CURRICULAM VITAE

P.THIRUGNANAM
Work Profile

Having more than 30 years of experience in Project Co-ordination, Electrical Installation, Testing and Commissioning. Educational Qualification Diploma in Electrical & Electronics Engineering, Year of Pass April 1977

Supervisory Competency Certificate Having C Certificate No.10476 Tamil Nadu Having A Certificate No.261/96 Pondicherry, Government of India.

Summary of Experience Co-ordination with design and erection teams, Customers, clients, subcontractors. Over 30 Years in various Electrical Installation. HV, LV Electrical, control Panels, ACDB, DCDB, LDB, PDB, EC panel and Laying of control and instrumentation cables with Terminations. Installation of Power Transformers, Circuit breaker, CT, PT, Isolator and Bus Duct etc. Sub-stations up to 400 KV Estimation & Costing of Bid. Erection, assisting to testing and commissioning of substations, Transformers, HV/LV Switchgears, Relays, Control Panels, AVR Panels, Battery charger and capacitor bank with panels. Technical & Commercial Evaluation of various contracts. Preparation of drawings and getting approval from CEIG and CEA. Arranging Inspection and getting Safety Certificate from CEIG and CEA. Design and erection of tower lighting Electrical control devices.

Erection and commissioning of DG set. Plant Earthing. MEP WORK IN Abu-Dhabi 132 sub station work in Pondicherry 220KV Cable Project in Kenya

EXPERIENCE DETAILS Name of the Concern Designation Period Name of the concern SIEMENS LIMITED, KENYA (NAIROBI) Energy sector, Transmission and Distribution, 220 K.V.s/s and 220 K.V. Cable project Site Manager Construction 08.10.2011 to till date KMC Engineers, 132/33/11KV Substation Project, Pondicheery-13 Designation Period Name of the concern Designation Period Responsibilities Site Manager SEP-2010 to OCT-2011 Auromin controls, Pondicherry Project Consultant OCT-2009 to AUG-2010 Project co-ordination for electrical erection 1x25mw CPP for ACC Ltd, CHANDRA WORKS, CHANDRAPUR, Maharashtra. VOLTAS LIMITED MEP-WORK-ABU-DHABI Sr. Construction Manager /project-Electrical Ferrari Experience-Yas IsIand Abu Dhabi & Dubai-UAE 11.08.2008 to 25.09.2009

Name of the concern Designation

Period Responsibilities

Overall responsibilities of MEP coordination and execution Installation of 22 KV Switchgear, 2000 KVA transformers, and 2000 KVA Generator sets, LV Switchgear LV Panel Boards and Low current System. Installation of Cable containments (Cable ladder, Tray and Trucking) Cable Pulling of HV and LV Lightning Protection

Name of the concern Designation Period Responsibilities

Mitsubishi Corporation, Qatar Cable Project. Site Manager (Cable Project) 05.02.07 to 6.08.2008

Laying of cable of 220kV,132kV,66kV XLPE Cable Cable Size 1CX2500Sqmm XLPE, 1CX2000SqmmXLPE, 1CX800Sqmm XLPE, 1CX630Sqmm XLPE Inspection of cable jointing of the above cables Testing Commissioning Co-coordinator for the above cables Laying of Fiber optic cable & DTS Cables Approx 22KM each M/s. SPIC JEL CONSTRUCTION ENGINEERING LIMITED., Project Consultant (Electrical) 27-5-2006 to 2.08.2007 Estimation, Project Co-Ordination, Human Resource etc., M/s. JAYAM ENGINEERING Site Manager 01.04.2006. To 26.05.2006

Name of the concern Designation Period Job Description Name of The concern Designation Period

Responsibilities Estimation for tender coding & Jobs. Subcontractor and Man power arrangements Submission of Drawings to CEIG & CEA and get Approvals Preparation of Completion report submitted to the CEIG & CEA, Arranging Inspection and get safety Certificates Execution of HT cables 220Kv, 33Kv,11Kv and 6.6Kv 1.8 ,1.2 ,2, 3.6Km respectively Execution of LT power & control cables 5 & 10 Km respectively. Name of The concern Designation Period Responsibility Estimation for tender coding & Jobs. Subcontractor and Man power arrangements Submission of Drawings to CEIG & CEA and get Approvals Preparation of Completion report submitted to the CEIG & CEA, Arranging Inspection and get safety Certificates Erection of HT and LT cable laying buried, cable trench and cable trays 1.5 & 10 Km respectively. M/s. TGM ELECTRICAL CONSULTANTS & CONTRACTS. Managing Partner. 21.12.2000 to 26.03.2006.

Name of The concern Designation Period Job Description

M/s. CHEMIN CONSULTING ENGINEERS Deputy Manager 01.11.1989 to 20.12.2000.

1. M/s. Neyveli Lignite Co-op Ltd.,TPS-II. Neyveli, Erection of Flood Light Tower, Cable Laying Internal Electrification Lighting Panel With associated Works. 2. M/s. BHEL, TPS II Neyveli, Unit IV, V & VII Erection of LT Switch Board, MCC Panel Lighting Panel, Power Distribution Board, LT Power, Control Cables, Cable Trays and Rectifier Transformer with associated works Approximately Laying cables buried HT 20Km LT & Instrumentation 60Km.
3. M/s. Neyveli Lignite Co-op Ltd., Mines 1, Neyveli. BRP 11 kV Feeder Over head Lines, 4 Pole Structure with associated works. 11Kv HT buried cables 1.5Km 4. M/s. Kothari Sugars & Chemicals Ltd., Kararikal Erection of 11kv / 433 V, 1250 KVA and 1600 KVA Plinth Mounted LT Power & Control Cable Laying, Trays, PCC, MCC and Power Distribution Board With associated Works. HT buried cable 22Kv 2.5Km, LT & Instrumentation cables 70Km. 5. M/s. Ponds India Limited, Vadamangalam, Pondicherry Erection of 630 KVA Plinth Mounted Transformer, Cable Laying, Cable Tray, Power Distribution Board with associated works. Laying of HT buried cables of 22KV .5 Km EID Parry India Limited, Nellikuppam.Erection of Lighting Tower with Flood Lighting, PCC, MCC Cabling, Street Light Pole with associated works, Preparation of Drawings and getting approval / safety certificate from CEIG. 6. M/s. EID PARRY CONFECTIONARY, Nellikuppam. Erection of 22kV/433V with 4 pole Structure, Bus Duct , PCC, MCC, Power and control cable laying, preparation of drawing and getting approval / safety certificate from CEIG.Laying of HT buried cables 22KV .3 Km, Laying of LT buried and Cable trench controls and Instrumentation 4 Km 7. M/s. Balaji Groups, Sedarpet, Pondicherry. Erection Diesel Generator set of 125 KVA, 100KVA, 75KVA, 12.5KVA, Power Distribution Board, Cable Lying, Power and Control with associated works, Preparation of Drawings and getting approval / safety certificate from CEA, Chennai. Laying of 1.1Kv power cable 2 Km. Laying of control cables 8 Km.

Name of the Concern


Designation Period 1. M/s.Neyveli Lignite Corp. Ltd.,

M/s. The English Electric Company of India Limited, Erection & project Division ( H.O Calcutta) Asst Engineer April 1981-October 1989

Erection of 33 kV Over head Lines 5Km Erection of 11 kV Over head Lines 1 Km Erection of structural etc for 33 / 11 kV S/Substation ( Town ship- Mins-11) Erection of 2 X 250 KVA Pole Mounted substation 11 Kv / 415 v 2 Nos, Block-5 230 kV / 11 kV Substation, Mines 11. Lying of HT Cables (buried) 33KV, 22KV, 11KV, 6.6KV & 3.6KV 15Km. Laying of LT & Instrumentation in various sizes buried and trays.- 160 Km 2. M/s. National Thermal power Corporation Limited., 400 Kv Switch yard Relay & control panel Erection works at Cuddapah, Andhra Pradesh. 3. Hindustan Zinc Limited, Vizag - AG control Desk and M.C.C Erection and Cable Laying Works. 4. M/s. Neyveli Lignite Corporation Limited, Neyveli Second Thermal Power Station Electrical Works Unit I, II & II. 5. Vizag Site, B.H.P.V V.S.P Jobs Erection & Commissioning of L.T., PDBs, MCCs, AXDBs & etc. Erection of L.T. Boards and power Transformers. 6. Erection of Cabling & Terminations at PARLI ( M.S.E.B) Thermal Power Station Unit-5 Maharashtra state. 7. Laying of HT Buried Cables at Ramakundam, Cuddapah, Vizag & Maharashtra (Parli M.S.E.B) 33KV ,11KV-20 Km. Laying of LT cables and Instrumentation buried, cable trench,& cable trays.- 200Km

PERSONAL DETAILS Name

P.THIRUGNANAM. N.K.Palaniyandi. Male 17.09.1951. No.112, Thanthai Periyar Street, St.Joseph Nagar, Kondur Post, Cuddalore- 607 002 Cell +91-9360656759 +91-9843278955 +254- 706099746 e-mail ptgece@rediffmail.com ptgece@yahoo.com Married Indian Hindu G1240025 DOE-8.01.2017

Fathers Name Sex Date of Birth Address

Marital Status Nationality Religion Passport Number

DECLARATION Hereby I declared that the above statements that I had given are true to the best of my knowledge