Вы находитесь на странице: 1из 13

Canada Water

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Mean low water

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Surrey Commercial Docks Local authority boundary

London Borough
Greenwich connection tunnel

Order limits

of Southwark London Borough of Tower Hamlets

Tunnel

Shaft

South Dock

Surrey Quays

Mean low water

om Ye

y Wa g uh l Po

an t ee r St

e v o r G n o t l i h C

Earl Pumping Station

w o L R r e d a o

Greenwich connection tunnel

100m

100m

Scale 1:2500 at A1 1:5000 if reproduced at A3

FOR INFORMATION

Location

Earl Pumping Station London Borough of Lewisham


Document Information

Section 48 publicity Location plan

London Borough of Lewisham


Book of plans - section 20
S48-PP-21X-EARPS-000264 July 2012

c Thames Water Utilities Ltd 2008

ut or eC b al C

a uy nQ vr ae T

k l Wa r ad n u C

P L O U G H

R E F IT TL A O B

Y WA

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

es t t r h u s c t Ru o r u C

A Y

r ut o t s C Ma

This drawing

Caronia Court

LB

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

t i4 Un

GR D AN NL EE QU AY
TCP

E S O L Key: RC E T G IH L

Limits of land to be acquired or used (LLAU) Existing levels (shown in metres above tunnel datum) Thames Water land

Posts

+ 105.40m

Thames Water buildings / structures

Existing trees within surveyed area

Plough
Bridge
Thames Water access

Notes:
O YE M AN ET RE ST

Earl Pumping Station building

+ 101.72

1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and the topographic survey base, both of which have been used in the preparation of this drawing.

a t bS Su El

Depot

H ne r bo us

G y el av r H e s ou

N O T L I H C

E V O R G

+ 101.75 + 101.83
C R O

H e s ou

FT

Thames Water sub station

w es Fr k c i H e s ou

R ST

Ps

T EE

Sewage pumping station

+ 101.65

1 t i n U

El

U n i t 5

Sub Sta 10m 0 40m

Scale 1:500 at A1 1:1000 if reproduced at A3

FOR INFORMATION
Depot

Location

Earl Pumping Station London Borough of Lewisham


Insulcrete Works Document Information

T F O R C
D pt eo

T E E R T S

W O O D C R O FT M EW S

Section 48 publicity As existing site features plan Book of plans - section 20


S48-PP-21X-EARPS-000265 July 2012

AC AC A I C LO
Saw Mill Works

Lime Tree House

SE
c Thames Water Utilities Ltd 2008

5 2

3 2 1 2

9 2 1 3

0 2

1 8

2 1

3 8

o 1t

Caronia Court

LB

3 7
5 1 o t 1

1 to 69

o 1t

1 7

TCP

5 6

7 6

16

4 2

32

Ps

t o p e D

36

Extent of area to be temporarily stopped up for the construction of a crossover for site and permanent accesses

D pt eo

12

o8 1t

6to8
9

1to6 Lime Tree House

12

o t

Melville Court
0 4 o t 6 1

4 3

4 1

6 4

T F O R C

8 4

8 0 1 o t 6 3 1

6 0 1 o t 0 7

d 2 2 d d 2 2 4 1 d 2 d 3 3 d 4

e s u o H r ua J

18

9 3 o t 1

N O T L I H C

E V O R G

El Sub Sta

4 2 1 o t 6 8

6 6 4 8

8 5 6 7

0 5 8 6

7 2

9 1 7 1

ut or eC b al C

N
k l Wa r ad n u C
1 9
3 9

P L O U G H

Y A RW E F IT TL A O B

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

0 4 o t 8 4

c 2 2 c c 2 2 4 1 d c 1 2 2 3 c 3 d d 1 1 4 1 c 4 d 1 3 d 2 d 1

0 3 o t 2

c 1 c2 c 1 4 1 c1 1 3 c 1 c 2

2 2 1 2

es t t r h u s c t Ru r u Co

A Y

Keyplan:

r ut o t s C Ma

El Sub Sta

This drawing

GR D AN NL EE QU AY

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance E S O Datum Newlyn. L RC E T H I LG

o r Bo GL t s, n Co yC l As

Key:
Iceland Wharf

Posts
3
1 5 1

Limits of land to be acquired or used (LLAU) Area of highway to be temporarily stopped up

Ap Ac
Plough Bridge

Access to permanent works Access to construction works

& t s n o
B L y Bd

Notes:
1. This plan does not show stopping up and diversions of limited duration (eg hoarding erection, minor utility diversions and minor highway works). 2. Only rights of way in or close to worksites are shown. The full extents of rights of way are not shown where they cease to be relevant to the project.

O YE M

a t bS Su El

AN ET RE ST

Ac/Ap
H
1 ne r bo us o t 24

n o l t r ai a t E S g n i p m u P

Ac/Ap

Depot

Tanks

Extent of area to be temporarily stopped up for the construction of a crossover for site access

G y el av r
1 o t 24

H e s ou

w es Fr

1 o t
23

e s ou

k c i H e s ou

Ac
74

B
El Works Sub Sta

C R

10m

40m

Ac/Ap
Scale 1:500 at A1 1:1000 if reproduced at A3
62

Depot

FOR APPROVAL
52

Location

T E E R T S

Earl Pumping Station London Borough of Lewisham


O D C R O FT
6

W O M EW S

Document Information

Section 48 publicity Access plan Book of plans - section 20


S48-AC-21X-EARPS-000019

AC AC A I

Works
Saw Mill
SE C LO

July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

London Borough of Southwark

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
n o i t a t S g n i p m u P l r a E
Local authority boundary Limits of land to be acquired or used (LLAU) Above ground structures to be removed Below ground structures to be removed or infilled

Depot

om Ye

Wall with security fence on top (approximately 3m high)

Notes:
1. Minor items to be removed (e.g. barriers, bollards etc.) are not shown. 2. General activities of site clearance such as removal of hardstanding and foundations,

an t ee r St
2 storey office building

e v o r G n o t l i h C

stripping of topsoil and clearance of minor vegetation not shown.

Industrial unit

Industrial unit

Depot

Wall with security fence on top (approximately 3m high)

1 6 . 1 0 1

Industrial unit

Industrial unit

Canopy

C et r te tS of r
Industrial unit Weighbridge Location 10m 0 10m Scale 1:200 at A1 1:400 if reproduced at A3

FOR APPROVAL

Earl Pumping Station London Borough of Lewisham


Document Information

Section 48 publicity Demolition and site clearance

London Borough of Lewisham


Book of plans - section 20
S48-PP-21X-EARPS-000266 July 2012

c Thames Water Utilities Ltd 2008

4 2

Table 1
Above ground permanent structure Maximum height above finished ground level (Minimum heights are in brackets where applicable)

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

O YE

Ventilation column(s) serving the interception chamber Interception and valve chamber(s)

6.0m

Keyplan:

4.0m

32

M AN

Drop shaft (Parapet)

5.0m

This drawing

ET RE ST

Ventilation structure(s) over shaft

7.0m (5.0m)

Ventilation column(s) serving the shaft

8m (4.75m)

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

9 3 o t 1
Zone within which ventilation column(s) serving the interception chamber may be located

Key:
Limits of land to be acquired or used (LLAU) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located (those listed in Table 1) Zone within which required landscaping would be located

n o l t r ai a t E S g n i p m u P
Zone within which Work No. 21b would be located

Notes:

N O T L I H C

E V O R G Zone within which interception and


valve chamber may be located

Tanks

1. The Site Works Parameter Key Plan identifies each zone independently. 2. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land to be acquired or used.

t o p e D

36

8 0 1 o t 6 3 1

74
10m 0 10m

B
Scale 1:200 at A1 1:400 if reproduced at A3

El Works Sub Sta


FOR APPROVAL

Zone within which the shaft and ventilation structure(s) over the shaft may be located

Location Zone within which Work No. 21a would be located

R
62

Earl Pumping Station London Borough of Lewisham


Document Information

Section 48 publicity Site works parameter plan Book of plans - section 20


S48-PP-21X-EARPS-000267 July 2012

c Thames Water Utilities Ltd 2008

GL , t As & t s n Co

GL , t As & t s n Co

18

18

4 2

4 2

16

16

32

32

9 3 o t 1

n o l t r ai a t E S g n i p m u P

Depot
H
1 ne r bo us o t

N O T L I H C

E V O R G

Tanks

36

36

t o p e D

B
El Works Sub Sta

Zone within which Work No. 21b would be located


GL t s, n 62 Co o r Bo

Zone within which Work No. 21a would be located


GL t s, n 62 Co o r Bo

Depot

18

18

4 2

16

16

4 2

Zone within which ventilation column(s) serving the interception chamber may be located
a t bS Su El

32

32

9 3 o t 1

n o l t r ai a t E S g n i p m u P

Depot
H
1 ne r bo us o t

N O T L I H C

E V O R G

Tanks

N O T L I H C

E V O R G

36

t o p e D

Zone within which interception and valve chamber may be located

t o p e D

36

B
El Works Sub Sta

Zone within which the shaft and ventilation structure(s) over the shaft may be located
62 62

Depot

8 0 1 o t 6 3 1

8 0 1 o t 6 3 1

6 0 1 o t 0 7

6 0 1 o t 0 7

0 5 8 6

0 5 8 6

8 0 1 o t 6 3 1

8 0 1 o t 6 3 1

6 0 1 o t 0 7

6 0 1 o t 0 7

0 5 8 6

B L y Bd

B L
y Bd

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:
O YE M O YE M

a t bS Su El

a t bS Su El

AN ET RE ST

AN ET RE ST

This drawing

9 3 o t 1

n o l t r ai a t E S g n i p m u P

Coordinates are to be Ordnance Survey Datum

Depot OSGB36. All levels are in metres and relate to the


Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

0 5 8 6

H
1 ne r bo us o t 24

24

N O T L I H C

E V O R G

Tanks

Key:
Limits of land to be acquired or used (LLAU) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located

H e s ou
a t bS Su El

H e s ou

t o p e D

74
W B

74
El Works Sub Sta

(those listed in Table 1) Zone within which required landscaping would be located

Notes:
1. The Site Works Parameter Key Plan identifies each zone independently. 2. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land Depot to be acquired or used.

C R
yC l As & t s n o B L

C R
yC l As & t s n o

52

52
y Bd

B L

y Bd

O YE

O YE M AN ET RE ST

M AN ET RE ST

9 3 o t 1

n o l t r ai a t E S g n i p m u P

Depot
10m 0 40m

H
1 ne r bo us o t 24

24

Tanks

Scale 1:500 at A1 1:1000 if reproduced at A3

H e s ou

e s ou

FOR INFORMATION

Location

Earl Pumping Station London Borough of Lewisham


El Works Sub Sta

74

74
W B

Document Information

Section 48 publicity Site works parameter key plan Book of plans - section 20
S48-PP-21X-EARPS-000268 July 2012

C R
52

R
52

Depot

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

16

O YE

32

Work No.20. 5m internal dia connection tunnel to Chambers Wharf

Ventilation chamber 101.80 Shaft superstructure

Existing sewage pumping station discharge culvert

Zone within which the shaft and ventilation structure(s) over the shaft may be located

8 0 1 o t 6 3 1

a t bS Su El
1.5m internal dia pump sump for suction culvert draw down Valve chamber

Keyplan:

o Ye AN

Access for maintenance vehicles

m an
Existing storm sewage pumping station This drawing Zone within which ventilation column(s) serving the interception chamber may be located Air ducts from valve chamber to 0.225m internal dia ventilation columns, 6m high Access for maintenance vehicles Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

ET t E ee r R St ST

9 3 o t 1

e v o r G n o t l i h C

Key:
Local authority boundary Limits of land to be acquired or used (LLAU) Existing sewers

0.125m internal dia draw down pipework

Electrical and control equipment located inside existing pumping station

Proposed access cover 104.50 Proposed level (shown in metres above tunnel datum) Zone within which all permanent site structures would be located

N O T L I H C
Existing penstock chamber

E V O R G

Zone within which the shaft would be located Zone within which permanent above ground structures would be located

5 6 . 1 0 1

Notes:
Interception chamber Valve chamber Zone within which Work No. 21b would be located Reinstate fence following construction 1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan.

Existing dry weather sewage pumping station

0 0 . 5 0 1

0.8m internal dia pump recirculation pipework Existing transformer building

1.2m x 1.2m ventilation column of 4.75m minimum to 8m maximum high 101.40 Earl Storm Relief Sewer

Zone within which interception and valve chamber may be located

Air bridge duct with valve Gate for access to hardstanding around shaft from pumping station site Part of Earl Sewer to be abandoned Work No. 21a. CSO drop shaft (17m internal dia) 105.00

10m

10m

El Sub Sta
Zone within which Work No. 21b would be located

Scale 1:200 at A1 1:400 if reproduced at A3

C et r te tS of r

ILLUSTRATIVE

Hardstanding - indicative extents only Location Ventilation structure minimum 4m x 4m x 5m high from existing ground level maximum 6m x 8m x 7m high from existing ground level Work No. 20. 5m internal dia connection tunnel to Greenwich Pumping Station

New fence Pavement reinstated Access for maintenance vehicles

Earl Pumping Station London Borough of Lewisham


Document Information

Section 48 publicity Permanent works layout Book of plans - section 20

Gate for access to hardstanding around shaft

62

S48-PP-21X-EARPS-000269 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

Electrical kiosk housed within puming station

N O T L I H C

E V O R G

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

North elev.

Key:
n o N i t O a I t T S A g T n i S p m G u N I P l P r a M E U
P E A R L

Limits of land to be acquired or used (LLAU) Zone within which permanent above ground structures would be located Zone within which required landscape would be located + 105.40m Existing levels (shown in metres above tunnel datum) Proposed levels (shown in metres above tunnel datum)

OM YE

AA

AN ET RE ST

105.40 2 No.Ventilation columns 6m high Rebuild existing wall Valve chamber

Existing trees within surveyed area

Notes:
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and the topographic survey base, both of which have been used in the preparation of this drawing. 3.Some planted areas around the shaft will have to be temporarily taken up to allow safe access for operation and maintenance access. Any areas that are moved will be reinstated upon completion.

+ 101.40

Brown roof 105.00 + 101.50

Ventilation column of 4m minimum to 8m maximum height

Landscape key
Land returned to Unit 1 once construction is complete

Land available for future development by others

Colour banded bounded gravel

New gates to existing compound

Rebuild existing wall


1 6 . 1 0 1

Access door to chamber

Stairs up to roof accessed from within compound

Access hatches (in roof) Maintence access path in concrete pavers inset on a brown roof construction Brown roof 10m 0 10m

New proposed brick wall to match existing 105.00

1 t i n U

Scale 1:200 at A1 1:400 if reproduced at A3

+ 101.80 CSO shaft building protrudes above ground by approximately 4.5m West elev.

+ 101.30

Colour banded bounded gravel New gates

ILLUSTRATIVE
Save for the scale of above ground structures which is indicative

Location Ventilation structure 1.5m minimum to 3m maximum height above shafts structural slab

Earl Pumping Station London Borough of Lewisham


Document Information

Section 48 publicity Proposed landscape plan Book of plans - section 20


S48-PP-21X-EARPS-000270 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Brown roof

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Earl Pumping Station 2 No. Ventilation columns 6m high Ventilation structure of 1.5m minimum to 3m maximum height above the shafts structural slab

Notes:
1. All dimensions and levels are approximate. 2. The purpose of this section is to illustrate the scale of the below ground infrastructure to be provided.

Ventilation column of 4m minimum to 8m maximum height

Brick cladding

Interception and valve chamber

CSO Drop Shaft

Section AA

10m

10m

Scale 1:200 at A1 1:400 if reproduced at A3

Connection tunnel to Greenwich Pumping Station

ILLUSTRATIVE

A A

Location

Earl Pumping Station London Borough of Lewisham


Document Information

Section 48 publicity Section AA Book of plans - section 20


S48-PP-21X-EARPS-000271 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
THIS DRAWING
N

Keyplan: Depot buildings Outline of pumping station building behind trees shown dotted

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn. CHILTON GROVE 1-39

Notes:
1. All dimensions and levels are approximate.

Chilton Grove Earl Pumping Station

Croft Street

Woodcroft Mews

Existing West elevation

Outline of pumping station building behind trees shown dotted

New brick clad CSO drop shaft building set in area of hardstanding

CHILTON GROVE 1-39

New valve chamber and ventilation column beyond

CSO drop shaft building

10m

10m

Scale 1:200 at A1 1:400 if reproduced at A3

ILLUSTRATIVE

Proposed West elevation

Location

Earl Pumping Station London Borough of Lewisham


Document Information

W on i at ev l te es

Section 48 publicity As existing and proposed West elevation Book of plans - section 20
S48-PP-21X-EARPS-000272 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Notes:
1. All dimensions and levels are approximate.

Chilton Grove

Yeoman Street

Earl Pumping Station

Croft Street

As existing North elevation

Ventilation structure of 3m maximum to 1.5m minimum height above shafts structural slab

CSO drop shaft 2 No.Ventilation columns 6m high

Valve chamber

CSO drop shaft 10m 0 10m

Scale 1:200 at A1 1:400 if reproduced at A3

Proposed North elevation


N

ILLUSTRATIVE
n o i t a v e l e h t r o N

Location

Earl Pumping Station London Borough of Lewisham


Document Information

Section 48 publicity As existing and proposed North elevation Book of plans - section 20
S48-PP-21X-EARPS-000273 July 2012

c Thames Water Utilities Ltd 2008

5 2
3 2 1 2

9 2 1 3
1 8

o 1t

A Y

0 2

2 1

Caronia Court
3 7

LB

o 1t

1 7

TCP
6 6 4 8

5 6

7 6
8 5 6 7

4 2

16

32

Crane

Shaft

Piling rig

Sewer diversion in Croft Street

Construction access, right turn out

D pt eo

12

o 1t

6to8
9

1to6 Lime Tree House

12

o t

Melville Court
0 4 o t 6 1

3
c Thames Water Utilities Ltd 2008

4 3

4 1

6 4

T F O R C

8 4

8 0 1 o t 6 3 1

6 0 1 o t 0 7

d 2 2 d d 2 2 4 1 d 2 d 3 3 d 4

e s u o H r ua J

18

9 3 o t 1

Excavated material storage and handling area


o t

4 3 . 1 0 1 3 3 . 1 0 1

N O T L I H C

E V O R G
r a c s

Stn 3JL 101.325

Ps
37 1. 10
r a c s

Stn 4JL 101.325

El Sub Sta

4 2 1 o t 6 8

0 5 8 6

6
7 1

k l Wa r ad n u C
1 9
3 9

P L O U G H

Y A RW E IT LF T A O B

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

0 4 o t 8 4

c 2 2 c c 2 2 4 1 d c 1 2 2 3 c 3 d d 1 1 4 1 c 4 d 1 3 d 2 d 1

5 1 o t 1

0 3 o t 2

c 1 c2 c 1 4 1 c1 1 3 c 1 c 2

1 2

es t t r h u s c t Ru r u Co

Keyplan:

r ut o t s C Ma

3 8

El Sub Sta
This drawing

1 to 69
1

GR D AN NL EE QU
AY

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the E S O L Tunnel Datum which is 100 metres below Ordnance RC E T H Datum Newlyn. I LG
o r Bo GL t s, n Co
3

Iceland Wharf

Key:
Posts
1 5 1

Limits of land to be acquired or used (LLAU) Hoarding Maximum extent of working area Route of temporary diversion of footway

yC l As
& t s n o

B L
y Bd
Stn 2JL 101.733

Offices

Plough Bridge
Site access Access / haul route Existing sewers

O YE M

Notes :
Welfare building
ET RE ST

a t bS Su El

AN

9 7 . 1 0 1

1. These construction phasing plans have been prepared to illustrate possible site layouts for

9 SL99.44
5 7 . 1 0 1

(NPV)
83 1. 10

0 7 . 1 0 1

0 7 . 1 0 1

l e v e L f o 5 o R 98 . 3 0 8 . 1 1 0 1

Storage (open area or containerised)

the principal construction phases. Contractors Vehicle marshalling may choose to lay sites out differently during construction depending on their preferred

S
7 7 . 1 0 1

O I

N
3 8 . 1 0 1

P E
73 1. 10

N I

G
Stn 1JL 101.322

Depot
Excavated material storage and handling area Security office

construction methods subject to any controls on layout imposed through the planning submission and approval process. 2. Traffic management plans for construction

H
1 ne r bo us 24

85 . 101
5 8 . 1 0 1

5 9 . 1 0 1

8 9 . 1 0 1

88 1. 10

4 8 . 1 0 1
7 5 . 1 0 1

phases of the work would be submitted to the appropriate authority for approval. Where

G y el av r
1

83 1. 10

H e s ou

84 1. 10

Sd4.98 (NFI) 3

58 . 101

2 8 . 1 0 1 101.82

o t 24

9 5 . 1 0 1

3 8 . 1 0 1

appropriate, outline traffic management


76 1. 10

73 1. 10

2 8 . 1 0 1

arrangements are shown. 3. Utility supplies for the construction of the works would be agreed with the relevant utility company.

w es Fr

1
o t 23

e s ou

55 1. 10

0 8 . 1 0 1

1 8 . 1 0 1

54 1. 10

k c i H e s ou

32 1. 10 36 1. 10

8 8 . 1 0 1
63 1. 10

4. Additional noise mitigation including noise barriers may be required but is not shown on this drawing.
5 0 . 3 0 1
78 . 101
66 1. 10

el v fLe oo 18 R 6. 10

6 4 . 1 0 1

1 6 . 1 0 1
62 1. 10

1 SL99.31

2 0 . 3 0 1

1 0 80 .1

Construction access, right turn in

38 1. 10
Stn 5JL 101.360

1 0 80 .6

5 0 . 3 0 1

Roof Level 112.47

El Sub Sta

Steel reinforcement preparation

Crane
62

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3 Site power structure Depot

Security office
52
1

ILLUSTRATIVE

T E E R T S

Location

Earl Pumping Station London Borough of Lewisham


C R O FT
6

W O O D M EW S

Document Information

Section 48 publicity Construction phases - phase 1 Site setup and shaft construction Book of plans - section 20

AC AC A I

Works
Saw Mill
SE C LO

S48-PP-21X-EARPS-000274 July 2012

P L W
A Y
0 2 o 1t

G H
1 3
1 8

r es ut c t

N
r ut o t s C Ma

2 1

3 8

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Caronia Court
3 7

LB

o 1t

El Sub Sta
N

1 to 69
1

Keyplan:

1 7

TCP
6 6 4 8

5 6

7 6
8 5 6 7

4 2

16

32

Piling rig

Steel reinforcement preparation

Construction egress, right turn out

D pt eo

12

o 1t

6to8
9

1to6 Lime Tree House

12

o t

Melville Court
0 4 o t 6 1

3 1

7 o t 1

31

30

3 2 o t 8

8 1 o t 3 1

2 2

3 2

9 2 o t 4 2

4 3

4 1

6 4

T F O R C

8 4

8 0 1 o t 6 3 1

6 0 1 o t 0 7

d 2 2 d d 2 2 4 1 d 2 d 3 3 d 4

e s u o H r ua J

18

Crane
9 7 . 1 0 1
9 SL99.44

9 3 Security office o t 1
4 3 . 1 0 1 3 3 . 1 0 1

N O T L I H C

E V O R G
r a c s

Stn 3JL 101.325

Ps
37 1. 10

r a c s

Stn 4JL 101.325

El Sub Sta

4 2 1 o t 6 8

0 5 8 6

0 4 o t 8 4

c 2 2 c c 2 2 4 1 d c 1 2 2 3 c 3 d d 1 1 4 1 c 4 d 1 3 d 2 d 1

5 1 o t 1
o r Bo

41to53

0 3 o t 2

c 1 c2 c 1 4 1 c1 1 3 c 1 c 2

GR D AN NL EE QU AY

E S O L RC E T G IH L

This drawing

Iceland Wharf

GL t s, n Co

Posts
3

1 5 1

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

yC l As
& t s n o

Short term lane closure in Chilton Grove to make connection to existing sewer

Temporary working area for drain - down pumping station construction

Offices

Key:
Plough
Bridge
Limits of land to be acquired or used (LLAU) Hoarding Maximum extent of working area

B L y Bd
Stn 2JL 101.733

O YE M

Route of temporary diversion of footway Welfare building Site access Shared access Access / haul route Existing sewers Vehicle marshalling Sheet piles Secant piles installed
AN

a t bS Su El

ET RE ST

5 7 . 1 0 1

(NPV)
83 1. 10

0 7 . 1 0 1

0 7 . 1 0 1

l e v e L f o 5 o R 98 . 0 1

3 8 . 1 0 1

S
7 7 . 1 0 1

O I

N
3 8 . 1 0 1

P E
73 1. 10

N I

G
Stn 1JL 101.322

Depot
Workshop storage area

H
1 ne r bo us

85 1. 10

5 9 . 1 0 1

5 8 . 1 0 1

Notes :
1. These construction phasing plans have been prepared to illustrate possible site layouts for

o t 24
7 5 . 1 0 1

8 9 . 1 0 1

88 1. 10

4 8 . 1 0 1
83 1. 10

G y el av r
1

H e s ou

84 1. 10

Sd4.98 (NFI) 3

58 1. 10

2 8 . 1 0 1 101.82

o t 24

9 5 . 1 0 1

3 8 . 1 0 1

the principal construction phases. Contractors


76 1. 10

73 . 101

w es Fr
7 1 3

1
o t 23

2 8 . 1 0 1

0 8 . 1 0 1

1 8 . 1 0 1

Construction access right turn in


63 1. 10

may choose to lay sites out differently during construction depending on their preferred construction methods subject to any controls on layout imposed through the planning

e s ou

55 1. 10
54 1. 10

k c i H e s ou

32 1. 10 36 1. 10

8 8 . 1 0 1

el v fLe oo 18 R 6. 10

6 4 . 1 0 1

66 1. 10

submission and approval process. 2. Traffic management plans for construction

1 6 . 1 0 1
62 1. 10

1 SL99.31

5 0 . 3 0 1

phases of the work would be submitted to the appropriate authority for approval. Where appropriate, outline traffic management

78 . 101

2 0 . 3 0 1

38 1. 10
Stn 5JL 101.360

1 0 80 .1

1 0 80 .6

5 0 . 3 0 1

Roof Level 112.47

arrangements are shown.


El Sub Sta

3. Utility supplies for the construction of the works would be agreed with the relevant utility company. 4. Additional noise mitigation including noise

Concrete formwork preparation

barriers may be required but is not shown on this drawing.

Crane
62

Shaft

Site power structure Depot 10m Security office Scale 1:500 at A1 1:1000 if reproduced at A3
1

40m

52

T E E R T S

ILLUSTRATIVE
C R O FT
6

O O D M EW S

Location

Earl Pumping Station London Borough of Lewisham


Document Information

AC

Works
Saw Mill
SE C LO

AC
A I

Section 48 publicity Construction phases - phase 2 Construction of other structures Book of plans - section 20
S48-PP-21X-EARPS-000275 July 2012

0 1

c Thames Water Utilities Ltd 2008

Вам также может понравиться