SHAHIMI MOHTAR, ZULKIFLI MOHAMED UDIN, FAISAL ZULHUMADI UUM College of Business, Universiti Utara Malaysia
ABSTRACT
In the present competitive industrial and business environment, information becomes one of the most valuable assets to organisations, since information is anything that reduces uncertainty. The utilisation of information that flows within the organisation is an important process. Information that flows from one entity or functional area to another should be able to support the management in formulating strategy. Focusing on the information supply chain in isolation is a shortcoming, as most managers realise that information is needed from the whole supply chain in order to make a sound decision. Supply Chain Management (SCM) has been adopted in various industrial contexts, namely manufacturing, textiles, healthcare, and foods. In this paper, the focus is on the construction supply chain, which in Malaysia has been emphasised upon by the Malaysian government through the Construction Industry Development Board (CIDB) to accelerate its practices among the industry players. The important aspect to realise the implementation of SCM is regarding information sharing practices. This paper presents an overview of information flow in the organisation, information supply chain, and construction supply chain, in order to understand the basis to information sharing practices. A brief explanation is given on the methodology used in the research, and the paper concludes with some insight regarding information sharing practices in the construction supply chain.
INTRODUCTION
The Construction Industry Master Plan (CIMP) has been released by the Malaysian government through its construction arm, Construction Industry Development Board (CIDB), which details out the strategic approach to accelerate the development of the construction industry in Malaysia. The implementation of SCM in the Malaysian construction industry is one of the key thrusts of the CIMP, where all the key players along the construction supply chain should continuously improve all the processes along the supply chain starting from the suppliers, all the way to the client. The SCM concept has been applied and proven successful empirically in the manufacturing sector, covering many industries including food, textile, and healthcare industries to name but a few. However, there were also some concerns raised over the applicability of such an approach in all the different industries. The variation of all the industries has perhaps caused doubt about the applicability of this concept. However, there are also efforts being made to explore its promising applicability in other viable sectors, such as the focus of this paper, the construction industry. The utilisation of information that flows within the organisation is an important process. Information that flows from one entity or functional area to another should be able to support the management in formulating the strategy. Strategy development for every functional area within the internal supply chain plays a major role in determining the success of Construction Supply Chain Management (CSCM) development (Bechtel & Jayaram, 1997). Furthermore, organisations should be able to develop a strategy that enables all members within the supply chain to share information, work together, and formulate common objectives to maintain the competitiveness of individual organisation, and thus have a spill-over effect to the entire supply chain.
84
85
External Information
Management Planning
R&D
Factory Planning
SalesPlanning
Product Design
Process Planning
Scheduling
Material Supplier
Procurement
Production
Distribution / Sales
Consumer
QC
Process Control
Cost Control
Figure 1: Organisation Information Flow (adapted from Hitomi, 1996) In addition, this also reflects on the daily supply chain operations, where the decision from one organisation has an effect either to the upstream or downstream of the supply chain, and also influences the information that flows throughout the chain. Therefore, many organisations utilise an intelligent information system to support the management in making a decision not only to solve daily unstructured problems, but also in planning and designing the support systems such as performance measurement system, production facility management, and production planning and control (Meziane, Vadera, Kobbacy, & Proudlove, 2000). Turban and Aronson (1998), and Mallach (2000) stressed that management needs a high quality of information that flows within the supply chain externally or internally, to enhance the effectiveness of decisions. Some information can be used to add some additional values to processes, decisions, or products purely by its correct usage. Furthermore, this decision should be reflected in improving customer service levels, lowering costs, and reducing delivery time in the whole network. This capability is needed
86
in order to make sure the information flows smoothly and is able to create and support supply chain collaboration. In addition with this environment, organisations can improve their respective relationships within the chain, which has led to the creation of not only products or services, but also the new marketing approaches and operations (Hoek, 1998).
87
OEMs, and customers have different objectives, their goals can be the same where they do share common processes, such as planning, forecasting, and replenishment. In addition, the utilisation of information technology infrastructure can simplify the process in managing the information supply chain. Members of a supply chain can share and exchange information through the capability of networking such as the Internet and centralised databases.
88
Supply chain management encompasses the planning and management of all activities involved in sourcing and procurement, conversion, and all logistics management activities. Importantly, it also includes coordination and collaboration with channel partners, which can be suppliers, intermediaries, third party service providers, and customers. In essence, supply chain management integrates supply and demand management within and across companies. SCM has been adopted in various industrial contexts as mentioned earlier. In the food industry, Mohtadi (2005) had revealed that information sharing increases the efficiency of players (retailers) because of better coordination of supplies and orders, but the level of sharing was dictated by the size of the chain, e.g. firms participating in larger chains tend to invest more in information and communication technologies in order to facilitate information sharing than the companies involved in smaller chains.
METHODOLOGY
Since this was an exploratory study, a mix-mode approach was used, which is using a combination of quantitative and qualitative approaches in order to investigate the phenomenon of information sharing in the desired construction context. Basically, this mix-mode approach consists of two phases, which are the inductive qualitative approach and the deductive quantitative approach. During the inductive phase, a phenomenon that is detected will be explored by performing qualitative data collection, which is then described and organised in a systematic way. The output from this process, a substantive theory can be produced, ready for verification and exploration. This theory will take the researcher back to the phenomenon, and the deductive cycle will then be commenced through an in-depth literature review to obtain the formal theory. This theory can then be proved or disproved by performing field or real world verification, which leads the focus back to the phenomenon when the researcher tries to make sense of the findings and perhaps may launch another inductive cycle as new data are observed. The scope of the research was narrowed down further to the industrialised building system (IBS) industry involved in the construction of residential buildings, and companies that were registered as between G5 and G7 companies. Therefore, the population lists were obtained from several authoritative sources. The supplier and contractor lists were obtained from CIDB and the developer list was obtained from REHDA. However, the restrictions set by the narrowing of scope cannot be applied to the developer list, since it is not feasible to determine their status individually through personal contact. Preliminary interview sessions were performed, by using a carefully crafted interview protocol, at several companies to indentify the problems and issues involved. A questionnaire was then developed by combining the initial findings with the results from the literature. A pilot study was performed to refine the questionnaire as well as the interview protocol for the main round of investigation. Thus, for the main round of investigation, a total of 300 questionnaires were sent (the minimum sample size were calculated using an online application at http://www.raosoft.com/samplesize.html) out to various companies via post that were randomly selected, and a total of 20 interviews were performed at the various companies. The interview sessions were recorded, where allowed, and transcribed later. For the interviews where recording was not possible, extensive note-taking was performed while the interview was performed. From these transcriptions, the resulting data was processed using NVIVO software, where the transcriptions were labelled and themes were identified and coded. The codification revealed an initial picture of information sharing in the construction supply chain. Information sharing in the context of the construction industry would be the way companies divulge their information with the players upstream and downstream relative to their company in the supply chain. In
89
the context of this research, various questions were asked in order to address and explore this issue. Several questions were presented to the respondent regarding this topic based on the preliminary interviews and previous literature, using a Likert-like scale of 1 (Low) to 4 (High). A total of 12 supply chain performance questions were also presented to the respondents, with a 1 (Low) to 4 (High) scale as well. The data obtained from this section was keyed-in the SPSS software, where it was used to run some initial statistical analysis.
RESULTS
From the analysis, it can be observed that most of the respondents were not ready to divulge information with their partners up and down the stream. This is because the highest ranked item (share supply chain information within the organisation) only had a mean of 2.90, and the lowest ranked item (have information technology system to communicate supply chain information with external parties) had a mean of 2.33. This meant that overall, the respondents were of the inclination to withhold information from other players in the supply chain. The rest of the items are presented in Table 1.
Meanwhile, with regard to supply chain performance, the items of information sharing were analysed using Pearson correlation to see if there are any relationships between the information sharing factors with supply chain performance. The summary of the results is presented in Table 2 below. From this, it can be observed that there were several items that were significantly correlated with the performance measures at the 99% significance level, which are ranked from highest to lowest as follows: 1. use SC information to plan the production/construction with cost performance (0.481), 2. use SC information for decision making with cost performance (0.449), 3. have information technology system to communicate SC information within the organisation with cost performance (0.415) 4. share SC information with suppliers/contractors with cost performance (0.414), and 5. share SC information with customer with flexibility performance (0.410). Out of the five significant correlations listed above, the four most significant are related to cost performance, while the lowest ranked significant correlation was with flexibility performance. This relationship is said to be very important in the literature, whereby organisations that want to improve their
90
supply chain performance should focus upon improving their information sharing capabilities, especially, in the context of this study, using shared information to plan the construction with all the related parties, even from the very early stages (OBrien et al., 2010; Pryke, 2009; Theodorakioglou et al., 2006). Additionally, there were also less significant correlations at the 95% significance level, but significant nevertheless. These are ranked in descending order as follows: 1. share SC information with suppliers/contractors with flexibility performance (0.391), 2. share SC information within the organisation with cost performance (0.359), and 3. have information technology system to communicate SC information with external parties with cost performance (0.306). Similar to the earlier 99% significant correlations, these weak correlations also exhibited relationships between the information sharing factors with flexibility and cost performance. Table 2 Correlation between information sharing items with supply chain performance Performance Item Quality Flexibility Timeliness C2.1-share SC information with Pearson .260 .391* .261 suppliers/contractors Correlation Sig. (2-tailed) .100 .011 .077 ** C2.2-share SC information with Pearson .066 .410 .119 customer Correlation Sig. (2-tailed) .683 .008 .425 C2.3-share SC information within the Pearson -.045 .289 .050 organisation Correlation Sig. (2-tailed) .781 .070 .741 C2.4-use SC information for decision Pearson .249 .195 .276 making Correlation Sig. (2-tailed) .117 .222 .060 C2.5-use SC information to plan the Pearson .090 .220 .271 production/construction Correlation Sig. (2-tailed) .577 .168 .065 C2.6-have information technology Pearson .132 .297 .205 system to communicate SC Correlation information within the organisation Sig. (2-tailed) .417 .062 .171 C2.7-have information technology Pearson .186 .166 .259 system to communicate SC Correlation information with external parties Sig. (2-tailed) .244 .300 .079 **. Correlation is significant at the 0.01 level (2-tailed). *. Correlation is significant at the 0.05 level (2-tailed).
Cost .414** .006 .290 .062 .359* .021 .449** .003 .481** .001 .415** .007 .306* .049
91
CONCLUSION
From the preliminary study, it was found that information sharing in SCM does require further investigation because of its due potential that had been observed in other settings. In the Malaysian construction industry however, supply chain management, is still at a stage where there is plenty of room for improvement. Based on the preliminary findings, it was revealed that the players within the construction industry are still not open and trusting of their partners to the extent that they can openly share sensitive information in order to perform joint business and mutual manpower development. It was observed that the players value quality and reliability of suppliers the most, but they are not ready to invest in the information technology structure to be able to take the communication and information sharing to another level, even though it is evident in the literature that collaborative practices are required. Therefore, an exhaustive data collection should be continued to explore more the concept of information sharing in the Malaysian construction industry. The question of trust and honesty remains unexplored territory for those researchers brave enough to venture into it, since this was identified as a very sensitive area during the interviews. The questionnaire could be refined further, and thus perform more efficiently at collecting the data and reducing the ambiguity among respondents towards this study.
REFERENCE
Albino, V., Pontrandolfo, P., & Scozzi, B. (2002). Analysis of information flows to enhance the coordination of production processes. International Journal of Production Economics, 75, 7-19. Andel, T. (1997). Information supply chain: Set and get your goals. Transportation and Distribution, 38(2), 33-36. Bechtel, C., & Jayaram, J. (1997). Supply chain management: a strategic perspective. The International Journal of Logistics Management, 8(1), 15-34. Benton, W. C., Jr., & McHenry, L. F. (2009). Construction purchasing and supply chain management. USA: McGraw-Hill Professional. Construction Industry Development Board (CIDB) (2007). Construction industry master plan Malaysia 2006 - 2015. Kuala Lumpur: CIDB. Council of Supply Chain Management Professionals (CSCMP) (2010). CSCMP supply chain management definitions. Retrieved April 11, 2010, from http://cscmp.org/aboutcscmp/ definitions.asp. Davis, T. (1993). Effective supply chain management. Sloan Management Review, 34(4), 35-45. Feitzinger, E., & Lee, H. L. (1997). Mass customisation at Hewlett-Packard: The power of postponement. Harvard Business Review, 75(1), 116-121. Graham, G., & Hardaker, G. (2000). Supply-chain management across the Internet. International Journal of Physical Distribution and Logistics Management, 30(3/4). Hitomi, K. (1996). Manufacturing Systems Engineering. London: Taylor & Francis Ltd. Hoek, R. I. V. (1998). Logistics and virtual integration: postponement, outsourcing and the flow of information. International Journal of Physical Distribution and Logistics Management, 28(7), 508523. Lee, C. C., & Yang, J. (2000). Knowledge value chain. Journal of Management Development, 19(9), 783793. Lummus, R. R., & Vokurka, R. J. (1999). Managing the demand chain through managing the information flow: Capturing moments of information. Production and Inventory Management Journal, 40(1), 16-20. Mallach, E. G. (2000). Decision support and data warehouse systems. London, McGraw-Hill.
92
Mason-Jones, R., & Towill, D. R. (1997). Information enrichment: Designing the supply chain for competitive advantage. Supply Chain Management, 2(4), 137-148. Meziane, F., Vadera, S., Kobbacy, K., & Proudlove, N. (2000). Intelligent systems in manufacturing: Current developments and future prospects. Integrated Manufacturing Systems, 11(4), 218-238. Mohtadi, H. (2005). The empirics of information sharing in supply chains: The case of the food industry. Working Paper 05-02, AgEcon search Research in agricultural and applied economics. Retrieved August 27, 2009, from http://purl.umn.edu/14323 Oakland, J. S., & Marosszeky, M. (2006). Total quality in the construction supply chain. Burlington, MA: Butterworth-Heinemann. OBrien, W. J., Formoso, C. T., Vrijhoef, R., & London, K. A. (Eds.) (2010). Construction supply chain management handbook. Boca Raton, FL: CRC Press. Pryke, S. (Ed.) (2009). Construction supply chain management: Concepts and case studies. West Sussex, UK: Wiley-Blackwell. Sarkis, J., & Sundarraj, R.P. (2000). Factors for strategic evaluation of enterprise information technologies. International Journal of Physical Distribution and Logistics Management 30(3/4), 196-220. Spekman, E. R., Kamauff, W. J., & Muhr, N. (1998). An empirical investigation into supply chain management: A perspective on partnerships. International Journal of Physical Distribution and Logistics Management, 28(8), 630-650. Theodorakioglou, Y., Gotzamani, K., & Tsiolvas, G. (2006). Supplier management and its relationship to buyers quality management. Supply Chain Management: An International Journal, 11(2), 148159. Turban, E., & Aronson, J. E. (1998). Decision support systems and intelligent systems. New Jersey: Prentice-Hall. Walsh, P., & Koumpis, A. (1998). Introducing the concept of information supply chains: The Buddy project. Logistic Information Management, 11(2), 74-79. Xu, K., Dong, Y., & Evers, P. T. (2001). Towards better coordination of the supply chain. Transportation Research Part E, (37), 35-54. Yu, Z., Yan, H., & Cheng, T. C. E. (2001). Benefits of information sharing with supply chain partnerships. Industrial Management and Data Systems, 101(3), 114-119. Zhao, X., Xie, J., & Zhang, W. J. (2002). The impact of information sharing and ordering co-ordination on supply chain performance. Supply Chain Management: An International Journal, 7(1), 24-40.
93