Tel: 802.658.4891
www.Hallam ICS.com E mail: info@Hallam ICS.com
Revision History
Revision
Release State
Date
Description of Change
Initial release
2/1/2012
Updated release
2/23/2012
Updated release
6/6/2012
3.2
3.3
80% milestone
3.4
Page 1 of 1
Direct Cost
$
$
$
$
$
783,616
600,881
382,162
367,375
134,312
Sub total
2,268,344
Cost
with cont.
$
10%
10%
10%
15%
10%
$
$
$
$
$
78,362
60,088
38,216
55,106
13,431
$
$
$
$
$
245,203
Notes
861,977
660,969
420,378
422,481 Additional contingency to cover telecom unknowns
147,743
2,513,547
Direct Cost
$
$
$
$
210,179
54,714
214,382
77,430
Sub Total
556,705
Cost
with cont.
$
15%
10%
10%
10%
Notes
$
$
$
$
31,527
5,471
21,438
7,743
$
$
$
$
241,706
60,186
235,820
85,173 Only DH piping, heat exchangers + metering
66,179
622,885
$
245,203
66,179
Cost
with cont.
$ 2,513,547
$
622,885
311,383
$
$
$
$
$
$
$
$
31,076
50,000
2,825
1,413
250
2,000
$
$
$
$
$
$
$
$
465,631
87,563
553,194
3,290,680
398,946
3,689,626
Component
Distribution Piping
In Building Work
Direct Cost
$ 2,268,344
$
556,705
%
N/A
N/A
2,825,049
N/A
General Conditions
Mobilization
Bonding
Builder's risk insurance
Safety program and coordination
Soil and materials testing
Contaminated soils
Permits (building, environmental)
$
$
$
$
$
$
$
$
310,755
100,000
28,250
14,125
2,500
10,000
10%
50%
10%
10%
10%
20%
0%
0%
Notes
3,136,432
Page 2 of 19
Unit
ea
ea
lf
lf
cy
cy
cy
lf
lf
ea
ea
ea
ea
ea
ea
ea
ea
lf
lf
ea
ea
lf
lf
ea
ea
sf
ea
cy
cy
cy
Qty.
2
2
130
1,750
237
20
1,070
63
2,536
4
24
4
4
2
2
2
4
63
2,536
12
130
20
60
3
3
100
10
100
350
120
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Unit Cost
550.00
550.00
5.00
12.00
15.00
18.00
15.00
20.00
55.00
130.00
550.00
625.00
550.00
2,250.00
3,000.00
1,500.00
30.00
51.00
77.00
300.00
500.00
55.00
24.00
1,500.00
2,200.00
100.00
600.00
30.00
20.00
45.00
Total
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
1,100.00
1,100.00
650.00
21,000.00
3,555.00
360.00
16,050.00
1,260.00
139,480.00
520.00
13,200.00
2,500.00
2,200.00
4,500.00
6,000.00
3,000.00
120.00
3,213.00
195,272.00
3,600.00
65,000.00
1,100.00
1,440.00
4,500.00
6,600.00
10,000.00
6,000.00
3,000.00
7,000.00
5,400.00
3 of 19
Unit
cy
lf
sy
sy
ls
ls
ea
ea
ls
cy
sy
ls
ls
sf
sf
lf
lf
ea
ls
Qty.
Unit Cost
400 $
35.00
130 $
40.00
120 $
65.00
1,430 $
85.00
1 $
1,000.00
1 $
6,250.00
2 $
250.00
2 $
250.00
1 $
3,750.00
4 $
27.00
22 $
25.00
1 $
2,500.00
1 $
6,250.00
530 $
1.25
100 $
3.75
2,600 $
10.00
1,300 $
3.00
5 $
1,400.00
1 $ 47,000.00
Subtotal
Contingency
10%
Montpelier Hot Water Distribution Construction Costs:
Total
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
14,000.00
5,200.00
7,800.00
121,550.00
1,000.00
6,250.00
500.00
500.00
3,750.00
108.00
550.00
2,500.00
6,250.00
662.50
375.00
26,000.00
3,900.00
7,000.00
47,000.00
783,615.50
78,361.55
861,977.05
4 of 19
Unit
lf
lf
cy
cy
cy
lf
lf
lf
lf
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
lf
lf
lf
lf
ea
ea
ea
Qty.
90
1,600
200
10
520
70
670
170
640
3
14
2
2
4
4
2
3
1
2
8
2
2
2
2
2
8
70
670
170
640
20
70
10
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Unit Cost
5.00
12.00
15.00
18.00
15.00
20.00
33.00
35.00
55.00
130.00
400.00
800.00
800.00
550.00
525.00
630.00
625.00
650.00
950.00
550.00
1,500.00
3,000.00
3,000.00
3,500.00
1,300.00
30.00
51.00
59.00
59.00
77.00
300.00
475.00
475.00
Total
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
450.00
19,200.00
3,000.00
180.00
7,800.00
1,400.00
22,110.00
5,950.00
35,200.00
390.00
5,600.00
1,600.00
1,600.00
2,200.00
2,100.00
1,260.00
1,875.00
650.00
1,900.00
4,400.00
3,000.00
6,000.00
6,000.00
7,000.00
2,600.00
240.00
3,570.00
39,530.00
10,030.00
49,280.00
6,000.00
33,250.00
4,750.00
page 5 of 19 pages
Qty.
Unit Cost
50 $
500.00
25 $
55.00
140 $
25.00
2 $
1,500.00
2 $
2,200.00
220 $
100.00
22 $
600.00
100 $
30.00
100 $
20.00
60 $
45.00
200 $
35.00
90 $
40.00
100 $
65.00
1,200 $
85.00
1 $
1,000.00
1 $
6,250.00
1 $
3,750.00
1 $
2,500.00
1 $
8,000.00
470 $
1.25
220 $
3.75
1,600 $
10.00
800 $
3.00
3 $
1,400.00
1 $ 66,000.00
Subtotal
Contingency
10%
Montpelier Hot Water Distribution Construction Costs:
Unit
ea
lf
lf
ea
ea
sf
ea
cy
cy
cy
cy
lf
sy
sy
ls
ls
ls
ls
ls
sf
sf
lf
lf
ea
ea
Total
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
25,000.00
1,353.00
3,500.00
3,000.00
4,400.00
22,000.00
13,200.00
3,000.00
2,000.00
2,700.00
7,000.00
3,600.00
6,500.00
102,000.00
1,000.00
6,250.00
3,750.00
2,500.00
8,000.00
587.50
825.00
16,000.00
2,400.00
4,200.00
66,000.00
600,880.50
60,088.05
660,968.55
page 6 of 19 pages
Unit
lf
lf
cy
cy
cy
lf
lf
lf
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
lf
lf
lf
ea
ea
ea
lf
lf
ea
ea
sf
Qty.
60
1,790
152
10
500
16
999
826
15
10
2
1
2
1
2
2
2
2
2
2
2
2
16
999
826
2
50
49
30
72
2
2
120
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Unit Cost
5.00
12.00
15.00
18.00
15.00
20.00
22.00
30.00
130.00
225.00
250.00
400.00
300.00
375.00
800.00
450.00
550.00
1,000.00
1,000.00
1,000.00
28.00
30.00
51.00
51.00
55.00
300.00
300.00
400.00
55.00
25.00
1,500.00
2,200.00
100.00
Total
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
300.00
21,480.00
2,280.00
180.00
7,500.00
320.00
21,978.00
24,780.00
1,950.00
2,250.00
500.00
400.00
600.00
375.00
1,600.00
900.00
1,100.00
2,000.00
2,000.00
2,000.00
56.00
60.00
816.00
50,949.00
45,430.00
600.00
15,000.00
19,600.00
1,650.00
1,800.00
3,000.00
4,400.00
12,000.00
page 7 of 19 pages
Unit
ea
cy
cy
cy
cy
lf
sy
sy
ls
ls
ls
cy
sy
ls
ls
sf
sf
lf
lf
ea
ea
Qty.
Unit Cost
12 $
600.00
100 $
30.00
100 $
20.00
70 $
45.00
190 $
35.00
60 $
40.00
100 $
65.00
920 $
50.00
1 $
1,000.00
1 $
5,000.00
1 $
5,000.00
10 $
27.00
10 $
25.00
1 $
2,000.00
1 $
6,750.00
350 $
1.25
120 $
3.75
1,900 $
10.00
950 $
3.00
4 $
1,400.00
2 $
3,400.00
Subtotal
Contingency
10%
Montpelier Hot Water Distribution Construction Costs:
Total
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
7,200.00
3,000.00
2,000.00
3,150.00
6,650.00
2,400.00
6,500.00
46,000.00
1,000.00
5,000.00
5,000.00
270.00
250.00
2,000.00
6,750.00
437.50
450.00
19,000.00
2,850.00
5,600.00
6,800.00
382,161.50
38,216.15
420,377.65
page 8 of 19 pages
Unit
lf
lf
cy
cy
cy
lf
lf
ea
ea
ea
ea
ea
ea
ea
lf
lf
ea
ea
lf
lf
ea
ea
sf
ea
cy
cy
cy
cy
lf
sy
sy
sy
ls
Qty.
720
1,200
50
70
540
40
1,730
2
12
2
2
2
2
2
40
1,730
4
70
6
24
1
1
40
4
40
100
70
200
720
380
40
300
1
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Unit Cost
5.00
12.00
15.00
18.00
15.00
20.00
30.00
130.00
225.00
400.00
800.00
550.00
1,000.00
30.00
51.00
55.00
300.00
400.00
55.00
25.00
1,500.00
2,200.00
100.00
600.00
30.00
20.00
45.00
35.00
40.00
65.00
85.00
85.00
5,000.00
Total
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
3,600.00
14,400.00
750.00
1,260.00
8,100.00
800.00
51,900.00
260.00
2,700.00
800.00
1,600.00
1,100.00
2,000.00
60.00
2,040.00
95,150.00
1,200.00
28,000.00
330.00
600.00
1,500.00
2,200.00
4,000.00
2,400.00
1,200.00
2,000.00
3,150.00
7,000.00
28,800.00
24,700.00
3,400.00
25,500.00
5,000.00
page 9 of 19 pages
Unit
cy
sy
ls
ls
sf
sf
lf
lf
ea
ea
Qty.
Unit Cost
30 $
27.00
130 $
25.00
1 $
2,000.00
1 $
5,000.00
340 $
1.25
40 $
3.75
1,760 $
10.00
880 $
3.00
3 $
1,400.00
1 $
3,800.00
Subtotal
Contingency
15%
Montpelier Hot Water Distribution Construction Costs:
Total
$
$
$
$
$
$
$
$
$
$
$
$
$
810.00
3,250.00
2,000.00
5,000.00
425.00
150.00
17,600.00
2,640.00
4,200.00
3,800.00
367,375.00
55,106.25
422,481.25
page 10 of 19 pages
Qty.
Unit Cost
20 $
5.00
90 $
12.00
6 $
15.00
10 $
18.00
170 $
15.00
658 $
22.00
8 $
130.00
658 $
51.00
30 $
300.00
100 $
30.00
100 $
20.00
30 $
45.00
60 $
35.00
20 $
40.00
60 $
65.00
40 $
50.00
1 $
500.00
1 $
5,000.00
1 $
5,000.00
50 $
27.00
270 $
25.00
1 $
4,000.00
1 $
6,750.00
70 $
1.25
700 $
10.00
350 $
3.00
2 $
1,400.00
1 $ 10,000.00
2 $
3,400.00
Subtotal
Contingency
10%
Montpelier Hot Water Distribution Construction Costs:
Union Mutual
Unit
lf
lf
cy
cy
cy
lf
ea
lf
ea
cy
cy
cy
cy
lf
sy
sy
ls
ls
ls
cy
sy
ls
ls
sf
lf
lf
ea
ls
ea
Total
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
100.00
1,080.00
90.00
180.00
2,550.00
14,476.00
1,040.00
33,558.00
9,000.00
3,000.00
2,000.00
1,350.00
2,100.00
800.00
3,900.00
2,000.00
500.00
5,000.00
5,000.00
1,350.00
6,750.00
4,000.00
6,750.00
87.50
7,000.00
1,050.00
2,800.00
10,000.00
6,800.00
134,311.50
13,431.15
147,742.65
page 11 of 19 pages
Item
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
Quantity
Unit
Unit Cost
Total
Notes
12
4
2
2
3
100
10
4
2
1
8
1
each
each
each
each
each
each
each
each
each
each
each
each
$
$
$
$
$
$
$
$
$
$
$
$
450
1,500
4,000
800
200
81
320
265
877
225
200
500
$
$
$
$
$
$
$
$
$
$
$
$
5,400
6,000
8,000
1,600
600
8,100
3,200
1,060
1,754
225
1,600
500
150
2
8
16
1
4
1
1
2
4
2
2
feet
each
each
each
each
each
each
each
each
each
each
each
$
$
$
$
$
$
$
$
$
$
$
$
81
200
450
320
225
6,500
3,500
500
7,500
265
877
800
$
$
$
$
$
$
$
$
$
$
$
$
12,150
400
3,600
5,120
225
26,000
3,500
500
15,000
1,060
1,754
1,600
1 each
10,895
10,895
$
$
$
$
60
160
5
108
$
$
$
$
5
2
200
2
square feet
each
pound
each
270
320
1,000 ~5 pounds per foot, 40 feet
216
Page 12 of 19
Item
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
Total
Quantity
Unit
Unit Cost
Total
Notes
Supply fan
Exhaust fan
1 each
1 each
$
$
315
315
$
$
Temperature indicators
Temperature transmitters
New controller, I/O and programming
New controller, I/O and programming
6
6
1
1
each
each
each
each
$
$
$
$
225
2,000
7,500
30,000
$
$
$
$
1 each
$
$
$
$
$
$
$
$
$
$
300
2,500
1,250
1,000
850
50
150
500
2,500
9,100
9,100
1
2
2
2
1
1
1
1
$
$
$
$
$
$
$
$
3,500
1,600
1,800
1,150
1,850
1,000
5,000
7,500
$
$
$
$
$
$
$
$
3,500
3,200
3,600
2,300
1,850
1,000
5,000
7,500
210,179
each
each
each
each
each
each
each
each
315
315
1,350
12,000 For building control system
7,500 To use district heat
30,000 To dispatch/replace existing
Page 13 of 19
Item
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
Quantity
Piping to header from HX
2 inch copper
2 inch tees
2 inch elbows
2 inch valves
Pressure gage assembly
Relief valve
Unit
Unit Cost
Total
Notes
160
4
10
2
1
1
feet
each
each
each
each
each
$
$
$
$
$
$
22
119
72
105
200
225
$
$
$
$
$
$
3,520
476
720
210
200
225
80
2
8
16
1
1
1
1
feet
each
each
each
each
each
each
each
$
$
$
$
$
$
$
$
19
200
174
51
225
6,500
2,500
500
$
$
$
$
$
$
$
$
1,520
400
1,392
816
225
6,500
2,500
500
Temperature indicators
4 each
225
900
1 each
2,010
2,010
Temperature transmitters
Control system modification
4 each
1 each
$
$
2,000
7,500
$
$
$
$
$
$
$
$
$
$
300
2,500
1,250
1,000
850
50
150
500
Police Page 14 of 19
Item
35
36
37
38
39
40
41
Total
Quantity
Unit
Unit Cost
Total
Notes
1 each
$
$
2,500
9,100
9,100
1
1
1
1
$
$
$
$
500
500
3,000
4,000
$
$
$
$
500
500
3,000
4,000
54,714
each
each
each
each
Police Page 15 of 19
Item
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
Quantity
Unit
Unit Cost
16
20
150
10
4
2
1
1
2
5
3
3
1
each
each
feet
each
each
each
each
each
each
each
each
each
each
$
$
$
$
$
$
$
$
$
$
$
$
$
271
126
27
200
323
645
1,117
2,262
5,000
200
5,000
225
1,005
Steam piping
3 inch isolation valve
3 inch elbows
3 inch piping
Warmup valve assembly
Control valves
2.5 inch isolation valve
2.5 inch elbows
2.5 inch piping
3
25
175
1
4
8
12
50
each
each
feet
each
each
each
each
feet
$
$
$
$
$
$
$
$
Condensate piping
1.5 inch isolation valve
1.5 inch elbows
1.5 inch piping
1 inch isolation valve
1 inch elbows
1 inch piping
Condensate pump/tank
Steam trap (drip) assembly
4
25
175
4
10
50
1
5
each
each
feet
each
each
feet
each
each
$
$
$
$
$
$
$
$
Total
Notes
780
147
30
500
1,941
780
126
27
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
4,336
2,520
4,050
2,000
1,292
1,290
1,117
2,262
10,000
1,000
15,000
675
1,005
7
7
2,340
3,675
5,250
500
7,764
6,240
1,512
1,350
238
47
25
140
36
18
5,817
1,000
$
$
$
$
$
$
$
$
952
1,175
4,375
560
360
900
5,817
5,000
6Baldwin Page 16 of 19
Item
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
Quantity
Steam trap (HX) assembly
Flash tank
1.5 inch piping (flash tank vent)
1.5 inch piping (condensate tank vent)
Unit
Unit Cost
Total
Notes
3
1
75
75
each
each
each
each
$
$
$
$
1,200
1,500
19
19
$
$
$
$
3,600
1,500
1,397
1,397
Cold water
1" copper
1" elbow
1" valve
Backflow preventor
Water meter w/ output
Hydrant
150
25
5
1
2
1
feet
each
each
each
each
each
$
$
$
$
$
$
12
33
45
315
351
250
$
$
$
$
$
$
1,800
825
225
315
702
250
5
2
200
2
1
1
1
square feet
each
pound
each
each
each
each
$
$
$
$
$
$
$
60
160
5
108
315
315
706
$
$
$
$
$
$
$
270
320
1,000 ~5 pounds per foot, 40 feet
216
315
315
706
Pipe covering
1 each
10,946.90
1 each
7,500
each
each
feet
each
each
$
$
$
$
$
6,234
1,000
27
104
71
$
$
$
$
$
6,234
1,000
5,400
312
1,420
10 each
20 each
$
$
225
225
$
$
2,250
4,500
Sanitary drain
Sump with pump
Concrete work for sump
2" copper piping
2" valve
2" copper elbow
Pressure indicators
Temperature indicators
1
1
200
3
20
6Baldwin Page 17 of 19
Item
69
70
71
72
73
74
75
76
77
78
79
80
81
Total
Quantity
Temperature transmitters
New controller, I/O and programming
New controller, I/O and programming
Unit
6 each
1 each
1 each
1
2
2
1
1
1
1
1
each
each
each
each
each
each
each
each
Unit Cost
Total
Notes
$
$
$
2,000
7,500
30,000
$
$
$
12,000
7,500
30,000
$
$
$
$
$
$
$
$
3,000
1,200
1,100
1,250
1,000
1,000
5,000
7,500
$
$
$
$
$
$
$
$
3,000
2,400
2,200
1,250
1,000
1,000
5,000
7,500
214,382
6Baldwin Page 18 of 19
Item
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Total
Quantity
4 inch district heating piping
Pressure gage assembly
4 inch valve
4 inch elbow
Relief valve
Heat exchanger
Control valve
Concrete pad
Pipe covering (10% of mechanical)
Unit
Total
Notes
feet
each
each
each
each
each
each
each
each
$
$
$
$
$
$
$
$
$
81
200
450
320
225
6,500
3,500
500
5,130
$
$
$
$
$
$
$
$
$
20,250
400
3,600
9,600
450
13,000
3,500
500
5,130
4 each
4 each
$
$
225
2,000
$
$
900
8,000
1 each
$
$
$
$
$
$
$
$
$
$
300
2,500
1,250
1,000
850
50
150
500
2,500
9,100
9,100
1 each
3,000
3,000
77,430
Temperature indicators
Temperature transmitters
250
2
8
30
2
2
1
1
1
Unit Cost
Indoor piping
UnionDH Page 19 of 19