Вы находитесь на странице: 1из 9

DOC. NO. ISSUE DATE REV NO. PAGE NO Caliber Construction Company Pvt Ltd. No.

235/12, 1st Floor, Suraj Centre, 27th Cross, Jayanagar 7th Block, Bangalore 560011.

CAL/TEND/F/01 15/12/05 00 1 0F 9

BUILDING SPECIFICATION-QUESTIONAIRE
Date :

I) GENERAL INFORMATION :
1. Name of the Customer

2. Office Address

3. Contact Person 4. Designation 5. Telephone - Office 7. Mobile 6. Fax 8. e-mail

9. Brief Discription of the Project (You may attach a separate write up/Brochure etc)

10. Time frame for Delivery : No. of days from the time of finalization of Engineering specifics or Lease agreements, whichever is later FOR THE OFFICE USE ONLY

1. Questionaire Received Date 2. Received By 3. Enquiry Number


DOC. NO. CAL/TEND/F/01

ISSUE DATE REV NO.

15/12/05 00 2 0F 9

Caliber Construction Company Pvt Ltd. No. 235/12, 1st Floor, Suraj Centre, 27th Cross, Jayanagar 7th Block, Bangalore 560011.

PAGE NO

II) SPACE REQUIREMENT


SR.NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 DESCRIPTION Land required (Tick Mark the unit) Construction Coverage Car Park-No.of cars Bus Park-No.of Buses Parking Space for trucks(Others) Total built up area considered Total Manufacturing Area required No.of floors considered Ratio of office vs. manufacturing area Is there any control rooms required Area required for Ware House Material storage type Height of rack Weigh Bridge requirement Weigh Bridge capacity Specify total area required for Utilities Kindly furnish various itemwise detail 16.1 16.2 16.3 16.4 16.5 Boiler House Chilling Plant Nitrogen Plant Air Compressors Electrical Panels Nos. Sq.Mtr Sq.Mtr Sq.Mtr Sq.Mtr Sq.Mtr Sq.Mtr
DOC. NO. ISSUE DATE REV NO. CAL/TEND/F/01 15/12/05 00 3 0F 9

UNIT Acres/Sq.Mtr % Maximum Nos. Nos. Nos. Sq.Mtr Sq.Mtr Nos. Ratio Yes/No Sq.Mtr Rack/Bins Mtr. Yes/No Capacity Sq.Mtr

INFORMATION

REMARKS

Sq.Mtr Sq.Mtr Sq.Mtr Sq.Mtr

16.5.1 No.of MCC 16.5.2 Area for MCC 16.5.3 Area for PCC 16.6 16.7 16.8 16.9 Area for server Area for DG room Area for cooling tower Area for any Other utility requirement

Caliber Construction Company Pvt Ltd.

PAGE NO

No. 235/12, 1st Floor, Suraj Centre, 27th Cross, Jayanagar 7th Block, Bangalore 560011.

SR.NO.

DESCRIPTION

UNIT Sq.Mtr Yes/No

INFORMATION

REMARKS

16.10 Area for Fuel/solvent storage facility 16.11 Whether separate space required for Liquid fuel/Gas

16.11.1 If yes, then furnish itemwise details 16.11.2 Area for LDO 16.11.3 Gas 1 16.11.4 Storage Capacity 16.11.5 Gas 2 16.11.6 Storage Capacity 16.11.7 Area for Gas Storage 16.11.8 Solvent 1 16.11.9 Storage Capacity 16.12 Area Required for cafeteria 16.13 Max.no. of persons dining at any time 16.14 Area rquired for any ancilliary units Kindly furnish various itemwise detail 16.14.1 Ancilliary unit -1 16.14.2 Area for unit-1 16.14.3 Ancilliary unit -2 16.14.4 Area for unit-2 16.14.5 Ancilliary unit -3 16.14.6 Area for unit-3 Type of structure desired (RCC framed structure/Pre-engineered Steel Building with RCC Columns and Walls) Occupancy Male to female ratio Space for loading/unloading bay Name Sq.Mtr Name Sq.Mtr Name Sq.Mtr Name M3 Name M3 Sq.Mtr Name M3 Sq.Mtr No. Sq.Mtr

16.5

RCC/PreEng.Str

16.6 16.7 16.8

PAX Ratio Sq.Mtr

DOC. NO. ISSUE DATE REV NO. PAGE NO Caliber Construction Company Pvt Ltd. No. 235/12, 1st Floor, Suraj Centre, 27th Cross, Jayanagar 7th Block, Bangalore 560011.

CAL/TEND/F/01 15/12/05 00 4 0F 9

SR.NO. 17 18 19 20 21 22 23 24 25 26 27 27.1 27.2 27.3 27.4 27.5 27.6 27.8 27.9 27.9

DESCRIPTION Provision for future expansion Floor height (Clear upto the services) Column spacing Live load on the floor Area of False ceiling requirement Hoistway provision EOT Requirement Capacity of EOT Area for Change rooms/Locker room Foundation Type Type of flooring Manufacturing Area Ware House Change rooms Assembly Office Area Toilets Cafeteria Reception Area Server Room

UNIT Sq.Mtr Mtrs

INFORMATION

REMARKS

Grid of ______Mtrs X _____Mtrs Kg/Sq.Mtr Sq.Mtr Yes/No Yes/No Ton Sq.Mtr

27.10 Utility areas 27.11 Staircases

27.12

Any Other information

PLEASE ATTACH A FLOW CHART / ASSEMBLY LINE SCHEMATIC OF THE PRODUCTION LAYOUT

Yes/No

DOC. NO. ISSUE DATE REV NO. PAGE NO Caliber Construction Company Pvt Ltd. No. 235/12, 1st Floor, Suraj Centre, 27th Cross, Jayanagar 7th Block, Bangalore 560011.

CAL/TEND/F/01 15/12/05 00 5 0F 9

III) ELECTRICAL REQUIREMENT


SR.NO. 1 2 3 4 5 5.1 5.2 5.3 6 7 8 9 10 11 12 DESCRIPTION Total connected load Attach all the details of process load Attach brief details of equipments (Including voltage and frequency rating of machine) Attach load details for UPS power Power distribution to process loads By Overhead cable tray By overhead bus bar trunking By floor trenches Attach socket configuration of assembly tables Illumination requirement Attach Colour of lights at various areas Requirement of stand by power by DG Auto/manual start of stand by power UPS batter (lead acid type/SMF) Any special earthing required KVA Lux UNIT KVA Yes/No Yes/No Yes/No INFORMATION REMARKS

13

Any other informations

IV) VENTILATION
1 2 3 4 Attach areas requiring ventilation system Filtration Area (10 Micron recommended) Static pressure requirement Any other informations

Micron MMWC

DOC. NO. ISSUE DATE REV NO. PAGE NO Caliber Construction Company Pvt Ltd. No. 235/12, 1st Floor, Suraj Centre, 27th Cross, Jayanagar 7th Block, Bangalore 560011.

CAL/TEND/F/01 15/12/05 00 6 0F 9

V) H V A C
SR.NO. 1 2 3 4 5 6 7 DESCRIPTION Attach layout with process load Cleanliness levels-Filtration level Any localized exhaust system required in hot work area Number of hours per day-Functional Temperature levels considered Relative humidity in the various areas Internal loads for a) Equipment b) Lighting 8 9 10 11 Is sound level of 55 DB acceptable Is 20 CFM/Person as per ASHRAE STANDARD acceptable Any equipment needs process cooling. Kindly furnish details Any specific refrigent choice Yes/No Yes/No
o

UNIT Yes/No

INFORMATION

REMARKS

% RH

R134A/ A470C/R22A

12

Any Other Informations

VI) SECURITY SYSTEM : ACCESS CONTROL/CCTV


1 2 3 Proximity card readers Emergency Exits Location of CCTV Nos. Nos. Nos.

Any Other Informations

DOC. NO. ISSUE DATE REV NO. PAGE NO Caliber Construction Company Pvt Ltd. No. 235/12, 1st Floor, Suraj Centre, 27th Cross, Jayanagar 7th Block, Bangalore 560011.

CAL/TEND/F/01 15/12/05 00 7 0F 9

VII) MECHANICAL SERVICES


SR.NO. 1 DESCRIPTION Quality of air a) Oil content b) Drier c) Model of compressor 2 3 4 5 6 7 Flow requirement Pressure Location of outlets on machinery layout Type of piping Any additional outlets for cleaning Type of compressor Screw/Recipr Copper/GI/SS CFM at Outlet Bar PPM of oil Dew Point UNIT INFORMATION REMARKS

Any other information

VIII) FIRE PROTECTION SYSTEM


1 2 3 3.1 3.3 Design code applicable Any corporate standard Type of system required Automatic Fire Hydrant-Internal/External Automatic sprinkler system-Production block-Above and below false ceiling Fire alarm and detection system Conventional/Analogue addressable system Gas based fire suppression system for HUB/Server Room Any other information NBC/NFPA/FM

3.4 3.5 4

DOC. NO. ISSUE DATE REV NO. PAGE NO Caliber Construction Company Pvt Ltd. No. 235/12, 1st Floor, Suraj Centre, 27th Cross, Jayanagar 7th Block, Bangalore 560011.

CAL/TEND/F/01 15/12/05 00 8 0F 9

IX) VACUUM PUMP REQUIREMENT


SR.NO. 1 2 3 4 5 DESCRIPTION Model of pump Suction air rate Vacuum Speed of motor Attch list of machines requiring vacuum M3/Hr MM of Hg RPM UNIT INFORMATION REMARKS

Any other information

X) WATER REQUIREMENT
1 2 3 4 5 6 Specify usuage of water Whether required for process application Quality of water Quantity of water required per day (Other than that of human consumption) Period of storage quantity desired Any other information M3/Hr

XI) SEWEGE/EFFLUENT TREATMENT


1 2 3 4 6 Specify type of discharge Quantity of discharge Type of disposal desired Type of treatment desired Any other information M3/Hr

DOC. NO. ISSUE DATE REV NO. PAGE NO Caliber Construction Company Pvt Ltd. No. 235/12, 1st Floor, Suraj Centre, 27th Cross, Jayanagar 7th Block, Bangalore 560011.

CAL/TEND/F/01 15/12/05 00 9 0F 9

XII) GAS REQUIREMENT


SR.NO. 1 2 3 4 5 6 7 6 DESCRIPTION Type of gases Form of gas and Purity Consumption Desired operating pressure Type of Piping List of probable machines using gases Storage - Cylinder/Bulk storage tanks Any other information % CuM/Month or SCFH Kg/cm2 PP/SS/Copper UNIT INFORMATION REMARKS

Вам также может понравиться