Академический Документы
Профессиональный Документы
Культура Документы
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Keyplan:
This drawing
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Key:
Surrey Commercial Docks Local authority boundary
London Borough
Greenwich connection tunnel
Order limits
Tunnel
Shaft
South Dock
Surrey Quays
om Ye
y Wa g uh l Po
an t ee r St
e v o r G n o t l i h C
w o L R r e d a o
100m
100m
FOR INFORMATION
Location
ut or eC b al C
a uy nQ vr ae T
k l Wa r ad n u C
P L O U G H
R E F IT TL A O B
Y WA
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Keyplan:
es t t r h u s c t Ru o r u C
A Y
r ut o t s C Ma
This drawing
Caronia Court
LB
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
t i4 Un
GR D AN NL EE QU AY
TCP
E S O L Key: RC E T G IH L
Limits of land to be acquired or used (LLAU) Existing levels (shown in metres above tunnel datum) Thames Water land
Posts
+ 105.40m
Plough
Bridge
Thames Water access
Notes:
O YE M AN ET RE ST
+ 101.72
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and the topographic survey base, both of which have been used in the preparation of this drawing.
a t bS Su El
Depot
H ne r bo us
G y el av r H e s ou
N O T L I H C
E V O R G
+ 101.75 + 101.83
C R O
H e s ou
FT
w es Fr k c i H e s ou
R ST
Ps
T EE
+ 101.65
1 t i n U
El
U n i t 5
FOR INFORMATION
Depot
Location
T F O R C
D pt eo
T E E R T S
W O O D C R O FT M EW S
AC AC A I C LO
Saw Mill Works
SE
c Thames Water Utilities Ltd 2008
5 2
3 2 1 2
9 2 1 3
0 2
1 8
2 1
3 8
o 1t
Caronia Court
LB
3 7
5 1 o t 1
1 to 69
o 1t
1 7
TCP
5 6
7 6
16
4 2
32
Ps
t o p e D
36
Extent of area to be temporarily stopped up for the construction of a crossover for site and permanent accesses
D pt eo
12
o8 1t
6to8
9
12
o t
Melville Court
0 4 o t 6 1
4 3
4 1
6 4
T F O R C
8 4
8 0 1 o t 6 3 1
6 0 1 o t 0 7
d 2 2 d d 2 2 4 1 d 2 d 3 3 d 4
e s u o H r ua J
18
9 3 o t 1
N O T L I H C
E V O R G
El Sub Sta
4 2 1 o t 6 8
6 6 4 8
8 5 6 7
0 5 8 6
7 2
9 1 7 1
ut or eC b al C
N
k l Wa r ad n u C
1 9
3 9
P L O U G H
Y A RW E F IT TL A O B
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
0 4 o t 8 4
c 2 2 c c 2 2 4 1 d c 1 2 2 3 c 3 d d 1 1 4 1 c 4 d 1 3 d 2 d 1
0 3 o t 2
c 1 c2 c 1 4 1 c1 1 3 c 1 c 2
2 2 1 2
es t t r h u s c t Ru r u Co
A Y
Keyplan:
r ut o t s C Ma
El Sub Sta
This drawing
GR D AN NL EE QU AY
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance E S O Datum Newlyn. L RC E T H I LG
o r Bo GL t s, n Co yC l As
Key:
Iceland Wharf
Posts
3
1 5 1
Ap Ac
Plough Bridge
& t s n o
B L y Bd
Notes:
1. This plan does not show stopping up and diversions of limited duration (eg hoarding erection, minor utility diversions and minor highway works). 2. Only rights of way in or close to worksites are shown. The full extents of rights of way are not shown where they cease to be relevant to the project.
O YE M
a t bS Su El
AN ET RE ST
Ac/Ap
H
1 ne r bo us o t 24
n o l t r ai a t E S g n i p m u P
Ac/Ap
Depot
Tanks
Extent of area to be temporarily stopped up for the construction of a crossover for site access
G y el av r
1 o t 24
H e s ou
w es Fr
1 o t
23
e s ou
k c i H e s ou
Ac
74
B
El Works Sub Sta
C R
10m
40m
Ac/Ap
Scale 1:500 at A1 1:1000 if reproduced at A3
62
Depot
FOR APPROVAL
52
Location
T E E R T S
W O M EW S
Document Information
AC AC A I
Works
Saw Mill
SE C LO
July 2012
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Keyplan:
This drawing
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Key:
n o i t a t S g n i p m u P l r a E
Local authority boundary Limits of land to be acquired or used (LLAU) Above ground structures to be removed Below ground structures to be removed or infilled
Depot
om Ye
Notes:
1. Minor items to be removed (e.g. barriers, bollards etc.) are not shown. 2. General activities of site clearance such as removal of hardstanding and foundations,
an t ee r St
2 storey office building
e v o r G n o t l i h C
Industrial unit
Industrial unit
Depot
1 6 . 1 0 1
Industrial unit
Industrial unit
Canopy
C et r te tS of r
Industrial unit Weighbridge Location 10m 0 10m Scale 1:200 at A1 1:400 if reproduced at A3
FOR APPROVAL
4 2
Table 1
Above ground permanent structure Maximum height above finished ground level (Minimum heights are in brackets where applicable)
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
O YE
Ventilation column(s) serving the interception chamber Interception and valve chamber(s)
6.0m
Keyplan:
4.0m
32
M AN
5.0m
This drawing
ET RE ST
7.0m (5.0m)
8m (4.75m)
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
9 3 o t 1
Zone within which ventilation column(s) serving the interception chamber may be located
Key:
Limits of land to be acquired or used (LLAU) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located (those listed in Table 1) Zone within which required landscaping would be located
n o l t r ai a t E S g n i p m u P
Zone within which Work No. 21b would be located
Notes:
N O T L I H C
Tanks
1. The Site Works Parameter Key Plan identifies each zone independently. 2. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land to be acquired or used.
t o p e D
36
8 0 1 o t 6 3 1
74
10m 0 10m
B
Scale 1:200 at A1 1:400 if reproduced at A3
Zone within which the shaft and ventilation structure(s) over the shaft may be located
R
62
GL , t As & t s n Co
GL , t As & t s n Co
18
18
4 2
4 2
16
16
32
32
9 3 o t 1
n o l t r ai a t E S g n i p m u P
Depot
H
1 ne r bo us o t
N O T L I H C
E V O R G
Tanks
36
36
t o p e D
B
El Works Sub Sta
Depot
18
18
4 2
16
16
4 2
Zone within which ventilation column(s) serving the interception chamber may be located
a t bS Su El
32
32
9 3 o t 1
n o l t r ai a t E S g n i p m u P
Depot
H
1 ne r bo us o t
N O T L I H C
E V O R G
Tanks
N O T L I H C
E V O R G
36
t o p e D
t o p e D
36
B
El Works Sub Sta
Zone within which the shaft and ventilation structure(s) over the shaft may be located
62 62
Depot
8 0 1 o t 6 3 1
8 0 1 o t 6 3 1
6 0 1 o t 0 7
6 0 1 o t 0 7
0 5 8 6
0 5 8 6
8 0 1 o t 6 3 1
8 0 1 o t 6 3 1
6 0 1 o t 0 7
6 0 1 o t 0 7
0 5 8 6
B L y Bd
B L
y Bd
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Keyplan:
O YE M O YE M
a t bS Su El
a t bS Su El
AN ET RE ST
AN ET RE ST
This drawing
9 3 o t 1
n o l t r ai a t E S g n i p m u P
0 5 8 6
H
1 ne r bo us o t 24
24
N O T L I H C
E V O R G
Tanks
Key:
Limits of land to be acquired or used (LLAU) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located
H e s ou
a t bS Su El
H e s ou
t o p e D
74
W B
74
El Works Sub Sta
(those listed in Table 1) Zone within which required landscaping would be located
Notes:
1. The Site Works Parameter Key Plan identifies each zone independently. 2. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land Depot to be acquired or used.
C R
yC l As & t s n o B L
C R
yC l As & t s n o
52
52
y Bd
B L
y Bd
O YE
O YE M AN ET RE ST
M AN ET RE ST
9 3 o t 1
n o l t r ai a t E S g n i p m u P
Depot
10m 0 40m
H
1 ne r bo us o t 24
24
Tanks
H e s ou
e s ou
FOR INFORMATION
Location
74
74
W B
Document Information
Section 48 publicity Site works parameter key plan Book of plans - section 20
S48-PP-21X-EARPS-000268 July 2012
C R
52
R
52
Depot
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
16
O YE
32
Zone within which the shaft and ventilation structure(s) over the shaft may be located
8 0 1 o t 6 3 1
a t bS Su El
1.5m internal dia pump sump for suction culvert draw down Valve chamber
Keyplan:
o Ye AN
m an
Existing storm sewage pumping station This drawing Zone within which ventilation column(s) serving the interception chamber may be located Air ducts from valve chamber to 0.225m internal dia ventilation columns, 6m high Access for maintenance vehicles Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
ET t E ee r R St ST
9 3 o t 1
e v o r G n o t l i h C
Key:
Local authority boundary Limits of land to be acquired or used (LLAU) Existing sewers
Proposed access cover 104.50 Proposed level (shown in metres above tunnel datum) Zone within which all permanent site structures would be located
N O T L I H C
Existing penstock chamber
E V O R G
Zone within which the shaft would be located Zone within which permanent above ground structures would be located
5 6 . 1 0 1
Notes:
Interception chamber Valve chamber Zone within which Work No. 21b would be located Reinstate fence following construction 1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan.
0 0 . 5 0 1
1.2m x 1.2m ventilation column of 4.75m minimum to 8m maximum high 101.40 Earl Storm Relief Sewer
Air bridge duct with valve Gate for access to hardstanding around shaft from pumping station site Part of Earl Sewer to be abandoned Work No. 21a. CSO drop shaft (17m internal dia) 105.00
10m
10m
El Sub Sta
Zone within which Work No. 21b would be located
C et r te tS of r
ILLUSTRATIVE
Hardstanding - indicative extents only Location Ventilation structure minimum 4m x 4m x 5m high from existing ground level maximum 6m x 8m x 7m high from existing ground level Work No. 20. 5m internal dia connection tunnel to Greenwich Pumping Station
62
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Keyplan:
N O T L I H C
E V O R G
This drawing
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
North elev.
Key:
n o N i t O a I t T S A g T n i S p m G u N I P l P r a M E U
P E A R L
Limits of land to be acquired or used (LLAU) Zone within which permanent above ground structures would be located Zone within which required landscape would be located + 105.40m Existing levels (shown in metres above tunnel datum) Proposed levels (shown in metres above tunnel datum)
OM YE
AA
AN ET RE ST
Notes:
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and the topographic survey base, both of which have been used in the preparation of this drawing. 3.Some planted areas around the shaft will have to be temporarily taken up to allow safe access for operation and maintenance access. Any areas that are moved will be reinstated upon completion.
+ 101.40
Landscape key
Land returned to Unit 1 once construction is complete
Access hatches (in roof) Maintence access path in concrete pavers inset on a brown roof construction Brown roof 10m 0 10m
1 t i n U
+ 101.80 CSO shaft building protrudes above ground by approximately 4.5m West elev.
+ 101.30
ILLUSTRATIVE
Save for the scale of above ground structures which is indicative
Location Ventilation structure 1.5m minimum to 3m maximum height above shafts structural slab
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Keyplan:
This drawing
Brown roof
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Earl Pumping Station 2 No. Ventilation columns 6m high Ventilation structure of 1.5m minimum to 3m maximum height above the shafts structural slab
Notes:
1. All dimensions and levels are approximate. 2. The purpose of this section is to illustrate the scale of the below ground infrastructure to be provided.
Brick cladding
Section AA
10m
10m
ILLUSTRATIVE
A A
Location
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
THIS DRAWING
N
Keyplan: Depot buildings Outline of pumping station building behind trees shown dotted
This drawing
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn. CHILTON GROVE 1-39
Notes:
1. All dimensions and levels are approximate.
Croft Street
Woodcroft Mews
New brick clad CSO drop shaft building set in area of hardstanding
10m
10m
ILLUSTRATIVE
Location
W on i at ev l te es
Section 48 publicity As existing and proposed West elevation Book of plans - section 20
S48-PP-21X-EARPS-000272 July 2012
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Keyplan:
This drawing
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Notes:
1. All dimensions and levels are approximate.
Chilton Grove
Yeoman Street
Croft Street
Ventilation structure of 3m maximum to 1.5m minimum height above shafts structural slab
Valve chamber
ILLUSTRATIVE
n o i t a v e l e h t r o N
Location
Section 48 publicity As existing and proposed North elevation Book of plans - section 20
S48-PP-21X-EARPS-000273 July 2012
5 2
3 2 1 2
9 2 1 3
1 8
o 1t
A Y
0 2
2 1
Caronia Court
3 7
LB
o 1t
1 7
TCP
6 6 4 8
5 6
7 6
8 5 6 7
4 2
16
32
Crane
Shaft
Piling rig
D pt eo
12
o 1t
6to8
9
12
o t
Melville Court
0 4 o t 6 1
3
c Thames Water Utilities Ltd 2008
4 3
4 1
6 4
T F O R C
8 4
8 0 1 o t 6 3 1
6 0 1 o t 0 7
d 2 2 d d 2 2 4 1 d 2 d 3 3 d 4
e s u o H r ua J
18
9 3 o t 1
4 3 . 1 0 1 3 3 . 1 0 1
N O T L I H C
E V O R G
r a c s
Ps
37 1. 10
r a c s
El Sub Sta
4 2 1 o t 6 8
0 5 8 6
6
7 1
k l Wa r ad n u C
1 9
3 9
P L O U G H
Y A RW E IT LF T A O B
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
0 4 o t 8 4
c 2 2 c c 2 2 4 1 d c 1 2 2 3 c 3 d d 1 1 4 1 c 4 d 1 3 d 2 d 1
5 1 o t 1
0 3 o t 2
c 1 c2 c 1 4 1 c1 1 3 c 1 c 2
1 2
es t t r h u s c t Ru r u Co
Keyplan:
r ut o t s C Ma
3 8
El Sub Sta
This drawing
1 to 69
1
GR D AN NL EE QU
AY
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the E S O L Tunnel Datum which is 100 metres below Ordnance RC E T H Datum Newlyn. I LG
o r Bo GL t s, n Co
3
Iceland Wharf
Key:
Posts
1 5 1
Limits of land to be acquired or used (LLAU) Hoarding Maximum extent of working area Route of temporary diversion of footway
yC l As
& t s n o
B L
y Bd
Stn 2JL 101.733
Offices
Plough Bridge
Site access Access / haul route Existing sewers
O YE M
Notes :
Welfare building
ET RE ST
a t bS Su El
AN
9 7 . 1 0 1
1. These construction phasing plans have been prepared to illustrate possible site layouts for
9 SL99.44
5 7 . 1 0 1
(NPV)
83 1. 10
0 7 . 1 0 1
0 7 . 1 0 1
l e v e L f o 5 o R 98 . 3 0 8 . 1 1 0 1
the principal construction phases. Contractors Vehicle marshalling may choose to lay sites out differently during construction depending on their preferred
S
7 7 . 1 0 1
O I
N
3 8 . 1 0 1
P E
73 1. 10
N I
G
Stn 1JL 101.322
Depot
Excavated material storage and handling area Security office
construction methods subject to any controls on layout imposed through the planning submission and approval process. 2. Traffic management plans for construction
H
1 ne r bo us 24
85 . 101
5 8 . 1 0 1
5 9 . 1 0 1
8 9 . 1 0 1
88 1. 10
4 8 . 1 0 1
7 5 . 1 0 1
phases of the work would be submitted to the appropriate authority for approval. Where
G y el av r
1
83 1. 10
H e s ou
84 1. 10
Sd4.98 (NFI) 3
58 . 101
2 8 . 1 0 1 101.82
o t 24
9 5 . 1 0 1
3 8 . 1 0 1
73 1. 10
2 8 . 1 0 1
arrangements are shown. 3. Utility supplies for the construction of the works would be agreed with the relevant utility company.
w es Fr
1
o t 23
e s ou
55 1. 10
0 8 . 1 0 1
1 8 . 1 0 1
54 1. 10
k c i H e s ou
32 1. 10 36 1. 10
8 8 . 1 0 1
63 1. 10
4. Additional noise mitigation including noise barriers may be required but is not shown on this drawing.
5 0 . 3 0 1
78 . 101
66 1. 10
el v fLe oo 18 R 6. 10
6 4 . 1 0 1
1 6 . 1 0 1
62 1. 10
1 SL99.31
2 0 . 3 0 1
1 0 80 .1
38 1. 10
Stn 5JL 101.360
1 0 80 .6
5 0 . 3 0 1
El Sub Sta
Crane
62
10m
40m
Security office
52
1
ILLUSTRATIVE
T E E R T S
Location
W O O D M EW S
Document Information
Section 48 publicity Construction phases - phase 1 Site setup and shaft construction Book of plans - section 20
AC AC A I
Works
Saw Mill
SE C LO
P L W
A Y
0 2 o 1t
G H
1 3
1 8
r es ut c t
N
r ut o t s C Ma
2 1
3 8
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Caronia Court
3 7
LB
o 1t
El Sub Sta
N
1 to 69
1
Keyplan:
1 7
TCP
6 6 4 8
5 6
7 6
8 5 6 7
4 2
16
32
Piling rig
D pt eo
12
o 1t
6to8
9
12
o t
Melville Court
0 4 o t 6 1
3 1
7 o t 1
31
30
3 2 o t 8
8 1 o t 3 1
2 2
3 2
9 2 o t 4 2
4 3
4 1
6 4
T F O R C
8 4
8 0 1 o t 6 3 1
6 0 1 o t 0 7
d 2 2 d d 2 2 4 1 d 2 d 3 3 d 4
e s u o H r ua J
18
Crane
9 7 . 1 0 1
9 SL99.44
9 3 Security office o t 1
4 3 . 1 0 1 3 3 . 1 0 1
N O T L I H C
E V O R G
r a c s
Ps
37 1. 10
r a c s
El Sub Sta
4 2 1 o t 6 8
0 5 8 6
0 4 o t 8 4
c 2 2 c c 2 2 4 1 d c 1 2 2 3 c 3 d d 1 1 4 1 c 4 d 1 3 d 2 d 1
5 1 o t 1
o r Bo
41to53
0 3 o t 2
c 1 c2 c 1 4 1 c1 1 3 c 1 c 2
GR D AN NL EE QU AY
E S O L RC E T G IH L
This drawing
Iceland Wharf
GL t s, n Co
Posts
3
1 5 1
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
yC l As
& t s n o
Short term lane closure in Chilton Grove to make connection to existing sewer
Offices
Key:
Plough
Bridge
Limits of land to be acquired or used (LLAU) Hoarding Maximum extent of working area
B L y Bd
Stn 2JL 101.733
O YE M
Route of temporary diversion of footway Welfare building Site access Shared access Access / haul route Existing sewers Vehicle marshalling Sheet piles Secant piles installed
AN
a t bS Su El
ET RE ST
5 7 . 1 0 1
(NPV)
83 1. 10
0 7 . 1 0 1
0 7 . 1 0 1
l e v e L f o 5 o R 98 . 0 1
3 8 . 1 0 1
S
7 7 . 1 0 1
O I
N
3 8 . 1 0 1
P E
73 1. 10
N I
G
Stn 1JL 101.322
Depot
Workshop storage area
H
1 ne r bo us
85 1. 10
5 9 . 1 0 1
5 8 . 1 0 1
Notes :
1. These construction phasing plans have been prepared to illustrate possible site layouts for
o t 24
7 5 . 1 0 1
8 9 . 1 0 1
88 1. 10
4 8 . 1 0 1
83 1. 10
G y el av r
1
H e s ou
84 1. 10
Sd4.98 (NFI) 3
58 1. 10
2 8 . 1 0 1 101.82
o t 24
9 5 . 1 0 1
3 8 . 1 0 1
73 . 101
w es Fr
7 1 3
1
o t 23
2 8 . 1 0 1
0 8 . 1 0 1
1 8 . 1 0 1
may choose to lay sites out differently during construction depending on their preferred construction methods subject to any controls on layout imposed through the planning
e s ou
55 1. 10
54 1. 10
k c i H e s ou
32 1. 10 36 1. 10
8 8 . 1 0 1
el v fLe oo 18 R 6. 10
6 4 . 1 0 1
66 1. 10
1 6 . 1 0 1
62 1. 10
1 SL99.31
5 0 . 3 0 1
phases of the work would be submitted to the appropriate authority for approval. Where appropriate, outline traffic management
78 . 101
2 0 . 3 0 1
38 1. 10
Stn 5JL 101.360
1 0 80 .1
1 0 80 .6
5 0 . 3 0 1
3. Utility supplies for the construction of the works would be agreed with the relevant utility company. 4. Additional noise mitigation including noise
Crane
62
Shaft
Site power structure Depot 10m Security office Scale 1:500 at A1 1:1000 if reproduced at A3
1
40m
52
T E E R T S
ILLUSTRATIVE
C R O FT
6
O O D M EW S
Location
AC
Works
Saw Mill
SE C LO
AC
A I
Section 48 publicity Construction phases - phase 2 Construction of other structures Book of plans - section 20
S48-PP-21X-EARPS-000275 July 2012
0 1