Scheduling/Leveling Report - 09-Aug-12 - PM.exe =============================================== Default Project..................................................OBG-UPD ATE2012-07-25 Projects: OBG-UPDATE2012-07-25............................................ .

Phase IV - OMAN BOTANIC GARDENS -JULY 2012_25 Scheduling/Leveling Settings: ----------------------------General ------Scheduling ......................................................Yes Leveling ........................................................No Ignore relationships to and from other projects .................No Make open-ended activities critical .............................No Use Expected Finish Dates .......................................Yes Schedule automatically when a change affects dates ..............Yes Level resources during scheduling ...............................No Recalculate assignment costs after scheduling ...................No When scheduling progressed activities use .......................Progres s Override Calculate start-to-start lag from ...............................Early S tart Define critical activities as Total Float less than or equal to .100 Compute Total Float As ..........................................Finish Float Calculate float based on finish date of .........................Each pr oject Calendar for scheduling Relationship Lag ........................Predece ssor Activity Calendar Advanced -------Calculate multiple float paths...................................No Statistics: ----------# Projects.......................................................1 # Activities.....................................................866 # Not Started....................................................618 # In Progress....................................................83 # Completed......................................................165 # Relationships..................................................1488 # Activities with Constraint.....................................19 Project: OBG-UPDATE2012-07-25 Activity: A1520 Project Completion & Handover Project: OBG-UPDATE2012-07-25 Activity: A1530 Issue of Construction Permit Project: OBG-UPDATE2012-07-25 Activity: A1550 Construction Commencement Date Project: OBG-UPDATE2012-07-25 Activity: A1570 Preparation & Submission of Commissioning protocols for the biomes Project: OBG-UPDATE2012-07-25 Activity: A1840 Develop Access to site, laydown areas, etc Project: OBG-UPDATE2012-07-25 Activity: A1850 Site Survey and identify building points Project: OBG-UPDATE2012-07-25 Activity: A1890

Plantings (by others) Project: OBG-UPDATE2012-07-25 Activity: A2070 Approved Kitchen Layout drawings - approved by Muscat Food Control Authority Project: OBG-UPDATE2012-07-25 Activity: A4370 Main Plantations in Northern Mountains (by others) Project: OBG-UPDATE2012-07-25 Activity: A8410 Plantings (by others) Project: OBG-UPDATE2012-07-25 Activity: A8420 Plantings (by others) Project: OBG-UPDATE2012-07-25 Activity: A8430 Plantings (by others) Project: OBG-UPDATE2012-07-25 Activity: A8440 Plantings (by others) Project: OBG-UPDATE2012-07-25 Activity: A8450 Main Plantations in overall Southern Mountains (by others) Project: OBG-UPDATE2012-07-25 Activity: A8460 Plantings (by others) Project: OBG-UPDATE2012-07-25 Activity: A8470 Plantings (by others) Project: OBG-UPDATE2012-07-25 Activity: A8480 Plantings (by others) Project: OBG-UPDATE2012-07-25 Activity: A8490 Plantings (by others) Project: OBG-UPDATE2012-07-25 Activity: A8500 All Plantings for the Wadi area (by others) Errors: ------Warnings: --------Activities without predecessors..................................1 Project: OBG-UPDATE2012-07-25 Activity: A1000 Award of letter to proceed / Award preferred tender status Activities without successors....................................5 Project: OBG-UPDATE2012-07-25 Activity: A1520 Project Completion & Handover Project: OBG-UPDATE2012-07-25 Activity: A8380 Procurement & delivery of Rock Fall Protection system Project: OBG-UPDATE2012-07-25 Activity: A9150 Fixing Ladder & Opening Cover to tank Project: OBG-UPDATE2012-07-25 Activity: WA - 853 0 Submission & approval of Architectural Shop drawings for Wadi Ancillary Building Project: OBG-UPDATE2012-07-25 Activity: WM - 853 0 Submission & approval of Architectural Shop drawings for Waster Manageme nt Facility Out-of-sequence activities.......................................59 Project: OBG-UPDATE2012-07-25 Activity: A1160 Pile head breaking, compaction - all incl pile cap concrete Project: OBG-UPDATE2012-07-25 Activity: A1170 Pile head breaking, compaction - all incl beam foundation Project: OBG-UPDATE2012-07-25 Activity: A1190 Construction of Suspended Slab for Ground Floor - Level 131.55 (DELETED) Project: OBG-UPDATE2012-07-25 Activity: A1250 Construction of Suspended Slab at Roof Level 137.50 (Grid L2 - L4) (taken at 141 lvl sloping slab) Project: OBG-UPDATE2012-07-25 Activity: A1260 Structural Steel Erection - upto Roof

Project: OBG-UPDATE2012-07-25 Activity: Construct MEP trenches, tunnels & biome platform Project: OBG-UPDATE2012-07-25 Activity: Set up Piling rigs for micropiling Project: OBG-UPDATE2012-07-25 Activity: Pile head breaking, compaction - all incl pile cap concrete Project: OBG-UPDATE2012-07-25 Activity: Erect Structural Steel Columns upto roof, etc Project: OBG-UPDATE2012-07-25 Activity: Construct MEP trenches & biome platform Project: OBG-UPDATE2012-07-25 Activity: Erect Structural Steel Framing for Concrete panels on Elevation Project: OBG-UPDATE2012-07-25 Activity: Set up Piling rigs for micropiling Project: OBG-UPDATE2012-07-25 Activity: Walls construction from foundation level to First level Project: OBG-UPDATE2012-07-25 Activity: General Excavation & localised for footings Project: OBG-UPDATE2012-07-25 Activity: Construction of Footing Project: OBG-UPDATE2012-07-25 Activity: Construct Tie Beams Project: OBG-UPDATE2012-07-25 Activity: Suspended Slab for Entry Buildings Project: OBG-UPDATE2012-07-25 Activity: Construct Hollow / Bubble Deck Slab Project: OBG-UPDATE2012-07-25 Activity: Blockwork Project: OBG-UPDATE2012-07-25 Activity: Site Survey and identify building points Project: OBG-UPDATE2012-07-25 Activity: Erect Structural Steel Columns upto Mezzanine & Roof Project: OBG-UPDATE2012-07-25 Activity: Concrete Slab on Grade Project: OBG-UPDATE2012-07-25 Activity: MEP 1st Fix & Plaster finish Project: OBG-UPDATE2012-07-25 Activity: Excavate for Wall Foundations Project: OBG-UPDATE2012-07-25 Activity: General Excavation for Southern Biome areas Project: OBG-UPDATE2012-07-25 Activity: Wall Foundations Project: OBG-UPDATE2012-07-25 Activity: Excavate for Wall Foundations Project: OBG-UPDATE2012-07-25 Activity: Wall Foundations Project: OBG-UPDATE2012-07-25 Activity: Construction of all Walls & Slabs upto Level 144.90 (Segment 1, 2, 3) Project: OBG-UPDATE2012-07-25 Activity: Excavation for Foundations & Tunnel Project: OBG-UPDATE2012-07-25 Activity: General Excavation & localised for footings Project: OBG-UPDATE2012-07-25 Activity: Construction of Footing for Retaining Wall Project: OBG-UPDATE2012-07-25 Activity: Construct Retaining Wall for External Bench & Waiting area Project: OBG-UPDATE2012-07-25 Activity: Construct Retaining Wall for External Bench & Waiting area Project: OBG-UPDATE2012-07-25 Activity: Site Survey & Site Clearance

A1290 A1460 A1480 A1500 A1730 A1740 A1870 A1910 A2040 A2050 A2060 A2080 A2090 A2140 A2440 A2480 A2510 A2540 A2880 A2900 A3380 A3440 A3450 A3460 A3510 A6020 A6030 A6060 A6190 A6770

Project: OBG-UPDATE2012-07-25 Activity: A7240 Blockwork partitions inside the biome Project: OBG-UPDATE2012-07-25 Activity: A8070 Procurement, fabrication & delivery of Structural Steel frame Project: OBG-UPDATE2012-07-25 Activity: A8120 Procurement, fabrication & delivery of Aluminium doors & Windows Project: OBG-UPDATE2012-07-25 Activity: A8160 Procurement of Artificial Rock items Project: OBG-UPDATE2012-07-25 Activity: A8210 Procurement & delivery of Structural Steel & sheeting for workshop Project: OBG-UPDATE2012-07-25 Activity: A9170 Site Survery & Excavation Project: OBG-UPDATE2012-07-25 Activity: ENT 8510 Submission & approval of Civil structural shop drawings for Entry Gate Building Project: OBG-UPDATE2012-07-25 Activity: ENT 8520 Submisison & approval of MEP Shop drawings for Entry Gate Building Project: OBG-UPDATE2012-07-25 Activity: ENT 8530 Submission & approval of Architectural Shop drawings for Entry Gate Building Project: OBG-UPDATE2012-07-25 Activity: GAR 8510 Submission & approval of Civil structural shop drawings for Garage Project: OBG-UPDATE2012-07-25 Activity: MOS 8510 Submission & approval of Civil structural shop drawings for Mosque Project: OBG-UPDATE2012-07-25 Activity: NB8580 Submission & approval of Vertical Structural steel shop drawings - Northern Biom e Project: OBG-UPDATE2012-07-25 Activity: NB8760 Submission & approval of all MEP shop drawings - Northern Biome Project: OBG-UPDATE2012-07-25 Activity: NM8775 Submission & approval of Civil Structural shop drawings for Northern Mountains Project: OBG-UPDATE2012-07-25 Activity: SB8680 Submission & approval of shop drawings for Ground Floor slabs - Southern Biome Project: OBG-UPDATE2012-07-25 Activity: SB8690 Submission & approval of shop drawings for Suspended slabs - Southern Biome Project: OBG-UPDATE2012-07-25 Activity: SB8730 Submission & approval of Glazing shop drawings - Southern Biome Project: OBG-UPDATE2012-07-25 Activity: TRA 8510 Submission & approval of Civil structural shop drawings for the Transformation C entre Project: OBG-UPDATE2012-07-25 Activity: TRA 8520 Submisison & approval of MEP Shop drawings for the Transformation Centre Project: OBG-UPDATE2012-07-25 Activity: TRN 8510 Submission & approval of Civil structural shop drawings for all Train Stations Project: OBG-UPDATE2012-07-25 Activity: TRN 8520 Submisison & approval of MEP Shop drawings for Train Stations Project: OBG-UPDATE2012-07-25 Activity: TRN 8540 Submission & approval of Shop drawings for Shade structure for Main train statio n Project: OBG-UPDATE2012-07-25 Activity: WA - 853 0 Submission & approval of Architectural Shop drawings for Wadi Ancillary Building Project: OBG-UPDATE2012-07-25 Activity: WIL 8520 Submisison & approval of MEP Shop drawings for Wilderness Activities with Actual Dates > Data Date.........................0 Milestone Activities with invalid relationships..................0 Scheduling/Leveling Results: ---------------------------# Projects Scheduled/Leveled.....................................1

# Activities Scheduled/Leveled...................................701 # Relationships with other projects..............................0 Data Date........................................................25-Jul12 Earliest Early Start Date........................................25-Jul12 Latest Early Finish Date.........................................23-Apr14 Exceptions: ----------Critical Activities..............................................550 Project: OBG-UPDATE2012-07-25 Activity: A1270 Installlation of Horizontal Roof structual Steel - Vector Foiltec Project: OBG-UPDATE2012-07-25 Activity: A1280 Installation of ETFE Roofing (using nets) - Vector Foiltec Project: OBG-UPDATE2012-07-25 Activity: A1300 Masonry work Project: OBG-UPDATE2012-07-25 Activity: A1310 Install Metallic substructures (for Tecu oxide panels) Project: OBG-UPDATE2012-07-25 Activity: A1320 Install Pladur Gypsum board & Plaster (internal) Project: OBG-UPDATE2012-07-25 Activity: A1330 Install Insulation, board & Tecu oxide Copper Sheets (external) Project: OBG-UPDATE2012-07-25 Activity: A1340 Strip nets / Commissioning / Clean Down Project: OBG-UPDATE2012-07-25 Activity: A1350 MEP Works in Plant Rooms (Basement) & Misc rooms (GF) Project: OBG-UPDATE2012-07-25 Activity: A1360 Internal Finishes to MEP rooms in Basement Project: OBG-UPDATE2012-07-25 Activity: A1380 Commissioning of the Biome Project: OBG-UPDATE2012-07-25 Activity: A1390 Snags, Cleaning & Handing over Project: OBG-UPDATE2012-07-25 Activity: A1400 Internal Finishes to Public areas & Rooms at GF Project: OBG-UPDATE2012-07-25 Activity: A1410 Internal Landscaping, Concrete Pathway & Terraces Project: OBG-UPDATE2012-07-25 Activity: A1450 Completion of Northern Biome Project: OBG-UPDATE2012-07-25 Activity: A1480 Pile head breaking, compaction - all incl pile cap concrete Project: OBG-UPDATE2012-07-25 Activity: A1490 Construction of Retaining wall Footing, Wall (incl short part) Project: OBG-UPDATE2012-07-25 Activity: A1500 Erect Structural Steel Columns upto roof, etc Project: OBG-UPDATE2012-07-25 Activity: A1510 Completion of Southern Biome Project: OBG-UPDATE2012-07-25 Activity: A1520 Project Completion & Handover Project: OBG-UPDATE2012-07-25 Activity: A1560 Availability of Permanent Services on site - Power, Water, etc Project: OBG-UPDATE2012-07-25 Activity: A1570 Preparation & Submission of Commissioning protocols for the biomes Project: OBG-UPDATE2012-07-25 Activity: A1580 Power Supply HV : [TRX room layout, HV Switch room lay-out, LDN approval, appr oved HV single line diagram] DESIGN Project: OBG-UPDATE2012-07-25 Activity: A1590 Installlation of Horizontal Roof structual Steel - Vector Foiltec Project: OBG-UPDATE2012-07-25 Activity: A1600 Installation of ETFE Roofing (using nets) - Vector Foiltec

Project: OBG-UPDATE2012-07-25 Activity: A1610 Strip nets / Commissioning / Clean Down Project: OBG-UPDATE2012-07-25 Activity: A1690 Blockwork on the back facade & insulation Project: OBG-UPDATE2012-07-25 Activity: A1700 Install Metallic substructures (for Tecu oxide panels) Project: OBG-UPDATE2012-07-25 Activity: A1710 Install Pladur Gypsum board & Plaster (internal) Project: OBG-UPDATE2012-07-25 Activity: A1720 Install Insulation, board & Tecu oxide Copper Sheets Project: OBG-UPDATE2012-07-25 Activity: A1730 Construct MEP trenches & biome platform Project: OBG-UPDATE2012-07-25 Activity: A1740 Erect Structural Steel Framing for Concrete panels on Elevation Project: OBG-UPDATE2012-07-25 Activity: A1750 Place concrete panels, insulation with all supports on Elevation Project: OBG-UPDATE2012-07-25 Activity: A1760 Place Wooden Board, metallic slats & local dressed stones on Elevation Project: OBG-UPDATE2012-07-25 Activity: A1770 Install HE 30 Pillar, Pladur gypsum board all complete with plaster behind eleva tion Project: OBG-UPDATE2012-07-25 Activity: A1780 Install door, windows, louvers Project: OBG-UPDATE2012-07-25 Activity: A1790 Internal finishes incl entry, exit & terrace & installing all walkway elements Project: OBG-UPDATE2012-07-25 Activity: A1800 Internal Landscaping, Concrete Pathway & Terraces Project: OBG-UPDATE2012-07-25 Activity: A1810 Commissioning of the Biome Project: OBG-UPDATE2012-07-25 Activity: A1820 Snags, Cleaning & Handing over Project: OBG-UPDATE2012-07-25 Activity: A1830 MEP works inside biome including interphasing with MEP channel Project: OBG-UPDATE2012-07-25 Activity: A1890 Plantings (by others) Project: OBG-UPDATE2012-07-25 Activity: A1900 Pile head breaking, compaction - all incl pile / beam foundation Project: OBG-UPDATE2012-07-25 Activity: A1910 Walls construction from foundation level to First level Project: OBG-UPDATE2012-07-25 Activity: A1920 Construction of Suspended Slab at First Level +128.50 Project: OBG-UPDATE2012-07-25 Activity: A1930 Backfilling / Compaction for Slab on Grade at + 124.15 Project: OBG-UPDATE2012-07-25 Activity: A1940 Walls construction to Roof level Project: OBG-UPDATE2012-07-25 Activity: A1950 Construction of Suspended Slab at Roof +133.50 Project: OBG-UPDATE2012-07-25 Activity: A1960 MEP works and Slab on Grade at Level + 124.15 Project: OBG-UPDATE2012-07-25 Activity: A1970 Structural Steel & Metal Decking works for Chiller Room, Pump Room & Electrogen Project: OBG-UPDATE2012-07-25 Activity: A1980 Internal Finishes to MEP rooms in Basement & GF incl louvers / metal slats Project: OBG-UPDATE2012-07-25 Activity: A1990 MEP Works in Plant Rooms (Basement) & Misc rooms (GF) Project: OBG-UPDATE2012-07-25 Activity: A2000 Commissioning of the Building / equipment Project: OBG-UPDATE2012-07-25 Activity: A2010 Snags, Cleaning & Handing over Project: OBG-UPDATE2012-07-25 Activity: A2020

Power Supply LV: [Electric room layouts, approved LV single line diagrams & lo ad schedules ] DESIGN Project: OBG-UPDATE2012-07-25 Activity: A2070 Approved Kitchen Layout drawings - approved by Muscat Food Control Authority Project: OBG-UPDATE2012-07-25 Activity: A2400 Preparation of shop drawings for HV rooms based on approved SLD & load schedules Project: OBG-UPDATE2012-07-25 Activity: A2500 Install Roof Sheeting & Flashing Project: OBG-UPDATE2012-07-25 Activity: A2530 Preparation of shop drawings for LV rooms based on approved SLD & load schedules Project: OBG-UPDATE2012-07-25 Activity: A2620 Site Survey Project: OBG-UPDATE2012-07-25 Activity: A2630 Excavation for wall foundations - Transformation Cenre Building Project: OBG-UPDATE2012-07-25 Activity: A2650 Construction foundations for walls - Retaining Wall behind the Building Project: OBG-UPDATE2012-07-25 Activity: A2670 Construct Retaining Walls behind the building Project: OBG-UPDATE2012-07-25 Activity: A2680 Excavation for wall foundations behind the building Project: OBG-UPDATE2012-07-25 Activity: A2860 Install 3rd / 4th Levels of Anchors Project: OBG-UPDATE2012-07-25 Activity: A2870 Excavate 3rd / 4th Stage Project: OBG-UPDATE2012-07-25 Activity: A2880 Excavate for Wall Foundations Project: OBG-UPDATE2012-07-25 Activity: A2890 Wall Foundations Project: OBG-UPDATE2012-07-25 Activity: A2900 General Excavation for Southern Biome areas Project: OBG-UPDATE2012-07-25 Activity: A2920 Site Survey & Site Clearance Project: OBG-UPDATE2012-07-25 Activity: A2930 Excavation Project: OBG-UPDATE2012-07-25 Activity: A2940 Compaction Project: OBG-UPDATE2012-07-25 Activity: A2950 Concrete Base Project: OBG-UPDATE2012-07-25 Activity: A2960 Small Masonry Wall Project: OBG-UPDATE2012-07-25 Activity: A2970 Wet mix Macadam with Irrigation pipe Project: OBG-UPDATE2012-07-25 Activity: A2980 Granular Material stabilised with Lime Project: OBG-UPDATE2012-07-25 Activity: A2990 Restoration of area, if damaged Project: OBG-UPDATE2012-07-25 Activity: A3000 Site Survey & Site Clearance Project: OBG-UPDATE2012-07-25 Activity: A3010 Excavation Project: OBG-UPDATE2012-07-25 Activity: A3020 Compaction Project: OBG-UPDATE2012-07-25 Activity: A3030 Lime Gravel mix Project: OBG-UPDATE2012-07-25 Activity: A3040 Restoration of area, if damaged Project: OBG-UPDATE2012-07-25 Activity: A3050 Construction of all Walls & Slabs upto Level 144.90 (Segment 1, 2, 3) Project: OBG-UPDATE2012-07-25 Activity: A3060 Site Survey & Site Clearance

Project: Excavation Project: Compaction Project: Concrete Base Project: Masonry Kerbs

OBG-UPDATE2012-07-25 OBG-UPDATE2012-07-25 OBG-UPDATE2012-07-25 OBG-UPDATE2012-07-25

Activity: Activity: Activity: Activity:

A3070 A3080 A3090 A3100 A3110 A3120 A3130 A3140 A3150 A3160 A3170 A3180 A3190 A3200 A3210 A3220 A3230 A3240 A3250 A3260 A3270 A3280 A3290 A3300 A3310 A3320 A3330 A3340 A3350 HVAC, fi A3360

Project: OBG-UPDATE2012-07-25 Activity: Wet mix Macadam with Irrigation pipe Project: OBG-UPDATE2012-07-25 Activity: Steel Mesh & Concrete Jointless Flooring Project: OBG-UPDATE2012-07-25 Activity: Top Soil Filling on the edges Project: OBG-UPDATE2012-07-25 Activity: Site Survey & Site Clearance Project: OBG-UPDATE2012-07-25 Activity: Excavation Project: OBG-UPDATE2012-07-25 Activity: Compaction Project: OBG-UPDATE2012-07-25 Activity: Concrete Base Project: OBG-UPDATE2012-07-25 Activity: Masonry Retaining walls & Masonry Kerbs Project: OBG-UPDATE2012-07-25 Activity: Wet mix Macadam with Irrigation pipe Project: OBG-UPDATE2012-07-25 Activity: Aggregate pavement stabilised with Lime Project: OBG-UPDATE2012-07-25 Activity: Top Soil Filling on the edges Project: OBG-UPDATE2012-07-25 Activity: Site Survey & Site Clearance Project: OBG-UPDATE2012-07-25 Activity: Excavation Project: OBG-UPDATE2012-07-25 Activity: Compaction Project: OBG-UPDATE2012-07-25 Activity: Install Structural Steel Framing on side Elevations Project: OBG-UPDATE2012-07-25 Activity: Install Steel & Cable System for ETFE Project: OBG-UPDATE2012-07-25 Activity: Wet mix Macadam with Irrigation pipe Project: OBG-UPDATE2012-07-25 Activity: Install ETFE Roofing Panels Project: OBG-UPDATE2012-07-25 Activity: Top Soil Filling on the edges Project: OBG-UPDATE2012-07-25 Activity: Divert / Control Water of the Wadi Project: OBG-UPDATE2012-07-25 Activity: Excavate & Compact Wadi base Project: OBG-UPDATE2012-07-25 Activity: Waterproof layer of clay as water bed Project: OBG-UPDATE2012-07-25 Activity: Dress & Place Wadi Natural rocks in Wadi area Project: OBG-UPDATE2012-07-25 Activity: Dress & Place Seat Stones in Wadi area Project: OBG-UPDATE2012-07-25 Activity: All MEP services related to Wadi incl irrigation, drainage, electrical, re, etc Project: OBG-UPDATE2012-07-25 Activity:

Construction of MEP Tunnels & Backfilling in Biome 1 Project: OBG-UPDATE2012-07-25 Activity: A3380 Wall Foundations Project: OBG-UPDATE2012-07-25 Activity: A3390 Construction of all Walls & Slabs upto Level 144.90 (Segment 1, 2, 3) Project: OBG-UPDATE2012-07-25 Activity: A3400 Install Structural Steel Framing on side Elevations Project: OBG-UPDATE2012-07-25 Activity: A3410 Install Steel & Cable System for ETFE Project: OBG-UPDATE2012-07-25 Activity: A3420 Install ETFE Roofing Panels Project: OBG-UPDATE2012-07-25 Activity: A3430 Construction of MEP Tunnels & Backfilling in Biome 1 Project: OBG-UPDATE2012-07-25 Activity: A3450 Wall Foundations Project: OBG-UPDATE2012-07-25 Activity: A3460 Construction of all Walls & Slabs upto Level 144.90 (Segment 1, 2, 3) Project: OBG-UPDATE2012-07-25 Activity: A3470 Install Structural Steel Framing on side Elevations Project: OBG-UPDATE2012-07-25 Activity: A3480 Install Steel & Cable System for ETFE Project: OBG-UPDATE2012-07-25 Activity: A3490 Construction of MEP Tunnels & Backfilling in Biome 1 Project: OBG-UPDATE2012-07-25 Activity: A3500 Install ETFE Roofing Panels Project: OBG-UPDATE2012-07-25 Activity: A3530 Backfill for Ground Floor Slab including Tunnel Project: OBG-UPDATE2012-07-25 Activity: A3540 Construct Slab on Ground Floor +123.40 Level including Tunnel Section Project: OBG-UPDATE2012-07-25 Activity: A3550 Verticals & Slab for First Floor + 128.50 Level including Tunnel Section Project: OBG-UPDATE2012-07-25 Activity: A3560 Verticals & Slab for Roof Slab + 132.85 Level Project: OBG-UPDATE2012-07-25 Activity: A3570 Blockwork Project: OBG-UPDATE2012-07-25 Activity: A3580 MEP 1st Fix & Plaster finish Project: OBG-UPDATE2012-07-25 Activity: A3590 Waterproofing & Insulation on Roof Project: OBG-UPDATE2012-07-25 Activity: A3600 MEP 2nd Fix incl installing of Equipments Project: OBG-UPDATE2012-07-25 Activity: A3610 External Plaster & Finishing Project: OBG-UPDATE2012-07-25 Activity: A3620 Ceiling Finishes Project: OBG-UPDATE2012-07-25 Activity: A3630 Floor Finishes Project: OBG-UPDATE2012-07-25 Activity: A3650 Door & Windows Project: OBG-UPDATE2012-07-25 Activity: A3660 MEP Final Fixes & Painting Project: OBG-UPDATE2012-07-25 Activity: A3670 Testing, Commissioning & Handing over Project: OBG-UPDATE2012-07-25 Activity: A3680 Site Survey & Site Clearance Project: OBG-UPDATE2012-07-25 Activity: A3690 Excavation Project: OBG-UPDATE2012-07-25 Activity: A3700 Compaction Project: OBG-UPDATE2012-07-25 Activity: A3710

Concrete Base Project: Masonry Kerbs Project: OBG-UPDATE2012-07-25 Activity: A3730 Wet mix Macadam with Irrigation pipe Project: OBG-UPDATE2012-07-25 Activity: A3740 Steel Mesh & Concrete Jointless Flooring Project: OBG-UPDATE2012-07-25 Activity: A3750 Top Soil Filling on the edges Project: OBG-UPDATE2012-07-25 Activity: A3890 All MEP services incl irrigation, drainage, electrical, HVAC, fire, etc Project: OBG-UPDATE2012-07-25 Activity: A3900 Aggregate pavement stabilised with Lime Project: OBG-UPDATE2012-07-25 Activity: A3910 Excavation & Cutting to profiles Project: OBG-UPDATE2012-07-25 Activity: A3920 Placing stones / boulders for terrace profile incl retaining wall & brackets Project: OBG-UPDATE2012-07-25 Activity: A3930 Excavation of Structural building for Shaded Structure Project: OBG-UPDATE2012-07-25 Activity: A3940 Construction of foundations, walls & Slab Project: OBG-UPDATE2012-07-25 Activity: A3950 Construction of Footings for Cables Project: OBG-UPDATE2012-07-25 Activity: A3960 Install Cables & Sun shade polythene material Project: OBG-UPDATE2012-07-25 Activity: A3970 Finishing works for the shaded building Project: OBG-UPDATE2012-07-25 Activity: A3980 Excavate for Foundation Project: OBG-UPDATE2012-07-25 Activity: A3990 Lean Concrete & Reinforced Concrete Base Project: OBG-UPDATE2012-07-25 Activity: A4000 Construct Reinforced concrete Wall Project: OBG-UPDATE2012-07-25 Activity: A4010 Install Steel structure frame Project: OBG-UPDATE2012-07-25 Activity: A4020 Place concrete sag Project: OBG-UPDATE2012-07-25 Activity: A4030 Place projected concrete & Surface resin coating Project: OBG-UPDATE2012-07-25 Activity: A4040 Excavate Pit for Platform Lift Project: OBG-UPDATE2012-07-25 Activity: A4050 Foundation pit for lift Project: OBG-UPDATE2012-07-25 Activity: A4060 Reinforced concrete walls for Lift Pit Project: OBG-UPDATE2012-07-25 Activity: A4070 Retaining wall with stone masonry Project: OBG-UPDATE2012-07-25 Activity: A4080 Backfill with granular material, soil, etc Project: OBG-UPDATE2012-07-25 Activity: A4090 Install Lift Project: OBG-UPDATE2012-07-25 Activity: A4100 Testing & Commissioning Project: OBG-UPDATE2012-07-25 Activity: A4110 Site Survey and identify building points Project: OBG-UPDATE2012-07-25 Activity: A4120 General Excavation & localised for footings Project: OBG-UPDATE2012-07-25 Activity: A4130 Construction of Footing for Columns & Walls inc Tie Beams Project: OBG-UPDATE2012-07-25 Activity: A4140 OBG-UPDATE2012-07-25 Activity: A3720

Construction of column upto Ground Slab level Project: OBG-UPDATE2012-07-25 Activity: Compaction & Backfill incl soil & base course Project: OBG-UPDATE2012-07-25 Activity: Construct RCC Ground Slab with all MEP embedments Project: OBG-UPDATE2012-07-25 Activity: Columns from Ground Slab to Roof Project: OBG-UPDATE2012-07-25 Activity: Construct Roof Slab (RCC) Project: OBG-UPDATE2012-07-25 Activity: Install Structural Steel Columns on Ground Floor Project: OBG-UPDATE2012-07-25 Activity: Site Survey and identify building points Project: OBG-UPDATE2012-07-25 Activity: General Excavation & localised for footings Project: OBG-UPDATE2012-07-25 Activity: Construction of Footing for Retaining Wall Project: OBG-UPDATE2012-07-25 Activity: Install Maintance Rings, maintenance cables on the periphery Project: OBG-UPDATE2012-07-25 Activity: Compaction & Backfill incl soil & base course for grade slab Project: OBG-UPDATE2012-07-25 Activity: Construct RCC Ground Slab with all MEP embedments Project: OBG-UPDATE2012-07-25 Activity: Main Plantations in Northern Mountains (by others) Project: OBG-UPDATE2012-07-25 Activity: Construct Retaining Wall for External Bench & Waiting area Project: OBG-UPDATE2012-07-25 Activity: Construct Stone Walls in Retaining walls Project: OBG-UPDATE2012-07-25 Activity: MEP 1st Fixes Project: OBG-UPDATE2012-07-25 Activity: Structural Steel Installations for Shaded Structure Project: OBG-UPDATE2012-07-25 Activity: MEP 2nd Fixes Project: OBG-UPDATE2012-07-25 Activity: Install Sun Shade Project: OBG-UPDATE2012-07-25 Activity: MEP Final fixes, Painting, accessories, etc Project: OBG-UPDATE2012-07-25 Activity: Testing, Commissioning & handing over Project: OBG-UPDATE2012-07-25 Activity: Site Survey and identify building points Project: OBG-UPDATE2012-07-25 Activity: General Excavation & localised for footings Project: OBG-UPDATE2012-07-25 Activity: Construction of Footing for Retaining Wall Project: OBG-UPDATE2012-07-25 Activity: Compaction & Backfill incl soil & base course for grade slab Project: OBG-UPDATE2012-07-25 Activity: Construct RCC Ground Slab with all MEP embedments Project: OBG-UPDATE2012-07-25 Activity: Construct Retaining Wall for External Bench & Waiting area Project: OBG-UPDATE2012-07-25 Activity: Construct Stone Walls in Retaining walls Project: OBG-UPDATE2012-07-25 Activity: MEP 1st Fixes Project: OBG-UPDATE2012-07-25 Activity: Structural Steel Installations for Shaded Structure Project: OBG-UPDATE2012-07-25 Activity:

A4150 A4160 A4170 A4180 A4200 A4310 A4320 A4330 A4340 A4350 A4360 A4370 A4380 A4410 A4440 A4450 A4460 A4470 A4490 A4500 A4510 A4520 A4530 A4540 A4550 A4560 A4570 A4580 A4590 A4600

MEP 2nd Fixes Project: OBG-UPDATE2012-07-25 Activity: Install Sun Shade Project: OBG-UPDATE2012-07-25 Activity: MEP Final fixes, Painting, accessories, etc Project: OBG-UPDATE2012-07-25 Activity: Testing, Commissioning & handing over Project: OBG-UPDATE2012-07-25 Activity: Site Survey and identify building points Project: OBG-UPDATE2012-07-25 Activity: General Excavation & localised for footings Project: OBG-UPDATE2012-07-25 Activity: Construction of Footing for Retaining Wall Project: OBG-UPDATE2012-07-25 Activity: Compaction & Backfill incl soil & base course for grade slab Project: OBG-UPDATE2012-07-25 Activity: Construct RCC Ground Slab with all MEP embedments Project: OBG-UPDATE2012-07-25 Activity: Construct Retaining Wall for External Bench & Waiting area Project: OBG-UPDATE2012-07-25 Activity: Construct Stone Walls in Retaining walls Project: OBG-UPDATE2012-07-25 Activity: MEP 1st Fixes Project: OBG-UPDATE2012-07-25 Activity: Structural Steel Installations for Shaded Structure Project: OBG-UPDATE2012-07-25 Activity: MEP 2nd Fixes Project: OBG-UPDATE2012-07-25 Activity: Install Sun Shade Project: OBG-UPDATE2012-07-25 Activity: MEP Final fixes, Painting, accessories, etc Project: OBG-UPDATE2012-07-25 Activity: Testing, Commissioning & handing over Project: OBG-UPDATE2012-07-25 Activity: Site Survey and identify building points Project: OBG-UPDATE2012-07-25 Activity: General Excavation & localised for footings Project: OBG-UPDATE2012-07-25 Activity: Construction of Footing for Retaining Wall Project: OBG-UPDATE2012-07-25 Activity: Compaction & Backfill incl soil & base course for grade slab Project: OBG-UPDATE2012-07-25 Activity: Construct RCC Ground Slab with all MEP embedments Project: OBG-UPDATE2012-07-25 Activity: Construct Retaining Wall for External Bench & Waiting area Project: OBG-UPDATE2012-07-25 Activity: Construct Stone Walls in Retaining walls Project: OBG-UPDATE2012-07-25 Activity: MEP 1st Fixes Project: OBG-UPDATE2012-07-25 Activity: Structural Steel Installations for Shaded Structure Project: OBG-UPDATE2012-07-25 Activity: MEP 2nd Fixes Project: OBG-UPDATE2012-07-25 Activity: Install Sun Shade Project: OBG-UPDATE2012-07-25 Activity: MEP Final fixes, Painting, accessories, etc Project: OBG-UPDATE2012-07-25 Activity: Testing, Commissioning & handing over Project: OBG-UPDATE2012-07-25 Activity: A4610 A4620 A4630 A4640 A4650 A4660 A4670 A4680 A4690 A4700 A4710 A4720 A4730 A4740 A4750 A4760 A4770 A4780 A4790 A4800 A4810 A4820 A4830 A4840 A4850 A4860 A4870 A4880 A4890 A4900

Site Survey and identify building points Project: OBG-UPDATE2012-07-25 Activity: General Excavation & localised for footings Project: OBG-UPDATE2012-07-25 Activity: Construction of Footing for Retaining Wall Project: OBG-UPDATE2012-07-25 Activity: Compaction & Backfill incl soil & base course for grade slab Project: OBG-UPDATE2012-07-25 Activity: Construct RCC Ground Slab with all MEP embedments Project: OBG-UPDATE2012-07-25 Activity: Construct Retaining Wall for External Bench & Waiting area Project: OBG-UPDATE2012-07-25 Activity: Site Survey and identify building points Project: OBG-UPDATE2012-07-25 Activity: General Excavation & localised for footings Project: OBG-UPDATE2012-07-25 Activity: Construction of Footing for Retaining Wall Project: OBG-UPDATE2012-07-25 Activity: Compaction & Backfill incl soil & base course for grade slab Project: OBG-UPDATE2012-07-25 Activity: Construct RCC Ground Slab with all MEP embedments Project: OBG-UPDATE2012-07-25 Activity: Construct Retaining Wall for External Bench & Waiting area Project: OBG-UPDATE2012-07-25 Activity: Construct Stone Walls in Retaining walls Project: OBG-UPDATE2012-07-25 Activity: MEP 1st Fixes Project: OBG-UPDATE2012-07-25 Activity: Structural Steel Installations for Shaded Structure Project: OBG-UPDATE2012-07-25 Activity: MEP 2nd Fixes Project: OBG-UPDATE2012-07-25 Activity: Install Sun Shade Project: OBG-UPDATE2012-07-25 Activity: MEP Final fixes, Painting, accessories, etc Project: OBG-UPDATE2012-07-25 Activity: Testing, Commissioning & handing over Project: OBG-UPDATE2012-07-25 Activity: Site Survey and identify building points Project: OBG-UPDATE2012-07-25 Activity: General Excavation & localised for footings Project: OBG-UPDATE2012-07-25 Activity: Construction of Footing for Retaining Wall Project: OBG-UPDATE2012-07-25 Activity: Compaction & Backfill incl soil & base course for grade slab Project: OBG-UPDATE2012-07-25 Activity: Construct RCC Ground Slab with all MEP embedments Project: OBG-UPDATE2012-07-25 Activity: Construct Retaining Wall for External Bench & Waiting area Project: OBG-UPDATE2012-07-25 Activity: Construct Stone Walls in Retaining walls Project: OBG-UPDATE2012-07-25 Activity: MEP 1st Fixes Project: OBG-UPDATE2012-07-25 Activity: Structural Steel Installations for Shaded Structure Project: OBG-UPDATE2012-07-25 Activity: MEP 2nd Fixes Project: OBG-UPDATE2012-07-25 Activity: Install Sun Shade Project: OBG-UPDATE2012-07-25 Activity:

A4910 A4920 A4930 A4940 A4950 A5030 A5040 A5050 A5060 A5070 A5080 A5090 A5100 A5110 A5120 A5130 A5140 A5150 A5160 A5170 A5180 A5190 A5200 A5210 A5220 A5230 A5240 A5250 A5260 A5270

MEP Final fixes, Painting, accessories, etc Project: OBG-UPDATE2012-07-25 Activity: Testing, Commissioning & handing over Project: OBG-UPDATE2012-07-25 Activity: Site Survey and identify building points Project: OBG-UPDATE2012-07-25 Activity: General Excavation & localised for footings Project: OBG-UPDATE2012-07-25 Activity: Construction of Footing for Retaining Wall Project: OBG-UPDATE2012-07-25 Activity: Compaction & Backfill incl soil & base course for grade slab Project: OBG-UPDATE2012-07-25 Activity: Construct RCC Ground Slab with all MEP embedments Project: OBG-UPDATE2012-07-25 Activity: Construct Retaining Wall for External Bench & Waiting area Project: OBG-UPDATE2012-07-25 Activity: Construct Stone Walls in Retaining walls Project: OBG-UPDATE2012-07-25 Activity: MEP 1st Fixes Project: OBG-UPDATE2012-07-25 Activity: Structural Steel Installations for Shaded Structure Project: OBG-UPDATE2012-07-25 Activity: MEP 2nd Fixes Project: OBG-UPDATE2012-07-25 Activity: Install Sun Shade Project: OBG-UPDATE2012-07-25 Activity: MEP Final fixes, Painting, accessories, etc Project: OBG-UPDATE2012-07-25 Activity: Testing, Commissioning & handing over Project: OBG-UPDATE2012-07-25 Activity: Site Survey and identify building points Project: OBG-UPDATE2012-07-25 Activity: General Excavation & localised for footings Project: OBG-UPDATE2012-07-25 Activity: Construction of Footing for Retaining Wall Project: OBG-UPDATE2012-07-25 Activity: Compaction & Backfill incl soil & base course for grade slab Project: OBG-UPDATE2012-07-25 Activity: Construct RCC Ground Slab with all MEP embedments Project: OBG-UPDATE2012-07-25 Activity: Construct Retaining Wall for External Bench & Waiting area Project: OBG-UPDATE2012-07-25 Activity: Construct Stone Walls in Retaining walls Project: OBG-UPDATE2012-07-25 Activity: MEP 1st Fixes Project: OBG-UPDATE2012-07-25 Activity: Structural Steel Installations for Shaded Structure Project: OBG-UPDATE2012-07-25 Activity: MEP 2nd Fixes Project: OBG-UPDATE2012-07-25 Activity: Install Sun Shade Project: OBG-UPDATE2012-07-25 Activity: MEP Final fixes, Painting, accessories, etc Project: OBG-UPDATE2012-07-25 Activity: Testing, Commissioning & handing over Project: OBG-UPDATE2012-07-25 Activity: Site Survey & Site Clearance Project: OBG-UPDATE2012-07-25 Activity: Excavation Project: OBG-UPDATE2012-07-25 Activity:

A5280 A5290 A5300 A5310 A5320 A5330 A5340 A5350 A5360 A5370 A5380 A5390 A5400 A5410 A5420 A5430 A5440 A5450 A5460 A5470 A5480 A5490 A5500 A5510 A5520 A5530 A5540 A5550 A5560 A5570

Compaction Project: Concrete Base Project: Masonry Kerbs Project: OBG-UPDATE2012-07-25 Activity: A5600 Wet mix Macadam with Irrigation pipe Project: OBG-UPDATE2012-07-25 Activity: A5610 Steel Mesh & Concrete Jointless Flooring Project: OBG-UPDATE2012-07-25 Activity: A5620 Top Soil Filling on the edges Project: OBG-UPDATE2012-07-25 Activity: A5630 All MEP services related to Southern Mountains incl irrigation, drainage, electr ical, HVAC, fire, etc Project: OBG-UPDATE2012-07-25 Activity: A5640 Aggregate pavement stabilised with Lime Project: OBG-UPDATE2012-07-25 Activity: A5650 Excavation & Cutting to profiles Project: OBG-UPDATE2012-07-25 Activity: A5660 Placing stones / boulders for terrace profile Project: OBG-UPDATE2012-07-25 Activity: A5810 Construct steps in stone masonry Project: OBG-UPDATE2012-07-25 Activity: A5820 Install Handrails for the Steps Project: OBG-UPDATE2012-07-25 Activity: A5830 Install Handrail Lift Project: OBG-UPDATE2012-07-25 Activity: A5840 Testing & Commissioning Project: OBG-UPDATE2012-07-25 Activity: A5850 Divert / Control Water of the Wadi Project: OBG-UPDATE2012-07-25 Activity: A5860 Excavate & Compact Wadi base Project: OBG-UPDATE2012-07-25 Activity: A5870 Waterproof layer of clay as water bed Project: OBG-UPDATE2012-07-25 Activity: A5880 Dress & Place Wadi Natural rocks in Wadi area Project: OBG-UPDATE2012-07-25 Activity: A5890 Dress & Place Seat Stones in Wadi area Project: OBG-UPDATE2012-07-25 Activity: A5900 Rock Retaining walls with joints & strata look Project: OBG-UPDATE2012-07-25 Activity: A5910 Survey & Set up Project: OBG-UPDATE2012-07-25 Activity: A5920 General Excavation and formation Project: OBG-UPDATE2012-07-25 Activity: A5930 MEP underground services - Irrigation, Fire piping, Electrical, etc Project: OBG-UPDATE2012-07-25 Activity: A5940 Concrete works for Barbeque stoves & fountain, etc incl concrete base Project: OBG-UPDATE2012-07-25 Activity: A5950 Stone works for Barbeque stoves, fountains, containers, etc Project: OBG-UPDATE2012-07-25 Activity: A5960 Install final fittings - light fixtures, sanitary accessories, etc Project: OBG-UPDATE2012-07-25 Activity: A5970 Erect Timber planks & Palm Rachis Shade Project: OBG-UPDATE2012-07-25 Activity: A5980 Construct Dirt Track in Picnic area Project: OBG-UPDATE2012-07-25 Activity: A5990 Construct Pedestrain Walkway area Project: OBG-UPDATE2012-07-25 Activity: A6000 Prepare substrate for Landscaping works OBG-UPDATE2012-07-25 Activity: A5590 OBG-UPDATE2012-07-25 Activity: A5580

Project: OBG-UPDATE2012-07-25 Activity: A6110 Install Sun Shade Project: OBG-UPDATE2012-07-25 Activity: A6240 Install Sun Shade Project: OBG-UPDATE2012-07-25 Activity: A6250 MEP Final fixes, Painting, accessories, etc Project: OBG-UPDATE2012-07-25 Activity: A6260 Testing, Commissioning & handing over Project: OBG-UPDATE2012-07-25 Activity: A6350 000000000000000000000 Project: OBG-UPDATE2012-07-25 Activity: A6360 Excavation Project: OBG-UPDATE2012-07-25 Activity: A6370 Compaction Project: OBG-UPDATE2012-07-25 Activity: A6380 Concrete Base Project: OBG-UPDATE2012-07-25 Activity: A6390 Masonry Kerbs Project: OBG-UPDATE2012-07-25 Activity: A6400 Wet mix Macadam with Irrigation pipe Project: OBG-UPDATE2012-07-25 Activity: A6410 Aggregate pavement stabilised with Lime Project: OBG-UPDATE2012-07-25 Activity: A6420 Top Soil Filling on the edges Project: OBG-UPDATE2012-07-25 Activity: A6430 Site Survey & Site Clearance Project: OBG-UPDATE2012-07-25 Activity: A6440 Excavation Project: OBG-UPDATE2012-07-25 Activity: A6450 Compaction Project: OBG-UPDATE2012-07-25 Activity: A6460 Wet mix Macadam with Irrigation pipe Project: OBG-UPDATE2012-07-25 Activity: A6470 Top Soil Filling on the edges Project: OBG-UPDATE2012-07-25 Activity: A6480 All MEP services related to Sabkha incl irrigation, drainage, electrical, HVAC, fire, etc Project: OBG-UPDATE2012-07-25 Activity: A6490 Site Survey & Site Clearance Project: OBG-UPDATE2012-07-25 Activity: A6500 Excavation Project: OBG-UPDATE2012-07-25 Activity: A6510 Compaction Project: OBG-UPDATE2012-07-25 Activity: A6520 Lime Gravel mix Project: OBG-UPDATE2012-07-25 Activity: A6530 Restoration of area, if damaged Project: OBG-UPDATE2012-07-25 Activity: A6540 Excavate and site clearance Project: OBG-UPDATE2012-07-25 Activity: A6550 Compaction and formation Project: OBG-UPDATE2012-07-25 Activity: A6560 Bedding Sand layer Project: OBG-UPDATE2012-07-25 Activity: A6570 EPDM waterproof geo-membrane Project: OBG-UPDATE2012-07-25 Activity: A6580 Fill with Salted crusts Project: OBG-UPDATE2012-07-25 Activity: A6590 Site Survey and identify building points Project: OBG-UPDATE2012-07-25 Activity: A6600

General Excavation & localised for footings Project: OBG-UPDATE2012-07-25 Activity: Construction of Footing Project: OBG-UPDATE2012-07-25 Activity: Construct Tie Beams Project: OBG-UPDATE2012-07-25 Activity: Backfilling for Slab on Grade / Ground Slab Project: OBG-UPDATE2012-07-25 Activity: Concrete Walls & Suspended Slab for Roof Project: OBG-UPDATE2012-07-25 Activity: Concrete Roof Parapets Project: OBG-UPDATE2012-07-25 Activity: Erect structural Steel Columns for Stone Masonry walls Project: OBG-UPDATE2012-07-25 Activity: Construct Slab on Grade Project: OBG-UPDATE2012-07-25 Activity: Construct Stone masonry walls Project: OBG-UPDATE2012-07-25 Activity: Blockwork Project: OBG-UPDATE2012-07-25 Activity: MEP 1st Fix & Plaster Project: OBG-UPDATE2012-07-25 Activity: MEP 2nd Fix Project: OBG-UPDATE2012-07-25 Activity: Install Doors & Windows incl Glass wall Project: OBG-UPDATE2012-07-25 Activity: Flooring Finish Project: OBG-UPDATE2012-07-25 Activity: MEP Final fix, painting, etc Project: OBG-UPDATE2012-07-25 Activity: Testing, Commissioning & Handing over Project: OBG-UPDATE2012-07-25 Activity: Roofing insulation & Stone works Project: OBG-UPDATE2012-07-25 Activity: Aggregate pavement stabilised with Lime Project: OBG-UPDATE2012-07-25 Activity: Top Soil Filling on the edges Project: OBG-UPDATE2012-07-25 Activity: Wet mix Macadam with Irrigation pipe Project: OBG-UPDATE2012-07-25 Activity: Top Soil Filling on the edges Project: OBG-UPDATE2012-07-25 Activity: Lime Gravel mix Project: OBG-UPDATE2012-07-25 Activity: Restoration of area, if damaged Project: OBG-UPDATE2012-07-25 Activity: All MEP services related to Central Desert incl irrigation, drainage, l, HVAC, fire, etc Project: OBG-UPDATE2012-07-25 Activity: Construction of Harkanawt Cliff - All complete including rockwork Project: OBG-UPDATE2012-07-25 Activity: Construction of Al Huqf Cliff - All complete including rockwork Project: OBG-UPDATE2012-07-25 Activity: Blockwork partitions inside the biome Project: OBG-UPDATE2012-07-25 Activity: Limestone Cladding on Elevations Project: OBG-UPDATE2012-07-25 Activity: Install Metallic substructures (for Tecu oxide panels - external) Project: OBG-UPDATE2012-07-25 Activity: MEP works inside biome including interphasing with MEP channel

A6610 A6620 A6630 A6640 A6650 A6660 A6670 A6680 A6690 A6700 A6710 A6720 A6730 A6740 A6750 A6760 A6830 A6840 A6880 A6890 A6930 A6940 A6950 electrica A6960 A6970 A6980 A7010 A7020 A7030

Project: OBG-UPDATE2012-07-25 Activity: A7040 Install Insulation, board & Tecu oxide Copper Sheets Project: OBG-UPDATE2012-07-25 Activity: A7050 Install Curtain Walling on Internal face side elevations Project: OBG-UPDATE2012-07-25 Activity: A7080 Install door, windows, louvers Project: OBG-UPDATE2012-07-25 Activity: A7090 All Internal finishes incl entry, exits, Technical gallery, MEP Cooling units, e tc Project: OBG-UPDATE2012-07-25 Activity: A7100 Internal Landscaping & Wadi works, Concrete Pathway & Terraces Project: OBG-UPDATE2012-07-25 Activity: A7110 Commissioning of the Biome Project: OBG-UPDATE2012-07-25 Activity: A7120 Snags, Cleaning & Handing over Project: OBG-UPDATE2012-07-25 Activity: A7130 Blockwork partitions inside the biome Project: OBG-UPDATE2012-07-25 Activity: A7140 Limestone Cladding on Elevations Project: OBG-UPDATE2012-07-25 Activity: A7150 Install Metallic substructures (for Tecu oxide panels - external) Project: OBG-UPDATE2012-07-25 Activity: A7160 MEP works inside biome including interphasing with MEP channel Project: OBG-UPDATE2012-07-25 Activity: A7170 Install Insulation, board & Tecu oxide Copper Sheets Project: OBG-UPDATE2012-07-25 Activity: A7180 Install Curtain Walling on Internal face side elevations Project: OBG-UPDATE2012-07-25 Activity: A7190 Install door, windows, louvers Project: OBG-UPDATE2012-07-25 Activity: A7200 All Internal finishes for entry, exits,Technical gallery, MEP Cooling units, Caf eteria, etc Project: OBG-UPDATE2012-07-25 Activity: A7210 Internal Landscaping & Wadi works, Concrete Pathway & Terraces Project: OBG-UPDATE2012-07-25 Activity: A7220 Commissioning of the Biome Project: OBG-UPDATE2012-07-25 Activity: A7230 Snags, Cleaning & Handing over Project: OBG-UPDATE2012-07-25 Activity: A7240 Blockwork partitions inside the biome Project: OBG-UPDATE2012-07-25 Activity: A7250 Limestone Cladding on Elevations Project: OBG-UPDATE2012-07-25 Activity: A7260 Install Metallic substructures (for Tecu oxide panels - external) Project: OBG-UPDATE2012-07-25 Activity: A7270 MEP works inside biome including interphasing with MEP channel Project: OBG-UPDATE2012-07-25 Activity: A7280 Install Insulation, board & Tecu oxide Copper Sheets Project: OBG-UPDATE2012-07-25 Activity: A7290 Install Curtain Walling on Internal face side elevations Project: OBG-UPDATE2012-07-25 Activity: A7300 Install door, windows, louvers Project: OBG-UPDATE2012-07-25 Activity: A7310 All Internal finishes incl entry, exits, Technical gallery, MEP Cooling units, e tc Project: OBG-UPDATE2012-07-25 Activity: A7320 Internal Landscaping & Wadi works, Concrete Pathway & Terraces Project: OBG-UPDATE2012-07-25 Activity: A7330 Commissioning of the Biome Project: OBG-UPDATE2012-07-25 Activity: A7340

Snags, Cleaning & Handing over Project: OBG-UPDATE2012-07-25 Activity: A7370 Receipt of "FOR CONSTRUCT" info for ETFE steel & panels - Northern Biome Project: OBG-UPDATE2012-07-25 Activity: A7400 Receipt of "FOR CONSTRUCT" info for Internal Landscape works - Northern Biome Project: OBG-UPDATE2012-07-25 Activity: A7470 Receipt of "FOR CONSTRUCT" info for ETFE steel & panels - Southern Biome Project: OBG-UPDATE2012-07-25 Activity: A7930 Submission & approval of Structural Steel trusses Project: OBG-UPDATE2012-07-25 Activity: A7940 Submission & approval of ETFE panels Project: OBG-UPDATE2012-07-25 Activity: A7950 Submission & approval of Tecu Oxide copper panels Project: OBG-UPDATE2012-07-25 Activity: A7960 Submission & approval of Curtain Walling Project: OBG-UPDATE2012-07-25 Activity: A7980 Submission & approval of Platform & rail side Lifts Project: OBG-UPDATE2012-07-25 Activity: A7990 Submission & approval of Kitchen equipment Project: OBG-UPDATE2012-07-25 Activity: A8000 Submission & approval of Limestone cladding. Project: OBG-UPDATE2012-07-25 Activity: A8020 Submission & approval of Shade structures - Train stations Project: OBG-UPDATE2012-07-25 Activity: A8040 Submission & approval of metal works incl metal decking Project: OBG-UPDATE2012-07-25 Activity: A8050 Submission & approval of various Floor finishes Project: OBG-UPDATE2012-07-25 Activity: A8060 Procurement of all MEP materials & equipment Project: OBG-UPDATE2012-07-25 Activity: A8080 Procurement, fabrication & delivery of Structural Steel trusses Project: OBG-UPDATE2012-07-25 Activity: A8090 Procurement & delivery of ETFE panels Project: OBG-UPDATE2012-07-25 Activity: A8100 Procurement, fabrication & delivery of Tecu Oxide copper panels Project: OBG-UPDATE2012-07-25 Activity: A8110 Procurement, fabrication & delivery of Curtain Walling Project: OBG-UPDATE2012-07-25 Activity: A8120 Procurement, fabrication & delivery of Aluminium doors & Windows Project: OBG-UPDATE2012-07-25 Activity: A8130 Procurement of Platform & rail side Lifts Project: OBG-UPDATE2012-07-25 Activity: A8140 Procurement & delivery of Kitchen equipment Project: OBG-UPDATE2012-07-25 Activity: A8150 Procurement & delivery of Stone cladding. Project: OBG-UPDATE2012-07-25 Activity: A8160 Procurement of Artificial Rock items Project: OBG-UPDATE2012-07-25 Activity: A8170 Procurement & delivery of Shade structures - Train stations Project: OBG-UPDATE2012-07-25 Activity: A8180 Procurement of Shaded structure - Northern Mountains Project: OBG-UPDATE2012-07-25 Activity: A8190 Procurment, fabrication & delivery of metal works incl metal decking Project: OBG-UPDATE2012-07-25 Activity: A8200 Procurement of various Floor finishes Project: OBG-UPDATE2012-07-25 Activity: A8220 Testing & Commissioning of the Biome non-exhibit areas Project: OBG-UPDATE2012-07-25 Activity: A8290 Procurement & delivery duration for Landscape plantations, etc Project: OBG-UPDATE2012-07-25 Activity: A8410

Plantings (by others) Project: OBG-UPDATE2012-07-25 Activity: Plantings (by others) Project: OBG-UPDATE2012-07-25 Activity: Plantings (by others) Project: OBG-UPDATE2012-07-25 Activity: Plantings (by others) Project: OBG-UPDATE2012-07-25 Activity: Main Plantations in overall Southern Mountains (by others) Project: OBG-UPDATE2012-07-25 Activity: Plantings (by others) Project: OBG-UPDATE2012-07-25 Activity: Plantings (by others) Project: OBG-UPDATE2012-07-25 Activity: Plantings (by others) Project: OBG-UPDATE2012-07-25 Activity: Plantings (by others) Project: OBG-UPDATE2012-07-25 Activity: All Plantings for the Wadi area (by others) Project: OBG-UPDATE2012-07-25 Activity: Testing & Commissioning of the area Project: OBG-UPDATE2012-07-25 Activity: Restoration of area, if damaged Project: OBG-UPDATE2012-07-25 Activity: Restoration of area, if damaged Project: OBG-UPDATE2012-07-25 Activity: Restoration of area, if damaged Project: OBG-UPDATE2012-07-25 Activity: Restoration of area, if damaged Project: OBG-UPDATE2012-07-25 Activity: Restoration of area, if damaged Project: OBG-UPDATE2012-07-25 Activity: Restoration of area, if damaged Project: OBG-UPDATE2012-07-25 Activity: Restoration of area, if damaged Project: OBG-UPDATE2012-07-25 Activity: Restoration of area, if damaged Project: OBG-UPDATE2012-07-25 Activity: Restoration of area, if damaged Project: OBG-UPDATE2012-07-25 Activity: Restoration of area, if damaged Project: OBG-UPDATE2012-07-25 Activity: Restoration of area, if damaged Project: OBG-UPDATE2012-07-25 Activity: Restoration of area, if damaged Project: OBG-UPDATE2012-07-25 Activity: Restoration of area, if damaged Project: OBG-UPDATE2012-07-25 Activity: Restoration of area, if damaged Project: OBG-UPDATE2012-07-25 Activity: Site Survey and identify building points Project: OBG-UPDATE2012-07-25 Activity: General Excavation & localised for footings Project: OBG-UPDATE2012-07-25 Activity: Construction of Footing Project: OBG-UPDATE2012-07-25 Activity: Construct Tie Beams Project: OBG-UPDATE2012-07-25 Activity: Concrete Walls & Suspended Slab for Roof Project: OBG-UPDATE2012-07-25 Activity:

A8420 A8430 A8440 A8450 A8460 A8470 A8480 A8490 A8500 A8510 A8520 A8530 A8540 A8550 A8560 A8570 A8580 A8590 A8600 A8610 A8620 A8630 A8640 A8650 A8660 A8670 A8680 A8690 A8700 A8710

Backfilling for Slab on Grade / Ground Slab Project: OBG-UPDATE2012-07-25 Concrete Roof Parapets Project: OBG-UPDATE2012-07-25 Erect structural Steel Columns for Stone Masonry walls Project: OBG-UPDATE2012-07-25 Construct Slab on Grade Project: OBG-UPDATE2012-07-25 Construct Stone masonry walls Project: OBG-UPDATE2012-07-25 Blockwork Project: OBG-UPDATE2012-07-25 MEP 1st Fix & Plaster Project: OBG-UPDATE2012-07-25 MEP 2nd Fix Project: OBG-UPDATE2012-07-25 Install Doors & Windows incl Glass wall Project: OBG-UPDATE2012-07-25 Flooring Finish & erect pergolas Project: OBG-UPDATE2012-07-25 MEP Final fix, painting, etc Project: OBG-UPDATE2012-07-25 Testing, Commissioning & Handing over Project: OBG-UPDATE2012-07-25 Roofing insulation & Stone works Project: OBG-UPDATE2012-07-25 Site Survey and identify building points Project: OBG-UPDATE2012-07-25 General Excavation & localised for footings Project: OBG-UPDATE2012-07-25 Construction of Footing Project: OBG-UPDATE2012-07-25 Construct Tie Beams Project: OBG-UPDATE2012-07-25 Concrete Walls & Suspended Slab for Roof Project: OBG-UPDATE2012-07-25 Backfilling for Slab on Grade / Ground Slab Project: OBG-UPDATE2012-07-25 Concrete Roof Parapets Project: OBG-UPDATE2012-07-25 Erect structural Steel Columns for Stone Masonry walls Project: OBG-UPDATE2012-07-25 Construct Slab on Grade Project: OBG-UPDATE2012-07-25 Construct Stone masonry walls Project: OBG-UPDATE2012-07-25 Blockwork Project: OBG-UPDATE2012-07-25 MEP 1st Fix & Plaster Project: OBG-UPDATE2012-07-25 MEP 2nd Fix Project: OBG-UPDATE2012-07-25 Install Doors & Windows incl Glass wall Project: OBG-UPDATE2012-07-25 Flooring Finish & erect pergolas Project: OBG-UPDATE2012-07-25 MEP Final fix, painting, etc Project: OBG-UPDATE2012-07-25 Testing, Commissioning & Handing over Project: OBG-UPDATE2012-07-25

Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity:

A8720 A8730 A8740 A8750 A8760 A8770 A8780 A8790 A8800 A8810 A8820 A8830 A8840 A8850 A8860 A8870 A8880 A8890 A8900 A8910 A8920 A8930 A8940 A8950 A8960 A8970 A8980 A8990 A9000 A9010

Roofing insulation & Stone works Project: OBG-UPDATE2012-07-25 Activity: A9020 Testing & Commissioning of the Biome non-exhibit areas Project: OBG-UPDATE2012-07-25 Activity: A9030 Testing & Commissioning of the Biome non-exhibit areas Project: OBG-UPDATE2012-07-25 Activity: A9040 Testing & Commissioning of the Biome non-exhibit areas Project: OBG-UPDATE2012-07-25 Activity: CD 8510 Submission & approval of all Civil Structural shop drawings for Central Desert Project: OBG-UPDATE2012-07-25 Activity: CD 8520 Submission & approval of MEP Shop drawings for Central Desert Project: OBG-UPDATE2012-07-25 Activity: CD 8530 Submission & approval of Landscaping Shop drawings for Central Desert Project: OBG-UPDATE2012-07-25 Activity: CD 8540 Submission & approval of Architectural Shop drawings for Central Desert Project: OBG-UPDATE2012-07-25 Activity: CD 8550 Submission & approval of Rockwork shop drawings for the Cliffs Project: OBG-UPDATE2012-07-25 Activity: NB8580 Submission & approval of Vertical Structural steel shop drawings - Northern Biom e Project: OBG-UPDATE2012-07-25 Activity: NB8590 Submission & approval of ETFE panels design / shop drawings - Northern Biome Project: OBG-UPDATE2012-07-25 Activity: NB8600 Submission & approval of Kitchen equipment shop drawings - Northern Biome Project: OBG-UPDATE2012-07-25 Activity: NB8610 Submission & approval of Tecu Oxide copper panels shop drawings - Northern Biome Project: OBG-UPDATE2012-07-25 Activity: NB8620 Submission & approval of Curtain Walling shop drawings - Northern Biome Project: OBG-UPDATE2012-07-25 Activity: NB8760 Submission & approval of all MEP shop drawings - Northern Biome Project: OBG-UPDATE2012-07-25 Activity: NM8290 Submission & approval of Platform & rail side Lifts - shop drawings Project: OBG-UPDATE2012-07-25 Activity: NM8775 Submission & approval of Civil Structural shop drawings for Northern Mountains Project: OBG-UPDATE2012-07-25 Activity: NM8780 Submission & approval of all Landscaping shop drawings Project: OBG-UPDATE2012-07-25 Activity: NM8790 Submission & approval of Shop drawings Structural works frame for Shaded structu re Project: OBG-UPDATE2012-07-25 Activity: NM8800 Submission & approval of Shop drawings for Shaded Structure Project: OBG-UPDATE2012-07-25 Activity: NM8810 Submission & approval of MEP shop drawings for Northern Mountains Project: OBG-UPDATE2012-07-25 Activity: PIC 8520 Submission & approval of MEP Shop drawings for Picnic Areas Project: OBG-UPDATE2012-07-25 Activity: PIC 8530 Submission & approval of Landscaping Shop drawings for Picnic Areas Project: OBG-UPDATE2012-07-25 Activity: PIC 8540 Submission & approval of Architectural Shop drawings for Picnic Areas Project: OBG-UPDATE2012-07-25 Activity: SAB 8510 Submission & approval of all Civil Structural shop drawings for Sabkha Project: OBG-UPDATE2012-07-25 Activity: SAB 8520 Submission & approval of MEP Shop drawings for Sabkha Project: OBG-UPDATE2012-07-25 Activity: SAB 8530 Submission & approval of Landscaping Shop drawings for Sabkha Project: OBG-UPDATE2012-07-25 Activity: SB8670 Submission & approval of shop drawings for wall foundations - Southern Biome Project: OBG-UPDATE2012-07-25 Activity: SB8680 Submission & approval of shop drawings for Ground Floor slabs - Southern Biome Project: OBG-UPDATE2012-07-25 Activity: SB8690

Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submisison & approval of Project: Submission & approval of Project: Submission & approval of

shop drawings for Suspended slabs - Southern Biome OBG-UPDATE2012-07-25 Activity: SB8700 ETFE cables & system Shop drawings - Southern Biome OBG-UPDATE2012-07-25 Activity: SB8710 Structural Steel Shop drawings - Southern Biome OBG-UPDATE2012-07-25 Activity: SB8720 Stone Cladding shop drawings - Southern Biome OBG-UPDATE2012-07-25 Activity: SB8730 Glazing shop drawings - Southern Biome OBG-UPDATE2012-07-25 Activity: SB8740 Flooring shop drawings - Southern Biome OBG-UPDATE2012-07-25 Activity: SB8750 Copper Cladding Shop drawings - Southern Biome OBG-UPDATE2012-07-25 Activity: SB8770 MEP Shop drawings - Southern Biome OBG-UPDATE2012-07-25 Activity: SM8510 Civil Structural shop drawings for Southern Mountains OBG-UPDATE2012-07-25 Activity: SM8520 all Architectural shop drawings for Southern Mountains OBG-UPDATE2012-07-25 Activity: SM8820 MEP shop drawings for Southern Mountains OBG-UPDATE2012-07-25 Activity: SM8821 Platform & rail side Lifts - shop drawings OBG-UPDATE2012-07-25 Activity: SM8830 all Landscaping shop drawings for Southern Mountains OBG-UPDATE2012-07-25 Activity: WAD 8510 all Civil Structural shop drawings for Wadi OBG-UPDATE2012-07-25 Activity: WAD 8520 MEP Shop drawings for Wadi OBG-UPDATE2012-07-25 Activity: WAD 8530 Landscaping Shop drawings for Wadi OBG-UPDATE2012-07-25 Activity: WAD 8540 Architectural Shop drawings for Wadi OBG-UPDATE2012-07-25 Activity: WAD 8550 Rockwork shop drawings for the Wadi OBG-UPDATE2012-07-25 Activity: WIL 8510 Civil structural shop drawings for Wilderness OBG-UPDATE2012-07-25 Activity: WIL 8520 MEP Shop drawings for Wilderness OBG-UPDATE2012-07-25 Activity: WIL 8530 Architectural Shop drawings for Wilderness OBG-UPDATE2012-07-25 Activity: WIL 8540 Shop drawings for Landscaping for Wilderness

Activities with unsatisfied constraints..........................2 Project: OBG-UPDATE2012-07-25 Activity: A1520 Project Completion & Handover Project: OBG-UPDATE2012-07-25 Activity: A2070 Approved Kitchen Layout drawings - approved by Muscat Food Control Authority Activities with unsatisfied relationships........................5 Project: OBG-UPDATE2012-07-25 Activity: A2040 General Excavation & localised for footings Project: OBG-UPDATE2012-07-25 Activity: A2880 Excavate for Wall Foundations Project: OBG-UPDATE2012-07-25 Activity: A2900 General Excavation for Southern Biome areas Project: OBG-UPDATE2012-07-25 Activity: A3370 Excavate for Wall Foundations Project: OBG-UPDATE2012-07-25 Activity: A3510

Excavation for Foundations & Tunnel Activities with external dates...................................0

Вам также может понравиться