Radiogram No. 8784u

Form 24 for 03/26/2012

ATV RENDEZVOUS AND DOCKING OBT


GMT
CREW

ACTIVITY

06:00-06:10

CDR,FE-4,
FE-5,FE-6

Morning Inspection

06:00-06:10

FE-1

Morning Inspection. SM [Caution & Warning Panel] Test

06:00-06:10

FE-2

Morning Inspection. Inspection of - connector on -


separator pump behind panel 139.

06:10-06:40

Post-sleep

06:40-07:30

FE-1,FE-2,FE4,
BREAKFAST
FE-5,FE-6

06:40-07:20

CDR

BREAKFAST

07:20-07:50

CDR

Ultrasound 2 Hardware Setup

07:30-07:50

FE-2,FE-4,
FE-5,FE-6

Work Prep

07:30-07:40

FE-1

Work Prep

07:40-07:50

FE-1

07:50-08:15

BAR TTM Charge Start


Daily Planning Conference (S-band)

08:15-08:35

CDR

Acoustic Dosimeters Hardware Setup

08:15-09:05

FE-5

EMCS Water Reservoir Replacement

08:15-10:15

FE-4

BAR Experiment Ops (A). Tagup (S-band)

08:15-08:25

FE-6

Work Prep

08:20-11:20

FE-1,FE-2

Symbolic Activity. Shilovs Paintings Ops

08:25-08:55

FE-6

BCR/RFID Reader Software Installation

08:35-08:55

CDR

Work Prep

08:55-09:20

CDR

Integrated Cardiovascular Echo Ultrasound Pre-Scan

09:05-09:15

FE-5

EMCS Switch Configuration

09:15-10:15

FE-5

Physical Exercise (T2)

09:20-10:20

CDR

ICV Echo Scan

09:25-10:15

FE-6

ICV - Echo Scanning Assistance

10:15-11:15

FE-4,FE-5

ATV Rendezvous and Docking OBT. Tagup (S-band)

10:15-11:45

FE-6

Physical Exercise (ARED)

10:20-10:30

CDR

Ultrasound 2 Data Transfer

10:50-11:35

CDR

VI Scanning Ops

11:15-12:15

FE-5

Crew Quarters (CQ) Battery Changeout

11:20-12:20

FE-1

Physical Exercise (VELO), Day 3

11:30-13:00

FE-2

Physical Exercise (TVIS), Day 3

11:35-11:50

CDR

Ultrasound 2 Equipment Deactivation and Stowage

11:45-11:55

FE-6

WRS Water Sample Analysis

11:45-13:00

FE-4

Physical Exercise (ARED)

11:50-12:35

CDR

HRCS - gathering items to support cable routing and UBNT installation

12:10-12:40

FE-6

BASS Procedure Review

12:15-12:45

FE-5

ATV3 Transfer List Review

12:20-13:00

FE-1

Maintenance

Page 2 of 3
12:35-13:25

CDR

ICV Monitoring Prep

12:40-12:55

FE-6

BASS Payload Crew Conference

12:55-13:05

FE-6

Glove Box (MSG) Activation

13:00-14:00

FE-1,FE-2,FE4,
LUNCH
FE-5

13:05-14:05

FE-6

LUNCH

13:25-14:25

CDR

LUNCH

14:00-16:00

FE-1,FE-2

BAR Experiment Ops. Tagup (S-band)

14:05-14:15
14:05-14:20

FE-6
FE-4,FE-5

BASS Video Camera Setup


ATV Rendezvous and Docking OBT Crew Conference. Tagup (S-band)

14:15-14:25

FE-6

TOCA 2 Data Recording

14:20-17:20

FE-4

325 #1459761746 R&R. Tagup (S-band)

14:25-14:55

FE-5,FE6,CDR

ATV3 Transfer Conference

14:55-15:20

CDR

Gather items required for AL Filter R&R

14:55-16:15

FE-6

SLICE/BASS Experiment Operations

15:00-15:15

FE-5

Crew Discretionary Conference

15:20-15:45

CDR

Airlock (A/L) Filter Remove and Replace (R&R)

15:20-15:50

FE-5

ISSAC Software Upgrade

15:45-17:15

CDR

Physical Exercise (ARED)

15:50-17:20

PMM cleanup for unpacking ATV3 items

16:00-17:00

FE-5
FE-2

16:00-16:20

FE-1

-4 data readout

16:15-17:15

FE-6

BASS Soot Removal

16:20-17:50

FE-1

Physical Exercise (TVIS), Day 3

17:00-18:00

FE-2

Physical Exercise (VELO), Day 3

17:15-18:15

CDR

Physical Exercise (CEVIS)

17:15-18:15

FE-6

Physical Exercise (T2)

17:30-17:40

FE-5

Glove Box (MSG) Powerdown

17:30-18:45

FE-4

Physical Exercise (TVIS), Day 3

17:40-19:10

FE-5

Physical Exercise (ARED)

17:50-18:20

FE-1

Auxiliary Laptop Anti-Virus Update

18:00-18:30

FE-2

SEINER Ocean Observations

18:15-18:35

FE-6

PI SPRINT Private Crew Conference

18:20-19:10

CDR,FE-1

Evening Work Prep

18:30-19:10

FE-2

Evening Work Prep

18:40-19:10

FE-6

Evening Work Prep

18:45-19:10

FE-4

19:10-19:35

Evening Work Prep


Daily Planning Conference (S-band)

19:35-21:30

FE-1,FE-2,
FE-5,FE-6

Pre-sleep

19:35-21:20

FE-4

Pre-sleep

19:35-19:40

CDR

P/TV Playback Start

19:40-21:25

CDR

Pre-sleep

Video Footage For Carousel Channel

Page 3 of 3
21:20-21:30

FE-4

-1 [Geophysical Studies]. Relaksatsiya Experiment Battery


Charging

21:25-21:30

CDR

P/TV Playback Stop

21:30-06:00

SLEEP

Task List

FE-1,FE-2,
FE-4

Preparation of reports for Roskosmos site


URAGAN. Observations and Photography
ECON. Observations and Photography

FE-1
IMS Update
Notes:
1. SM Window #9 shutter opening is at crew discretion w/ Report to MCC
2. See OSTP for references to US activities
3. Pre-sleep ops: daily food prep, dinner, pre-sleep
End of Radiogram