Академический Документы
Профессиональный Документы
Культура Документы
-Av5
PC TII ft;
]"
Septernber ?0Og
NATIoNAI ENGINBERING SERVICEs
PAKISTAN (PVt'.; L'r'D.
,'rdI
TABLE OF CONTENTS
PAGE NO.
A.
B.
Executive Summary
PC.1
(i)
- (iii)
01
01
1. 2. 3. .1. 5.
6.
Location
Authorities
Pl:rn Provisiort
Pro.iect ()b.jectives
0l
0t
&
its
02
02-07 07-08
08
08-09
09
l.
09-12
12
12.
tJ.
t2-13
15.
Certificate
I
Annexes
Location M.p
Traffic Studies
.
r
An,nex-V
Annex-VI
RIVER AT EMAI'.{AWALA
EXECUTIVE S(IMMARY
o
NATIONAL HIGHWAY AUTHORITY
Construction of a New Bridge Ower Sutlej Riwer at Ernanawala
EXBCUTIVE SUMMARY
1.
BACKGROUND.
The construction of the bridge across River Satlej at Emanawala is a part of the
Multan Development Package. At present a jeep-able crossing is available. There is no road connection between Trinda Muhammad Panah (N-5) & Jalalpur, Shujabad and Multan. A temporary boat bridge did exist,'but it has been
dismantled. The river bed is almost 500m to 550m width with 4m - 5m high banks
un both sides.
2.
IlRO.IIrqI.
'['hr: sclrerne plovides fbr the cons[ruction of a Z-lane (8.5rn) 600 meters long bridge
rucross
either side. Construction of the bridge will provide the shortest route to the traffic
Muzaffargarh
/ other
and UCH Sharif, which will be connected with the National Highway network.
by
financial
sr,rstaintrble lcvi:1. & thtrs contribute Lolvalds the socio-econornic uplift of the area.
14
O
Itemized details of the project cost are summarized as under:
Bill
No.
I
Description
EARTI{ WORK SUB-BASE & BASE
SURFACE COURSE & PAVEI\,TENT STRUCTURES (Bridge)
GLTIDE BANKS WITH RIP PROJECTION
Arnount
(Rs. Million)
45.L3 9.76 5.70 434.94 202.62 5.04 37.64
2
.t
4
5
t)
iJ
;\NCILI-\RY WORKS c l.rN1.l tL\L I't'taN,ls ttLE("t'Rlc,\t, w( ) Rlis CIVIL WORI( COST BASED ON CSR
PROPOSED PREMIUNT 2s% ON CSR
2OO8
r5.00
755.83
188.96
2OO8
TOTAL TENTATIVE CIVILWORKS COST NHA Establishment Charges@ 2% Contingencies Charges @ 3% Supervision Charges @ 3% Cost of Escalation Land Compensation & Relocation of Utilities Sports Facilities Cost Affbrestation .|OTAL TENTATIVE PROJECT COST
3.
FINANCIAL PHASING
The financial phasing of the project is given as under:
S.
No
Description
I Civil Works
2
U
236
7
378
12 7 12
331
9
945
28
19
o
7
tl
4
tr it
I
43
28 68 50
25 50
t)
5
8
UTr-rlestation
306
434
407
r,147 Billion
D.
ECONOMIC ANALYSIS.
The economic analysis has yielded the results given below:-
2.93:1
Sensitivity Analysis:
Assurnptions
Base case
EIRR(Percent)
27 25 26
Sensiti
vitt"Iests
(10%, r'eclucticrn)
i. fJenefits ir.
('o-sts
* ( I0'Zr irrcleirse)
6.
PERIOD OF IMPLEMENTATION
The project is likely to be completed tn 22 months. The commencement of work has been fixed tentatively for February 2009, and the completion by November
201 1.
7.
CAPACITY ANALYSIS
The capacity analysis has revealed that the proposecl facility shall cater to the
traff ic at the fbllo$'ir-rs levels of service:-
Sr,No
I
2 J
Period
2012 2020 2032
Level of Service
B
C
- 19
31 36
ill
RIVER AT EMANAWALA
PC-I
PC.1 FORM
Code No. For Project
2. l,ocation:
Annex-I.
3. Authoi"ities
Responsible for:
i. ii. iii.
Sponsoring Execution
Ministry of Comrnunications
National Highway Authority
and
Operation
inistr'1'
o1'
Comrnunications
Ministry
4. Plan Provision: i. If the project is included in the current five year plan specify actual
allocation:
Nil
PC-l for the Constmction of Nerv Bridpe Over Sutlei River at Emanas'ala
i.
Project Objectives.
road connection betu'een IJCH Sharif and Jalalpur l)ilnan'ula. 'fhis n,or-rld also facilitate & streamline
r:t.rrrrrr-rr.rnicartion
for the traffic commuting between Karachi & Lahore / Rawalpindi / NWFP through the proposed M-4. The
provision of the proposed new bridge over river Satlej at
Emanawala, would reduce considerably the travel time &
operating cost
flom l(arachi.
of the project is in keeping with the sector devt:lopn.rc'nt objectives which provides fbr the sustainable delivery of' a productive and efficient connection rvith
1-rr-rr'1-rose
'fhe
lower
6. Justification,
Description, Technical
i. Justification
at an adequate levei of
service.
This rvould restrlL in significant benefits to the economy. ('<rnst lr-rclion o1' t,he ne\\, bridge across River Satlej at
Llrnanau'ala constitutes a pzrrt of the Multan Development Package, which focuses primarily on adequate linkage of
& Trinda Muhammad Panah (on N-5) with N{ultan City (Southern Punjab) and the motorway
Uch Sharif
expressway network of Pakistan.
F
river at Emanawala all kinds of traffic of N-5 coming from Karachi towards Rawalpindi & the NWFP & vice versa, will
also use this road thereby reducing the traffic congestion
particularly of the heavy vehicular traffic on the Trinda NlLrhammzrd Pannah - Btrhawalpur - Lahore stretch of the
Nzrtional Highway N-5.
ii.
Description.
A.
TechnicalPaiameters.
Standards / Specifications:
Geometrics:Conslmction of'nerv bridge over Satlej river at Emanawala shall conlbrm to the fbllorving specifications
Bridge Length:
600m approx.
way and
Tentative span
Provision of pile
45m
concrete
lJrrrlge
()\ct
SUtlct
lll\r,l itt
l.lr)]lrnitrr;rllr
speed
rvidth
80 KPh
7.3 rn Paved
2.5 m treated
T1'pical
lhe
rrlrlrloach lriacls ur:t1' be seen at Annex-II. Codes ond Startd,ard,s: The fbllowing codes and standards have been considered for adoption in the design of the pr:oject road:-
Geometric Design:
Uniform Building
Codes
Map of Pakistan
.AASHTO
and
AASHTO Specifications for Highway Bridges for Ioad thctors for various limit states and lateral force due to
earthquake.
Traffic: 'fraffic forecast based on the following has been carried out:-
i. ii.
Determinalion
Loran road.
PC-l tbr the Construction ot'Nerv Bridge Ove r Sutlej Rivel at Blnatrarvala
regression analysis.
7.03
5.4
3.89 4.12
3.5
J.lo
3.41
Trucks
7.42 5.55
4.25
3.57
4.34
2.98 2.63
Motorcycles &
Rickshaws
1
Car I
Jeeos
3s5
009
Trucks
157
Total
1
843
2121
944
1 586 2228
3849 6006
81 65
4545 oYov
818'1
2870 3512
4154
945 1163
10322
12481
14638
1382
1600
Annex-III.
B. Civil Works:
Details of the civil works ancl their scope are given below:-
of 7% is
approach
Bridse:
Tentative Salient features of the bridge are given as under:-
. . . . .
600 meters
2
- Iane
Width of Deck
Span
8.5 m
Foundation
C.
Acquisition of Land:
i
as
ii t
D.
Multan District.
Southern Punjab experiences a pleasant climate during
winter and extreme heat during the summer. The summer
season starts in lV1arch rvhen abrupt changes in temperature
year while August and September are characterized by somehow lower temperatures and higher humidity \rnonsoon period). The avcrage mean maximum and
minimum temperatures during the summer are 43oC and
33oC, respectively.
ext.ends
The winter seasoh, rvhich is mild, fi'orn November to February. During winter the
nrzlxi
ilvel'ago ure,llr
PC-l tbr the Construction ol-Nerv Bride,e Ovcr Sutlet Rivel at
Emanarvala
I I I
il
fl
il
600/o).
7.
('it;rital ('ost
listimatcs:
Date of Estimation of the Capital Cost.
Septernber. 2008.
il f,l
itl
iti
$l
i!
!ll
,
ll.
$ ri
'I
it :i
t!
:i
,i
lll.
Capital Cost.
Runee
FEC
(Rs.
Million.) Total
r,147
t.\47
nder':
Bill
No.
Description
EARTH WORK SUB.BASE & BASE SURFACE COURSE & PAVEMENT STRUCTURES (Bridee) GUIDE BANKS WITH RIP PROJECTION
Amouut
(Rs.
Million)
9.76 5.70
I
2
45.13
J
4 5 b
7
434,94
202.62 5.04
37.64 15.00
2OO8
ANCILI,ARY WORKS
GENERAL ITEMS
755.83
I
88.96
944.79
1E.90
Contingencies Charqes @) 39'i, Surrervision Charges @ 39i, Cost of Escalation Land Compensation & Relocation of Utilities Sports Facilities Cost
28.34 28.34
V.
7
Frnou u ts req
u i red
Description
Civil Works
Contingencies Charges Departrnental Estab[shment Charges
2008-09 236
7 t) I
2009-10 378
Total
945 28
19
TI
{l
:il $t
1l
2
i
t2
7
I I
.13
l
c
6
lonstnrciion SuPervision
Price Escalation Land Acquisition. Cotttpensation,
t2
25
28 68
bU
ti
it
DU
it il
i:
Cosr 5
.\{forr'stal iort
306
434
407
1,147
Billion
8.
9.
il'he demand and supply has been considered from the stand
poir-rt of' the capacitv
lane calriagewa)' to cater lbr the existing and projected traffic. The degree of adequacy at r,vhich the proposed upgraded facility would handle the commuting traffic, has been determined
as
defined in the Highway Capacity Manual.of the American Transport Research Board. A capacity analysis based on the
the
in
both
factors)
PC-l lbr the Construction of Nerv Bridse Over Sutlet Rivel at Btuanau'ala
Re9utt.
ltestrlt of the capzrcity analysis is given as under:
Sr;No
Period
20L2 2020 2032
Level of Service
B
C
I
2 ,i
r9 3r
36
r!
f B t 'i
:I
II
I)roj ect
benefits
and analysis:
i. ii.
Financial
Economic
within the framework of the efficiency criterion of public investment using the 'Discounted Cash Flow Technique'. Economic measures like the 'Net Present value (NP\D
'Benefit cost Ratio' and the Economic rate of return', have
been detelmined, in this regard. Broad parameters, inputs, crit,erion, assurnptions and the rnethodology adopted in the analysis are detailed below:
Broad Criteria
The following broad parameters have been adopted:
. . .
2}Years
L2%
2009 to 2011
Costs The economic analysis has been carried out on the basis of
domestic prices. As no tradition items / material is involved
in ploject
been
trsec{/a1.rplied.
unsl<illed labor have been taken as 0'9 and 0'75 resperctively. 'fhe shadow wage rate factor has been
est,irnated by comparing the average labor wage rate in the region and the project labor wage. taking into account the
existing r-rnernployment l'ate. In order to convert the financial costs into economic costs, a factor of 0.90 as been adopted. This factor ensures that eiements of indirect or hiclden part of all externalities, if present in the project cost
are removed.
i. ii.
the period
of
flenefits
There are trvo tangible benefits accruing to the project lvhich have been considered in
below:
the
analysis as detailed
r.
Reduction in the uehicle operating costs' 'Ihese savings will accrue from the improved sulface
conditions for the commuters using the proposed road as against the poor surfilce conditions of the existing road, as indicated by therir
operating
&
those traveling on
the improved road r,r,ith far better surface conditions, have been taken from the Pakistan Transport PIan
Sauings
These benefits will accrue from the higher cornmuting speed of the vehicles traveling on the
of
good level of
service), as against the lorv speed of vehicles traveling (ln the existing road with very poor traveling conditions.
Salvage Value:
Components
Right of Way / Land Earthwork Pavement Base Pavement Surface Structures
100% increase by the end of th,e
design
life.
90%
80%
0%
50%
50o/o
27%
Sensitivity Analysis:
Assumptions
Base case
EIRR(Percent)
21 25 26
Sensitivity Tests
ii.
'l'hc
lrnpact
Quality Standards (NEQS) dclinc the limits fbr pollutants in air, water and soil frorn
Nat,ic-nral [,in'n'ironment
or
rn'ater quality
the
construction phase.
All potentially
PC-l tbr the Constmction of Nerv Bridge Over Sutlej River at Emanatvala
72. Implementation
The proposed
commencement
Schedule:
l:i.
Management
s-h"ucture &
manpower
requirements
including specinlized
a,
Manpower Requirements
NHA ESTABLISHMENT
Designation
No. of
Posts
)
No.
of
Months
30 30
30
Man Months
-10
:i
t!
:l
i\ssisturrt [)ilcctor ( l--nel') i\ssistant [)ilcctor' ( Adnrin ) i\ssistlrrt I)ilector (,\ccounts lnspectol/ Suoelvisor Sulvevor' Accountant
Superintendant (Adrnin)
)
I
)
I
30 30 30 30 30
30 60 30 30 60 30 30 30 60 60
30
itenotypist
Corrrputor Ooerator
z
2
BS. BS-
i0
30
BS. I
30
30 30 30 30 30
JU
BS-09
2 2
5
30 60 60
)river
N/Qasid
l-le
BS-04
BS-O I
r50 r80
6A
lpel
z
2
BS-01
BS-O
I
30
lhor.r'kidar
)rvecl)er
IJS-{J I
i0
30
60
60
Rivci'at Bnrana*.ala
l2
CONSULTANT'S STAFF
Designation
I(esidcrrt Engineer' Assistlrrt l{csiderrt Etrgineer (Structures) I t.tspectttr ( ll iehu,ays)
Irrspector' ( Structures
Surv
)
No. of
Posts
No. of
Months
30
Man Months
30 30
i0 l0
2 4
I
I
30
30
cvtlls
30 30
30
60
t20
JU
Drivers
nowKloars
2
2
30 30 30 30 30 30
30 30 60 60 60
14. Additional
projects/decisions
i
:l ,i i!
h'
required maximize
to socio-
li
llurnnau,ala bridce
I.
ll.
iii.
Dualization
Kumharanwala to
I'C-l lbr
\/
I
15.
Certificate:-
I L.---
-- -'
_____).--- -
of instructions has been prepared on the basis certified that the proiect proposal
givenby..thePlanningCommissionforpreparationofthePc-Iforthe
Infrastructure Sector Projects'
Prepared bY:
'v'iv^"v'v"
Reeast bY:
\@
Checked br':
&^",>
\tra-
4VW_6.A,LatiV
Member (Planning)
National HighwaY AuthoritY (NHA) Islamabad.
Approved BY:
audhry)
Chairman'
(Saiful
SecretarY
h Sherwanee)
nications
I I I
ANNEX-T
LOCATIOAT MAP
Fl
'1
-:
t1
d
F q)
l-(
,tt
| '"r I.? rn. I
h;
.:Y
1
I
"
j i
/1i-
'- ai ta-*
I
I I
'at-
'
:i,t::,:
F"
t Ft)
sir' ',
.r'
,l
,ii
-- l. )':
nl $l rll
fl
;r'.::"ti
FT
fl
:|
ji
i! ii
(5
o? t{
F
H
ii
3
il z tr
E
fEI
!i
f
|f
z f.
fA
o v, fEI 2 l{ oM H ob p Fl
E
}f il t(. p a
za M
o o
H
o
1
t{ N
4
if
ll{
il
lt
r"
\\ \J\
I
Q\
nr
-:
t
ii
ANNEX.TI
TYPICAL CROSS SEC?IO^rSS
J = z = IIJ
--+-E
I
LU
IA
J'
t-l t_
T\J
o
-)
F
UI
N-
1E,, \.,
:-' FUJ
oJo
HEX
@aE cnE_
9{fi +<>
eex
NUF (,od
t-u c = crrr
F tr
9(#
<L
Pt< xo
EE z
o z o F o f
v,
tL
E ()
E.
Eg ..i?
lf)f
@
TU
o o
-+-
L______,_
-'-) 2
ll
,/ - .z_ .-{
II
tl l!t
{l
:ll
ill
$l
oF
$t
O O (\
<lol Jl.<l
<IEQI
q-ll-l
5
,' .--]
t!
__)
:.]\\
\i':;1.r
o-
->.t-l ---ftll.--l
'--l
trll
I f
;t
|
rnl vl
r-\
b{l (\l
l
ol
RI
I
tr+ltl L ,I}.T-{I
.
*lml
I
$ ii
-l rYl
<lF.l ltr--l
T-llF>l
-l
lHl -t-l
-I
JI,
il
JI
i|
Flr-,i
t|+l
ol c)l
_t
N\
i !il.'i
.-Jloll
...-ltlil Flti-r)l
qt-l F\l /l
,aT".-
-l
ml<l t}--l
i
I
r-l vl r-r)
t
I
|
lrl
it
t i I
E
(t\
tl
I
_l
/-1i\
)
'/lFT{l HI}-.+I
-v>|
3t
EIUI t_
l::lllr nl lr ,.'...--lvl
l-l
-i
I
lDt
>lzl OIFI
r--rlul ,+lr rl
r \ll-f ll v I t_--71
f--\l <il r--41 z-rl fP.l r-\l ''tvt
-l\--ll
t)
o-
0002
0t0r
Cfll i- rl
-::=_.......-...-'
ANNEX-TII
TRAFFIC STUDItrS
Annex-III
NAL HI
Construction of New Briclge Over Sutlej River at Emanawala
Traffic'Stu'dies
1.
GENERAL
The proposed bridge when constrttcted q'ould provide a dependable link between Jalalpur piranwala and UCH Sharif for both light as r'vell as heavy traffic with a considerable shorter length. The proposed bridge
is 2-Iane, 8'5 meter wide, 600 meters long rvith approach roads of 01-krn either side on river Sutlej at
Flmanan,irla at conuect s'ith the existing load netlvork'
2.
'l'
Rr\I"l'l O Sl'Ul)I ES
The main objective of the traffic studies is to assess the present volumes and composition of traffic loads and to project the present volumes of traffic for the future years to judge the vehicles likely to use the proposed bridge in the next 20
years.
2.1
Traffic
Traffic likely to use the proposed bridge is given as utrcler:
Base Year
Traffic
(AADr)
Vehicles
Nl
rt,r'r:r'c li'*iRi,,k*j'r,irr*
_]."1:
1061
Cars/Jeeps
472 224 30
138
1925
generated With the proposecl construction, about 10% ler'v traffic is expected to be and use the bridge.
,. ,.
il
$l Il i!I
:i it
ri
0n pasl clata, lr,rttrr'e traflic grorvth rates have been worked out using
(ACGR %)
Vehicles / Years
2008-13
20 13-18
$l
2028-33
9.46
10.93
6.40 7.03
4.84 5.19
3.26
3.41
7.42 5.55
5.40
4.34
4.25
6.O t
3.50 3.03
2.98 2.63
Trucks
2.:J
'l'r'a f fi c I.'orecasts
'l'hc traffic plojection baseci on the afbresztid annual conrpound growth rates may
be seen
in Table-l.
Annex-III
TabIe-I
Car / Jeeps
?qq
Trucks
1E7
I
Total
{AADT)
1
009
843
1171
1
432
to
2131
358
czJ
638 776
386
197
2466
2857
1576
1
423 464
508 546 s86 ozY
O r.O
220
828
246
275 291 307
3314
3848 4205 4596
2008
2009
2121
944
1047
1
2010
2011
161
1288
324
5024 5492
6006
1429
1 1
342
377
585 697
IZO
/oo
807
6385 6789
JI IJ
401 5
8s0
896
7219
7676
81 63
945
985 1027
1
2464 .2592"
:2021
2022 2023 2024 2025
070
163
j496
513
JJZ
zt zo
zoo6
2986
31
ttto
1
0320
1204 1246
1
548
565
10719
oztJ
6455
09
11133
11564
1201',!
2026
2027
3237
290 335
582
599 617 634
o/uo
oYo /
JJ/U
3509
2028 2029
2030 2031
1382
1423
1
12475
12880 13297
3629
3753
3881 401 3
465
509
650
667
685
7 n'1.
:13728
14173
2032
ZUJJ
1554
1 1 1
4150
4291
14632
15106
1
2034
2035 2036
721
74Q
4438 4589
5596
9005
1748
760
16102
ANI{EX-IV
DRAWIIVGS SHOWIIVG
TRAATSVtrRStr StrCTIOAl &
THE STRUCTURES
ANr{EX-V
TE IV TAT IVE E IV G I I{ EER'S
COST ESTIMATES
Annex-V
NATIONAL HIGHWAY AUTHORITY
construction of New Bridge over sutlej River at Emanawala
Tentative Engineer's Cost Estimates Abstract of Cost
Bill
I
No.
Description
Amount
(Rs. Million)
45.13 9.76 5.70 434.94 202.62 5.04 37.64 15.00
$ li
i;
F}\lt'l'tl \\'()Rli
$l
iil
$l
J
,_
ill
iI $
i[
,!l
2
lf,
ti
ll
ANCILLARY WORKS
GENERAL ITEMS ELECTRICAL WORKS
7 8
ii
f
2OO8
755.83 188.96
944.79 r8.90
28.34 28.34
!'ln
@ 3%
Afforestation
L,t47.77
ITEM NO
DESCRIPTION
UNIT
QUANTITY
(csR
(Rs')
101
AMOUNT (Rs.)
SM
50,000.00
12.07
603,500.00
102a
Each
100.00
198.34
19,834.00
102b
Each
100.00
517.38
51,738.00
102c
Each
50.00
2,069.52
103,476.00
103
Stripping
CM
5000.00
105.14
525,700.00
104
Comoaction of natural oround Formation of embankment from roadway excavation in common material Formation of embankment from borrow excavation in common material Sub-grade preparation in earth cul
SM
50,000.00
12.03
601,500.00
'108a
CM
2,000.00
204.16
408,320.00
08c
CM
200.000.00
212.43
42,486,000.00
09a
SM
10.000 00
330,600.00
Total
45,130,668.00
i{
lil
fl iil
tl
ft
(csR 2008)
4,730,824.00
$l
1,173.43
5.022,280.40
l,
]T
9,753,104.40
i{
it
lF
iI iI $
ii
il
$
ii
ii
CONSTRUCTION OF BRIDGE
2,455,700.00
f,l $l
$l
14,700.00
3,237,234.00
ill
It
it
5,692,934.00
$
ii ii
{
ii
qTRIICTIIRFS IBRIDGE
DESCRIPTION Structural Excavation in Common Material Str,rcturat Excavation in common Material below water level Granular back fill Concrete class A'l i) Under ground
ri) On ground
ITEM NO
1A7a
1
UNIT
CM CM CM
OUANTITY
1,000.00 2,000.00 2,000.00
07b
107d 4A1a
CM CM CM
1,187,'178.00
1,250,240.00 6,881,820.00
CM CM CM CM CM
6,500.00 400.00 4,000.00 100.00 400.00 50.00 2,000.00 200.00 20.00 1,700,000.00 250.00
140.00
43,104,880.00 2,778,732.00
31j22,200.00
368,164.00 3,361,448.00 4,375,429.00 198.642.160.00 32,407,032.00 9,602.40 3,791,000.00 7,500,000.00 42,000.00 339,170,685.40
Precast concrete class A Reinforcement as per AASHTO M-31 grade 40 Rernforcement as per AASHTO M-31 grade 60 Prestessing ropes / strands Remolded joint filler 12 mm thick with bitumastic joint seal Electrometric bearing pads size (500 x 400 x 60mm) Expansion joints transflex or equivalent Mortar pad under electrometric bearing pad
Ton
Ton
99,32L0B
162,035.16
480.12
Ton
SM
UUIII
Each
Carried over
KAItr
UNIT QUANTITY
DESCRIPTION
(csR
2008)
lRs I
Brouqht forward Cast-in-place concrete piles (boring only) 600.00 0,000.00
AMOUNT (Rs')
339,170,685.40
407d
a) 1000 mm dia
b) 2000 mm dia
6,000,000.00
1,800.00
15,000.00
27.000.000.00
407k
Confirmatory boring
100.00
1,913.67
191,367.00
NSI
60.00
25,000.00
1,500,000.00
NSI
1,000.00
45,000.00
45.000,000.00
NSI
Each
1.00
500,000.00
500,000.00
405b
launching of Girders
Ton
10,000.00
bd6.zb
6,882,600.00
606a
Concrete (bridge railing) Reinforcement as per AASHTO, M31 Grade 60 (bridge railing) Reinforcement as per AASHTO, M31 Grade 40 (bridge railing) Deck drainage
M3
400.00
1,000.00
4,400,000.00
606b
Ton
40.0c
85,000.00
3,400,000.00
606c
Ton
5.00
75,000.00
375,000.00
SP-31
LS
500,000.00
500,000.00
'18,000.00
SP-32
M2
150.00
120.00
Total
434,937,652.40
ITEM NO
DESCRIPTION
OUANTITY
(csR
RATE 2008)
(Rs.)
1 ,1
AMOUNT (Rs.)
nl 509c
Riprap, Class C
CM
150,000 00
63.1 0
174,465,000.00
ill
li ii
$ l[
.68
3,558,400.00
NSI
CM
200,000.00
120.00
24,000,000.00
$
1l
i;
B
NSI
Concrete chute
Each
150.00
4,000.00
600,000.00
Total
202,623,400.00
ITEM NO
DESCRIPTION
(csR
RATE 2008)
(Rs.)
719.28
AMOUNT (Rs')
'1,438,560.00
il
Il !tl
601dii
Pre-cast kerb
2,000.00
604a
1,000.00
1,963.73
1,963,730.00
$t
fi
]T
:,
604b
Each
10.00
1.453.72
14,537.20
il iI
604d
Each
50.0c
278,388.00
$ fi ;t
607a
Each
20.0Q
8,529.77
170,595.40
607b
Each
10.00
11,048.52
110,485.20
607e
SM
40 00
i 0,845.16
433,806.40
608b2
Pavement marking with reflective CR oaint for lines of 15 cm width Reflectorized Pavement Stud (Raised Profile type
double)
6,300.00
51.75
326,025.00
609d
Each
600.00
J I O.O/-
226,092.00
NSI
Delineator
Each
250.00
300.00
75,000.00
Total
5,037,219.20
CONSTRUCTION QF BRIDGE
i
ovE[sutle.l
ntvER
nt EttllRrunwnln
BILL NO
ITEM NO
G ENERAL ITEMS
DESCRIPTION UNIT
OUANTITY
RATE
(csR-2008)
(Rs.)
I
701a
701 b
Provide Surveying & Allied Instruments Maintain Survey instruments and Provide teams for Survey Provide office accommodation (Rental Basis) for tht Employer/Engineer's Representative Furnish and Equip. the Employer/Engineer's Representative office & Residence Maintain Employer/ Engineer's Oftice & Residence Provide Material testing Project Laboratory Equip, and Furnish Material Testing Project Labora
P.S
2,500,000
22
irl
itl :!l fl
il
Month
25,000
550,000
fl
ii
702a
P.S
2,000,000
$ i|
I
ig
702b
P.S
3,000,000
ii ti $
Month H.5
zz
75,000
1,650,000 2,000,000
r.J
Month L.5
22
2,000,000
70,000 1,540,000
3,500,000 1,500,000
3,500,000
708b
,,uoo,ooo
2,000,000
t
88 22 150
,,ooo,ooo
6,160,000
Runnrng & Maintenance of Engineer's Transport Running & Maintenance of Employer's Transport
708cii
',,uoo,ooo 2.700.000
37,640,000
ITEM NO
DESCRIPTION
QUANTITY
(csR
RATE 2008)
AMOUNT
(Rs.)
(Rs.)
it
it
il
f
Electric poles, cable, connection for Wapda Lum Sum 15,000,000.00
li
Total
15,000,000.00
ANhTEX.VI
CAPACITY AI{ALYffS
Annex-VI
AL HIG
at Emanawala Construction of New Bridge Over Sutlej River CaPacitY AnalY'sis
stand point of the capacity for the The demancl and supply hzrs been considered from the for the existing and projected l.lrrrtrpiru,rrll llr.itlge u it['r ir 2 lape cetrriageu'a5' to cater would handle trallic. 'f he degrec of'acleclrtacy ttt n'hich the ploposed up-graded facility of sern'ice, as defined the commuting traffic, has been determined. in terms of the Levels in the Highway Capacity Manual of the American Transport Research Board. A capacity
{l itl
BI sl
$r
$
ti r!
analysis based on the said manual has accordingly been carried out for the proposed upgraded road. The Levels of Service have been determined by comparing the Service Flow Rate in both directions for the prevailing roadway and traffic conditions (through application of the relevant adjustment factors) rvith the Peak Hour Flow (PHF) in both
directions.
li
ti
--
\V hcre:
Sl-i
Total service florv rate in both directions for prevailing roadrvay and traffic conditions, for levei of service i, in vph; ratio of flow rate to ideal capacity for level of selvice i; adjustment factor for directional distribution of traffic;
adjustment factor for narrow lanes and restricted shoulder rvidth; adjustment factor for the presence of heavy vehicles in the traffic stream,
(vic)1 =
fr= t-
fnv firr'
computed as;
1/[1+Pr(Er- 1) + Pn(En - 1) + Ps(Es Peak hour Flow l)t'lrl< lr,rrr r l'-iri:tor' . ,\'\D'l' / Pt:al< Hour F actor
=
1)]
It c str lt s.
'l'he trtrllic den'rand rvili be met by the fzrcilities envisaged tbr construction under the project against different levels of service, as indicated below:
Sr.No:
Period
2012 2020 20:t2
Level of Service
B
C
I
2
'J
19
- 31 - 36
1: Table- 2:
Table-
>l tl
!tl
0?l
@
(f)
o o
@ @ A
(o N @
oq
o q @
@
N
@
o A
(> O
o s v A
@ @
o)
ro
o o, oq @ o o c;
(o
r |-
A o
@ @
o,
@ o,
\l
L d
J:A ',<
irl
Fs
n
o v 3 U. s $ @ o o o o
lr) @ (o r) @ @ oq @
t@
@ s @ o, v v o :
(r)
@
c.)
tr)
.i
$ ro ro () r) .q .q
CO
(r) (o @ oq
ro lr)
t.t F. @ @ ro lr) (o co oq co cq
trn
N
,H
lJl !i
'r
v
<)
(o (o (o
t-
o o
N N
N
F.-
oq
F..
Y r
A -i
F* @
(o (o FT o, l.- t- t* F- N toq
c;
t- N
A
o
oq
oq
N @ @
ai
o
+)
o) <) @ !+ F(t o r, (o N @ @ F
o o
l.(o
o e ro
@
F- @
@ o r) o) o
o)
s N Fo o o o
@
g, I
(o
(,
N !c (!
(, o c{
(t F- @ () @ o, c.l N N N (\l o (t v
N q
f?)
(o
@ (o N C)
tt)
o rt
a;
YJ E o^*
Fo
Lr*
N o r) $ (r) (o (o o) @ F ro (o () co ro
c.) N
O O
() o
N (o
ro
o ()
o)
A
@ v o) q v v
@ @ F.f rf v
N $
c;
oo-r h0F
!Fl
.r< F
: (4
oqqq
N NA N -NF
^/t .a .d'
$ra
r"!
Za
o>>
Cq
ol
F, 53d o- ql
i
x
q
c!
ro
o o
'6-
o F
(l,
.rtr .i
CJ
>,
N N (o N d) (o o
CO
O)
rf
c!
@ v v s
N q
c') (o t--
(o
n v \o
(o
(o
(o @ o
F-
CO
v o (o
F- |r)
(o
co
N N
o (o
N
ho ax
o o
0,
|....
.9
c{
(o f.N
@
o
N N
lf)
o,
v o
ro g) I... t.- (o (o (o N
tr) N
(f)
N N N
N $
(o
o)
v 0
F- co
o,
.1.
o 6
J
t (,
Q
od
Lr.J
l--
c)
r.rJ
oa
<mo
od
od
t!
rf
N N
ro (o f-
N o N o O N
N (a N N N N N
N N
v () N o
N
N c!
f.. N N
@ N N N
o
N N
N N
co .f
ro (o
co
o
N
c{
4 a
c!
f)
ro (o
FT
c! $ N N N
F o o
N
P TU
UJ
.9
0)
tt
o
m
\t
*l vl
\l <il \l
65
)
Eo 'o
ab rl,
co cc) co co
o o o
o r a o r o
ct
N
o
@ o,
E:i
G >y ZEE
$ N $ .+ N v
s s
t
o o
N o N F. F. N
(.) rO @
(o @
CO
.ir;
q H
bY
(.) O (o $ <t
o ro (r)
N
o,
CO
(o
v (o
N
v o
N
N N
s tr
(r)
N
<t
(o
O)
o
CE
o
ul
rO
N N N o) O) A
N A
o)
o, o)
o
A
(o O
1:.
c',
c;
A
N
Q N
a{ F lv
::-:'::
=
o
(L
-.:
o J
U)
r o r v N @ @ N o, .{ s t N q N .t s s N N N
N N N O N <f 6 o
N N N N
rO
@ o)
ro ro (r)
N
o o (}
N
(o \o
cv N
(}
N
c{ N N
ro
N
6'E
() 6 r o a CE o o o
@
\t @ r @ .t a o o o
o o N o @ o o o t-
(f)
lf) o
.$
o o
s o (o r @ LO o o o o a o o @ o a o o o o o o o 'f @ @ o o
@ @
g3
I*{I
n,:
(J
O
:.L
^l t<l F. Fl '-
o o J o
to
r r o r r r r o N @ r
6
@
t*
N
@
co co
(o
r r @
(o FF- N
.s>
d;E
>o L
.o
(t)
I q <l :'6
Pl
<l
l+ll zkl v jr' - .i VI Y^O r-1t w tE
Hta ilJl ''t.-d v vl
a7
Bl gi-E ii.il x 4
f1
a!
tsl riliN
6i
o )
(O
(o v
o a
(o (o
F- F-' N cl ()
() s F
Y N
N N 6
|-.-
F. N
o o
ro
t-
rf)
o F. o
o r N [)
(o
f.- N
ro
o n
o g,
o o o o @
N N N
N N
o)
N N
o) o,
N N
v v
N N N
o,
O)
r)
N N
lf) N N
(o
N
<o
ct, o)
(o (o
N N
6 .!i
'
oOE e qt;
lu
rl r< .'l
3
>,
c+i 0)
o
b
c)
==
tro
o o o o o
Al vl
zl
0.9
F<l
<l 'zl
o
u
o o
;
+)
fi
4 o o
J
;
(r) cf)
r
@
o o
I o o oq N o o o o o o o c;
n o
@ @
oq
;
N cf, ro
r o
oq
N O
o o o o
o)
ljr
ci
o
I, J
o
.E
U)
u o
J
ro
@
d N
U)
o
.o
(D
0
to
-r o=
o
G
dJ
r)
o
J N
N v v .i ci
IO
oq
o) ro v r 9 o if s oq r) ;
ci
s (o ro ro o
(o (o (o ro t.. r)
o
<t
N
-i
c;
@ co
F* ()
(o @ (r)
og
F'a
ON !d -UE Xo
ci
O .i
o o o o
; o
J
U1
N lr)
s
A
tt, @
A
(o I.* Ot (o .0
co oq
l'-
o
g
;
N
N r N r co @
F-
(o r) o r N @ @ A o o o
.t-
F-
N N
oq
o, o, r r r r @ @
:
r N
N
@ co
o
N C' (f) O O N Y
N @ 6
s)
:
N
o n 5
o
a
6 o o
N N
o
O N N
F- @
N
o N
N
o N
N N
N N
o N
N N
C4
N N o o N N
(r,
ro (o
N O N
N N
o o
N N O N
o
N N N
CO
fr)
'Es dO
;N
=v
s.Z
o)
] o
o o
J o
q J
o)
,'i
v o N
N
z.
(t,
$ ro
o,
o
N
o N
,d5 ! u,
g't
>o
u,
\l
AT{NtrX-VII
ECOA{O]UIIC
AIVALYffS
t
$ ,i
i
li
I ii
Annex-VII
,i
.t
rl
Economic Analysis
1.
GENERAL
The objective of the project is to provide connection between Jalalpur Piranwala
and UCH Sharif through the construction of bridge with the proposed construction. UCH Sharif u'ill be connected with highways network and easy to
approach Multan and other major cities rvith a considerable shorter length.
It
would also contribute toward the socio-economic uplift of the rural area by reducing the travel time and operating cost of the commuting traffic to the most
economical and financial sustainable level.
its
llrrrl)lrrllilit-t' itr terl'ttts ol'e.rcerss of'benefits to the economy over economic costs by using the discounted cash florv technique. All costs and benefits attributed to the project are expressed at a constant 2008 price levels. The projected stream of
economic benefits over the economic life of the project has been compared to the estirnated stream of economic costs by bringing the two to a uniform basis through
the process of discounting. The economic ind.icators such as Net Present Value (NP\D, Benefit Cost Ratio (B/C Ratio) and Internal Rate of Return (IRR) have
been computed.
i)
a) b) c) 2.
PROJECT BENEF'ITS
Tangibie benefits accruing frorn the implementation o{' any road/bridge project comprise of vehicle operating cost (VOC) savings as u,ell as travel time cost CyTT)
savings. Hor'vever, a major and important part of the benefits from the project
.l
T
ri
;l
.t
rE
r
:I
t
3
A summary of the traffic lil<ely to use the proposed bridge is detailed in traffic
study chapter.
fi
fi fi I I t
Speeds
Average operating speeds for various vehicles have been utilized vehicle operating costs. 'fhese are as given ttnder:
to
workout
t f, !
It
i
I
Motorcycle
Car
Bus
TruckTractors
20
l
55
30
2lt
Pr r-rject
With Project
70
60
60
50
2.L.3 Economic Prices usecl for calculating Vehicle Operating Costs (VOC) For working out VOC/I(m, prices of different vehicles such as Cars, wagons' Coasters, Buses and trucks and those of fuel, Iubricants and tyres have been expressed in economic prices by excluding duties and taxes from the financial/
market prices. These are given in Table-1.
'l'e ar.r'ir,t: irt \'OC/tini. the plil'sical values of' ftte-l consutnption, engine oil
consumption. tyre lvear', maintenance cost, depreciation, interest and wages etc' at various speed.s as applicable to the rvithout and with project conditions are
required..
VOC have been based on a set of linear and cluadratic equations which
have been derived from the reports of JICA and NTRC. Using these Equations per
kiloneter vehicle operating costs for variolts vehicles against respective operating speeds have been calculated and given in Table-Z.
i!
I
:'
il
tl a
:!
ii
:t
Ilased on thc abuve parameters. econon-]ic r.'alue of travel time expressed in Rs per
hotti' have been ivorked out for occupants of Car, Wagon/Mini Bus and Bus. Various assumptions regarding monthly income, working hours etc. made in this
regards are given in Table-3. Based on these assumptions per kilometer value of
speeds
2.2 Quantification
of Project Benefits
As stated earlier a major part of the economic benefits from the project implementation is expected to accrue from the VOC savings. It is, therefore,
irttpot'Lltut to havc u leliitbli: esLrnrate o1'r'ehicle operating costs per Km both under
n itlror.rt irnd
Based on the quaclratic equations discussed above ancl economic prices, vehicle
operating cost per kilometer by type of vehicie under without project conditions
have already been worked out (refer to Table-1). To arrive at total annual vehicle operating costs (AVOC) both under without and with project conditions, VOC per
kilometer have been rnultiplied r.vith the AADT and distance travelled in a year. Annual vehicle operating costs worked out in respect of existing traffic both under
rvithout and with project conditions are given in Table-5 and are summarized
belorv:
\\:ith Project
Savings
[!]ua_tw"t
Qepc{p!io4
2012 *
:326
91
Million Rs.
2030 918 223 696
236
Savings due to Existine Traffic Generated Traffic Total: *' Ist year after construction 2.2.2 Annual Savings in Value of Travel Time
696
8
704
Basic parameters required for valuing travel time for Car, Wagon, Coaster and Bus passengers have already' been detennined above. Value of travel time under
rvithoLrl and n,ith project conditions have been calcr.rlated by dividing value of tirne
pcl
hor.rr'
Annual value of travel time (AVTT) is a function of VTT per km, ADT and annual
distance covered. Based on these parameters worked out earlier, annual AVTT in
respect of diverted traffrc are given in Table - 6 and are summarized below:
20L2 *
oo
DD
Million
Rs. 2030
130
10
29
23
r00
2012 *
23
10
Mi ion Rs.
2030
100
2
24
102
2.2.3 Total Project Benefits Total project benefits including savings attributed to diverted plus generated traffic as detailed above are given in Table-7 and have been summarized as given
u
ll(t(,1':
Savings
VOC Savings
VTT Savings
T'otal:
t02
8105
262
.\lpurrl stlt:ipr-r of'tot:tl ltlojgct benefits over the period of analysis is given in
'['able-8.
3.
PROJECT COSTS
The project costs include capital cost of construction, recurring costs and overlay
costs. These are discussed below:
3.1
This cost (i.e Rs. 1,080 Nlitlion) has been expressed in economic terms as Rs' 972 Million by applying Standard Conversion Factor of 0.90 (as calculated in Tabiel0). Annual phasing of these costs is detailed in Table-9 and summary of the same
is given under:
Mi on Rs.
Year
I
Financial
2
Economic
275 368 329 972
306 434
'ti,rio l'ot
3.2
:!q9-I 148
- --
Recurrent Costs Operating and Nlaintenance (O&M) costs work out as Rs. 1.148 Million. By
applying SCF of 0.90, the economic costs are estimated as Rs. 0.972 or say Rs. 1-00
Million.
it
3.3
Overlay Costs
Overlay cost estimated as Rs. 14.600 Nlillion occurring in the llth year after llro.icct irnlllernc'ntation has bc'en expressed in economic terrns as Rs. 13.l40
llillion.
4.
The discounted cash flow of net benefits is given in Table-ll. The economic
indicators, thus cornputed are summ arrzed belorv:
LLo/o
Discount
Rate
2,204.53 751.36
1.453.16 2.93 27
'l'he lesr.rlts given above indicate that the proposed bridge is econornicaliy viable as
the calculated rate of return is well above 12 percent. The project is ,therefore,
recommended to be irnplemented as planned
5.
SENSITIVITY ANALYSIS In order to examine the effect of a possible increase in project costs and or decrease in estimated economic benefits of the project, two alternate economic
analyses have been undertaken on the basis of a set of assumptions. The result of the sensitivity analysis are given below:
t
i. ii.
Assumptions
EIRR (Percent)
27 25
26
- -----_---
The results of sensitivity analysis given above shorv that in all cases, the project is not sensitive to any of the above assumptions as the calculated EIRR is aII cases is
l6
li rt
,a
:t .i
ii
TABLE- 1 (a)
VEHICLE PRICES
Sr. No.
ITEMS
Motor Cycle
Rickshaw
Car
Bus
z-axle
Trucks
I 3-axle I tl | |
37s0000
*'-.' axes/uuues
I
?3950
9646 64304
2osoooolrtztooolrgooooolrrzuooo
Market PrLe
qdjestment Factor
leis
.*r^l*"*1l*.r*lr^r*
|
raezaoo
1.1
1 1
14014?2
1.1
1
zeeorzo
1.1
zro+oec
2721335
,tr.* | rr**
I
1.1
3265602
Economic Price
Adj. Factor:-
IVTJJ
1.1 124348
.1
550661
541 564
2049152
2932732
3592163
As SCF has been calculated as 0.90 thereby all traded commodities are to be adjusted by a factorof
TABLE- 1 (b)
Sales Tax
Eco. Price
(Market price less sales tax)
TUBE PRICEES
B6 117 365
574 783
2,435
3,304 6,087 17,391 19,565
Truck
2-Axle 3-Axle 4-Axle & above 28,000
30,000 25,000
24,348
26,O87
Tractor
21.739
TABLE-
(c
FUEL PRICES
r (d)
(Rupees)
47.28 3.44 43.84
1.1
TABLE- 1 (e)
CNG PRICE
Market Price Taxes'/ Profit Margins Price less Sales Tax Adjustment Factor
(Rupees)
212.21 31.83 180.38
't .1
Economic Price
48.22
:conomic Price
TE: Ad,i.Factor;2008
198.41
'
,!
:,
rt
ir ri
il
TABLE.2
VEHICLE OPERATING COST PER KM
WTH PROJECT
Rs./KM
SPEEDS
MOTOR CYCLE
iICKSHA\A
CAR
WAGON VIINI-BUf
BUS
TRUCK
2.AXLE
3-AXLE
I annrrr
10
I o nxre
4.48 J-/O
)n qq
17.48
26.08
22. 15 19.94 18.47
42.68
71
57.85 49.28 42.72 37.35 32.89 ZJ.ZJ 26.30 24.08 22.55 21.69 21 .49 21.95 23.07 24.84 27.26 30.32 0.00
20
IJ
3.36 3.09
2.91
2.BO
t( 7a
14.57
33.24
30.91
JU
4.54 4.25
4.2'l
4.ZZ
13.48 13.24
t3.73
13.10
40 45
AN
2.73 2.70
2.71
't2.84
I
z.J6
12.07
60 65
70
4.29 4.40
11.90
11.55 11.25 10.91
'10.81
t1.94
2.01
29.28 28.15
zI.+z
27.O4
4.57 4.78
5.04 5.34 5.69 6.09
75 80
B5
3.46
J.bY
J. VO
10.68
10.70
10.77
90
34.25
36.45
CAR
WAGON
vllNl-BU:
BUS 2-AXLE
TRUCK
3-MLE I +-nxie
I aRn\/tr
102.69 87.12 75.67 66.55 59.18 48.80 45.58
4J.OZ
10
'15
5.18 4.45
8.15
7.O2
t(\
25 ?n
4.03
3.76 3.45 ??a
b.5/
5.67 5.48 5.33 5.35 5.43 5.57 5.75 5.99 6.28
t6.30
|
zc.Jo
24.38 23.66 23.16 22.83 22.67 22.65 22.76 23.00 23.36 23.83 24.43 13. t5
35 40 45
50 55 60
5.71
3.42
3.51
65
70
3.64 3.80
75
80
B5
?ao
4.21
18.48 IB.1B
18.01
52.28 44.69 40.38 37.56 35.63 34.34 33.54 ?2 10 33.22 33.62 34.37 35.44 36.85 38.56 40.60 42.94 45.58
17.96
69.04 58.39 50.58 44.35 39.27 35.16 31.93 29.54 27.94 27.13 ?7.09
27.81
48.42 43.66
40.01 37.41
35.83
JC.ZJ
JC.O
I
42.89
43.37
o.oz
7.00 7.44
36.96
45.05
90
4.47 4.76
4.98 2.77
t9.60
0.00
TABLE
DESCRI P'TION
i\ro1'oR
cYcl.ll
RtcKslt.\\r'
CAR
\\"\co\
I I
il
t,\cu
co,\sTErv
Fl,\'rNG CO,\Cil
Btis
I8'!- ErJ!r!rE-\!!!XEpEX\-sS
:
li\rcrxgq Jng."r. of
I
l)asscrrgcr
1Rs./\lonrh) * Rs./Alnunr)
15.000
r
6.000
24.000 238.t)00
10,00c)
3.000
9_200 I 10,.100
l,\r.,,,u. l,,.nur. of
l)asscnrcr
80.000
t92.000
I20.000
56.000
2l9l
82.r5
t.00
2t9l
8
2t9l
r3 t..15
2t9l
54.77
2l9l
71.20 25.00
I
2t9l
50.39 40.00
r
7.63
No. of Occuparts
1.50
260
i4 r .76
t4.00
'766.77
82 t5
ri
1.45
780.0
2015 52
ccononric
20.5J
0l
rD
32.86
Rfl\\'illpindi -J
85.{-t
19t.6.)
.f
{5.00
503.88
TAI}I,E
'rRi\\,t:,I,'ilIrr: \"\l-u!)
SPEIIDS
RICKSIIN W
IIIA(
llus
3i.s9
25.t9 t6.80 t2.60
I
t5
t0
30
l.l7 l.0i
0.68
2.19 t.64
t2.78
9.58 .t.79 3.83
3.
l0
50 60
Ll0
0.82 0.66 0.55
; "^
.
t9
22.25 t4.83
0.i
().1
i
|
tt.li
8
e-g
0.i4
7.42
0.08 8.40
NO
IE:-
'l-ltc vnlue of lravcl liDre itr a !!urnbcr of studics havc bcen cstimatcd ilt 259lo to i3'% ol'thc rvrllc ratc 'tluc to lack ofiufonnntion on thc splil ofuorli and norrrvork travcl anronr passcngcrs and llc
TABLE.
Million
YEAR
YDARS
Rs.
YEAR
AFTE,I{ PROJECT
OF
CONSTRUCTION
COMPLIlTION
BENEFITS
2008-09 2009-10
I
2
3
2
3
2010-l 2012
2013 2014 2015 2016
4
5
2
3
6 7
8
4
5
3s6.67
83.37 410.07 426.78
3
20t7
201
B
6
7
B
l0
2019
2020
2021
ll
t2 l3
l0
2022 2023
l4
l5
ll
t2
13
2024
2025 2426 2027
l6
17
535.66 571.70
14
l8
t9
20
l5 l6 t7 l8
19
619;t4
661.79 703.83 735.96 768.09 1359.12
2028
2029
2l
22
23
2030
2031
20*
TOTAL
I
TABLE . 9
PROPOSED PROJECT COST PHASING BRIDGE OVER RIVER SUTLEJ AT EMANAWALA
s. N
o
I
I
Description
CivilWorks
Contingencies Charges @
3o/o
331
945
28
19
7 o
a
Construction Supervision @ 3% Price Escalation @ 6.5% Shifting of Utilities Sports Facilities Cost 0.5% of Construction Cost
12
28 68 50
25 50
43
I
B
5 5 5
306
434
408
1,148
Economic Costs
Financial Less Price Escalation Applying SCF (0.90)
306 275 409 368 365 329 1,080
972
I
TABLE - 1O
Description
2001-02
2002-03
2003-04
2004-05
2005-06
Average
714,372
897,825
1,223,079 1,649,657
854,088 117,243 117,767 962,399 136,982 148,344
1,023,913
652,294
68,835 97,569
709,036
89,900 109,550 14,700
2,OBB
747,753 92,155
111,308 14,779 2,560
4
5
a 5?? 4,054
19,700 2,050
23,700
3,510
M+X
(M+Tm) + (X-Tx)
1771665
1957789
SCF
0.90
M X
= CIF value of imports = FOB value of exports Tm = Net value of taxes on imports Tx = Net value of taxes on exports Economic Survey 2005-06 Ministrv of Finance lslamabad.
Annex-Vll
Table-11
ANALYSIS
Ten (10%)
'
Cash Flow with 10% lncreased Costs
(Rs. Million)
.."
Yea r
2008-09
2009-1 0
201 0-1
1
0 0
0
-275.000 -368.000 -329.000 261.460 275.580 302.280 328.980 382.370 409.070 425.780
-302.500 -404.800 -361.900 261.360 275.480 302.'t80 328.880 355.570 382.270 408.970 425.6B0
4 5 o
7
2012
1.00
zoz..tov 276.580
303.280 329.980
J3O.O
/.
.100
1.00
1.00 1.00
1.100 1.100
1
248.922
zt z.vaz 296.982
321.003 345.033
JOY.UbJ
.100
1.00 1.00
J6J.J
/U
10
11
2018
20'19
0
0
1.00 1.00
384.102
399.1 41
383.102
398.1 41
12 t.)
2020
2021
0
0 0 0 0
;
t3
100 100
13 14
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
'1.00
442.390
459.090 462.446 492.510 534.560 576.600 618.640 660.690 702.730 734.860 766.990 1798,020
460 190
476 900 493 6'10 535.660 577.700 619.740 661.790 703.830 735.960 768.090
1
414.171
413.171 416.07C
14 454
1.100 1.100
429.210
444.249 482.094 519.930 557.766 595.611 633.447 ooz.Jb4
691 .281
lo
17 18
'19
0 0 0 0 0 0
1.100
1.100 1.100
20
21
1 100
1.100
1.'100
632.447 661.364
690.281
22 ZJ
2030
2031
-400
359.1 20
-438.900
1223.208
1622.208 8922.603
1.232.71
NPV:
572.000 32.140 1058s.270 9981.130 664.554 9s26.743 9920.716 743.56 7.80 2,204.53 1,453.16 826.s0 1,984.08 't.378.03
2.93
Result of the Economic BenefiU Cost Ratio @ 12o/, Discount Rate: Net Present Value:@ 12Yo
Inlernal Rate of Return Ten (10%) Increased Costs Benefit / Cost Ratio Net Present Value: Internal Rate of Return Ten (10-%) in Benefits BenefiU Cost Ratio: Net Present Value: Internal Rate of Return:
Rs.
1,453.16 Million
27%
2.667
Rs.
1,378.03 Million
26%
2.64
Rs.
'1,232.71 Million
25%
NEX-VTII
IMPLEXIEIVTATIOAT
SCHtrDULtr/BAR CHART
"'#
\l
TI
i5J
\|
$t
'v
)':
a
,{
kFr oc{
>f
Ei
BI rrl rril Hl
>5, vm b05
!q >
,'al
zl o
I.
I
<l
z'j
I
,F,
l-r
Irr
zl
F<l 7r,l \l
c*E
+J
o: