04 - FILLING FOUNDATION, CONCRETE WORK

NOTES : 4.1 Rates include :(a) All leads and lifts of matrerials unless otherwise specified. (b) The cost of materials in which water includes. (c) The cost of mixing motor, curing and scaffolding etc 4.2 Rates do not include centring, shuttering or form work unless otherwise specified. 4.3 Rates are also applicable for filling under floors. 4.4 Form work of RCC will be provided by the contractor and shall be removed by him. No lead and lift of form work will be payable. 4.5 For RCC work the rates includes all finishing on all exposed surface, projections etc. as per design. The resulting surface should be smooth and plain. Bottom faces of RCC slabs, lintels and chajjas etc. shall be finished with suitable thickness of 1:3 cement mortar to make surface smooth and even, where ever required. Ceiling plaster shall not be paid separately in any case. 4.6 The rate includes for centring for providing fan hooks etc. For drip course where ever required the seperate rates will be paid. 4.7 For plum concrete the plum used shall be of 150 mm maximum size rubble. 4.8 For fine and coarse aggregates IS 383 - 1970 may be referred, for plain and reinforced concrete IS 456 - 2000 may be referred. 4.9 No seperate payment for lead and lift shall be permissible unless otherwise specified. 4.10 The proportion of various size of coarse aggregates in concrete is detailed below. (This quantities are for 1 cum of concrete) Concrete Max size of Metal or single Size and qty Total Mix. Graded metal in cum. . 40 mm 20 mm 10 mm C.C. 1:2:4 20 mm 0.67 cum 0.22 cum. 0.89cum C.C. 1:3:6 C.C. 1:3:6 C.C. 1:4:8 C.C. 1:5:10 C.C. 1:6:12 40 mm 20 mm 40 mm 40 mm 40 mm 0.65 cum 0.65 cum 0.65 cum 0.65 cum 0.69 cum 0.24 cum 0.70 cum 0.24 cum 0.24 cum 0.24 cum 0.50 cum 0.24 cum 0.89cum 0.94cum 0.89cum 0.89cum 0.89cum 0.94cum

Lime concrete 40 mm with lime mortar any ratio.


Code Description
0401

Unit cum

Rate (Rs.) 37.5

Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m 04 - FILLING FOUNDATION, CONCRETE WORK

RES - NIC MPSU

Page 1 of 4

Code Description
0402 0403 0404 0405 0406 0407 0408 Filling foundation and around masonry work with moorum I/c ramming layers and watering. Labour only for item no.0402 Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. Labour only for item no. 0404 Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. Labour only for item no.0406 Providing and laying in foundation, plinth and under floors lime concrete with 40mm nominal size graded stone aggregates (metal) and 40% lime mortar. i/c ramming in layers and curing complete excluding cost of form work. (a) Lime mortar 1:2 (1lime putty, 2sand) (b) (c) (d) 0409 0410 0411 Lime mortar 1:3 (1lime putty, 3sand) Lime mortar 1:1:1 (1lime putty, 1surkhi, 1sand) Lime mortar 1:2 (1lime putty, 2surkhi)

Unit cum cum cum cum cum cum

Rate (Rs.) 174.9 37.5 187.0 31.2 752.8 449.3

cum cum cum cum cum cum cum

1195.7 1137.4 1190.6 1185.4 476.4 121.9 1248.8

Labour only for item no. 0408 (for any proportion of lime mortar used) Deduct from item No. 0408 if shingles (pebbles) are used in place of 40mm nominal metal. Providing and laying on terrace upto floor two level lime concrete with graded brick aggregate 25mm nominal size and 50% mortar comprising of 1 lime putty and 2 surkhi and curing etc. complete. Labour only for item no. 0411. Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work (a) C.C. 1:2:4 (1cement, 2sand, 4metal) (b) (c) (d) (e) C.C. 1:3:6 (1cement, 3sand, 6metal) C.C. 1:4:8 (1cement, 4sand, 8metal) C.C. 1:5:10 (1 cement, 5sand, 10metal) C.C. 1:6:12 (1 cement, 6sand, 12metal)

0412 0413

cum

454.4

cum cum cum cum cum cum cum

2528.3 1927.5 1652.9 1433.2 1323.3 394.1 15 % of item no. 0414 for each floor

0414 0415

Labour only for item no. 0413 (for any proportion of cement concrete) Add to item No. 0413 for concrete work in super structure upto floor two level for wall independent pillars and like. Add to item No. 0413 and 0415 if in place of 40mm metal. (a) (b) If 20 mm graded metal is used If 12 mm graded metal is used

0416

cum cum

44.6 59.5

RES - NIC MPSU

04 - FILLING FOUNDATION, CONCRETE WORK

Page 2 of 4

Code Description
0417 Extra rate for providing and fixing in position upto floor two level, units of precast C.C. work of any mix fixing in cement mortar 1:2 and finishing with cement plaster 6mm thick in cement mortar 1:3 including scaffolding . Extra rate for laying cement concrete in or under water or liquid mud including cost of pumping and bailing out and removing slush etc. complete. Extra rate for providing and mixing water proofing material in cement concrete work in the proportions recommended by the manufacturers. Providing and laying damp proof course 50mm thick with C.C.1:2:4 with 20mm size graded stone aggregate. including curing. Applying one coat of hot bitumen (80/100) or equivalent using 1.7kg. Per sqm On damp proof courses after cleaning the surface with brushes and finally with a piece of cloth tightly soaked in kerosene oil. Plum cement concrete 1:2:4 with 75% graded metal of 40mm size and 25% plums of 150mm size. Plum cement concrete 1:3:6 with 75% graded metal of 40mm size and 25% plums of 150mm size. Plum cement concrete 1:4:8 with 75% graded metal of 40mm size and 25% plums of 150mm size. Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing. (a) CC 1:1:2 (1cement, 1sand, 2graded stone aggregate 20 mm nominal size) (b) CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size) (c) CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size) Labour only for item 0425. Add extra for labour only for additional floor or 6.m height and part thereof PCC or RCC work in item no.0426 False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift Labour only for item no. 0428. False work for R.C.C. and P.C.C. work in plinth and foundation Labour only for item no. 0430 Deduct for mixing of cement concrete/ lime concrete without mechanical mixer in item no. 0408, 0409, 0411 to 0414, 0420, 0422 to 0426 and 0432 Deduct for concrete unvibrated in item no. 0425

Unit cum

Rate (Rs.) 1419.7

0418

cum

60.8

0419 0420 0421

Bag sqm. sqm.

44.4 163.0 65.4

0422 0423 0424 0425

cum cum cum

1656.2 1422.8 1238.9

cum cum cum cum cum

3951.0 3104.1 2679.9 539.0 15 % of item no. 0426 for each floor 145.0

0426 0427

0428

sqm.

0429 0430 0431 0432 0433

sqm. sqm. sqm. cum cum

69.7 114.4 48.2 68.7 114.4

RES - NIC MPSU

04 - FILLING FOUNDATION, CONCRETE WORK

Page 3 of 4

Code Description
0434 Providing and laying five courses damp proofing treatment sumps, reservoirs, roof etc. consisting of 1st. 3rd and 5th courses of blown type petroleum bitumen of I. S. grade 85/25 applied @1.6kg/sqm and 2nd and 4th courses of self finished bitumen felt type 3 grade 2 (Hessian Base) with priming coat of bituminous solution applied hot at the rate of minimum of 0.25litre per sqm including preparation of surface by grouting cracks, providing cement concrete fellets rounding of cerlers etc. wherever required and cleaning and drying of surface before priming cost is applied, complete as per direction of the engineers-in-charge. Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide) Deduct from item no 0413 if 63mm graded metal used in place of 40mm metal False work for Arches up to 6meter span. Labour only for item no. 0437 Brick bat filling in trenches or soak pits. Labour only for item no.0439

Unit sqm.

Rate (Rs.) 398.6

0435 0436 0437 0438 0439 0440

RM cum sqm. sqm. cum cum

6.6 18.6 589.1 254.4 269.6 63.6