16442 Montpelier District Heating Cost Estimate


Cost Estimate

Revision History
Revision

Release State

Date

Description of Change

Initial release

2/1/2012

Updated release

2/23/2012

Improved cost allocations and added alternate system


configurations

Updated release

6/6/2012

Explicitly removed West Branch

3.2

Updated release, Pre 80%


milestone

Cover and summary page only, electrical costs and


8/16/2012 bridge structural require additional work, only includes
Union Elementary district heat cost.

3.3

80% milestone

8/17/2012 Lacks Union Elementary conversion work

3.4

Corrected distribution piping cost, still lacks Union


Changed during final review
8/17/2012
Elementary conversion work
with owner

16442 Cost Estimate rev 3.4.xlsx

Page 1 of 1

16442 Montpelier District Heating Cost Estimate


Cost Summary City Costs Only
Underground Piping and Civil Restoration Work
Contingency
Component

Direct Cost

Distribution Piping Plant to Elm/State Intersection


Distribution Piping Elm/State to Main/School
Distributiopn Piping Main/Langdon to City Hall
Distribution Piping Main/School to Union Elementary
Distribution Piping 6 Baldwin to 139 State

$
$
$
$
$

783,616
600,881
382,162
367,375
134,312

Sub total

2,268,344

Cost
with cont.

$
10%
10%
10%
15%
10%

$
$
$
$
$

78,362
60,088
38,216
55,106
13,431

$
$
$
$
$

245,203

Notes

861,977
660,969
420,378
422,481 Additional contingency to cover telecom unknowns
147,743
2,513,547

In Building Connection and Conversion Work


Contingency
Component

Direct Cost

City Hall Connection and Conversion


Police Department Connection and Conversion
6 Baldwin HX Room
Union Elementary District Heat Piping, HXs and Meter

$
$
$
$

210,179
54,714
214,382
77,430

Sub Total

556,705

Cost
with cont.

$
15%
10%
10%
10%

Notes

$
$
$
$

31,527
5,471
21,438
7,743

$
$
$
$

241,706
60,186
235,820
85,173 Only DH piping, heat exchangers + metering

66,179

622,885

Total Project Cost


Contingency
$
$

$
245,203
66,179

Cost
with cont.
$ 2,513,547
$
622,885

311,383

$
$
$
$
$
$
$
$

31,076
50,000
2,825
1,413
250
2,000

$
$
$
$
$
$
$
$

341,831 11% of construction cost


150,000
31,076 1.0% of construction cost
15,538 0.5% of construction cost
2,750
12,000

465,631

87,563

553,194

3,290,680

398,946

3,689,626

Component
Distribution Piping
In Building Work

Direct Cost
$ 2,268,344
$
556,705

%
N/A
N/A

Total Direct Costs

2,825,049

N/A

General Conditions
Mobilization
Bonding
Builder's risk insurance
Safety program and coordination
Soil and materials testing
Contaminated soils
Permits (building, environmental)

$
$
$
$
$
$
$
$

310,755
100,000
28,250
14,125
2,500
10,000

Sub Total General Conditions

Total all costs

16442 Cost Estimate rev 3.4.xlsx

10%
50%
10%
10%
10%
20%
0%
0%

Notes

3,136,432

Page 2 of 19

1350 Landmark Towers


345 St. Peter Street
St. Paul, Minnesota 55102 1611

ENGINEER'S CONSTRUCTION ESTIMATE


Hot Water Pipe Installation
Montpelier, Vermont
August 17, 2012

Power Plant to Elm & State Street


Item Description
1
Clear and Grub Tree
2
Clear and Grub Bush
3
Remove Curbing
4
Saw Cutting (Full Depth)
5
Remove Bituminous Pavement
6
Remove Sidewalk
7
Trench Excavation
8
2.5"/6" Steel HWP (DN65, Series 2)
9
8"/14" Steel HWP (DN200, Series 2)
10
2.5"/6" Pre7Insulated 907degree Bends (Series 2)
11
8"/14" Pre7Insulated 907degree Bends (Series 2)
12
8"x2.5" Pre7Insulated Tees (Series 2)
13
2.5" Isolation Valves (Series 2)
14
8" Isolation Valves (Series 2)
15
8" Isolation Valves w/ 1 7 2" Service Valves (Series 2)
16
2" Pre7Insulated Air Release Valve (Series 2, 8" Main)
17
2.5"/6" End Seals
18
Install 2.5"/6" Steel HWP (Series 2)
19
Install 8"/14" Steel HWP (Series 2)
20
F&I 2.5"/6" Jointing (Insulation, Alarm Wiring, Shrink Film, and Sleeve)
21
F&I 8"/14" Jointing (Insulation, Alarm Wiring, Shrink Film, and Sleeve)
22
6" Ductile Iron Pipe CL 52
23
12" PVC Pipe SCH 80
24
Connect into Storm Sewer Structure
25
2'x3' Flash Chamber
26
HS725 Structural Concrete Slab
27
Casting Assembly (R719107B)
28
Dense Graded Crushed Stone
29
Granular Borrow
30
Pipe Bedding Material

16442 Cost Estimate rev 3.4.xlsx

Unit
ea
ea
lf
lf
cy
cy
cy
lf
lf
ea
ea
ea
ea
ea
ea
ea
ea
lf
lf
ea
ea
lf
lf
ea
ea
sf
ea
cy
cy
cy

Qty.
2
2
130
1,750
237
20
1,070
63
2,536
4
24
4
4
2
2
2
4
63
2,536
12
130
20
60
3
3
100
10
100
350
120

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

Unit Cost
550.00
550.00
5.00
12.00
15.00
18.00
15.00
20.00
55.00
130.00
550.00
625.00
550.00
2,250.00
3,000.00
1,500.00
30.00
51.00
77.00
300.00
500.00
55.00
24.00
1,500.00
2,200.00
100.00
600.00
30.00
20.00
45.00

Total
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

1,100.00
1,100.00
650.00
21,000.00
3,555.00
360.00
16,050.00
1,260.00
139,480.00
520.00
13,200.00
2,500.00
2,200.00
4,500.00
6,000.00
3,000.00
120.00
3,213.00
195,272.00
3,600.00
65,000.00
1,100.00
1,440.00
4,500.00
6,600.00
10,000.00
6,000.00
3,000.00
7,000.00
5,400.00

3 of 19

1350 Landmark Towers


345 St. Peter Street
St. Paul, Minnesota 55102 1611

ENGINEER'S CONSTRUCTION ESTIMATE


Hot Water Pipe Installation
Montpelier, Vermont
August 17, 2012

Power Plant to Elm & State Street


Item Description
31
Pipe Backfill Material
32
Granite Curbing
33
5" Portland Cement Concrete Sidewalk
34
Bituminous Pavement Restoration
35
Pavement Striping
36
Traffic Control
37
2" Caliper Deciduous Tree (B&B)
38
2" Caliper Coniferous Bush (B&B)
39
Landscape Restoration
40
6" Topsoil Borrow
41
Sodding
42
Erosion Control
43
Utility Potholing
44
2"x24"x48" Expansion Board
45
HI 100 Styrofoam Blue Board
46
2" Non7Metallic Conduit SCH80
47
Fiberglass Communications Cable
48
Handholes
49
Alarm Wiring Monitoring System

16442 Cost Estimate rev 3.4.xlsx

Unit
cy
lf
sy
sy
ls
ls
ea
ea
ls
cy
sy
ls
ls
sf
sf
lf
lf
ea
ls

Qty.
Unit Cost
400 $
35.00
130 $
40.00
120 $
65.00
1,430 $
85.00
1 $
1,000.00
1 $
6,250.00
2 $
250.00
2 $
250.00
1 $
3,750.00
4 $
27.00
22 $
25.00
1 $
2,500.00
1 $
6,250.00
530 $
1.25
100 $
3.75
2,600 $
10.00
1,300 $
3.00
5 $
1,400.00
1 $ 47,000.00
Subtotal
Contingency
10%
Montpelier Hot Water Distribution Construction Costs:

Total
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

14,000.00
5,200.00
7,800.00
121,550.00
1,000.00
6,250.00
500.00
500.00
3,750.00
108.00
550.00
2,500.00
6,250.00
662.50
375.00
26,000.00
3,900.00
7,000.00
47,000.00
783,615.50
78,361.55
861,977.05

4 of 19

1350 Landmark Towers


345 St. Peter Street
St. Paul, Minnesota 55102 1611

ENGINEER'S CONSTRUCTION ESTIMATE


Hot Water Pipe Installation
Montpelier, Vermont
August 17, 2012

State & Elm to Main & School


Item Description
1
Remove Curbing
2
Saw Cutting (Full Depth)
3
Remove Bituminous Pavement
4
Remove Sidewalk
5
Trench Excavation
6
2.5"/5.5" Steel HWP (DN65, Series 2)
7
6"/11" Steel HWP (DN150, Series 2)
8
6"/13" Steel HWP (DN150, Series 3)
9
8"/14" Steel HWP (DN200, Series 2)
10
2.5"/6" Pre7Insulated 907degree Bends (Series 2)
11
6"/11" Pre7Insulated 907degree Bends (Series 2)
12
8"/14" Pre7Insulated 607degree Bends (Series 2)
13
8"/14" Pre7Insulated 757degree Bends (Series 2)
14
8"/14" Pre7Insulated 907degree Bends (Series 2)
15
6"x2.5" Pre7Insulated Tees (Series 2)
16
6"x4" Pre7Insulated Tees (Series 2)
17
8"x2.5" Pre7Insulated Tees (Series 2)
18
8"x2.5" Pre7Insulated Parallel Tees (Series 2)
19
8"x6" Pre7Insulated Reducers (Series 2)
20
2.5" Isolation Valves (Series 2)
21
6" Isolation Valves (Series 2)
22
6" Isolation Valves w/ 2 7 2" Service Valves (Series 2)
23
8" Isolation Valves w/ 1 7 2" Service Valves (Series 2)
24
8" Isolation Valves w/ 2 7 2" Service Valves (Series 2)
25
2" Pre7Insulated Air Release Valve (Series 2, 6" Main)
26
2.5"/6" End Seals
27
Install 2.5"/6" Steel HWP (Series 2)
28
Install 6"/11" Steel HWP (Series 2)
29
Install 6"/14" Steel HWP (Series 3)
30
Install 8"/14" Steel HWP (Series 2)
31
F&I 2.5"/6" Jointing (Insulation, Alarm Wiring, Shrink Film, and Sleeve)
32
F&I 6"/11" Jointing (Insulation, Alarm Wiring, Shrink Film, and Sleeve)
33
F&I 6"/12.5" Jointing (Insulation, Alarm Wiring, Shrink Film, and Sleeve)
16442 Cost Estimate rev 3.4.xlsx

Unit
lf
lf
cy
cy
cy
lf
lf
lf
lf
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
lf
lf
lf
lf
ea
ea
ea

Qty.
90
1,600
200
10
520
70
670
170
640
3
14
2
2
4
4
2
3
1
2
8
2
2
2
2
2
8
70
670
170
640
20
70
10

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

Unit Cost
5.00
12.00
15.00
18.00
15.00
20.00
33.00
35.00
55.00
130.00
400.00
800.00
800.00
550.00
525.00
630.00
625.00
650.00
950.00
550.00
1,500.00
3,000.00
3,000.00
3,500.00
1,300.00
30.00
51.00
59.00
59.00
77.00
300.00
475.00
475.00

Total
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

450.00
19,200.00
3,000.00
180.00
7,800.00
1,400.00
22,110.00
5,950.00
35,200.00
390.00
5,600.00
1,600.00
1,600.00
2,200.00
2,100.00
1,260.00
1,875.00
650.00
1,900.00
4,400.00
3,000.00
6,000.00
6,000.00
7,000.00
2,600.00
240.00
3,570.00
39,530.00
10,030.00
49,280.00
6,000.00
33,250.00
4,750.00
page 5 of 19 pages

1350 Landmark Towers


345 St. Peter Street
St. Paul, Minnesota 55102 1611

ENGINEER'S CONSTRUCTION ESTIMATE


Hot Water Pipe Installation
Montpelier, Vermont
August 17, 2012

State & Elm to Main & School


Item Description
34
F&I 8"/14" Jointing (Insulation, Alarm Wiring, Shrink Film, and Sleeve)
35
6" Ductile Iron Pipe CL 52
36
12" PVC Pipe SCH 80
37
Connect into Storm Sewer Structure
38
2'x3' Flash Chamber
39
HS725 Structural Concrete Slab
40
Casting Assembly (R719107B)
41
Dense Graded Crushed Stone
42
Granular Borrow
43
Pipe Bedding Material
44
Pipe Backfill Material
45
Granite Curbing
46
5" Portland Cement Concrete Sidewalk
47
Bituminous Pavement Restoration
48
Pavement Striping
49
Traffic Control
50
Landscape Restoration
51
Erosion Control
52
Utility Potholing
53
2"x24"x48" Expansion Board
54
HI 100 Styrofoam Blue Board
55
2" Non7Metallic Conduit
56
Fiberglass Communications Cable
57
Handholes
58
Structural work on Langdon Street Bridge

Qty.
Unit Cost
50 $
500.00
25 $
55.00
140 $
25.00
2 $
1,500.00
2 $
2,200.00
220 $
100.00
22 $
600.00
100 $
30.00
100 $
20.00
60 $
45.00
200 $
35.00
90 $
40.00
100 $
65.00
1,200 $
85.00
1 $
1,000.00
1 $
6,250.00
1 $
3,750.00
1 $
2,500.00
1 $
8,000.00
470 $
1.25
220 $
3.75
1,600 $
10.00
800 $
3.00
3 $
1,400.00
1 $ 66,000.00
Subtotal
Contingency
10%
Montpelier Hot Water Distribution Construction Costs:

16442 Cost Estimate rev 3.4.xlsx

Unit
ea
lf
lf
ea
ea
sf
ea
cy
cy
cy
cy
lf
sy
sy
ls
ls
ls
ls
ls
sf
sf
lf
lf
ea
ea

Total
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

25,000.00
1,353.00
3,500.00
3,000.00
4,400.00
22,000.00
13,200.00
3,000.00
2,000.00
2,700.00
7,000.00
3,600.00
6,500.00
102,000.00
1,000.00
6,250.00
3,750.00
2,500.00
8,000.00
587.50
825.00
16,000.00
2,400.00
4,200.00
66,000.00
600,880.50
60,088.05
660,968.55

page 6 of 19 pages

1350 Landmark Towers


345 St. Peter Street
St. Paul, Minnesota 55102 1611

ENGINEER'S CONSTRUCTION ESTIMATE


Hot Water Pipe Installation
Montpelier, Vermont
August 17, 2012

Main & Langdon to City Hall


Item Description
1
Remove Curbing
2
Saw Cutting (Full Depth)
3
Remove Bituminous Pavement
4
Remove Sidewalk
5
Trench Excavation
6
1.5"/4" Steel HWP (DN 40, Series 2)
7
2.5"/5.5" Steel HWP (DN65, Series 2)
8
4"/9" Steel HWP (DN100, Series 2)
9
2.5"/6" Pre7Insulated 907degree Bends (Series 2)
10
4"/9" Pre7Insulated 907degree Bends (Series 2)
11
2.5"x1.5" Pre7Insulated Tees (Series 2)
12
4"x2.5" Pre7Insulated Tees (Series 2)
13
2.5"x2.5" Pre7Insulated Parallel Tees (Series 2)
14
4"x2.5" Pre7Insulated Parallel Tees (Series 2)
15
4"x2.5" Pre7Insulated Reducers (Series 2)
16
1.5" Isolation Valves (Series 2)
17
2.5" Isolation Valves (Series 2)
18
2.5" Isolation Valves w/ 2 7 2" Service Valves
19
4" Isolation Valves (Series 2)
20
2" Pre7Insulated Air Release Valve (Series 2, 4" Main)
21
1.5"/5.5" End Seals
22
2.5"/6" End Seals
23
Install 1.5"/5.5" Steel HWP (Series 2)
24
Install 2.5"/6" Steel HWP (Series 2)
25
Install 4"/9" Steel HWP (Series 2)
26
F&I 1.5"/5.5" Jointing (Insulation, Alarm Wiring, Shrink Film, and Sleeve)
27
F&I 2.5"/6" Jointing (Insulation, Alarm Wiring, Shrink Film, and Sleeve)
28
F&I 4"/9" Jointing (Insulation, Alarm Wiring, Shrink Film, and Sleeve)
29
6" Ductile Iron Pipe CL 52
30
12" PVC Pipe SCH 80
31
Connect into Storm Sewer Structure
32
2'x3' Flash Chamber
33
HS725 Structural Concrete Slab
16442 Cost Estimate rev 3.4.xlsx

Unit
lf
lf
cy
cy
cy
lf
lf
lf
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
lf
lf
lf
ea
ea
ea
lf
lf
ea
ea
sf

Qty.
60
1,790
152
10
500
16
999
826
15
10
2
1
2
1
2
2
2
2
2
2
2
2
16
999
826
2
50
49
30
72
2
2
120

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

Unit Cost
5.00
12.00
15.00
18.00
15.00
20.00
22.00
30.00
130.00
225.00
250.00
400.00
300.00
375.00
800.00
450.00
550.00
1,000.00
1,000.00
1,000.00
28.00
30.00
51.00
51.00
55.00
300.00
300.00
400.00
55.00
25.00
1,500.00
2,200.00
100.00

Total
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

300.00
21,480.00
2,280.00
180.00
7,500.00
320.00
21,978.00
24,780.00
1,950.00
2,250.00
500.00
400.00
600.00
375.00
1,600.00
900.00
1,100.00
2,000.00
2,000.00
2,000.00
56.00
60.00
816.00
50,949.00
45,430.00
600.00
15,000.00
19,600.00
1,650.00
1,800.00
3,000.00
4,400.00
12,000.00
page 7 of 19 pages

1350 Landmark Towers


345 St. Peter Street
St. Paul, Minnesota 55102 1611

ENGINEER'S CONSTRUCTION ESTIMATE


Hot Water Pipe Installation
Montpelier, Vermont
August 17, 2012

Main & Langdon to City Hall


Item Description
34
Casting Assembly (R719107B)
35
Dense Graded Crushed Stone
36
Granular Borrow
37
Pipe Bedding Material
38
Pipe Backfill Material
39
Granite Curbing
40
5" Portland Cement Concrete Sidewalk
41
Bituminous Pavement Restoration
42
Pavement Striping
43
Traffic Control
44
Landscape Restoration
45
6" Topsoil Borrow
46
Sodding
47
Erosion Control
48
Utility Potholing
49
2"x24"x48" Expansion Board
50
HI 100 Styrofoam Blue Board
51
2" Non7Metallic Conduit
52
Fiberglass Communications Cable
53
Handholes
54
Construct 2.5" Service Entry

16442 Cost Estimate rev 3.4.xlsx

Unit
ea
cy
cy
cy
cy
lf
sy
sy
ls
ls
ls
cy
sy
ls
ls
sf
sf
lf
lf
ea
ea

Qty.
Unit Cost
12 $
600.00
100 $
30.00
100 $
20.00
70 $
45.00
190 $
35.00
60 $
40.00
100 $
65.00
920 $
50.00
1 $
1,000.00
1 $
5,000.00
1 $
5,000.00
10 $
27.00
10 $
25.00
1 $
2,000.00
1 $
6,750.00
350 $
1.25
120 $
3.75
1,900 $
10.00
950 $
3.00
4 $
1,400.00
2 $
3,400.00
Subtotal
Contingency
10%
Montpelier Hot Water Distribution Construction Costs:

Total
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

7,200.00
3,000.00
2,000.00
3,150.00
6,650.00
2,400.00
6,500.00
46,000.00
1,000.00
5,000.00
5,000.00
270.00
250.00
2,000.00
6,750.00
437.50
450.00
19,000.00
2,850.00
5,600.00
6,800.00
382,161.50
38,216.15
420,377.65

page 8 of 19 pages

1350 Landmark Towers


345 St. Peter Street
St. Paul, Minnesota 55102 1611

ENGINEER'S CONSTRUCTION ESTIMATE


Hot Water Pipe Installation
Montpelier, Vermont
August 17, 2012

Main & School to Union Elementary


Item Description
1
Remove Curbing
2
Saw Cutting (Full Depth)
3
Remove Bituminous Pavement
4
Remove Sidewalk
5
Trench Excavation
6
2.5"/6" Steel HWP (DN100, Series 2)
7
4"/9" Steel HWP (DN100, Series 2)
8
2.5"/6" Pre7Insulated 907degree Bends (Series 2)
9
4"/9" Pre7Insulated 907degree Bends (Series 2)
10
4"x2.5" Pre7Insulated Tees (Series 2)
11
6"x4" Pre7Insulated Reducers (Series 2)
12
2.5" Isolation Valves (Series 2)
13
2" Pre7Insulated Air Release Valve (Series 2, 4" Main)
14
2.5"/6" End Seals
15
Install 2.5"/6" Steel HWP (Series 2)
16
Install 4"/9" Steel HWP (Series 2)
17
F&I 2.5"/6" Jointing (Insulation, Alarm Wiring, Shrink Film, and Sleeve)
18
F&I 4"/9" Jointing (Insulation, Alarm Wiring, Shrink Film, and Sleeve)
19
6" Ductile Iron Pipe CL 52
20
12" PVC Pipe SCH 80
21
Connect into Storm Sewer Structure
22
2'x3' Flash Chamber
23
HS725 Structural Concrete Slab
24
Casting Assembly (R719107B)
25
Dense Graded Crushed Stone
26
Granular Borrow
27
Pipe Bedding Material
28
Pipe Backfill Material
29
Granite Curbing
30
5" Portland Cement Concrete Sidewalk
31
6" Reinforced Portland Cement Concrete Sidewalk
32
Bituminous Pavement Restoration
33
Traffic Control
16442 Cost Estimate rev 3.4.xlsx

Unit
lf
lf
cy
cy
cy
lf
lf
ea
ea
ea
ea
ea
ea
ea
lf
lf
ea
ea
lf
lf
ea
ea
sf
ea
cy
cy
cy
cy
lf
sy
sy
sy
ls

Qty.
720
1,200
50
70
540
40
1,730
2
12
2
2
2
2
2
40
1,730
4
70
6
24
1
1
40
4
40
100
70
200
720
380
40
300
1

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

Unit Cost
5.00
12.00
15.00
18.00
15.00
20.00
30.00
130.00
225.00
400.00
800.00
550.00
1,000.00
30.00
51.00
55.00
300.00
400.00
55.00
25.00
1,500.00
2,200.00
100.00
600.00
30.00
20.00
45.00
35.00
40.00
65.00
85.00
85.00
5,000.00

Total
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

3,600.00
14,400.00
750.00
1,260.00
8,100.00
800.00
51,900.00
260.00
2,700.00
800.00
1,600.00
1,100.00
2,000.00
60.00
2,040.00
95,150.00
1,200.00
28,000.00
330.00
600.00
1,500.00
2,200.00
4,000.00
2,400.00
1,200.00
2,000.00
3,150.00
7,000.00
28,800.00
24,700.00
3,400.00
25,500.00
5,000.00
page 9 of 19 pages

1350 Landmark Towers


345 St. Peter Street
St. Paul, Minnesota 55102 1611

ENGINEER'S CONSTRUCTION ESTIMATE


Hot Water Pipe Installation
Montpelier, Vermont
August 17, 2012

Main & School to Union Elementary


Item Description
34
6" Topsoil Borrow
35
Sodding
36
Erosion Control
37
Utility Potholing
38
2"x24"x48" Expansion Board
39
HI 100 Styrofoam Blue Board
40
2" Non7Metallic Conduit
41
Fiberglass Communications Cable
42
Handholes
43
Construct 4" Service Entry

16442 Cost Estimate rev 3.4.xlsx

Unit
cy
sy
ls
ls
sf
sf
lf
lf
ea
ea

Qty.
Unit Cost
30 $
27.00
130 $
25.00
1 $
2,000.00
1 $
5,000.00
340 $
1.25
40 $
3.75
1,760 $
10.00
880 $
3.00
3 $
1,400.00
1 $
3,800.00
Subtotal
Contingency
15%
Montpelier Hot Water Distribution Construction Costs:

Total
$
$
$
$
$
$
$
$
$
$
$
$
$

810.00
3,250.00
2,000.00
5,000.00
425.00
150.00
17,600.00
2,640.00
4,200.00
3,800.00
367,375.00
55,106.25
422,481.25

page 10 of 19 pages

1350 Landmark Towers


345 St. Peter Street
St. Paul, Minnesota 55102 1611

ENGINEER'S CONSTRUCTION ESTIMATE


Hot Water Pipe Installation
Montpelier, Vermont
August 17, 2012

135 State Street to Union Mutual


Item Description
1
Remove Curbing
2
Saw Cutting (Full Depth)
3
Remove Bituminous Pavement
4
Remove Sidewalk
5
Trench Excavation
6
2.5"/5.5" Steel HWP (DN65, Series 2)
7
2.5"/6" Pre7Insulated 907degree Bends (Series 2)
8
Install 2.5"/6" Steel HWP (Series 2)
9
F&I 2.5"/6" Jointing (Insulation, Alarm Wiring, Shrink Film, and Sleeve)
10
Dense Graded Crushed Stone
11
Granular Borrow
12
Pipe Bedding Material
13
Pipe Backfill Material
14
Granite Curbing
15
5" Portland Cement Concrete Sidewalk
16
Bituminous Pavement Restoration
17
Pavement Striping
18
Traffic Control
19
Landscape Restoration
20
6" Topsoil Borrow
21
Sodding
22
Erosion Control
23
Utility Potholing
24
2"x24"x48" Expansion Board
25
2" Non7Metallic Conduit
26
Fiberglass Communications Cable
27
Handholes
28
Alarm Wiring Monitoring System
29
Construct 2.5" Service Entry

Qty.
Unit Cost
20 $
5.00
90 $
12.00
6 $
15.00
10 $
18.00
170 $
15.00
658 $
22.00
8 $
130.00
658 $
51.00
30 $
300.00
100 $
30.00
100 $
20.00
30 $
45.00
60 $
35.00
20 $
40.00
60 $
65.00
40 $
50.00
1 $
500.00
1 $
5,000.00
1 $
5,000.00
50 $
27.00
270 $
25.00
1 $
4,000.00
1 $
6,750.00
70 $
1.25
700 $
10.00
350 $
3.00
2 $
1,400.00
1 $ 10,000.00
2 $
3,400.00
Subtotal
Contingency
10%
Montpelier Hot Water Distribution Construction Costs:

16442 Cost Estimate rev 3.4.xlsx

Union Mutual

Unit
lf
lf
cy
cy
cy
lf
ea
lf
ea
cy
cy
cy
cy
lf
sy
sy
ls
ls
ls
cy
sy
ls
ls
sf
lf
lf
ea
ls
ea

Total
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

100.00
1,080.00
90.00
180.00
2,550.00
14,476.00
1,040.00
33,558.00
9,000.00
3,000.00
2,000.00
1,350.00
2,100.00
800.00
3,900.00
2,000.00
500.00
5,000.00
5,000.00
1,350.00
6,750.00
4,000.00
6,750.00
87.50
7,000.00
1,050.00
2,800.00
10,000.00
6,800.00
134,311.50
13,431.15
147,742.65

page 11 of 19 pages

16442 Montpelier District Heating Cost Estimate


City Hall Connection and Conversion

Item
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34

Quantity

Unit

Unit Cost

Total

Notes

Piping to header from HX


4 inch isolation valve
4 inch suction diffuser
Hot water pumps (P2.2/P2.1)
4 inch check valve
Pressure gage assembly
4 inch pipe
4 inch elbow
4 inch flexible connector
4 inch suction diffuser
Relief valve
Vents and drains
Concrete pad

12
4
2
2
3
100
10
4
2
1
8
1

each
each
each
each
each
each
each
each
each
each
each
each

$
$
$
$
$
$
$
$
$
$
$
$

450
1,500
4,000
800
200
81
320
265
877
225
200
500

$
$
$
$
$
$
$
$
$
$
$
$

5,400
6,000
8,000
1,600
600
8,100
3,200
1,060
1,754
225
1,600
500

District heating piping at entrance


4 inch district heating piping
Pressure gage assembly
4 inch valve
4 inch elbow
Relief valve
Heat exchanger
Control valve
Concrete pad
District hot water pumps (P1.1/P1.2)
4 inch flexible connector
4 inch suction diffuser
4 inch check valve

150
2
8
16
1
4
1
1
2
4
2
2

feet
each
each
each
each
each
each
each
each
each
each
each

$
$
$
$
$
$
$
$
$
$
$
$

81
200
450
320
225
6,500
3,500
500
7,500
265
877
800

$
$
$
$
$
$
$
$
$
$
$
$

12,150
400
3,600
5,120
225
26,000
3,500
500
15,000
1,060
1,754
1,600

1 each

10,895

10,895

$
$
$
$

60
160
5
108

$
$
$
$

Pipe covering (10% of mechanical)


Louvers (18"x18" each)
Damper (12"x12" each) w/ actuator
Ductwork (12"x12"x40')
Diffusers

5
2
200
2

square feet
each
pound
each

270
320
1,000 ~5 pounds per foot, 40 feet
216

Page 12 of 19

16442 Montpelier District Heating Cost Estimate


City Hall Connection and Conversion

Item
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
Total

Quantity

Unit

Unit Cost

Total

Notes

Supply fan
Exhaust fan

1 each
1 each

$
$

315
315

$
$

Temperature indicators
Temperature transmitters
New controller, I/O and programming
New controller, I/O and programming

6
6
1
1

each
each
each
each

$
$
$
$

225
2,000
7,500
30,000

$
$
$
$

District heat controller7meter


Lockable cabinet
Meter (electronic)
Programmable logic controller
Temperature transmitters (two)
Flow transmitter
Fiber optic termination
Network switch with fiber and copper
Panel assembly and test
Differential pressure transmitter
Total controller7meter

1 each

$
$
$
$
$
$
$
$
$
$

300
2,500
1,250
1,000
850
50
150
500
2,500
9,100

9,100

100A Panel and Feeder


VFD for 3HP pumps
VFD for 5HP pumps
Combination Starters for Fans
Conduit and for feeds to motors
Misc electrical work
Electrical 7 district controls and comm.
Electrical 7 building controls and comm.

1
2
2
2
1
1
1
1

$
$
$
$
$
$
$
$

3,500
1,600
1,800
1,150
1,850
1,000
5,000
7,500

$
$
$
$
$
$
$
$

3,500
3,200
3,600
2,300
1,850
1,000
5,000
7,500

210,179

each
each
each
each
each
each
each
each

315
315
1,350
12,000 For building control system
7,500 To use district heat
30,000 To dispatch/replace existing

Page 13 of 19

16442 Montpelier District Heating Cost Estimate


Police Department Connection and Conversion

Item
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34

Quantity
Piping to header from HX
2 inch copper
2 inch tees
2 inch elbows
2 inch valves
Pressure gage assembly
Relief valve

Unit

Unit Cost

Total

Notes

160
4
10
2
1
1

feet
each
each
each
each
each

$
$
$
$
$
$

22
119
72
105
200
225

$
$
$
$
$
$

3,520
476
720
210
200
225

80
2
8
16
1
1
1
1

feet
each
each
each
each
each
each
each

$
$
$
$
$
$
$
$

19
200
174
51
225
6,500
2,500
500

$
$
$
$
$
$
$
$

1,520
400
1,392
816
225
6,500
2,500
500

Temperature indicators

4 each

225

900

Pipe covering (10% of mechanical)

1 each

2,010

2,010

Temperature transmitters
Control system modification

4 each
1 each

$
$

2,000
7,500

$
$

8,000 For building control system


7,500 Allowance

$
$
$
$
$
$
$
$

300
2,500
1,250
1,000
850
50
150
500

District heating piping at entrance


1.5 inch district heating piping
Pressure gage assembly
1.5 inch valve
1.5 inch elbow
Relief valve
Heat exchanger
Control valve
Concrete pad

District heat controller7meter


Lockable cabinet
Meter (electronic)
Programmable logic controller
Temperature transmitters (two)
Flow transmitter
Fiber optic termination
Network switch with fiber and copper
Panel assembly and test

Police Page 14 of 19

16442 Montpelier District Heating Cost Estimate


Police Department Connection and Conversion

Item
35
36
37
38
39
40
41
Total

Quantity

Unit

Unit Cost

Total

Notes

Differential pressure transmitter


Total controller7meter

1 each

$
$

2,500
9,100

9,100

Circuit breakers for existing panel


Conduit and wire to control panel
Electrical 7 district controls and comm.
Electrical 7 building controls and comm.

1
1
1
1

$
$
$
$

500
500
3,000
4,000

$
$
$
$

500
500
3,000
4,000

54,714

each
each
each
each

Police Page 15 of 19

16442 Montpelier District Heating Cost Estimate


6 Baldwin HX Room

Item
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34

Quantity

Unit

Unit Cost

District heat piping


2.5 inch isolation valve
2.5 inch elbows
2.5 inch piping
Vents and drains
2.5 inch flexible connector
2.5 inch suction diffuser
2.5 inch air separator
Expansion tank
Hot water pump
Pressure gage assembly
Heat exchanger
Relief valve
Chemcial shot feeder

16
20
150
10
4
2
1
1
2
5
3
3
1

each
each
feet
each
each
each
each
each
each
each
each
each
each

$
$
$
$
$
$
$
$
$
$
$
$
$

271
126
27
200
323
645
1,117
2,262
5,000
200
5,000
225
1,005

Steam piping
3 inch isolation valve
3 inch elbows
3 inch piping
Warmup valve assembly
Control valves
2.5 inch isolation valve
2.5 inch elbows
2.5 inch piping

3
25
175
1
4
8
12
50

each
each
feet
each
each
each
each
feet

$
$
$
$
$
$
$
$

Condensate piping
1.5 inch isolation valve
1.5 inch elbows
1.5 inch piping
1 inch isolation valve
1 inch elbows
1 inch piping
Condensate pump/tank
Steam trap (drip) assembly

4
25
175
4
10
50
1
5

each
each
feet
each
each
feet
each
each

$
$
$
$
$
$
$
$

Total

Notes

780
147
30
500
1,941
780
126
27

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

4,336
2,520
4,050
2,000
1,292
1,290
1,117
2,262
10,000
1,000
15,000
675
1,005
7
7
2,340
3,675
5,250
500
7,764
6,240
1,512
1,350

238
47
25
140
36
18
5,817
1,000

$
$
$
$
$
$
$
$

952
1,175
4,375
560
360
900
5,817
5,000

6Baldwin Page 16 of 19

16442 Montpelier District Heating Cost Estimate


6 Baldwin HX Room

Item
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68

Quantity
Steam trap (HX) assembly
Flash tank
1.5 inch piping (flash tank vent)
1.5 inch piping (condensate tank vent)

Unit

Unit Cost

Total

Notes

3
1
75
75

each
each
each
each

$
$
$
$

1,200
1,500
19
19

$
$
$
$

3,600
1,500
1,397
1,397

Cold water
1" copper
1" elbow
1" valve
Backflow preventor
Water meter w/ output
Hydrant

150
25
5
1
2
1

feet
each
each
each
each
each

$
$
$
$
$
$

12
33
45
315
351
250

$
$
$
$
$
$

1,800
825
225
315
702
250

Louvers (18"x18" each)


Damper (12"x12" each) w/ actuator
Ductwork (12"x12"x40')
Diffusers
Supply fan
Exhaust fan
Hot water unit heater

5
2
200
2
1
1
1

square feet
each
pound
each
each
each
each

$
$
$
$
$
$
$

60
160
5
108
315
315
706

$
$
$
$
$
$
$

270
320
1,000 ~5 pounds per foot, 40 feet
216
315
315
706

Pipe covering

1 each

10,946.90

Carpentry work for walls, doors, paint

1 each

7,500

each
each
feet
each
each

$
$
$
$
$

6,234
1,000
27
104
71

$
$
$
$
$

6,234
1,000
5,400
312
1,420

10 each
20 each

$
$

225
225

$
$

2,250
4,500

Sanitary drain
Sump with pump
Concrete work for sump
2" copper piping
2" valve
2" copper elbow
Pressure indicators
Temperature indicators

1
1
200
3
20

10,947 10% of mechanical

6Baldwin Page 17 of 19

16442 Montpelier District Heating Cost Estimate


6 Baldwin HX Room

Item
69
70
71
72
73
74
75
76
77
78
79
80
81
Total

Quantity
Temperature transmitters
New controller, I/O and programming
New controller, I/O and programming

100A Panel and Feeder


VFD for 1HP pumps
Combination Starters for Fans
Conduit and for feeds to mech equip
Receptacles & Lighting
Misc electrical work
Electrical 7 controls
Electrical 7 communication

Unit
6 each
1 each
1 each

1
2
2
1
1
1
1
1

each
each
each
each
each
each
each
each

Unit Cost

Total

Notes

$
$
$

2,000
7,500
30,000

$
$
$

12,000
7,500
30,000

$
$
$
$
$
$
$
$

3,000
1,200
1,100
1,250
1,000
1,000
5,000
7,500

$
$
$
$
$
$
$
$

3,000
2,400
2,200
1,250
1,000
1,000
5,000
7,500

214,382

6Baldwin Page 18 of 19

16442 Montpelier District Heating Cost Estimate


Union Elementary District Heat Piping, HXs and Meter

Item
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Total

Quantity
4 inch district heating piping
Pressure gage assembly
4 inch valve
4 inch elbow
Relief valve
Heat exchanger
Control valve
Concrete pad
Pipe covering (10% of mechanical)

Unit

Total

Notes

feet
each
each
each
each
each
each
each
each

$
$
$
$
$
$
$
$
$

81
200
450
320
225
6,500
3,500
500
5,130

$
$
$
$
$
$
$
$
$

20,250
400
3,600
9,600
450
13,000
3,500
500
5,130

4 each
4 each

$
$

225
2,000

$
$

900
8,000

District heat controller7meter


Lockable cabinet
Meter (electronic)
Programmable logic controller
Temperature transmitters (two)
Flow transmitter
Fiber optic termination
Network switch with fiber and copper
Panel assembly and test
Differential pressure transmitter
Total controller7meter

1 each

$
$
$
$
$
$
$
$
$
$

300
2,500
1,250
1,000
850
50
150
500
2,500
9,100

9,100

Electrical 7 district controls and comm.

1 each

3,000

3,000

77,430

Temperature indicators
Temperature transmitters

250
2
8
30
2
2
1
1
1

Unit Cost

Indoor piping

UnionDH Page 19 of 19