Вы находитесь на странице: 1из 1

Bridge Alternatives and Assessment of Connectivity to Existing and Proposed Bicycle Facilities within the Study Area

Bike Facilities: (indicates either existing, proposed in


current plans, or a future needed facility) North Salem Area Pine Street NE (existing) Commercial St NE/Liberty St NE couplet (existing) Front Street NE (future) Broadway Street NE (future) Downtown Salem Area Union Street NE corridor (proposed) n.c.
1 additional lane on Commercial St. to cross Crossing Commercial St. at Marion St. (north side) must navigate new southbound to westbound ramp

Bridge Alternatives
1 - No Build 2A 2B 3 4A 4B 4C/4E 4D

n.c. n.c. n.c. n.c.

n.c. n.c. n.c. n.c.

n.c. n.c. n.c. n.c.

n.c. n.c. n.c.

n.c.

n.c.

n.c.

Crossing on north side of Marion St. simplified by closure of Commercial St. to the north of Marion St.

Marion St @ Commercial St intersection n.c. Center St Bridge path & Marion St Bridge sidewalk to/from Front Street and downtown (existing) West Salem Area Wallace Road [north of Orchard Heights] (existing) Marine Drive separated multi-use path (proposed) 2nd Street "bike bridge" over Wallace connecting to Union St trail (future) Edgewater trail [next to Hwy 22] (existing) Edgewater Street (existing) Center St Bridge path & Marion St Bridge sidewalk to/from Edgewater/Wallace Road (existing)
Remains

n.c.

n.c.

Same as 2A

n.c. Remains

n.c. Remains

Eliminated

Eliminated

Remains

Remains

Eliminated

n.c. n.c. n.c.


Remains

n.c.
Grade-separated crossing over Wallace Rd. Eliminated

n.c. n.c.
Eliminated

n.c.
Remains

n.c.
Remains

n.c.
Eliminated

n.c.
Eliminated

n.c.
Eliminated

n.c.
Remains

n.c.
Eliminated

Remains

n.c.
Remains

n.c.
Remains

n.c.
Eliminated

Remains

Remains

Key n.c. = No change to existing connections = Alternative increases bicycle connections across the river to the existing/planned bike facility = Alternative would require additional design work to determine the best way to connect to the existing or proposed facility = Bicyclists and pedestrians would need to use the Union St Railroad Pedestrian and Bicycle Bridge = Reduced future traffic volumes expected on Commercial St. at Union St., possibly making it easier to travel east/west on Union St. at this un-signalized intersection Note: The above evaluation is not part of the DEIS for the Salem River Crossing Project, but is provided for informational purposes and is subject to future modification.

5/8/2012

Вам также может понравиться