The training of site survey

The training of site survey Table of Contents


The step of site survey The content of site survey The usage of tools and software The choice of site The record on spot The site survey report The drawing model of site designing

The step of site survey


Receiving the site survey task Collecting the Information about the sites network planning

Preparing and checking up the tools

Making sure the survey course and setting down the survey order with NT staff

Surveying on spot

Feeding back to the project leader or the network planner in time,then we make sure .

Recording the survey Information on spot

Making sure the site designing including the transmissionwith NT staff on spot

Confirming the designing for the second site

Making out the site survey report and list Delivering the site drawing to project department ,then begin to construct thesite equipment.

Applying the site report to NT

Design and Making out the site drawing

The training of site survey Table of Contents


The step of site survey The content of site survey The usage of tools and software The choice of site The record on spot The site survey report The drawing model of site designing

The content of site survey


Site survey for the traffic distributing
The covering users typesResidential area highwaydetached houses ; The development of the covering users and economy; The altitude of the hot area and its distance to the site.

Site survey for wireless transmission environment


The description of the site positionLongitude Latitude Building Altitude, and so on; The whole description of the site environment landformssurface featuressuch as mountainous areariverplain The description of the barrierits characterheightdistance The electromagnetism environment description around the site Microwave siteTV stationtransformerhigh voltage lines and so on.

The content of site survey

Site survey on spot


Inside the roomsize of room size of equipmentsequipment layoutCable Ladder Cable Route and so on outside the roomtower Antenna\Feeder Cable System outdoor cable trayCable Route and so on AC importingposition of transformer AC power line route Grounding System Earthing Bar Others room bearing.

The training of site survey Table of Contents


The step of site survey The content of site survey The usage of tools and software The choice of site The record on spot The site survey report The drawing model of site designing

Tools and software for Site survey

Main tools for Site survey


GPSrange findertapesteel rule(5m)camera compassboardpentelescope nite writer pen

Main software for Site survey


MapInfoGoogle Earthphotoshopautocadoffice

Tools for Site survey


GPS
The main purpose Save the site navigation Measure the distance between two sites

The precision of the GPS must be more than5~8meters ,when we note the longitude and the latitude,so we must wait a while after open the GPS.

Tools for Site survey

Range finder: The main purpose


Measure the dimension of the BTS room Measure the height of the building

software for Site survey


Mapinfo and Google Earth Photoshop Outocad2006

The training of site survey Table of Contents


The step of site survey The content of site survey The usage of tools and software The choice of site The record on spot The site survey report The drawing model of site designing


General Principles
as close as possible to the planning sitemake for the network optimization later; distance between sites in dense urban area 200300mdeviation should be less than 50 m distance between sites in urban area 400500m deviation should be less than 100 m ; distance between sites in suburban or rural area 8001000m deviation should be less than 200 m . site position choice for early establishment should meet the coverage in hot area, such as highwaymarket or temple ; site position choice in dense urban buildings should avoid the tall buildings or the construction of tall buildings near the antenna


General Principles

Try to avoid large electromagnetic interference, the choice to the electromagnetic environment around the site should avoid radar stations, power stations or high voltage lines (> 30 m); Leasehold BTS room is the primary choicebuilding the roof top towerreducing investment attention to the building load-bearing; With transmission conditions.

The training of site survey Table of Contents


The step of site survey The content of site survey The usage of tools and software The choice of site The record on spot The site survey report The drawing model of site designing

Site Equipments
BTS Equipment Configuration
model Site type S444+S666 S444+S444 8018 indoor BTS S666 S444 S222(indoor) 8206 8202 S222(outdoor) O2 Rack Qty. Rack size per 1 rack 2 2 1 1 1 1 1 640x555x330 (mm) 580x400x284 (without base, mm) 1600x600x550(H*W*D mm)

Site Equipments
Power Products Configuration

Site Equipments
Antenna Products Configuration

GSM 900 Antenna, 12 dBi Omni O2 SIZE:603245mm

GSM900M Dual Polarized Directional Antenna MB900-65-17DT/MB900-65-17DT3 (S444: 3 degree electronical Down Tilt) (S222: 0 degree electronical Down Tilt) SIZE:1600280100mm

Site Equipments
Antenna Products Configuration

GSM 1800M Antenna 18 dBi, 65 degreeS444S666 MB1800-65-18DT3 SIZE:182020075mm

GSM Dual Band Antenna 16 dBi, 65 degree ODP-065R17B6/18C6 6 degree electronical Down Tilt fixed SIZE:2345320195mm

Site Equipments
Antenna Products Configuration

WCDMA Antenna TypeMB3F-65-18DT2 electronical Down Tilt 2 degree Mechanical Down Tilt >12 degree

Transmission choice
Cable Transmission
Optical fiber transmission

DDF module imitating siemens DDF

SDH(1663E1N63E1)

PDH(416E1)

DDB

Transmission choice
Cable Transmission
IP transmission G.SHDSL
TC-200GT support DSL line distance of at least 3.3 km(0.4 mm cable) for E1 75 Ohms unbalanced impedance. -48V DC power Front Panel

Rear Panel

Transmission choice
Wireless transmission
Microwave

Microwave transmission condition view range


Frequency:4-38 GHz

Antenna &ODU

Link Capacity:4E1 16E1 N1 STM-1

Antenna &ODU

One hop of Microwave Transmission Equipment Unit

?
If there is no phone line or the distance of the line is more than 3Km,Microwave must be chosen.

Transmission choice
Wireless transmission
Centrol Room Microwave

sites

Transmission choice
Wireless transmission
Microwave

Microwave Equipment

Microwave Antenna

Site Equipments
Shelter

Shelter Dimension Height(mm) H 3 120 Width(mm) W 2 970 Length(mm) L 4 750 Square(m2) 14.1

Site Equipments
Tower

5m rooftop tower5M.pdf 8m rooftop tower8m.pdf 18m Ground tower18m 20m Ground tower20M

Ground System
Ground System

5/8m rooftop tower.dwg 18m Ground tower18M.dwg 20m Ground tower20m.dwg

The record on spot


Existing site (indoor photos)

Site name

inside whole

REC

Battery 300AH/Group II

BTS

AC BOX and lightingproof box

The record on spot


Existing site (indoor photos)

LCD of the RECTIFIER

The record on spot


Existing site (indoor photos) The information of the air switch!

The maximal power of BTS B8018 is 3400W ,and the air switch we should select is 63A &32A The maximal power of BTS B8206/B8202 is 380W ,and the air switch we should select is 16A.

The record on spot


Existing site (indoor photos) The information of the feeder and the feeder window

The record on spot


Existing site (indoor photos) The information of Air-condition! Manufacturer? Capacity? Working or not?

Reused & change?

The record on spot


How to draw the BTS room and the equipment??

The record on spot Existing site (outdoor photos)

the whole tower

the antenna and the poles the outdoor ladder and the Router

The record on spot Existing site (outdoor photos)

The record on spot Existing site (outdoor photos)

The record on spot


How to draw the plan of outside??

The record on spot


How to draw the plan of outside??

Site survey New site


Finding out the information of the new site:site configthe amount of the equimentthe demand about the room area Marking down the new site position on the map,then input the longitude and the latitude to the GPS Reaching the exact position of the new site with GPS surveying around environmentfinding out the hot area Confirming the new site ,talking about the leasehold room with its owner Surveying the site and recording all the information

The record on spot New site

Site name

inside whole

window

rooftop

Ground

building

The record on spot New site

The record on spot


How to draw the plan of NEW SITE??

The record on spot


How to draw the plan of NEW SITE??

The record on spot


How to draw the plan of NEW SITE??

The record on spot


How to draw the plan of NEW SITE??

The site survey report Table of Contents


The step of site survey The content of site survey The usage of tools and software The choice of site The record on spot The site survey report The drawing model of site designing

The site survey report

The site survey report

The training of site survey Table of Contents


The step of site survey The content of site survey The usage of tools and software The choice of site The record on spot The site survey report The drawing model of site designing

The drawing model


All kinds of drawing models
5m/8m rooftop tower(cross-shaped) 5m/8m rooftop tower(I-shaped) 18m Ground tower 20m Ground tower S222 S444 S444/S444 S444/S666 Shelter Existing site (change HUAWEIS BTS)