Академический Документы
Профессиональный Документы
Культура Документы
(A Govt. of Haryana Undertaking) O/o Chief Engineer/MM, Shakti Bhawan (Basement), Sector-6, Panchkula (Website www. hvpn.gov.in) TELEFAX NO. 0172-2583724,/2583727)
You are hereby authorised to draw the following material against new work/replacement from the store mentioned:Sr. No. A 1. B 1. C Qty. Name of the D/Store. 66 KV S/Stn Badshapur, HVPNL, Gurgaon 66 KV, T/F CTs (300-150-75/1-1/0.577A) 03 Ballabgarh 66 KV S/Stn Q-Block, HVPNL, Gurgaon 66 KV, T/F CTs (300-150-75/1-1/0.577A) 03 Ballabgarh 66 KV S/Stn Maruti, HVPNL, Gurgaon 1 66 KV, T/F CTs (300-150-75/1-1/0.577A) 03 Ballabgarh . Description
NOTE: 1. 2. 3. 4. 5. 6. 7. 8. The allocation is in view of Stock Balance Statement ending 31.07.2012 It is valid for 2 months in case of new works except for steel structures and one month in case of replacement. The availability of the material be got confirmed from the store before deputing the vehicle to the store for collection of the same. The S.R. No and date of drawl be intimated to this office after drawl of the material. Please ensure that the above material has not been drawn before and previous allocation of the above material if any stands cancelled. Other material is not available at present in the HVPNL D. stores. Funding arrangement of your works may please be ensured before lifting of the material Utilization certificate indicating name of work be supplied after completion of work
--------sd-----Executive Engineer/Tr(p) for Chief Engineer/ MM, HVPNL, Panchkula. CC: 1. Executive Engineer/TS, Division, HVPNL, Gurgaon. 2. AEE/Dedicated Store, HVPNL, Ballabgarh.
You are hereby authorised to draw the following material against new work/replacement from the store mentioned:Sr. No. A. 1. 2. 132 KV LA 33 KV LAs Description Qty. Name of the D. Store
132 KV S/Stn HVPNL Kanina 01 Ballabgarh 03 Ballabgarh B. 220 KV S/Stn HVPNL Narnaul 1. 132 KV LAs 02 Ballabgarh C. 220 KV S/Stn HVPNL Mohindergarh 1 33 KV, Capacitor CT (150/1A) 01 Panipat . NOTE:
1. The allocation is in view of Stock Balance Statement ending 31.07.2012. 2. It is valid for 2 months in case of new works except for steel structures and one month in
case of replacement. 3. The availability of the material be got confirmed from the store before deputing the vehicle to the store for collection of the same. 4. The S.R. No and date of drawl be intimated to this office after drawl of the material. 5. Please ensure that the above material has not been drawn before and previous allocation of the above material if any stands cancelled. 6. Other material is not available at present in the HVPNL D. stores. 7. Funding arrangement of your works may please be ensured before lifting of the material 8. Utilization certificate indicating name of work be supplied after completion of work
Executive Engineer/Tr(p) for Chief Engineer/ MM, HVPNL, Panchkula CC: 1. Superintending Engineer/TS, Circle, HVPNL, Gurgaon. 2. AEE/Dedicated Store, HVPNL Ballabgarh, Panipat.