t6

Putney Lower Common


2

Draco Gate

Kings
2

Yard

Putney Lower Common

1 4 1

1 4 3

1 4 5t o1 4 9

D IE S R E N U E Q

The Spencer Arms

14 1

t6 1o
1

12 1

1 3

13 5

15 5

0 21

GP
209

4 5

4 5

13 6

11 7

1 1

173

181

191

9 13

1 21

217

227

235

Ac/Ap

d n a t S
m ig pn o Sl

Lighting Tower

Tennis Courts

Barn Elms Schools Sports Centre

Mean low water


hW g n Hi a Me

Fulham Football Ground

Tennis Courts

Thames path

Playing Fields
RO

d a tn S
Lighting Tower

Boat House

D Fn slipway

Pond

Barn Elms School Sports Centre

Sand and Shingle

Sluice

CS
9 7
2 3

Barn Elms Schools Sports Centre

o r o B

L G , t s n o C

& t s n o C y l s A

B L

y d B

d n U

Sand and Shingle Scout

Existing Beverley Brook footpath

Hall

Mud

C S

Bonthron
o 2 1t 1

B e v e r ly e

PC

Mud

Sluice

1t o4 0

H O R N EW A Y

F o l d o G t a s e

Mud

Sluice

Putney Lower Common


Forrest House
o 2 1t 1

Mud
1t o2 4

Playground

Knox
H O R N E
1 to 12

House
Playground
A Y

Lancaster House
2t 2 2 o7
1 t 9o 2 1

Putney Lower Common

2t 8 3 o3

Faulkner House
TCB

Jay House
1t 2 o 4

3t 4 3 o9 1 t 3o 1 8

Pavilion
37

SO T C K U H R S C T L O E S

Leaders Gardens
7o t1 2

38

t2 1o 0
1o t6
k a e e l s B u o H

SO T C K U H R S C T L

Tennis Courts

18 2

5 4 1

Queen Elizabeth Walk

8 5

0 6

y e l p i R

n e d e v i l C

e g e l l o C lb u l a C i t r e a p o B m I

9 5

1 3 1

1 0 1 3 0 1

Surgery

Eternit

Lodge

e g Ld ro ea C d
5 0 1 7 0 1

9 9

Centre

Cedar

0 t3 1o

7 9

1 to 30

s Ah e og Ld

LB

6 3 1

6 5

ms o o gR n i s e rs D

8 4
4 5

5 7

K L I WA NT TR EE

3 8

5 8

8 7

7 6

N O Y N E K

T E E R T S

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

5 8

9 7

1 9

3 9

3 0 1

3 1

t4 1o

30

OSE TT CL

4o 7 1 t1

18

21

0 10

6 2

8 8

6 1

Keyplan:

9 1

W CCL
e g s Ed e tr Wa

8 1

3 0

e tr hW a n g a Hi Me

2 1

r s ny o ig Sl p n m a o

1 1

This drawing

e n l ig d Sh n da n Sa

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

o 1t

d e o g m L El

d Mu

2 2

1 6

1 a 6
SM
GL s, n t o r Co Bo

a h m e T v r Ri

e tr hW a n g a Hi Me

e n l ig d Sh n da n Sa

1 4

EN EV ST

y B Bd L s & n t y l Co As

AG E RO AD

Key:
Limits of land to be acquired or used (LLAU) Existing public right of way

s e
CC W L

8 2

6 1

Ap Ac
d n a St

ATC te nr Ce

Access to permanent works

r ny o s a

Access to construction works

Notes:
1. This plan does not show stopping up and

2 1 3
1

tr ae

e l n ig d Sh n da n Sa

d n a St

diversions of limited duration (eg hoarding erection, minor utility diversions and minor highway works). 2. Only rights of way in or close to worksites are shown. The full extents of rights of way are not shown where they cease to be relevant to the project.

ig pn o Sl
r ny o s ma

S CK

E AN L

R am Th er v i

3 1

es

9 1

C C

LW
o or B

e us Ho at Bo

C ,G t ons L y l s A C
t& s on

LB

am Th er v i

dy B

3 4

es

RO CKS AN L

ng i op Sl m

6 5

y r on as

5 5

C C LW

4 4
7 6

M EL G RO VE RO AD

h at P

M n ea

H
gh i

W
er at

OR CT RE Y RO AD
0 2 1 9

3 9

8 1

1 0 1

M H W
h at P

e g d i r B t o o F

AN SL CK E

m ha T er v i

C a e S Q H C t e d a
s p r o

es

r s ny ma o o ig Sl p n

y B n t L Bd l Asy Co s &

100m

100m

Scale 1:2000 at A1 1:4000 if reproduced at A3

AY EW

M E

f De

N A B
M K N E

d n a S

HO RN
AY EW

n a e H

d n a e l g n i h S

0 3

h g i W r e t a

FOR APPROVAL

Location

0 4

77

SEFTON STREET

Barn Elms London Borough of Richmond Upon Thames


Document Information

3 0

2 6

5 t 8 o 6 0
6 9

t Pa h

OW STREET PENTL

4 5

M I L HI L L L

5 0

8 2
3 3

4 4

4 2

5 5

4 2

Section 48 publicity Access plan


4 8

2 9

1 7
6 3

0 2

3 8

5 1

1 5

2 1

erl o g J ro d L d e

h t a P

2 1

2 6

4 2
1 1

3 5

Book of plans - section 5


3 6

S48-AC-04X-BAREL-000003 July 2012

2 5

4 1

E CO M M O NDAL

OW STREET PENTL

ra e e Th Te r c

1 4

SEFTON STREET

2 6

1 3

2
1 4

1 a

1t 3 o

c Thames Water Utilities Ltd 2008

02 5. 10

73 . 104

103.76

103.77

103.75

103.74

103.74

103.75

103.77

103.77

103.77

103.80

103.83

103.86

103.88

103.90

103.90

103.90

103.90

103.89

103.89

95 5. 10
23 5. 10

N
03 5. 10
54 4. 10

98.70

103.75

103.74

103.73

103.71

103.72

103.73

103.74

103.73

103.72

103.73

103.76

103.79

103.82

103.84

103.82

103.82

103.82

103.82

103.83

103.86

103.86

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

76 4. 10

95 5. 10

29 92 4. 3. 10 10

37 5. 10
103.89

76 4. 10

82 4. 10

48 4. 10

89 3. 10

95 5. 10

75 4. 10

56 4. 10

95 4. 10

83 4. 10

94 . 105

Keyplan:

.3 51 0 1

30 2. 10

90 3. 10

103.73

103.73

103.73

103.72

103.69

103.71

103.72

103.70 103.68

103.66

103.69

103.74

103.79

103.84

103.82

103.81

103.80

103.78

103.81

103.86

79 4. 10

Matchline: Sheet 2

77 4. 10

.4 59 .8 0 51 1 0 1 .8 38 0 1

96 4. 10

98.72 100.67

85 4. 10

m ha T er v i

59 4. 10

103.72

103.74

103.74

103.72

103.69

103.68

103.68

103.66

103.64

103.63

103.66

103.71

103.76

103.81

103.82

103.81

103.80

103.78

103.78

103.83

103.85 103.85
79 4. 10

This drawing

8 8 0 . 1 3

84 4. 10

01 . 105

105.16

79 4. 10

5 9 0 . 1 5

London Borough of
103.69

es

Mean low water


59 4. 10
86 . 104

5 2 0 . 1 5

Richmond Upon Thames


103.75 103.75 103.72

103.69

103.66

103.65

103.63

103.62

103.62

103.64

103.68

103.73

103.78

103.82

103.81

103.79

103.78

103.76

103.80

103.83

103.87

02 . 105

92 4. 10

92 . 104

1 0 5 . 9 6

98.73

103.66

103.72

103.75

103.72

103.68

103.64

103.62

103.61

103.59

103.61

103.63

103.65

103.70

103.75

103.79

103.80

103.78

103.77

103.76

103.78

103.88

103.96 104.03 104.80

1 0 5 . 1 3

105.04

1 0 5 . 2 9
1 0 5 . 9 3 1 0 5 . 8 0

4 1 . 5 0 1

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

1 1 0 . 1 5

9 8 0 . 1 3

81 4. 10

95 4. 10

04 5. 10 13 5. 10

67 4. 10

94 2. 10

1 0 5 . 8 4

78 4. 10

86 4. 10

CL105.21

.0 53 0 1

101.44

89 4. 10

103.62

103.68

103.72

103.69

103.65

103.62

103.60

103.58

103.58

103.60

103.62

103.64

103.67

103.71

103.75

103.78

103.77

103.75

103.74

103.72

103.81

103.91

104.36

1 2 . 5 0 1

1 0 3 . 0 0

Key:
Local authority boundary
39 2. 10

12 5. 10

87 . 104

61 4. 10

.2 52 0 1
104.96

98.73 98.98

103.57

103.62

103.65

103.67

103.62

103.60

103.58

103.56

103.57

103.59

103.61

103.62

103.61

103.65

103.70

103.75

103.75

103.73

103.72

103.70

103.75

103.89

103.89

104.11

CL105.08

104.85

6 0 0. 15

0 0. 15 4

104.97

Limits of land to be acquired or used (LLAU) Trees to be pruned

89 4. 10

84 4. 10

20 2. 10

4 9 . 4 0 1

8 0 . 02 1

.2 50 0 1

85 4. 10

0 2 0. 15
8 0 0. 15 4 9 0. 14

105.04
4 0 0 . 1 5

105.00

1 0 4 . 8 9

98 4. 10

105.83

100.38
70 4. 10

8 9 0 . 1 4

91 4. 10

105.02

103.52

103.55

103.58

103.61

103.60

103.58

103.56

103.54

103.56

103.58

103.59

103.59

103.58

103.58

103.63

103.68

103.72

103.71

103.69

103.67

103.69

103.89

104.11
00 5. 10

105.54

Notes:
04 5. 10

6 8 0 . 1 4
01 5. 10
vl ee g L i e Rd 5 0 0. 19

104.99

05 5. 10

Barn Elms Schools Sports Centre


103.45 103.48 103.51 103.54 103.57 103.55 103.53 103.53 103.54 103.56 103.57 103.56 103.55 103.55 103.57 103.61 103.66 103.67 103.66 103.64 103.66 103.89 104.11 105.11

77 4. 10

99.01

UT T H O U SC
9 0 . 5 0 1

9 9 . 4 0 1

6 9 . 4 0 1

105.11

1.
105.00
1 0 5 . 0 9

105.09

3 1 . 5 0 1

100.13

105.86 104.27
2 9 0. 14 d e t ia sm Et

7 0 . 5 0 1

2.
101.00 99.01

105.07

103.38

103.42

103.47

103.55

103.54

103.53

103.51

103.51

103.53

103.55

103.54

103.54

103.55

103.55

103.57

103.58

103.59

103.64

103.63

103.65

103.67

103.83

104.07

104.07

105.16 104.72

1 0 4 . 8 6

7 9 e . td 4 0 ma 1 t i s E

3.
6 1 . 5 0 1
1 0 5 . 0 0

103.34

103.40

103.49

103.52

103.51

103.50

103.48

103.49

103.51

103.54

103.54

103.55

103.56

103.57

103.58

103.59

Removal of existing grass, top soil and sub soil to enable construction of both construction access and permanent access routes.
103.61 103.62 103.65 103.66

105.06

105.13 105.15 105.21

4.
99.02 99.04 99.02 99.04

103.69

103.78

104.03

104.42 105.09

15 0. 2 6
105.24 105.16 105.18 105.11
3 2 . 5 0 1

5 3 . 5 0 1

6 5 . 5 0 1
2 7 . 5 0 1

7 3 . 5 0 1

0 2 0. 15

3 8 . 5 0 1

9 . 95 6

6 2 . 5 0 1

8 0 . 5 0 1

1 0 5 . 3 4

Temporary construction access route to be enclosed on both sides by secure fencing approximately 2.4m high. Demolition and site clearance shown for construction access only. Minor items to be removed (e.g. barriers, bollards etc.) are not shown. General activities of site clearance such as removal of hardstanding and foundations, stripping of topsoil and clearance of minor vegetation not shown.

05 5. 10

08 5. 10

75 4. 10

96 0. 10

3 0 0 . 1 5

05 5. 10

09 5. 10

14 5. 10

13 5. 10

7 1 . 5 0 1

01 5. 10

8 9 0 . 1 5

19 4. 10

89 . 99

22 5. 10
25 5. 10

2 0 . 5 0 1

19 5. 10

1 5 5. 10
99.00 99.01

105.14 105.11

2 2 0. 15
7 1 0. 15

3 7 . 5 0 1

3 8 5. 10

0 3 . 5 0 1
.0 53 0 1 .5 53 0 1

1 8 . 5 0 1

2 9 5 9.
0 4 . 9 9

3 9 7 9.

32 5. 10

103.34

103.34

103.42

103.50

103.49

103.48

103.47

103.46

103.50

103.53

103.55

103.55

103.56

103.57

103.58

103.59

103.60

103.62

103.65

103.68

103.70

103.71

103.73

104.01

104.01

97 5. 10

104.30

105.19

105.12

1 3 0. 15
105.14
9 0 0. 15
9 1 0. 15

.1 53 0 1

.5 52 0 1

.7 54 0 1 .2 02 0 1

105.36

105.15

9 1 0. 15

.9 52 0 1

.1 44 0 1 .6 41 0 1
.8 02 0 1

.7 01 0 1

99.75

10 5. 66

8 2 0. 15

104.34 105.37 105.33

6 1 0. 15

4 6 . 5 0 1

4 3 . 0 0 1 2 8 . 5 0 1 2 8 . 5 0 1
70 5. 10

2 8 . 5 0 1
69 5. 10

15 0. 4 6 5 5 . 5 0 1 Stn A1 105.493

96 5. 10

42 5. 10

1 2 0. 15

.1 51 0 1

.2 41 0 1
100.53

.7 04 0 1

.3 03 0 1

10 5 . 64

1 60 0 .5

103.36

103.45

103.47

103.45

103.47

103.49

103.50

103.52

103.55

103.56

103.56

103.57

103.58

103.59

103.61

103.62

103.65

103.68

103.71

103.74

103.75

103.75

103.96

104.24

9 6 . 5 0 1

10 1 5. 0 5 96 . 9 9

.8 55 0 1

1 3 0 .7 1 52 0. 15

100.78

100.54

100 . 10

9 6 . 5 0 1

.3 52 0 1

100 . 17

10 5. 96

105.63

105.75 105.70

99.83
1 5 0. 10 8 0 0. 10

100 . 10

1 5 0 . 0 2

10 5. 05

105.86 105.85 103.47 103.44 103.44 104.29 104.26 103.49 103.52 103.53

1 0 0 . 1 6

99.05

98 . 99

1 7 . 5 .8 0 56 1 0 1

8 5 . 5 0 1

49 . 5 10
29 . 105

99.99

.9 51 0 1

99.76 99.79 99.78

3 5 . 5 0 1

1 6 . CL105.43 5 0 1

7 3 . 5 10

34 5. 10

.9 41 0 1

.6 11 0 1

.8 10 0 1

99.81 99.79

26 5. 0 1

0 5 0. 10

100.07

105.97

5 0 0. 1 6.9 3 0 15

3 8 0. 1 5 .1 3 0 15

100.34
11 5. 10

1 1 0 . 1 0

4 7 0 . 1 1

100.06

100.30

99.83

R (

35 5. 10

106.06

1 0 6 . 0 9

2 4 0. 14 9 0 0. 6 14 4 . 4 0 .5 1 42 0 1
1 0 6 . 0 7

100.06

3 5 0 . 1 0
100.40

99.87 105.50 99.94

7 1 . 5 10

03 . 101

22 5. 10

100.04

100.06
0 2 . 5 10

7 5 0 . 1 0 6 7 0 . 1 1

104.00

19 5. 10

103.53

103.54

103.57

103.58

103.58

103.59

103.60

103.61

103.63

103.65

103.68

103.71

103.74

103.77

103.78

103.78

103.92

104.19 105.82 CL106.09 103.93

100.42

99.97

99.97

99.97

10 0. 37

103.53

103.92

99.91

1 0 5 . 2 5

6 7 0 . 1 1

99.98 99.97 100.59 100.73 100.82 100.96 100.80 101.29 100.89 100.79

Exact alignment of hoarding to be modified locally to reflect existing trees


104.33 103.55 103.55 103.56 103.56 103.58 103.59

105.68

10 0. 63 10 4. 71

1 0 6 . 0 8 1 0 7 . 1 2

99.97
93 4. 10

3 0 0 . 1 0

1 0 5 . 7 7

0 .5 1 17

86 4. 10

1 0 5 . 8 8 1 0 6 . 8 2

100.00

103.59

105.28 103.59 103.60 103.60 103.62 103.63 103.66 103.69 103.71 103.74 103.77 103.78 103.80 103.81 103.89 104.09

E V 1 0 E 5 . 5 T R 0 I L D E E Y B 1 B 0 5 A . R 4 R 2 O R O I E K 1 0 R 5 . 5
1

6 0 . 5 10

93 4. 10

7 0. 11 6
99.99

7 0. 11 6 9 0. 11 4

7 0. 11 6

Stn 1MD 104.798

06 5. 10

92 4. 10

1 0 6 . 4 6

103.04
01 . 5 10

103.19 1 0 4 . 9 9
1 0 5 . 2 6 1 0 6 . 1 8

10 4. 64

3 8 . 1 0 2 1 9 . 1 1 0 0 1 5 . 2 2

8 0. 11 5

01 . 5 10 8 5 4. 10 0 9 . 4 10

75 4. 10

05 . 05 1

Sheet Layout Sheet 4

69 4. 10

104.43 103.59 103.98 103.58 103.59 103.62 103.62 103.62 103.64 103.66 103.69 103.71 103.73 103.75 103.77 103.78 103.80 103.82 103.85 103.95 104.41

1 0 5 . 0 3 1 0 6 . 0 3

6 9 4. 10
7 7 4. 10

104.28 103.57
84 4. 10

Sheet 3
CL104.57

55 4. 10

104.36

4 7 0 . 1 4

104.21 103.64

1 49 0 .2
1 4 0 . 7 5

0 .7 1 48

103.64

103.65

103.64

103.64

103.66

103.68

103.70

103.72

103.73

103.78

103.79

103.79

103.78

103.83

103.90

104.36

Sheet 2
1 4 0 . 8 6

1 4 0 . 9 3

1 4 0 . 9 4

104.36

103.68

103.96

1 4 0 . 6 8

1 4 0 . 7 4

104.29

.4 47 0 1
1 4 0 . 9 3
1 4 0 . 6 9

103.65

103.67

103.69

103.69

103.73

103.77

103.80

103.80

103.83

103.82

103.90

Sheet 1

1 4 0 . 7 8

104.77

103.74

1 4 0 . 9 3

1 4 0 . 9 1

14 0. 8 7 1 0. 14 4 8 0. 9 9 8 14 0. 9 5 15 0. 0 5
14 0. 9 9

0 9 . 4 0 1

14 0. 8 8
14 0. 9 6

CL103.95 103.67 103.68 103.72 103.76

103.76

103.80

103.87

103.91

103.91

103.88

104.27 104.45 103.86

104.31 103.65 103.69

104.53 104.98

10m
104.63

40m

103.73

103.98

104.49

103.84 104.60

104.65

104.49

Scale 1:500 at A1 1:1000 if reproduced at A3

B E V E R L E YB R O O K

FOR APPROVAL

London Borough of Wandsworth

Location

Barn Elms London Borough of Richmond Upon Thames


Document Information

Section 48 publicity Demolition and site clearance Sheet 1 of 4 Book of plans - section 5
S48-PP-04X-BAREL-000029 July 2012

c Thames Water Utilities Ltd 2008

02 4. 10

99 4. 10

104.23

104.23

105.27
06 4. 10

N
W B/ CP ,
15 5. 10

104.17 104.21 104.13


104.20 FH

104.18

Horse Chestnut g 2.1 h 20.0

CL 104.21 104.26

105.27

104.12

7 1 d. TF U T

104.09 104.15 Lime g 1.5 h 18.0


Grass

Horse Chestnut g 2.5 h 20.0


19 5. 94 10 . 5 10

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

95 of p 105. To l al 14 W 4. 10

&
F L C/

m 2 . 2

Lime g 0.1 h 7.0 104.17 Lime g 0.1 h 7.0


4 5 0. 14

Lime g 0.1 h 7.0

Lime g 0.1 h 7.0

2 0 . 5 0 1

Lime g 0.2 h 7.0

5 0. 14 2

14 7 0. 4

3 5 0. 14

14 0. 4 0

Lime g 0.1 h 7.0

Concrete

19 4. 10

104.16

4 0. 14 5

507
14 8 0. 3

Lime g 2.1 h 16.0


14 0. 3 5
1 0 43 .3

104.18 Lime g 1.5 h 16.0

Lime g 0.1 h 7.0

Lime g 0.1 h 7.0

6 4 0. 14

Keyplan:
105.54 105.25 105.19

18 4. 10

0 6 0. 14

3 5 0. 14

1 0 43 .0

1 0 4 . 3 0

104.21

5 6 0. 14

6 5 0. 14
Lime g 0.1 h 7.0

Lime g 1.6 h 18.0


1 0 4 . 1 9

104.17
Lime g 0.5 h 6.0

508
104.39

p m t Su 8 0 g .

9 5 0. 14

2 6 0. 14

Lime g 1.8 h 16.0


Lime g 1.4

Lime g 0.5 h 6.0

Lime g 1.2 h 12.0

Lime g 0.1 h 7.0

s ot Ps ol G a

10 4 . 21

1 0 4 . 1 8

Horse Chestnut g 2.5 h 22.0


17 5. 10

6 5 0. 14

104.23
3 6 0. 14

104.30

1 0 4 . 0 9

To 10 p 5

05 . o 3 7 . fW 9 6 a l l

Horse Chestnut g 2.2 h 18.0 Horse Chestnut g 1.2 h 12.0

h 15.0
5 5 0. 14
9 5 0. 14

This drawing
Horse

16 4. 10
18 4. 10

8 0 4. 10

104.37

WP

Tarmac

3 5 0. 14
5 5 0. 14
3 5 0. 14
Lime g 0.5 h 6.0

Lime g 1.0

Chestnut g 2.0 h 20.0

104.13

h 12.0 104.31

London Borough of
Horse Chestnut g 2.2 h 22.0

17 4. 10

4 5 0. 14

Lime g 0.5 h 6.0

104.31

506
09 4. 10

Horse Chestnut g 0.6 h 10.0

104.27
0 5 0. 14

104.24

Hammersmith & Fulham


Horse Chestnut g 0.7 h 8.0

16 5. 10

5 1 . 4 0 1

17 4. 10

Lime g 1.0 h 10.0

104.09

105.42

Lime g 1.5 h 15.0

104.32
104.26

CW

09 4. 10

17 4. 10

104.39 104.17 104.17

104.10

104.23

104.15

Horse Chestnut g 2.8 h 20.0

104.34

104.24

Horse Chestnut g 1.2 h 12.0

104.26

Horse Chestnut g 3.1 h 22.0


104.21

og Gon R u h ru d

Grass

104.13

104.20
104.30

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

20 4. 10
47 5. 10 95 5. 10

24 5. 10

19 4. 10

19 4. 10

19 . 104
& P h ,C 2m W 2. B/ LF C/

m r Ta ac

104.13 104.28

Horse Chestnut g 1.2 h 10.0

Horse Chestnut g 1.2 h 12.0

25 . 104
19 4. 10

104.25

19 4. 10

Football Pitches
104.19
104.08

Horse Chestnut g 1.3 h 12.0 105.42

Key:
Local authority boundary
Horse Chestnut g 1.3 h 12.0 Horse Chestnut g 1.5 h 13.0

33 5. 10

24 4. 10
105.96

Horse Chestnut g 1.3 h 12.0 104.21

.9 41 0 1

3 2 4. 0 1

Grass

.6 41 0 1

104.09
.8 42 0 1

505
104.21

Limits of land to be acquired or used (LLAU) Trees to be removed


Horse Chestnut g 1.3 h 12.0
7 2 . 5 0 1

1 3 . 05 1

f .5 po 59 To l 0 l1 a W
.0 43 0 1 .3 42 0 1

105.43

.7 41 0 1

104.10

.9 42 0 1

104.21

Trees to be pruned
105.34
og Gon R u h ru d
17 5. 10

.3 42 0 1

.1 42 0 1

Matchline: Sheet 3
104.07

104.04

105.28

Notes:
am Th er v Ri
02 5. 10

.3 41 0 1
CW

Horse Chestnut g 1.4 h 12.0

.5 41 0 1

.2 41 0 1

1 0 58 .3

.1 42 0 1

f 6 po 0 . 59 To l1 al W

83 5. 10

Oak g 3.2 h 18.0

.4 41 0 1

1.

104.06

Horse Chestnut g 1.6 h 14.0

104.03

504
3 2 0 . 1 4

Horse Chestnut g 2.0 h 16.0

2. 3.

104.04

104.03

Horse Chestnut g 1.0 h 12.0

Horse Chestnut g 0.6

h 12.0
Horse Chestnut g 0.6

h 12.0

4.

104.05

Horse Chestnut g 1.8

Horse Chestnut g 0.6 h 12.0

h 16.0

Removal of existing grass, top soil and sub soil to enable construction of both construction access and permanent access routes.

Horse Chestnut g 1.0 h 12.0

104.07

Temporary construction access route to be enclosed on both sides by secure fencing approximately 2.4m high. Demolition and site clearance shown for construction access only. Minor items to be removed (e.g. barriers, bollards etc.) are not shown. General activities of site clearance such as removal of hardstanding and foundations, stripping of topsoil and clearance of minor vegetation not shown.

1 42 0 .8

0 5 0 . 1 4

8 8 5. 0 1

W B/

7 3 0 . 1 4
c m r a Ta

,CP &

LF C/

11 5. 10

.0 59 0 1

es

2m 2. h

.7 60 0 1

0 4 0 . 1 4

5 2 0 . 1 4

16 5. 10

.0 61 0 1

8 3 0 . 1 4

4 2 0 . 1 4

Horse Chestnut g 16.0 h 16.0

Horse Chestnut g 1.6 h 14.0

MG
8 0 . 5 0 1

.8 43 0 1
.5 60 0 1
Rough Ground
43 4. 10

104.01

Grass

104.03

1 42 0 .6

s p e t S e t e r c n Co
HR
1m 1.

7 1 . 6 0 1

58 4. 10

503
Grass
104.27

ot os B a H ue
Tarmac

15 4. 10 18 4. 10 53 4. 10

103.97

104.38

104.07

e et r nc Co

17 4. 10 26 4. 10

104.01

104.51

Tarmac

HR 1m 1. h

s ep St
e et r c Con

HR
1m 1.

s ep St

98.66

25 4. 10 34 4. 10

104.06

CL 104.57 PNV . 02 d
0 10 T UT
r a c S

RWP RE 0 0 1

Sheet Layout
MH(S)

Soakaway 23 x 0 CL 104.58 Pit IL 103.71

0 1 0

41 . 104 44 4. 10

ar Sc

F T T U

ot os B a H ue

502
104.02

9 5 . 4 0 1

PIG

r ul t F e Soe

Sheet 4 Sheet 3
100.46
49 1. 10

0 .2 1 44

W B

mh 2 . 1

9 6 . 4 0 1

104.21

0 8 . 4 0 1
5 9 . 4 0 1

67 4. 10

104.05 104.62

Boat house
3 4 . 4 0 1
4 7 . 4 0 1
3 . d1

1 d1.

59 4. 10

104.02

e et r nc Co

Barn Elms Schools Sports Centre


104.07

65 1. 10

104.05

c n o C

105.18
21 5. 10

7 8 . 4 0 1

3 5 . 4 0 1
MG

c n o C

Sheet 2
75 1. 10
98.68

37 4. 10

Rough Grass
64 5. 10 46 5. 10

33 5. 10
2 9 . 4 0 1

2 7 . 4 0 1
78 P 4. C 10 e at G

52 4. 10

104.22

Gravel
mh 2 . 2 F L / C

MG

104.85

&

LF C/

R /
F

104.05

7 3 . 5 0 1

P C
Horse Chestnut g 2.2

&

2m 2.

1m 1.

s as Gr

h
on

SF

TF UT . 0 d2

o t ad B aY r

07 6. 10 97 5. 10

104.05

h 12.0
MG
7 0 . 6 0 1

105.92

Sheet 1

C
RW

7 2.

m Un

104.09

9 7 . 5 0 1

CP
W C

9 2 . 5 0 1

e ad

78 4. 10

105.42 TP
TP

105.12

h t Pa

105.22

s as Gr

104.08

77 5. 10

105.53
44 5. 10

60 4. 10

11 4. 10

96 5. 10

105.69

F S h

104.04

16 5. 10

42 4. 10

5 2.

103.95

RWP

55 4. 10

74 5. 10 13 4. 10

98.69
e on t S

54 4. 10

105.36

b n l ai Cu Sig l
77 4. 10
AR

104.01

Horse Chestnut g 2.2 h 13.0

FL

50 1. 10

105.43
CS

m E

32 5. 10

104.04

105.55

105.41

2 7 . 4 0 1

m k ban
ent

96 5. 10

103.98

104.04

105.09

CP
&

h 69 2m 4. 2. 10 LF C/

104.09

9 0 . 5 0 1

48 5. 36 10105.

27 . 105

London Borough of Richmond Upon Thames


104.04 104.13
104.14

105.28

Tarmac

10 4. 59

104.29

Ash g 0.8 s 7 h 9 Dead g 0.5 s 3 h 5


54 4. 10

53 4. 10

Grass

MG

o t ad B aY r

104.01
105.37

Dead g 0.7 L Plane s 6 g 2.5 h 7 s 12 h 9 Ash g 0.7 s 8 h 7 100.51 Mud / Shingle

10m
98.68

40m

42 4. 10

105.25

0 8 0. 14

104.73 Tarmac

9 5 . 4 0 1

24 5. 10

s he s Bu

105.28

5. 10 97 5. 39 5. 10 10

e at

104.07

TP

86 4. 10

104.06

104.08

104.10 L Plane
Horse Chestnut g 2.9 g 2.8 s 14 h 18.0

105.15

104.12

h 16

104.17

501
M RF /

98.70

105.29

104.04

Scale 1:500 at A1 1:1000 if reproduced at A3

W / B ,C

50 . 104

32
1m 1.
h on

s he s Bu

& C LF /

5m 2.
h

23 . 105

.2 45 0 1

105.32
Rough Grass / Tarmac

104.05

T r e e

57 1. 10

CR W

104.09

Storage Containers

C a n o p y L i n e

45 4. 10

91 4. 10

41 4. 10

33 5. 10

96 5. 10

103.98

104.03

104.09

104.11

104.08

104.01

104.06

0 5 . 3 1 4 0 4 . 2 5
1 0 5 . 4 6
104.25

28 4. 10

105.38

7 4 . 4 0 1

SF h 7 2.
53 4. 10

104.13

Container

F R P . 7 0 h 1 5 . 4 0 1

PR

F S h 5 2.
65 4. 10

F h 7 0.

46 . 104

P Willow g 2.0 s 11 h 8 98.70


52 4. 10

104.03

Horse Chestnut g 2.4 h 16.0

1 0 5 . 4 2

Poplar g 3.3 s 12 h 25

104.09

L Plane g 2.8 s 12 h 13 104.17

1 0 5 . 9 6
P 104.45

FOR APPROVAL
T H A M E S

48 4. 10

IV E

s he s Bu

75 4. 10

104.10

103.83

103.86

103.90

103.95

104.00

104.13

104.10

104.09

104.17

105.35 104.32 104.27


1 0 5 . 4 0

36 4. 10

49 1. 10

104.12

1 0 5 . 9 6

Ash g 1.0 s 5 h 10

U nm e ad h at P

Mean low water


Maple g 0.5 s 5 Willow h 8 g 3.0 s 12 h 8

42 5. 10
D e s en on i at et eg V

47 4. 10

13 4. 10

48 4. 10

s as Gr

Location
100.46

56 4. 10

90 4. 10

103.81

103.81

103.83

103.87

103.92

103.96

104.01

104.02

104.13

104.15

104.18

104.18

104.18

104.09

Barn Elms
R
98.70

96 . 05 49 1 5. 10

60 4. 10

61 4. 10

SF
h

IV

London Borough of Richmond Upon Thames


T S E M E A R H O H

1 2.
98 4. 10

63 4. 10
49 4. 10

E R

O R

103.82

s he s Bu

Chestnut g 3.0 s 9 h 15 Chestnut g 3.0 s 9 h 15 Chestnut g 3.0 s 9 h 15

71 1. 10

63 . 104

103.80

103.80

103.80

103.79

103.79

103.81

103.84

103.88

103.93

103.97

104.00

104.01

104.02

104.04

104.07

104.03

104.02

TP WV

Poplar g 3.0 s 14 h 15

Document Information

95 5. 10
O H /

60 4. 10

Chestnut g 3.0 s 9 h 15

90 4. 10

Section 48 publicity
L Plane g 1.8 s 7 h 5

61 4. 10

94 . 105

62 95 5. . 10 105

88 5. 10

WV

95 5. 75 10 5. 10

97 3. 10

Chestnut
61 . 105

103.75

103.77

103.79

103.78

103.77

103.76

103.77

103.79

103.80

103.84

103.87

103.90

103.93

103.95

103.96

103.97

103.98

103.97

103.96 103.96

g 3.0 s 9 h 15

Poplar g 3.0 s 9 h 15

Demolition and site clearance


98.71 Ash g 1.2 s 8 h 14

60 4. 10

103.95

103.73 WV

Sheet 2 of 4
Mud / Shingle

51 4. 10

65 4. 10

60 5. 10
s ee Tr

65 . 104

g 1.2 s 8 h 14
69 4. 10

Book of plans - section 5


S48-PP-04X-BAREL-000030

07 2. 10

94 4. 10

e s en
on i at et eg V

d an s he s Bu

s he s Bu

Ash g 3.0 s 7 h 9 Ash g 0.6 s 5 h 9

100.57

21 5. 10

02 5. 10

73 . 104

F S

103.71 103.72

103.71

103.74

103.76

103.77

103.75

103.74

103.74

103.75

103.77

103.77

103.77

103.80

103.83

103.86

103.88

103.90

103.90

103.90

103.90

103.89

103.89

2 2.

e on t S

103.73

Matchline: Sheet 1
BARN SPORTS ELMS CENTRE

July 2012
Ash g 0.6 s 5 h 7 98.70

95 . 105 23 5. 10

m E m nk ba

nm
ade

Chestnut g 1.7 s 14 h 10

t en

h at P

03 . 105

54 4. 10

76 4. 10

95 5. 10

29 92 4. 3. 10 10

37 5. 10

76 4. 10

82 . 104

48 4. 10

103.64

103.68

103.67

103.66

103.69

103.73

103.75

103.74

103.73

103.71

103.72

103.73

103.74

103.73

103.72

103.73

103.76

103.79

103.82

103.84

103.82

103.82

103.82

103.82

103.83

103.86

103.86

Chestnut g 1.4 s 10 h 12
95 5. 10

Poplar g 4.4 s 8 h 20

89 3. 10

75 4. 10

Chestnut g 2.2 s 18 h 16
94 5. 10
.3 51 0 1

Ash g 1.4 s 7 h 10

56 4. 10

Chestnut g 2.2 s 18 h 16
Chestnut g 1.1 s 8 h 10 Chestnut g 1.8 s 16 h 12
96 4. 10

95 4. 10
83 4. 10

30 2. 10

90 3. 10

WV 103.57 103.63 103.62 103.63 103.67 103.71 103.73 103.73 103.73 103.72 103.69 103.71 103.72 103.70 103.68 103.66 103.69 103.74 103.79 103.84 103.82 103.81 103.80 103.78 103.81 103.86 103.89

L Plane g 2.0 s 8 h 12
77 4. 10

79 4. 10

.8 51 0 1

BARN

ELMS

98.72

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Local authority boundary

London Borough of Richmond Upon Thames

Limits of land to be acquired or used (LLAU) Trees to be removed Existing track and field facilities to be relocated

Trees to be pruned Structure to be removed and relocated or reinstated

Notes:
1. Mean low water 2. 3. 4.
7 1 0. 14
Gy 104.16

7 1 0. 14

CL 104.13
3 0 d.

WM

I CG T U T

MH(F) CL 104.13

Temporary construction access route to be enclosed on both sides by secure fencing approximately 2.4m high. Demolition and site clearance shown for construction access only. Minor items to be removed (e.g. barriers, bollards etc.) are not shown. General activities of site clearance such as removal of hardstanding and foundations, stripping of topsoil and clearance of minor vegetation not shown.

6 1 0 . 1 4

Barn Elms Sports Centre


MH(F) CL 104.17

6 3 0. 14
RWP
RE

0 .5 1 43

6 3 0. 14

0 .4 1 43

P C S

0 .2 1 41 CDC
5 2 0. 14

4 3 0. 14

I CG

4 2 0. 14

7 7 t0 . f1 6 oi Sf

MH(S) CL 104.24
RG 104.11

0 .7 1 42

CL 104.23 B
P G

RG 104.12

1 3 0. 14
7 2 0. 14

G M

P G
4 2 0. 14
104.29 IC
m 2 h e . r1 Wi WP&

5 h 1 m e . eg Hd

8 1 0. 14

CL 104.26

1 3 0. 14

FH CL 104.16
104.10

104.12

Gy

104.12 104.18
104.22

Existing Changing room 1 facilities to be demolished and alternative facilities provided

9 2 0 . 1 4 5 2 0 . 1 4

Sheet Layout Sheet 4

RE

0 3 0. 14

Grass

3 7 t0 . f1 6 oi Sf
RWP

RG 104.11

0 .8 1 42

104.16

Sheet 3 Note: Topographical survey of this area pending

Cypress g 1.8 h 12.0


5 3 0 . 1 4

104.19

MH(S) CL 104.27
5 3 0. 14

Gy

Gy 104.16

8 2 0. 14

VP

104.36
6 3 0. 14

104.26

9 7 t0 . f1 6 oi Sf

7 2 0. 14

Barn Elms Schools Sports Centre


MH(F) CL 104.26

Sheet 2

CPS

MH(F) CL 104.27

armac T
104.14

104.18
7 2 0 . 1 4

9 1 0 . Gy 14 104.10

104 . 33

a e r t g Cn i s Soa e o t n r

5 4 0 . 1 4 5 5 0 . 1 4

M a c l e Sh e 4 thi : e t n

0 .6 1 43
MH(S) CL 104.26 RG

104.27

Sheet 1
92 4. 10
104.06

5 2 0 . 1 4

104.19 PNV

RG

104.19

RG

0 .7 1 42
RG

104.17

104.21
104.12 RG

RE

104.21
05 4. 10

104.14

Horse Chestnut g 1.6 h 20.0

5 2 0 . 1 4

104.26
MH(S)

105.28
CW

Rugby Pitch

104.14

94 of 5. p 03 10 . To l al 104 W

Soakaway CL 104.25

104.14

0 .9 1 42

6 2 0. 14

9 2 0. 14

1 0 4 . 3 0

104.20

Rough Ground

104.23
.8 42 0 1

104.08
0 3 0 . 1 4

02 4. 10

Cypress g 2.5 h 12.0

104.05

Grass

Matchline: Sheet 2
104.17

104.23

10m
W B/

40m

99 4. 10

104.23
105.27

4 3 0 . 1 4

06 4. 10

511
.0 43 0 1
Plane g 4.0

104.30

104.18
104.21

h 25.0
Bushes 2.0mh

104.13

Horse Chestnut g 2.1 h 20.0

104.20

FH CL 104.21

95 of p 105. To l al 14 W 4. 10

CP ,

104.26

105.27

104.12

104.04
9 2 0. 14

104.09 104.15 104.09

Lime g 1.5 h 18.0

Horse Chestnut g 2.5 h 20.0

Scale 1:500 at A1 1:1000 if reproduced at A3


2 0 . 5 0 1

15 5. 10

& F L C/

.0 43 0 1

m 2 . 2

.2 43 0 1
.3 43 0 1

8 2 0 . 1 4
Cypress g MB h 12.0 104.33

19 . 4 105 9 5. 10

Grass
104.30 Lime g 0.1 h 7.0

Lime g 0.1 h 7.0


5 0. 14 2

104.06

Lime g 0.1 h 7.0


14 7 0. 4

104.32

104.17
Lime g 0.1 h 7.0

Lime g 0.2 h 7.0

3 5 0. 14

104.03 104.16

14 0. 4 0

Lime g 0.1 h 7.0

Concrete

19 4. 10

104.04
Lime g 0.1 h 7.0 Lime g 1.5 104.21 h 16.0

Lime g 0.1 h 7.0

4 5 0. 14
6 4 0. 14

4 0. 14 5

507
14 8 0. 3
14 0. 3 5
1 0 43 .3

Lime g 2.1 h 16.0

18 4. 10

6 2 0. 14 0 3 0. 14

104.18 103.98

0 6 0. 14

Cypress g 2.2 h 12.0 104.08 103.92 103.91 104.11

3 5 0. 14

1 0 43 .0
1 0 4 . 3 0

105.54
105.25 105.19

6 3 0 . 1 4

103.99

5 6 0. 14

6 2 0. 14

h .m 22 L /F C

Atlas Cedar g 1.2 h 14.0

Grass

6 5 0. 14
Lime g 0.1 h 7.0

Lime g 1.6 h 18.0

103.92

104.17 Lime g 0.5 h 6.0

508
104.39
p m t Su 8 0 g .

1 0 4 . 1 9
s ot Ps ol G a

5 3 0. 14
103.95

9 5 0. 14

2 6 0. 14
Lime g 1.2 h 12.0

.7 43 0 1

Lime g 0.1 h 7.0

1 0 4 . 1 8

1 04 . 2 1

Horse Chestnut g 2.5 h 22.0

FOR APPROVAL
17 5. 10

o e Ae Wo d d ra

104.18 Lime g 0.5 h 6.0

103.96
104.13 104.01 Lime g 1.4 h 15.0 104.08 104.09 104.03
5 5 0. 14

Lime g 1.8 h 16.0

6 5 0. 14

104.23
3 6 0. 14

104.30

1 0 4 . 0 9

To 10 1 p 5. 0 3 5 of 7 . 96 W a l l

Horse Chestnut g 2.2 h 18.0


Horse Chestnut g 1.2 h 12.0

24 4. 10

16 4. 10
18 4. 10

104.03

104.08
WP

9 5 0. 14

104.37

Sign

Tarmac
3 5 0. 14
5 5 0. 14

104.05

104.07

Lime g 1.0 h 12.0 Lime g 0.5 h 6.0 Lime g 0.5 h 6.0 104.31

Horse Chestnut g 2.0 h 20.0

8 0 . 4 0 1

4 3 0 . 1 4
Prunus g 0.8

104.13

Grass
Lime g 1.5 h 15.0
104.01 104.02

Lime g 1.5 h 15.0

h 6.0

3 5 0. 14
4 5 0. 14

Horse Chestnut g 0.6 h 10.0

Horse Chestnut g 2.2 h 22.0

Location

17 4. 10

6 3 0 . 1 4

T armac

104.31

506
09 . 104

Lime g 1.6 h 12.0


Lime g 1.4

16 5. 10

6 4 0. 14

104.27
0 5 0. 14

104.24

104.07

Lime g 1.4 h 13.0

h 13.0
2 4 0. 14

Lime g 1.0 h 10.0

104.09

Barn Elms
Horse Chestnut g 0.7 h 8.0

05 4. 10
104.08 Lime g 1.6

5 1 4. 0 1
105.42

17 4. 10

9 3 0. 14

2 4 0. 14

Lime g 1.5 h 15.0 Lime g 0.8

h 12.0
Lime g 1.4 h 14.0

104.32 104.26
104.39 104.17 104.17 104.10

509
1 4 0. 14

London Borough of Richmond Upon Thames


Document Information

CW

09 4. 10

17 4. 10

h 12.0
Lime g 1.2 h 12.0

104.14 104.16
104.13 Prunus g 0.8 h 5.0 Lime g 0.1 Lime g 1.4 h 14.0

8 3 0. 14
7 3 0. 14

104.23

104.15

41 4. 10

Lime g 1.0 h 12.0


3 3 0. 14

Horse Chestnut g 2.8

h 20.0 104.34 104.24

Horse Chestnut g 1.2 h 12.0


24 5. 10

20 4. 10

Lime g 1.8 h 16.0

h 5.0

Lime g 1.4
2 3 0. 14

Lime g 1.4 h 13.0

47 5. 10 95 5. 10

104.26

19 4. 10

h 13.0

0 4 0 . 1 4
1 0 4 . 4 0
Lime g 1.1

3 3 0. 14

Lime g 1.1 h 22.0

Lime g 1.6 h 18.0

Lime g 1.4 h 12.0 104.21

Horse Chestnut g 3.1 h 22.0


og Gon R u h ru d

19 . 104

0 3 0. 14

19 4. 10

Grass
104.13

9 2 0. 14

9 2 0. 14
Lime g 0.1 h 12.0

Lime g 1.0 h 12.0

104.18
& P h ,C 2m W 2. B/ LF C/

Section 48 publicity Demolition and site clearance Sheet 3 of 4 Book of plans - section 5
S48-PP-04X-BAREL-000031 July 2012
1 3 5. 10
33 . 105

6 2 0. 14

104.20
104.30 104.17

8 2 0. 14

m r Ta

h 14.0

s ot Ps ol G a
9 2 0. 14

510
2 3 0. 14

Lime g 1.8 h 16.0


5 1 0. 14

104.24
104.28

14 3 0. 3

7 2 0. 14

4 4 0. 14

2 3 0. 14

Lime g 1.8 h 16.0

104.25
104.26

Football Pitches
6 3 0. 14 5 4 0. 14

Lime g 0.2 h 6.0


104.16

104.24
104.20 104.20

104.19

Removal of existing grass, top soil and sub soil to enable construction of both construction access and permanent access routes.

Horse Chestnut g 1.2 h 10.0

ac

.8 43 0 1
h 2 .m F2 L C/

104.13

Horse Chestnut g 1.2 h 12.0

25 4. 10

19 4. 10

19 4. 10

24 4. 10

104.08

Horse Chestnut g 1.3 h 12.0


105.42

105.96

.9 43 0 1
t e ap Cr
104.14

Horse Chestnut g 1.3 h 12.0


104.21
.9 41 0 1

104.23

3 2 . 4 0 1

t e ap Cr
104.23

Grass

5 2 0. 14
t e ap Cr
104.13

t e ap Cr

Horse Chestnut g 1.5 h 13.0

.6 41 0 1

104.19
104.09

t e ap Cr t e ap Cr t e ap Cr t e ap Cr t e ap Cr t e ap Cr

Horse Chestnut g 1.3

f .5 po 59 To l 0 l1 a W

.8 42 0 1

h 12.0

8 0 0. 14

104.14

505
104.21

104.13

105.43

.0 43 0 1 .3 42 0 1

9 0 0. 14
104.08

1 5 0 . 1 4 1 4 0 . 1 4

104.10

1 3 0 . 1 4

.7 41 0 1

Cricket Nets
2 1 0. 14
104.10

Horse Chestnut g 1.3 h 12.0

7 2 . 5 0 1

104.10

.9 42 0 1

104.21

8 9 0. 13

Concrete
2 0 0. 14

3 3 0 . 1 4

8 4 0 . 1 4 8 3 0 . 1 4
7 0 0. 14

.3 42 0 1

105.34

.1 42 0 1

og Gon R u h ru d
17 5. 10

3 0 0. 14

104.04

.3 41 0 1

105.28

CW

104.07

Horse Chestnut g 1.4 h 12.0

.5 41 0 1

4 4 0 . 1 4

6 2 0 . 1 4

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU) Trees to be pruned London Wetlands Area Structure to be removed and relocated or reinstated

Notes:
1. Temporary construction access route to be enclosed on both sides by secure fencing approximately 2.4m high. Demolition and site clearance shown for construction access only. Minor items to be removed (e.g. barriers, bollards etc.) are not shown. General activities of site clearance such as removal of hardstanding and foundations, stripping of topsoil and clearance of minor vegetation not shown.

2. 3. Existing car parking spaces removed 4.

7 1 0. 14

0 n v ra g g re 5 m O eh n i Te 1 . h
Cypress g 2.2

MH(F) CL 104.13

MG

0 F . h / CL 2 m

h 14.0
3 0. 14 2
" T 3S

2 0. 14 5

3 0. 14 5

7 1 0. 14
1 0. 14 9
WM

0 F . h / CL 2 m

Cypress g 1.3

Grass

Cypress g 1.3 h 14.0


104.15

Cypress g 1.3

h 14.0

Cypress g 1.3 h 14.0

Cypress g 1.5 h 14.0

Cypress g 1.3 h 14.0

Cypress g 0.6 h 14.0

Cypress g 1.3 h 14.0

U T TF

GV
104.28 104.32

I CG T U T

Gy 104.16

6 1 0 . 1 4

6" CI
104.25 104.20

104.27

2 0. 14 9
2 R . h H 1 m
Sign

513
104.39 104.37 104.27
104.29

TP

MH(F) CL 104.13

104.39 104.25

h 14.0
RS

104.17

104.19

armac T

0 eg 2 m H de . h
0 0. 14 7

104.06

GP

104.09

104.07

104.13
104.09
104.06 104.11

104.14

TP

104.34 104.31 104.25 104.24

MH(S) CL 104.12

103.99
9 0. 13 7

6" CI

104.04

2 0. 14 6
2 0. 14 2 0 0. 14 8
104.18

104.30
104.21

Barn Elms Sports Centre


MH(F) CL 104.17

6 3 0. 14
RWP
RE

0 .5 1 43

TP

6 CI "

pe B m S ed u p

6 3 0. 14
14 9 0. 1

0 .8 1 39

103.98
4 DK 0 0. 14 KO 104.03 MH(F) CL 104.03

104.02

104.00

104.15
0 .7 1 39

MG

0 .4 1 43

k l h z u e Ei b t Q e n la e Wa
am c Tra

MH(F) CL 104.20

P C S

0 .2 1 41 CDC

2 W

104.00
0 0. 14 1

WV
AC

i r e s

9 0. 13 7

4 3 0. 14

9 0. 13 9
103.98

WV

104.16
9 0. 13 1

9 0. 13 4

0 h eg 2 m H de .

9 0. 13 6

5 h eg 1 m H de .

103.98

GP

1 0 39 .4

MH(F) CL 104.09

FH CL 104.21
104.15

104.21

Gy 104.07
I CG
4 2 0. 14

5 2 0. 14

7 7 t0 . f1 6 oi Sf

MH(S) CL 104.24
RG 104.11

104.14
9 0. 13 7
104.09

KO 104.06

0 0. 14 6

8 0. 13 9
MH(F) CL 103.95

MH(F) CL 103.94

104.07 TP
Grass
103.98

104.01

WV
8 0 0. 14

MH(S) CL 104.23

0 .7 1 42

Car Park
T armac

RG 103.97

B
P G

RG 104.12

k W l h a z i bt la e ue E Q en
.1 38 0 1

.7 38 0 1

1 3 0. 14
7 2 0. 14

Car Parking
103.84
RG 103.82

G M
MH(S) CL 104.20 MH(F) CL 104.22 104.21 MH(F) CL 104.21 B

104.17

P G
4 2 0. 14
104.29 IC
m 2 h e . r1 Wi WP&

5 h 1 m e . eg Hd

8 1 0. 14

104.06 103.86 103.93

MH(F) CL 104.21

Gy 104.10
I CG

Sign
B

CL 104.26

1 3 0. 14

103.92

D C C
5 2 0. 14

103.83

9 7 0. 13
1 7 0. 13
0 7 0. 13
m 0 h g . n 2 o ri H ad

MH(S) CL 104.02

WV
103.79

4 2 0. 14 Gy Gy 104.21
104.19

RE

FH CL 104.16
104.10

9 2 0 . 1 4

RG 103.75

104.12

h 0 .m g2 n ri ad Ho

9 7 0. 13

.9 40 0 1

1 0. 14 1

o g G as R u h rs
Gy

104.20
Plane g 2.4 RE Gy

h 22.0
1 1 0. 14

CPS

.1 40 10

104.12 104.18
104.22

6 7 0. 13
h .m 30 L /F C

o g G as R u h rs
Plane g 1.8

.2 39 0 1

h 20.0

Tennis Courts
3 1 0. 14
.0 40 0 1

MH(F) CL 104.20

RE

0 3 0. 14

Grass

3 7 t0 . f1 6 oi Sf
RWP

RG 104.11

o g G as R u h rs
Gy

104.16

Existing Changing room 1 facilities to be demolished and alternative facilities provided

Sheet Layout Sheet 4 Sheet 3

0 .1 1 42

" 3 ST

5 2 0 . 1 4

0 .8 1 42

.7 38 0 1

104.17

Plane g 2.0 h 20.0


.5 39 0 1

W CL 104.20

RWP
5 3 0 . 1 4

Cypress g 1.8 h 12.0

104.19

Barn Elms Sports Centre


MH(S) CL 104.27
Gy

0 .3 1 42

Gy 104.13
Unknown g 1.0

1 2 0. 14

Gy 104.16

8 2 0. 14

VP

104.36
6 3 0. 14

104.26

0 .2 1 42

Outbuilding

5 3 0. 14
RE RWP

9 7 t0 . f1 6 oi Sf

7 2 0. 14

h 7.0

8 1 0. 14 RWP

t f oi Sf 2 3 0. 16

8 1 0. 14
MH(S) CL 104.19 Gy 104.19
MH(F) CL 104.20
.9 38 0 1

MH(F) CL 104.26

Sheet 2
armac T
104.14 104.18
7 2 0 . 1 4

CPS

104.02

MH(F) CL 104.27

.3 39 0 1

armac T

104.17

Gy 104.19

104.27

Changing room 2

MH(S) CL 104.26

RG

104.19 PNV
. 400 0 1
.mh 30 L /F C

RG

104.19

Gy 104.19

RG

104.17

.0 39 0 1

Gy 103.83 PNV
.8 38 0 1

RG

104.06

.8 39 0 1
RG

104.21
104.12

MH(S) CL 104.19
1 2 0. 14
Gy

9 1 0 . Gy 14 104.10

RE

104.21

104.08
104.26
MH(S)

Rugby Pitch

512
MH(F) CL 104.20
MH(F) CL 104.19
6 2 0. 14

Soakaway CL 104.25

Replacement changing room facilities to be provided in this area, either: 1) Provision of temporary facilities, or 2) Construction of permanent facilities exact details to be agreed with London Borough of Wandsworth

0 .8 1 41

0 .6 1 43

Sheet 1

10 4. 33

h 0 .m F3 L C/ h 0 .m F3 L C/

5 2 0 . 1 4

0 .7 1 42

5 2 0 . 1 4

0 .9 1 42

Tennis Courts

9 2 0. 14

1 0 4 . 3 0

.1 40 0 1

.8 42 0 1

104.08
0 3 0 . 1 4

104.25
4 3 0 . 1 4

Cypress g 2.5 h 12.0

104.05

10m

40m

Grass

.5 42 0 1

511
.0 43 0 1
Plane g 4.0

104.30

h 25.0
Bushes 2.0mh

104.04
9 2 0. 14

Barn Elms Schools Sports Centre

Scale 1:500 at A1 1:1000 if reproduced at A3

.6 40 0 1
.2 43 0 1
a e r t g Cn i s Soa e o t n r

.0 43 0 1
104.32

8 2 0 . 1 4
Cypress g MB h 12.0 104.33

104.09

104.30

Tennis Court Area

.3 43 0 1

.4 41 0 1
.2 42 0 1

6 2 0. 14 0 3 0. 14

6 3 0 . 1 4

Cypress g 2.2 h 12.0 104.08

104.11
h .m 22 L /F C

Atlas Cedar g 1.2 h 14.0

Grass

6 2 0. 14

5 3 0. 14
.7 43 0 1

o e Ae Wo d d ra

e r uv y c s pi l ah a p r o g t o m o i tf L i
103.95

103.92

FOR APPROVAL

103.96

5 4 0 . 1 4 5 5 0 . 1 4

24 4. 10
104.03

104.01

104.03

4 3 0 . 1 4
Prunus g 0.8

Sign

104.05

104.07

Grass

h 6.0
104.01 104.02

Location

6 3 0 . 1 4

T armac

Barn Elms
104.07 104.08 Lime g 1.4 h 14.0

05 4. 10
104.14 104.16
104.13 Prunus g 0.8 h 5.0 Lime g 0.1 Lime g 1.4 h 14.0

London Borough of Richmond Upon Thames


Document Information

41 4. 10

Lime g 1.8 h 16.0


0 4 0 . 1 4

h 5.0

2 3 0. 14

3 3 0. 14

Lime g 1.1 h 22.0

Lime g 1.6 h 18.0

0 3 0. 14

9 2 0. 14

9 2 0. 14
Lime g 0.1 h 12.0

Lime g 1.0 h 12.0

Section 48 publicity Demolition and site clearance Sheet 4 of 4

6 2 0. 14

1 0 4 . 4 0

8 2 0. 14
Lime g 1.1

h 14.0

.8 43 0 1
h 2 .m F2 L C/

9 2 0. 14

510
2 3 0. 14

Lime g 1.8 h 16.0


5 1 0. 14

14 3 0. 3

7 2 0. 14

4 4 0. 14

2 3 0. 14

Lime g 1.8 h 16.0

6 3 0. 14 5 4 0. 14

Lime g 0.2 h 6.0


104.16

104.24
104.20

Book of plans - section 5


S48-PP-04X-BAREL-000032
104.14

.9 43 0 1
t e ap Cr
104.14

t e ap Cr

5 2 0. 14

t e ap Cr t e ap Cr
104.13

t e ap Cr

M a c l e Sh e 3 thi : e t n

t e ap Cr t e ap Cr t e ap Cr t e ap Cr t e ap Cr

8 0 0. 14

July 2012

104.13

9 0 0. 14
104.08

1 5 0 . 1 4 1 4 0 . 1 4

104.10

1 3 0 . 1 4

Cricket Nets
2 1 0. 14
104.10

8 9 0. 13

Concrete
2 0 0. 14

3 3 0 . 1 4

8 4 0 . 1 4 8 3 0 . 1 4
7 0 0. 14

3 0 0. 14

4 4 0 . 1 4

6 2 0 . 1 4

c Thames Water Utilities Ltd 2008

d Mu

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

G s, n t o r Co Bo

Playground

a h m e T v r Ri

e tr hW a n g a Hi Me

e l ig hn dS n da n Sa

y B Bd L s & n t y l Co L As

Keyplan:
Stevenage Wharves

k l h t Wa ae zb Ei n l ue Q e

s e

Sluice

This drawing
CC

W L

For continuation showing LLAU at road junction, see inset below


7
5

k l h z u e Ei b t Q e n la e Wa

Barn Elms School Sports Centre

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

m ig pn o Sl r ny o s a

Sluice

Lakeside

Key:
Tennis Courts

Table 1
Pond

Tennis Courts

Barn Elms Schools Sports Centre

Limits of land to be acquired or used (LLAU) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located (those listed in Table 1) Zone within which required landscaping would be located
e l ig hn dS n da n Sa

Above ground permanent structure


Tennis Courts

Maximum height above finished ground level (Minimum heights are in brackets where applicable) 6.0m (4.0m)

Integrated electrical kiosk(s) and ventilation column(s) and habitat enclosure

Playing Fields

RTn g u i n n rc a k

Notes:
1. The Site Works Parameter Key Plan identifies each zone independently. 2. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land to be acquired or used.
dy B

Boat House

slipway

C C LW
o or B

H at Bo

C ,G t s on

e s ou

Pond

y l s A C t& s on

R
am Th er v i es

LB

ng i op Sl

1 6

1 to 22

l og Em L d e
1 a 6

y r on as

SM

GL s, n t o r Co Bo

Playground

a h m e T v r Ri

e tr hW a n g a Hi Me

1 3

Sand and Shingle

e l ig hn dS n da n Sa

14

Stevenage
1

k l h a tW ae zb Ei n l ue Q e

Wharves

Sluice

2
Spencer House

k l h z u e Ei b t Q e n la e Wa
TCB
1

Barn Elms School

i l l o w

t o

L o d g e

1 4

y lC As y B Bd &L n t o s

s e
CC W L

1 5 7

Hall
u o t Sc ate Sen r Ce
5

TCB

19 6

Garage
6

Garage
15 5

Red Lion Hotel (PH)


Bn ak
1 7 4
2

K L H WA T E B IA LZ NE E E U Q

Sluice

Lakeside
Lighting Tower

Tennis Courts

Pa rd a e

1 5 4

15 4a

3 15

e hr o t Lw

El Sub Sta

Pond

2 15

BARNES
LB

Tennis Courts
d Mu

Tennis Courts Lodge


0 12

Ba n k

Bank

AD

Shelter
5

RO

Barn Elms Playing Fields


e l ig hn dS n da n Sa

G RO

VE

EL M

Pavilion
0 1

Barn Elms Playing Fields


RTn g u i n n rc a k

1 2

8 1

0 2

4 2

1 2

3 2

6 3

Barn Elms Playing Fields


1 3

9 2

8 4

5 4

5 3

Barn Elms School Sports Centre

LW

0 6

Sand and Shingle

W MLW T i d e B a r r i e r

1 4

2 7

Mud

M H

Mud

ha r f M

Barn Elms Playing Fields

RTa k un rc ni n g

7 4

4 8

5 o5 8t 4

7 2

Pavilion

6 9

FB

B vr e el e Bo y ro k
8 9

5 1

0 0 1

1 o7 6t 5

3 1

0 1 1

a t bS u S l E
1 1 1

Huntingford House

De f

L W

2 2 1

2
5

1
Pavilion

CF

Wad rB y d

9
0 1

3 1

PCs TCB

14

Bowling Green
n t GL r Bo o Co s ,

L B

B d y

W MLW T i d e B a r r i e r

Mud

M H

Mud

ha r f M

CR

Putting Green
RO

LB

B o r o C o n s t , GL A s l y C o n s t &

LW

10a

E H V G A A EA R N L

D Fn

N E E U A EA H V R N LG A

Rock Lane Recreation Ground


Tennis Courts

ASH L ONE ROA D

h a Pt
h a Pt

Posts

Old Barnes Cemetery

Pearson House
o 1t 4 3

De f

Inset showing LLAU at road junction


f De
Posts

Forrest House
o 2 1t 1

4 0

TCB

House

1 t 3o 1 8

1 to 6

Hewett House

4 0

6 1 t o

6 4

48

Pavilion

SO T C K U H R S C T L O E S

4 5

0 10

8 8

h at P

Sports Centre

M n ea H

te nr Ce ATC

gh i

m ig pn o Sl

W er at

r ny o s a

Barn Elms Schools Sports Centre

Tennis Courts

Barn Elms Schools Sports Centre

hW g n Hi a Me

Tennis Courts

Zone within which ventilation column(s) and electrical and control kiosk(s) may be located Zone within which work no. 4c would be located
Scout Hall

tr ae

e l ig hn dS n da n Sa

d n a St

ig pn o Sl

r ny o s ma

Playing Fields
RO S CK AN L

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3


W

100m

R am Th er v i

3 1
Boat House
9 1

es

slipway

Zone within which work no. 4a would be located


h at P

M H

C LW
o or B

H at Bo e s ou

C
,G t s on

Pond

y l s A
C

t& ons

R am Th er v i

LB dy B

d Mu

k o o r B y e l r e v e B

FOR APPROVAL

3 4

es

RO S CK AN L E

ng i op Sl m y r on as

5 5

C C LW

Location

4 4
7 6

M EL GR E OV RO AD
CS
9 7
2 3
Sluice

h at P

M n ea H

Barn Elms
r s ny ma o o ig Sl p n

gh i W er at

Barn Elms Schools Sports Centre

B e v e r ly e

London Borough of Richmond Upon Thames


Document Information
Mud

OR CT RE Y RO AD
0 2 1 9

Bo k ro

3 9

Sand and Shingle Scout

Section 48 publicity
Sluice

8 1

1 0 1

Hall

Site works parameter plan


F o l d o G t a s e
Mud Sluice

M H W
h at P

1t o4 0

H O R N EW A Y

2
d Mu

k o o r B y e l r e v e B

e g d i r B t oo F

Book of plans - section 5


S48-PP-04X-BAREL-000033
Mud

AN SL CK E

C ea S Q H
C t e d a

C S

s p or

1t o2 4

Bonthron House
o 2 1t 1

B e v e r ly e

July 2012
2t 2 2 o7

r s ny ma o o ig Sl p n

y B n t L Bd l Asy Co s &

HO

Bo k ro

Knox
PC

House
Playground

Lancaster House
1 t 9o 2 1

o 1t 0 3

RN AY EW

Mud

Sluice

2t 8 3 o3

1t o4 0

Jay
H O R N EW A Y

Huntingford House
HOR

F o l d o G t a s e

Mud

Sluice

Plan
1 t 9o 2 1

3t 4 3 o9 1 t 3o 1 8

House

1t 2 o 4

Putney Lower Common

NE W AY
Mud
1t o2 4

(Scale 1:2500)
Putney Lower Common
1 to 12

Knox
H O R N E

House
Playground

Lancaster House
2t 2 2 o7

(Scale 1:1250)
t2 1o 0

SO T C K U H R S C T L O E S

HORN

o 1t 0 3

AY EW

A Y

2t 8 3 o3

Faulkner House

Jay
1t 2 o 4

3t 4 3 o9

SO T C K U H cS R Thames TC L

Water Utilities Ltd 2008

o 1t

d e o g m L El

2 t 9 o

5 5

d Mu

2 2

1 to 22

4.6m

l og Em L d e

Alder Lodge

N
Lighting Tower

d a tn S

Playground

14

Stevenage
1

k l h t Wa ae zb Ei n l ue Q e

Wharves

i l l o w

Boat House

5.0m

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

R am Th er v i

SM

GL s, n t o r Co Bo

a h m e T v r Ri

t o

L o d g e

e tr h a g W n i a H Me
Sluice

o t

28

e n l ig d Sh n da n Sa

y lC As y B Bd &L n t o s

es

s e

4.3m

8.3m

CC W L

N
D Fn slipway

k l h z u e Ei b t Q e n la e Wa

Keyplan:

C
LW

3.9m

Barn Elms School

o or B

4.4m
7
Sluice

Sports Centre

tH Boa

C ,G t s on

Lakeside
Lighting Tower

Pond

RTn g u i n n rc a k

Barn Elms Playing Fields

RTa k un rc ni n g

B vr e el e Bo y ro k

4.6m

o r Bo

L G , t s n Co

& t s n Co y l As

B L

L W

d n U

d Mu

Sand and Shingle Scout

k o o r B y e l r e v e B

B o r o C o n s t , G L A s l y C o n s t &
L W

LW

L B

B d y

W MLW T i d e B a r r i e r

Mud

M H

Mud

ha r f M

d Mu

k o o r B y e l r e v e B

B o r o C o n s t , GL A s l y C o n s t &

LW

ha r f M

L B

B d y

Mud

C S

House

Rock Lane Recreation Ground

Bo k ro
5.4m

ASHL ONE RO AD

House

Bo k ro
5.4m

ASH L ONE ROA D

House
HOR

Sluice

Putney Lower Common


Forrest

Pearson House
o 1t 4 3

Huntingford House
HO RN

De f

Pearson House
o 1t 4 3

Huntingford

De f

4 0

6 1 t o

6 4

3 9

9 5

7 5

1 to 6

Hewett House

1 to 22

2 t 9 o

5 5

Boat House

k l h t Wa ae zb Ei n l ue Q e

Wharves

4.3m
8.3m

Sluice

D Fn slipway

k l h z u e Ei b t Q e n la e Wa

3.9m

Barn Elms School


4.4m
7

Sports Centre

i l l o w

5.0m

t o

14

Stevenage

L o d g e

4.6m

d n a t S
m ig pn o Sl

Sluice

Lakeside
Lighting Tower

Tennis Courts

Barn Elms Schools Sports Centre


Pond

o t

8 2

Sand and Shingle

RTn g u i n n rc a k

4.6m

Barn Elms Schools Sports Centre

4.6m

o r o B

L G , t s n o C

& t s n o C y l s A

B L

y d B
Barn Elms School Sports Centre

d n U
4.6m

Sand and Shingle

Barn Elms Playing Fields


Scout Hall

RTa k un rc ni n g

Zone within which ventilation column(s) and electrical and control kiosk(s) may be located
LW
B o r o C o n s t , G L A s l y C o n s t &

L W

B vr e el e Bo y ro k
4.6m
L G , t s n o C

d Mu

k o o r B y e l r e v e B

ha r f M

L B

d Mu

C S

k o o r B y e l r e v e B

5.4m

B o r o C o n s t , GL A s l y C o n s t &

LW

L B

Bonthron House
o 2 1t 1

B d y

ASHL ONE RO AD

B e v e r ly e

W MLW T i d e B a r r i e r

Mud

4.7m

M H

Mud

ha r f M

L W

B d y

W MLW T i d e B a r r i e r

M H

Mud

Mud

Bo k ro
5.4m

PC

Rock Lane Recreation Ground

House

ASH L ONE RO AD

Mud

Sluice

5.4m
1t o4 0

Pearson House
o 1t 4 3

De f

5.7m

Huntingford House
HO RN

H O R N EW A Y

Pearson House
o 1t
4 3

Huntingford House
HOR

De f

4.3m

F o l d o G t a s e

Mud

Sluice
f De

Forrest House
o 2 1t 1

5.4m
Mud
1t o2 4

Playground

6 1 t o

6 4

Knox
H O R N E
1 to 12

House
Playground

Lancaster House
2t 2 2 o7
1 t 9o 2 1

4 0

4.1m

3 9

Bowling Green

9 5

7 5

1 to 6

A Y

2t 8 3 o3

Hewett House

4 5

4 5

4.6m

d n a t S
m ig pn o Sl r ny o s a

e s ou

L y l s A
C

t& s on

R am Th er v i

LB
dy B

This drawing

Tennis Courts

Barn Elms Schools Sports Centre

es

d Mu

hW g n Hi a Me

Fulham Football Ground

Tennis Courts

ng i op Sl

tr ae

e l n ig d Sh n da n Sa

d n a St

y r on as

4.5m

Sand and Shingle

Playing Fields

4.6m

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

ig pn o Sl

e l n ig d Sh n da n Sa

r ny o s ma

C
LW

R am Th er v i
h at P

Boat House

es

n ea

4.3m

H gh i W
er at

slipway

Key:
Limits of land to be acquired or used (LLAU)

C
C LW
o r Bo

Barn Elms Schools Sports Centre


t& ns Co

e us Ho at Bo

C ,G t ons
L

Pond

y l s A

R am Th er v i es

LB y Bd

Barn Elms School Sports Centre

Sand and Shingle

4.6m

o r o B
LW

L G , t s n o C

& t s n o C y l s A

B L

y d B

Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located (those listed in Table 1) Limits of permanent access Zone within which required landscaping would be located

ng i op Sl m y r on as

d n U

4.6m

Sand and Shingle Scout


M n ea

h at P

Hall
gh i

Sluice

W
er at

CS

Barn Elms Schools Sports Centre

M H W
h at P

Zone within which Work No. 4c would be located

y Bd

Zone within which Work No. 4a would be located

e g d i r B t o o F

Hall

M H W
Mud

Notes:
C a e S Q H C t e d a

h at P

e dg i r B t oo F

C S

W MLW T i d e B a r r i e r

M H

5.4m

Bonthron
o 2 1t 1

B e v e r ly e

4.7m

PC

5.4m

Bonthron
o 2 1t 1

B e v e r ly e

4.7m

PC

Mud

Mud

Sluice

Sluice

5.4m
1t o4 0

5.4m
H O R N EWA Y

5.7m

F o l d o G t a s e

Mud

5.7m

1t o4 0

4.3m
H O R N EW A Y

House

F o l d o G t a s e

Mud

Sluice

5.4m
Mud

1t o2 4

Playground

Knox
H O R N E
1 to 12

House
Playground

Lancaster House
2t 2 2 o7
1 t 9o 2 1

Forrest
o 2 1t 1

House
2t 8 3 o3

Putney Lower Common

A Y

5.4m
Mud

1. The Site Works Parameter Key Plan identifies each zone independently. 2. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land to be acquired or used.
N E
T

s p r o

r s ny ma o o ig Sl p n

C a e S Q H

n t GL r Bo o Co s ,
y B n t L Bd l Asy Co s &
o 2 1t 1

C et ad ps or

r s ny ma o o ig Sl p n

NE W AY

f De

AY EW

HOR

o 1t 0 3

NE
W AY

M E N A B M K

Faulkner House
TCB

Jay House
1t 2 o 4

3t 4 3 o9 1 t 3o 1 8

1t o2 4

Playground

HO

Pavilion
37

SO T C K U H R S C T L O E S

Leaders Gardens
7o t1 2

Knox
H O R N E
1 to 12

38

House
Playground

Lancaster House
2t 2 2 o7
1 t 9o 2 1
d Mu

o 1t 0 3

RN AY EW

Bowling Green

1 to 20
1o t6

4.1m
o 1t

d e o g m L El

d a tn S
Lighting Tower

A Y

2t 8 3 o3

2 2

4.6m

l og Em L d e

Alder Lodge

R am Th er v i es

SM

G s, n t o r Co Bo

Playground

a h m e T v r Ri

e tr hW a n g a Hi Me

e n l ig d Sh n da n Sa

y d BB L s & n t y l Co L As

s e
CC W L

C C LW
o or B

tH Boa e s ou

C ,G t s on L y l s A C t& s on
r ny o s a

R am Th er v i es

LB dy B

d Mu

hW g n Hi a Me

Fulham Football Ground

Tennis Courts

ng i op Sl m y r on as
Playing Fields 4.5m

tr ae

e l n ig d Sh n da n Sa

d n a St

ig pn o Sl

e l ig hn dS n da n Sa

r ny o s ma

C C

LW

R am Th er v i

h at P

M n ea H gh i

Boat
House

es

4.3m

W
er at
e us Ho at Bo
Pond Sluice slipway

C
C LW
o r Bo ,G t ns Co L y l s A
C t& ons

R am Th er v i es

LB
dy B

FOR INFORMATION
C

ng i op Sl m y r on as
Sand and Shingle

C
LW

h at P

M ean

Location
W
er at

H
gh i

CS

Barn Elms Schools Sports Centre

Barn Elms London Borough of Richmond Upon Thames


& t s n o C y l s A B L
y Bd

M H W
h at P
o r Bo

d n U

Sand and Shingle Scout Hall

Document Information

e g d i r B t o o F
C a e S Q H C t e d a s p r o

Section 48 publicity
M
H

W
h at P

Site works parameter key plan Book of plans - section 5


C ea S Q H C t de a ps or

e dg i r B t oo F

r s ny ma o o ig Sl p n

n t GL r Bo o Co s , y B n t L Bd l Asy Co s &

C S

5.4m

S48-PP-04X-BAREL-000034
4.7m
PC

r s ny ma o o ig Sl p n

Bonthron
o 2 1t 1

B e v e r ly e

Bo k ro
5.4m

July 2012

Mud

Sluice

5.4m
1t o4 0

5.7m

H O R N EWA Y

F o l d o G t a s e

Mud

Sluice

Putney Lower Common


Forrest House
o 2 1t 1

NE W AY

5.4m
Mud

1t o2 4

AY EW
HO

Playground

HOR

Knox
H O R N E
1 to 12

House
Playground
A Y

Lancaster House
2t 2 2 o7
1 t 9o 2 1

o 1t 0 3

NE

M E N A B M K N E T
Putney Lower Common
Faulkner House

Y WA

2t 8 3 o3

Jay
TCB

3t 4 3 o9 1 t 3o 1 8

House

1t 2 o 4

o 1t 0 3

RN AY EW

Pavilion
37

SO T C K U H R S C T L O E S

Leaders Gardens
7o t1 2

38

1 to 20
1o t6

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn. Existing storm overflow Location

Key:
6 1 d.

Local authority boundary Limits of land to be acquired or used (LLAU)

1 2 d.

Existing sewers Proposed access cover + 105.40m Existing level (shown in metres above tunnel datum) Proposed levels (shown in metres above tunnel datum) Zone within which all permanent site structures would be located Zone within which permanent above ground structures would be located New access route

Permanent access road to cross high pressure gas main


8 1 d.

105.40
B E V E T R I L D E E Y B B A R R O R O I E K R

P TH 5 S 70

Existing high pressure gas main - see note 4

Barn Elms Schools Sports Centre

0 2 d.

Access for maintenance vehicles

Zone within which Work No. 4c would be located

Notes:
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan. 4. High risk item : The Richmond to Fulham high pressure gas main is laid beneath the Barn Elms School Sports Centre operating at high pressure in excess of 7bar. Gas main believed to be steel 30" diameter.

Permanent hardstanding area to be elevated above existing ground level. Change in level will be via a battered slope.

Integrated electrical and control kiosk and ventilation column. Both surrounded by a habitat enclosure Electrical and control kiosk 6m x 2.5m Ventilation columns 1 No. 0.6m internal dia and 1 No. 0.225m internal dia both enclosed within a 2.5m x 1.5m structure of 4m minimum to 6m maximum height Interception chamber + 103.80 Ventilation duct Habitat enclosure 5m x 8m, minimum 4m to maximum 6m high Perimeter length of habitat enclosure approx. 22m

Sheet layout:
Sheet 3 Sheet 2

Zone within which Work No. 4a would be located

Sheet 1 Work No. 4b. 2.2m internal dia. connection tunnel 10m Public footpath 0 10m

Valve chamber Work No. 4a. CSO drop shaft (6m internal dia.) 104.50

Scale 1:200 at A1 1:400 if reproduced at A3

Zone within which kiosk and ventilation column may be located

ILLUSTRATIVE

Location 104.50

Barn Elms London Borough of Richmond Upon Thames


Document Information

B ee vr l e y Bo ro k

Section 48 publicity Permanent works layout


Ventilation ducting Passive filter chamber

Sheet 1 of 3 Book of plans - section 5


S48-PP-04X-BAREL-000035 July 2012 West Putney Storm Relief Sewer

c Thames Water Utilities Ltd 2008

104.13

RE RWP RWP

MH(F) CL 104.26 Gy 104.19 MH(F) CL 104.20 MH(F) CL 104.27

MH(S) CL 104.19

N
MH(S) CL 104.26 RG 104.19 PNV RG 104.19 RG 104.17 RG 104.21 RG RE 104.21

Gy

AR

104.19

AR

Gy 104.19

Gy 103.83 PNV MH(S) CL 104.19 Gy

A R
Gy 104.08

104.10

MH(S) Soakaway CL 104.25 MH(F) CL 104.20 MH(F) CL 104.19

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

FH CL 104.21

M a c l e Sh e 3 thi : e t n

Existing access road to boat house facilities

Keyplan:

Mean low water This drawing

Zone within which Work No. 4c would be located

Mean low water

Authorised channel

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Local authority boundary Limits of land to be acquired or used (LLAU) Proposed access cover Access for maintenance vehicles Zone within which all permanent site structures would be located Zone within which the shaft would be located
W CL 104.57 PNV

RWP RE MH(S) Soakaway CL 104.58

PIG

W B

h m 2 . 1

Zone within which permanent above ground structures would be located New access route

ar Sc

m ha T er v i

Existing boat house & sailing club facilities


TP
RWP

es

Notes:
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan.

TP

Permanent access to be located adjacent to existing retaining wall

Barn Elms Schools Sports Centre

Existing Scout Hut


MH(S) CL 104.64 UTL IL102.18(R)

Sheet layout:
Sheet 3 Sheet 2 Sheet 1

PS

4 5 0

4 5 0

Access for maintenance vehicles approx. 3m in width 10m 0 100m

For details see Sheet 1

4 3 . 00 1

Scale 1:1000 at A1 1:2000 if reproduced at A3

R) (

ILLUSTRATIVE
B E V E R L E Y

Location
B R OO K

Barn Elms London Borough of Richmond Upon Thames


Work No. 4b. 2.2m internal dia. connection tunnel Document Information

Section 48 publicity Permanent works layout Sheet 2 of 3 Book of plans - section 5


S48-PP-04X-BAREL-000036 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Mean low water Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Mean low water

Key:
Local authority boundary Authorised channel Limits of land to be acquired or used (LLAU) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located Limits of permanent access

am Th er v Ri

103.79

Permanent access for maintenance vehicles

es

New access route

Replacement track and field facilities to be provided in this area

Notes:
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan.

Replacement changing room facilities to be provided in this area, either: 1) Provision of temporary facilities, or 2) Construction of permanent facilities exact details to be agreed with London Borough of Wandsworth

p m t Su 8 0 g .

Sheet layout:
Sheet 3 Sheet 2 Sheet 1

Access for maintenance vehicles approx. 3m in width 10m


W B

100m

h m 2 . 1

Scale 1:1000 at A1 1:2000 if reproduced at A3

Barn Elms Schools Sports Centre

ILLUSTRATIVE

Location Zone within which Work No. 4c would be located

Barn Elms London Borough of Richmond Upon Thames


Document Information

Section 48 publicity Permanent works layout Sheet 3 of 3 Book of plans - section 5


S48-PP-04X-BAREL-000037 M a c l e Sh e 2 thi : e t n July 2012

c Thames Water Utilities Ltd 2008

N
West Putney storm relief CSO

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

Route for maintenance access 3m wide

Barn Elms Schools Sports Centre

Maintenance vehicle access with reinforced grass system to allow natural plant growth

B e v e r l e y B r o o k T i d e B a r r i e r

M H W

This drawing

MLW

u M d

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

North Elev.

Key:
Limits of land to be acquired or used (LLAU) Zone within which permanent above ground structures would be located Zone within which required landscape would be located Battered slope + 105.40m Mud 105.40 Existing levels (shown in metres above tunnel datum) Proposed levels (shown in metres above tunnel datum) Approximate position of CSO outlet Existing trees location shown notionally only Integrated electrical and control kiosk and ventilation column. Both surrounded by an illustrative habitat enclosure with brown roof of 4m minimum. to 6m maximum height Openings within habitat enclosure to be filled with suitable media to attract different species or animals and invertebrae. Exact media to be agreed Existing chainlink fence to be reinstated along boundary Existing vegetation shown notionally 104.50 + 104.45m Vent outlets Existing trees within surveyed area
tah op t o o o kf e Br v r y Be e l

S ot p c t b rc n g rd ot ad . p r ih o e e o f ue n r w rs s t i h

Maintenance vehicle access approx 700mm above sports field level with reinforced grass system to allow for grass/natural plant growth

+ 103.78m + 103.80m

Proposed trees

Existing chain link fence to be maintained along the boundary

Natural grassland.

Notes :
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and the topographic survey base, both of which have been used in the preparation of this drawing.

AA

+ 103.80m

+ 103.80m 104.50

Landscape Key:
Hard Landscaping Soft Landscaping (Reinforced grass system) Tree / Vegetation Canopy

104.50 Embankment to path level

+ 104.60m
h t o a o p f t ok ro e B ry e el Bv

Mud

+ 104.49m

10m South Elev.

10m

Scale 1:200 at A1 1:400 if reproduced at A3

INDICATIVE
Save for the layout of above ground structures which is illustrative

Mud

Location

Barn Elms London Borough of Richmond Upon Thames


Document Information

Section 48 publicity Proposed landscape plan

Beverley Brook
Ln ac at s e r H os ue

Book of plans - section 5


S48-PP-04X-BAREL-000038 July 2012

Ho re n W

a y

Jy a H os ue

c Thames Water Utilities Ltd 2008

Openings within habitat enclosure cladding to be filled with suitable media to attract different species of animals and invertibrates. Exact media to be agreed Integrated Electrical and Control Kiosk and Ventilation column. Both surrounded by a habitat enclosure with brown roof 4m min. to 6m max high

Existing trees location shown notionally Maintenance vehicle access with reinforced grass system to allow natural plant growth. Existing chain link fence to be reinstated along the boundary

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Notes :
1. All dimensions and levels are approximate. 2. The purpose of this section is to illustrate the scale of the below ground infrastructure to be provided.

e e el Bo k B v r y ro o a o p h f t t

Valve chamber Interception chamber

Section AA

CSO drop shaft

1m

10m

Scale 1:100 at A1 1:200 if reproduced at A3

N
R am Th er v i

ILLUSTRATIVE

es

Sand and Shingle

Location

Barn Elms
er at

M ean
H gh i W

London Borough of Richmond Upon Thames


Document Information
Sand and Shingle

Section 48 publicity Section AA Book of plans - section 5


S48-PP-04X-BAREL-000039 July 2012
ASH L ONE ROA D

Connection tunnel to main tunnel


M
d Mu
k o o r B y e l r e v e B

M H W

Mud
MLW

Mud

B e v e r ly e

A
Bo k ro

A
H O R N EW A Y

H O R N E

A Y

M
HOR NE W AY
HOR NE
Y WA

H W

c Thames Water Utilities Ltd 2008

Trees shown notionally Buildings beyond Chain link fence

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Notes :
1. All dimensions and levels are approximate.

Barn Elms Schools Sports Centre

As Existing North Elevation

Concealed doors to match wall finish pattern

Integrated Electrical and Control Kiosk and Ventilation column. Both surrounded by a habitat enclosure with brown roof 4m minimum to 6m maximum high

Openings within habitat enclosure cladding to be filled with suitable media to attract different species of animals and invertibrates. Exact media to be agreed Maintenance vehicle access approximately 700mm above sports field level with reinforced grass system to allow natural plant growth Existing chain link fence to be reinstated along the boundary

Earth slope graded into existing amenity grass Buildings beyond

1m

10m

Electrical and control kiosk/ ventilation column/ habitat wall

Crane operation area

Scale 1:100 at A1 1:200 if reproduced at A3

R
am Th er v i

Proposed North Elevation

ILLUSTRATIVE

es

Sand and Shingle

Location
M

n o i vt e l a hE ot N r
B e v e r ly e

M H W

Mud MLW
Mud

Bo k ro

H O R N EW A Y

H O R N E

A Y

SO T C K U H R S C T L O E S

ASH L ONE ROA D

n ea
H

Barn Elms London Borough of Richmond Upon Thames


Document Information
Sand and Shingle

gh i
W er at
d Mu

Section 48 publicity As existing and proposed North elevation Book of plans - section 5
S48-PP-04X-BAREL-000040 July 2012

M
k o o r B y e l r e v e B

H W

HOR NE W AY
HO
RNE

Y WA

c Thames Water Utilities Ltd 2008

Existing trees beyond shown notionally

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Existing Trees shown notionally Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Chain link fence

Notes :
1. All dimensions and levels are approximate.

Beverley Brook

Barn Elms Schools Sports Centre

As Existing South Elevation


Existing trees beyond shown indicative only Existing chain link fence to be reinstated along the boundary Integrated Electrical and Control Kiosk and Ventilation column. Both surrounded by a habitat enclosure with brown roof 4m min. to 6m max high Gaps and holes on the pattern/motif cladding used for habitat entry. Cladding to be appropriate material for habitat enclosure.

Proposed new trees

1m

10m

Crane operation area

Electrical and control kiosk/ ventilation column/habitat wall

Scale 1:100 at A1 1:200 if reproduced at A3

N
R

am Th er v i es

ILLUSTRATIVE

Proposed South Elevation


Sand and Shingle

Location

Barn Elms
W
er at

M H W

Mud MLW

H O R N EW A Y

n i ao vt Ee h l ot Su

H O R N E

A Y

ASH L NE O ROA D

M ean
H gh i

London Borough of Richmond Upon Thames


Document Information

Section 48 publicity
Sand and Shingle

As existing and proposed South elevation Book of plans - section 5


S48-PP-04X-BAREL-000041 July 2012

d Mu

M
k o o r B y e l r e v e B

H W

Mud

HOR NE W AY
HOR NE
Y WA

c Thames Water Utilities Ltd 2008

4 1

1 a 6
SM

5.0m
Playground

GL s, n t o r Co Bo

4.9m

k l h t Wa ae zb Ei n l ue Q e

Wharves

Sluice

2
Spencer House

8.3m

i l l o w

Dedicated construction access route entrance.

Construction access road to be constructed parallel to existing retaining wall.

t o

1 4

Stevenage

L o d g e

a h m e T v r Ri

e tr h a g W n i a H Me

1 3

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

o t

8 2

e n l ig d Sh n da n Sa

1 4

y B Bd L s & n t y l Co As

s e
CC W L

N
5.0m
TCB
1

k l h z u e Ei b t Q e n la e Wa

3.9m

Barn Elms School


4.1m Hall
u o t Sc ate Sen r Ce
5

Keyplan:
4.6m

1 5 7

TCB

19 6

Garage
6

4.4m

Garage
15 5

Limit of public highway


Sluice

Red Lion Hotel (PH)


Bn ak
1 7 4
2

K L A HW T E B IA LZ NE E E U Q 5.0m

Lakeside

Site security office


Tennis Courts

Tennis Courts
1 5 4

15 4a
a 1

Pa rd a e

3 15

e hr o t Lw

El Sub Sta

Pond

5.4m Tennis Courts

2 15

BARNES
LB

Tennis Courts Lodge


0 12
0 10

5.7m

Shared access route

Ba n k

Construction vehicle holding bay


Tennis Courts

Bank

AD

Shelter
5

RO

Barn Elms Playing Fields

Pavilion
0 1

4.6m

Works

Barn Elms Playing Fields


RTn g u i n n rc a k
AN L

Queen Elizabeth Walk

1 2

Probable location of alternative changing room facilities. Exact details to be agreed with London Borough of Wandsworth.

VE

G RO

EL M

0 2

8 1

1 2

Rocks Lane
3 2

Junction works-modification to northbound stopline and repositioning of traffic lights


Pond

4 2

6 3

Barn Elms Playing Fields


1 3

9 2

3.9m
5 4

8 4

3 3

5 3

0 6

1 4

2 7

7 3

Barn Elms Playing Fields


3.9m

RTa k un rc ni n g

7 4

9 2

4 8

5 o5 8t 4

7 2

Pavilion

6 9

4.0m

FB

B vr e el e Bo y ro k
0 0 1
1 Washout with penstock IL102.18 (NFI) 103.42

8 9

5 1

4 5 0 ( UT T)

1 o7 6t 5

4 5 0 ( UT T)

4.2m

3 1

( R)

0 1 1

a t bS u S l E
1 1 1

2 2 1

2
5

1
Pavilion

CF
Stn A1 105.36 105.493
4 3 00. 1

Wad rB y d
) R P( TH 5 S 70
d 13 .
7 5 0S TH P

4.4m
9

El Sub Sta
0 1

4.4m
3 1

d2.1
9 SL100.62 (NPV)

ha r f M

R C

Putting Green
RO

d1.6
R () 1 94

LB

IL100.20

10a

E H V G A A EA R N L

PCs TCB

14
9 1

Bowling Green
n t GL r Bo o Co s ,

B o r o C o n s t , G L A s l y C o n s t &

d0 . 5

7 5 0S TH P

d1.8

L B

P TH 5 S 70

3.9m

4.7m

B d y
d. 15

d2.0

9 4 1 ( R)

18

T i d e B a r r i e r
B
E V E T R I L D E E Y B B A R R O R O I E K R

4.1m N E E U A EA H V R N LG A

D Fn

C S

70 5 S TH P

d0 . 4

Rock Lane Recreation Ground


Tennis Courts

1 49 0 .2

House

h a Pt
h a Pt

1 4 0 . 9 4

1 4 0 . 9 3

Bonthron
o 2 1t 1

B e v e r ly e

d . 04

1 4 0 . 9 3

d . 04

1 4 0 . 9 3

9 4 1 ( R

5.9m

5.5m
Sluice 6.6m
1t o4 0

Posts

Old Barnes Cemetery

Pearson House
o 1t 4 3

Huntingford House
HO RN

De f

6.7m

6.3m

Posts

Barnes Common

Barn Elms School Sports Centre

Protection slab to be provided over high pressure gas main

6 1 d.

Concrete batching plant and aggregate storage area


8 1 d.

n m i s a e a rg su es h r i p Hg

1 2 d.

P TH 5 S 70

0 2 d.

d. 15

Crane
70 5 S TH P

d. 17

B e v e r ly e

Bo k ro

d . 04

Site power structure


1t o4 0

Huntingford House
HO R NE W AY

H O R N EW A Y

Crane

Shaft

De f

Offices / welfare building

(Scale 1:500)
c Thames Water Utilities Ltd 2008

8 8

4.4m

Sports Centre

Construction vehicle passing point


m ig pn o Sl r ny o s a

6 1

8 2

74

2 1

D L FE BY RD GA EN S

8 5

6 5

d n a t S

Lighting Tower

0 6

te nr Ce ATC

This drawing
Lighting Tower

Authorised channel
d n a St
Barn Elms Schools Sports Centre

d Mu

2 1 3
1

hW g n Hi a Me

Working area to exclude existing changing room facility. Changing rooms to remain in use throughout construction period.
Playing Fields

Fulham Football Ground

tr ae

4.5m

Existing boat house and sailing club facilities


ig pn o Sl
e l n ig d Sh n da n Sa
r ny o s ma

e l ig hn dS n da n Sa

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
d a tn S

d n a St

RO CKS E

Construction access route to cross existing access road to boat house. Gated crossing to be utilised to avoid vehicle conflict.

Lighting Tower

ms o o gR n i s e rs D

Boat House

Construction vehicle passing point


es
D Fn slipway

R am Th er v i

Key:
Limits of land to be acquired or used (LLAU) Existing public right of way

3 1

5.0m

4.3m

9 1

C C LW
o or B
Stn CA5 105.313

H at Bo

C ,G t s on

e ous

L y l s A C

Exact alignment around existing significant trees to be determined.

t& s on

Hoarding

LB

am Th er v i

dy B

3 4

Open mesh fence

es

RO CKS AN L
Barn Elms School Sports Centre

ng i op Sl m

6 5

y r on as

Sand and Shingle

5.4m

Maximum extent of working area

5 5

Exact alignment of access to minimise impact on tree roots.


M n ea H gh i
Sluice

C C
LW

Access / haul route

4 4
7 6

M EL G RO VE RO AD
9 7

Existing sewers Existing scout facility.

W er at

CS
2 3

OR CT RE Y RO AD
0 2 1 9

Notes :
9 . d0

0 d1.

104.85

o r o B

L G , t s n o C

& t s n o C y l s A

B L

y d B

1. These construction phasing plans have been prepared to illustrate possible site layouts for the principle construction phases. Contractors

3 9

39 2. 10 102. 20

d n U

For details of this area see site Inset below


750 ST HP

Sand and Shingle

8 1

1 0 1
d 1. 5

UT T H O U SC
) I V ( 0 . 9 d P H T S 0 5 7

may choose to lay sites out differently during construction depending on their preferred Thames Path

2
) (I 0V 9 d.

k o o r B y e l r e v e B
IL101.24

10

IL101.36

construction methods subject to any controls on layout imposed through the planning

e g d i r B t o o F

900

900 UTT) (

N (

) I F

35 . 5 0 1

105.

2 . d0

25

d 13 .

AN SL CK E

4 . 0 d
Stn 1MD 104.798

submission and approval process.


Outfall

6 0 . 5 0 1
105.

C a e S Q H

05 105. 01

8 . d0

C t e d a

6 9 . 4 0 1

d. 17

2. Traffic management plans for construction phases of the work would be submitted to the
3 . 0 d

84 104.

s p r o

r s ny ma o o ig Sl p n

0 .7 1 48

CR 1WD Dd0.20
0 . d1

11 1WD Dd0.33 1WD Dd0.40

12 (UTL)

y B n t L Bd l Asy Co s &

5.4m

1WD Dd0.33

Stn A2 104.623

Bo k ro
5.4m

9 7 . 04 1
4 . d0

13
0 9 . 4 0 1
15 0. 0 5

IL104.33 (blocked)
9 0. d

Outfall

Mud

) C e 0. A l1 4 9 9 ( o h n a m o t

14 0. 9 6

5 2 2 T) E (

appropriate authority for approval. Where appropriate, outline traffic management


4.3m

72 4. 10 64 4. 10

5.4m

5.7m

H O R N EWA Y

arrangements are shown. 3. Utility supplies for the construction of the works would be agreed with the relevant utility company.
d n a S

4 d0.

Site Plan
f De

F o l d o G t a s e

Mud

Sluice

Putney Lower Common


Forrest House
o 2 1t 1

AY EW

M E N A B

(Scale 1:2000)
Putney Lower Common

5.4m
Mud

M K

1t o2 4

N E

Playground

HO

Knox
H O R N E
1 to 12

House
Playground

Lancaster House
2t 2 2 o7
1 t 9o 2 1

4. Additional noise mitigation including noise barriers may be required but is not shown on this drawing.

n a e

d n a

o 1t 0 3

RNE W AY

H h g i W

e l g n i h S

4.1m

r e t a

A Y

2t 8 3 o3

Faulkner House
TCB

Jay House
1t 2 o 4

3t 4 3 o9 1 t 3o 1 8

CR (UTT)

) (I 0V 9 d.

) R P( TH 5 S 70

k o o r B y e l r e v e B

4 3 . 0 0 1

Thames Path

100m

100m

Scale 1:2000 at A1 1:4000 if reproduced at A3 10m 0 40m

N (
) I F

T i d e B a r r i e r
B E V E T R I L D E E Y B B A R R O R O I E K R

Scale 1:500 at A1 1:1000 if reproduced at A3 Steel reinforcement preparation

Storage (open area or containerised)

C a e S Q H C t e d a s p r o

8 . 0 d

ILLUSTRATIVE
CR 11 1WD Dd0.33
0 . d1

Excavated material storage and handling area

r s ny ma o o ig Sl p n
Mud

1WD Dd0.20 1WD

1WD Dd0.40

Dd0.33

Location

Barn Elms London Borough of Richmond Upon Thames


Document Information
9 . d0

Section 48 publicity Construction phases - phase 1 Site setup , shaft construction & tunnelling Book of plans - section 5
S48-PP-04X-BAREL-000042 July 2012

Mud

Inset

5.0m
Playground

0 5 1

N
EN EV ST
5 4 1

1 3

4.9m

k l h t Wa ae zb Ei n l ue Q e

Wharves

i l l o w

Dedicated construction access route entrance.


Spencer House

L o d g e

o t

8 2

t o

1 4

Stevenage

Sluice

8.3m 4.8m
CC

5.0m
TCB
1

k l h z u e Ei b t Q e n la e Wa

3.9m

Barn Elms School


4.1m Hall
u o t Sc ate Sen r Ce
5

4.4m
7

Sports Centre

1 5 7

TCB

8 5

19 6

Garage
6

4.4m

Garage
15 5

Limit of public highway


Sluice

4.6m

d n a t S

Lighting Tower

0 6

Red Lion Hotel (PH)


Bn ak
1 7 4
2

K L A HW T E B IA LZ NE E E U Q 5.0m

Construction vehicle passing point


Lighting Tower

Lakeside

Tennis Courts
1 5 4

15 4a
a 1

Pa rd a e

Site security office


Barn Elms Schools Sports Centre
Pond Tennis Courts

Authorised channel
d n a St

3 15

e hr o t Lw

El Sub Sta

5.4m

2 15

BARNES
LB

Tennis Courts Lodge


0 12
0 10

5.7m

Shared access route

Ba n k

Construction vehicle holding bay

Fulham Football Ground

Bank

AD

Shelter
5

4.5m

RO

Barn Elms Playing Fields


e l n ig d Sh n da n Sa

G RO

VE

EL M

Pavilion
0 1

Playing Fields 4.6m


RO

Works

Barn Elms Playing Fields


RTn g u i n n rc a k
AN L

Queen Elizabeth Walk

Existing boat house and sailing club facilities


R am Th er v i

1 2

d a tn S
Lighting Tower

0 2

8 1

Boat

5.0m

1 2

Rocks Lane
3 2

4 2

House

4.3m

D Fn slipway

Construction vehicle passing point


o or B C ,G t s on L y l s A C t& s on

Stn CA5 105.313

6 3

Barn Elms Playing Fields


1 3

Pond

9 2

3.9m
5 4

8 4

3 3

5 3

Barn Elms School Sports Centre

0 6

Sand and Shingle

5.4m

1 4

2 7

7 3

Barn Elms Playing Fields


3.9m

RTa k un rc ni n g

7 4

Sluice

9 2

4 8

CS
5 o5 8t 4

Existing scout facility


Pavilion

7 2

6 9

4.0m

FB

B vr e el e Bo y ro k
0 0 1
1 Washout with penstock IL102.18 (NFI) 103.42

1 o7 6t 5

4 5 0 ( UT T)

104.85

o r o B

L G , t s n o C

& t s n o C y l s A

B L

y d B

8 9

5 1

4 5 0 ( UT T)

d n U

4.2m

3 1

( R)

Sand and Shingle

750 ST HP

d 1. 5

a t bS u S l E
1 1 1

For details of this area see inset below

0 1 1

) I V ( 0 . 9 d P H T S 0 5 7

2 2 1

2
5

1
Pavilion

CF
Stn A1 105.36 105.493
4 3 00. 1

Wad rB y d
) R P( TH 5 S 70
d 13 .
7 5 0S TH P

) (I 0V 9 d.

4.4m
9

El Sub Sta
0 1

4.4m
3 1

d2.1
9 SL100.62 (NPV)

ha r f M

R C

Putting Green
RO

d1.6
R () 1 94

LB

IL100.20

10a

E H V G A A EA R N L

k o o r B y e l r e v e B
IL101.24

10

PCs TCB

14
9 1

Bowling Green
n t GL r Bo o Co s ,

B o r o C o n s t , G L A s l y C o n s t &

d0 . 5

IL101.36

105.

25

d 13 .
7 5 0S TH P

d1.8

L B

P TH 5 S 70

3.9m

4.7m

B d y
d. 15

d2.0

9 4 1 ( R)

18

T i d e B a r r i e r
B
E V E T R I L D E E Y B B A R R O R O I E K R

Stn 1MD 104.798

4.1m N E E U A EA H V R N LG A

D Fn

C S

70 5 S TH P

d0 . 4

d. 17

Outfall

Rock Lane Recreation Ground


Tennis Courts

CR 1WD Dd0.20
0 . d1

11 1WD Dd0.33 1WD Dd0.40

1 49 0 .2

12 (UTL)

5.4m

1WD Dd0.33

House

h a Pt
h a Pt

1 4 0 . 9 4

1 4 0 . 9 3

Bonthron
o 2 1t 1

B e v e r ly e

d . 04

Stn A2 104.623
3 . 0 d

Bo k ro
5.4m
9 4 1 ( R

1 4 0 . 9 3

d . 04

13
1 4 0 . 9 3

5.9m

0 9 . 4 0 1
15 0. 0 5

IL104.33 (blocked)
9 0. d

Outfall

Mud

) C e 0. A l1 4 9 9 ( o h n a m o t

14 0. 9 6

5 2 2 T) E (

5.5m
Sluice 6.6m
1t o4 0

5.4m Posts 4.3m


H O R N EWA Y

Old Barnes Cemetery

Pearson House
o 1t 4 3

Huntingford House
HO RN

De f

5.7m

Site Plan
6.7m

F o l d o G t a s e

Mud

Sluice

Putney Lower Common


Forrest House
o 2 1t 1

6.3m

Posts

(Scale 1:2000)
Putney Lower Common

5.4m
Mud

1t o2 4

Playground

Knox
H O R N E
1 to 12

House
Playground

Lancaster House
2t 2 2 o7
1 t 9o 2 1

4.1m

A Y

2t 8 3 o3

Faulkner House

Jay
1t 2 o 4
TCB

3t 4 3 o9 1 t 3o 1 8

Barnes Common

House

Barn Elms Schools Sports Centre

Protection slab to be provided over high pressure gas main

CR (UTT)

k o o r B y e l r e v e B

Thames Path
d0 . 5

6 1 d.

n m i s a e a rg su es h r i p Hg
8 1 d.

1 2 d.

P TH 5 S 70

0 2 d.

d. 15

T i d e B a r r i e r
B E V E T R I L D E E Y B B A R R O R O I E K R

Crane
70 5 S TH P

d. 17

Workshop building / storage (open area or containerised)


r s ny ma o o ig Sl p n

d 0 . 4

CR 11 1WD Dd0.33
0 . d1

1WD Dd0.20 1WD

1WD Dd0.40

Dd0.33

d . 04

B e v e r ly e

Bo k ro

3 . 0 d

d . 04

Mud

Site power structure


4 . d0

1t o4 0

Offices / welfare building


H O R N EW A Y

Huntingford House
HO R NE W AY

Shaft

De f

Mud

Inset
(Scale 1:500)
c Thames Water Utilities Ltd 2008

1 3 1

8 8

4 1

1 a 6
SM
GL s, n t o r Co Bo

a h m e T v r Ri

e tr h a g W n i a H Me

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

e n l ig d Sh n da n Sa

1 4

y B Bd L s & n t y l Co As

AG E RO AD

s e
W L

Keyplan:
6 5

6 1

8 2

74

2 1

D L FE BY RD GA EN S

te nr Ce ATC

m ig pn o Sl

r ny o s a

This drawing

d Mu

2 1 3
1

hW g n Hi a Me tr ae

e l ig hn dS n da n Sa

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

d n a St

ig pn o Sl
r ny o s ma

CKS E

ms o o gR n i s e rs D

Key:
Limits of land to be acquired or used (LLAU) Existing public right of way

3 1

es

9 1
H at Bo

e ous

Hoarding

LB

am Th er v i

dy B

3 4

Open mesh fence

es

RO CKS AN L

ng i op Sl m

6 5

y r on as

Maximum extent of working area

5 5

C C
LW

Access / haul route

4 4
7 6

M EL G RO VE RO AD
9 7

M n ea H gh i W er at

Existing sewers

2 3

OR CT RE Y RO AD
0 2 1 9

Notes :
9 . d0

0 d1.

1. These construction phasing plans have been prepared to illustrate possible site layouts for the principle construction phases. Contractors may choose to lay sites out differently during construction depending on their preferred construction methods subject to any controls on layout imposed through the planning

3 9

39 2. 10 102. 20

8 1

1 0 1

UT T H O U SC

e g d i r B t o o F

900

900 UTT) (

N (

) I F

35 . 5 0 1

2 . d0

AN SL CK E

4 . 0 d
6 0 . 5 0 1
105.

submission and approval process. 2. Traffic management plans for construction phases of the work would be submitted to the
9 7 . 04 1

C a e S Q H

05 105. 01

8 . d0

C t e d a

6 9 . 4 0 1

84 104.

s p r o

r s ny ma o o ig Sl p n

0 .7 1 48

y B n t L Bd l Asy Co s &

appropriate authority for approval. Where appropriate, outline traffic management arrangements are shown. 3. Utility supplies for the construction of the works would be agreed with the relevant utility company.
d n a S

4 . d0

72 4. 10 64 4. 10
4 d0.

AY EW

M E

f De

N A B M K N E

HO

4. Additional noise mitigation including noise barriers may be required but is not shown on this drawing.

n a e

d n a

o 1t 0 3

RNE W AY

H h g i W

e l g n i h S

r e t a

100m

100m

Scale 1:2000 at A1 1:4000 if reproduced at A3 10m


2 . d0

N (
) I F
4 . 0 d

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

C a e S Q H C t e d a s p r o

8 . 0 d

ILLUSTRATIVE

Location

Barn Elms London Borough of Richmond Upon Thames


Document Information
9 . d0

4 . d0

Section 48 publicity Construction phases - phase 2 Construction of other structures Book of plans - section 5
S48-PP-04X-BAREL-000043 July 2012

Вам также может понравиться