Praveen Ranjan Resident Project Manager India-Bangladesh Inter-connector Project Powergrid Corporation Of India Ltd.
POWERGRID, An OVERVIEW
Incorporated in 1989 for transmission of Electric Power across the country. Central Transmission Utility - Navaratna PSU Asset over Rs. 56000 Crs World's Leading Power Transmission Utility (3rd)
POWERGRID, An OVERVIEW
76800 Ckt.Km line-128 Substations
Technology Leader in EHVAC & HVDC Transmission. Carries more than 50% of Generated Power Across Country.
URI
KISHENPUR
JULLANDHAR MOGA BALLABGARH (DELHI RING) HISSAR M'BAD BEARILLY LUCKNOW A'PUR MEERUT TEHRI
BHUTAN
TEESTA TALA RANGANADI G'PUR M'PUR PURNEA VARANASI SILIGURI/BIRPARA 500MW BARH KAHALGAON B'SHARIF VINDHYAMAITHON CHAL NORTH JAMSHEDPUR KARANPURA BONGAIGAON
NR JAIPUR
SHIROHI
BHIWADI
AGRA
250 0M W
ZERDA DEHGAM NAGDA
NER
BANGLA DESH
GANDHAR/ LIMBDI AMRELI KAWAS CHEGAON JETPUR VAPI BHANDARA PIPAVAV BOISAR TARAPUR AKOLA
HIRMA
ER
ROURKELA
DHABOL KOYNA
WR
TALCHER JEYPORE
KARAD
RAMAGUNDAM
KOLHAPUR
SR
NARENDRA SIRSI
MW 00 20
GAZUWAKA
20 00 M W
KRISHNAPATNAM CHITTOOR HOSUR SOUTH CHENNAI LEGEND X PLAN EXISTING/ IX PLAN 765 KV LINES 400 KV LINES HVDC B/B HVDC BIPOLE NATIONAL GRID XI PLAN SINGARPET PUGALUR CUDDALORE KARAIKUDI KAYATHAR KUDANKULAM
MYSORE
BANGALORE
KOZHIKODE
K LA AD SH E WE P
SALEM
7 - Talcher-Kolar (2500MW)
8 Ballia-Bhiwadi(2500 MW)
Approx. Value of the Contract: Rs. 457 Crore Start date: Feb-1986 Completion date: Dec-1991 Main Data: Power rating : 1500MW No. of Poles : 2 AC Voltage : 400 kV DC Voltage : + 500 kV Converter TransformerRihand Terminal : 6 x 315 MVA Dadri Terminal : 6 x 315 MVA Length of over head DC line: 816 KM.
(iii)
(iv) (v)
AC Voltage
DC Voltage
: 400 kV
: 70 kV : 8 x 156 MVA
Converter Transformer
Approx. Value of the Contract: Rs. 702.78 Crore Start date: November 1993 Completion date: Dec 1997 Main Data: Power rating : 2 x 500 MW.
No. of Blocks
AC Voltage DC Voltage
: 2
: 400 kV : + 205 Kv
Converter Transformer
: 12 x 234 MVA
No. of Poles
AC Voltage DC Voltage Converter TransformerTalcher Kolar
: 2
: 400 kV : + 500 kV : 6 x 398 MVA : 6 x 398 MVA
HVDC Talchar Kolar link was designed for 2000 MW continuous rating
with inherent short term overload capacity depending onAmbient temperature Prevailing voltages at Talcher and Kolar Cooling mechanism. Further, DC Bipole lines with quad conductor was capable to transmit 1250 MW continuously with marginal incremental loss . The inherent overload capability was utilized to meet the system contingencies by up gradation of Talcher Kolar HVDC link capacity from 2000 MW to 2500 MW . This enhanced capacity is to be used only under contingency and not for increasing HVDC Capacity for firm transfer of 2500 MW
Salient Features:
Main objective of this HVDC project is to transfer power from Talcher Super Thermal Power Station (Eastern Region), to Kolar (Southern Region) of Indian Grid The most important features of the project are -Better over all economy as compared to AC Transmission -Halved right-of-way requirements, -Lower transmission loses, better stability and controllability.
This is the longest (1369 KM.) commercial HVDC link in India.
: 1
: 400 kV : 205 kV : 6 x 234 MVA
Connects Pusauli (Eastern Region) to Sasaram (Eastern part of Northern Grid) of Indian Grid (Power Transfer mainly from ER to NR)
Main Data: (i) Power rating (ii) No. of Blocks (iii) AC Voltage (iv) DC Voltage
POWERGRID installing +/-800 kV, 6000 MW HVDC multi-terminal system of approx length of 1728 km from North Eastern Region to Agra.
One Rectifier station in Biswanath Chariali (pooling station in North Eastern Region), second one in Alipurduar (pooling station in Eastern Region) and Inverter station at Agra (in Northern Region) Converter stations at Biswanath Chariali and Alipurduar each handles a nominal power of 3000 MW and Converter station at Agra handles nominal power of 6000 MW. This Transmission System originates from Assam and passes through West Bengal, Bihar and terminates in Uttar Pradesh.
2 x 500 MW HVDC BTB Station at Kolhapur between Kolhapur (Western Region ) and Narendra (Southern Region) of Indian Grid at
Consultancy Assignment:
1 x 500 MW India-Bangladesh Interconnecter HVDC Back To Back Station, Bheramara Bangladesh
Why O&M?
To Run the system Smoothly to achieve highest availability and avoid outages
Converter Transformer
DC Filter: DT 12/24 DT 12/36 DC Filter: DT 12/24 DT 12/36
Converter Transformer
Modes of Operation
Bipolar
Smoothing Reactor Thyristor Valves DC OH Line Smoothing Reactor Thyristor Valves Current
Converter Transformer
Converter Transformer
Modes of Operation
Monopolar Ground Return
Smoothing Reactor Thyristor Valves DC OH Line Smoothing Reactor Thyristor Valves
Converter Transformer
Current
Converter Transformer
Modes of Operation
Monopolar Metallic Return
Smoothing Reactor Thyristor Valves DC OH Line Smoothing Reactor Thyristor Valves
Converter Transformer
Current
Converter Transformer
RPC
Q Mode V Mode
Auto / Manual
Type of Maintenance
Preventive Maintenance
Outage Maintenance
Valve Hall
The status of the Thyristor levels in the valve hall is available
online in the Control Room Valve Control System monitors continuously, the healthiness of
Failure may be in
Thyristor Snubber capacitor Snubber resistor TE card
To test the thyristor level Thyristor Level Test Unit is used which tests thyristor and associated components Failure of the thyristor can be detected
AC SWITCHYARD EQUIPMENTS
Converter Transformer
Following tests are done during yearly shutdown
Capacitance and tan of the bushings
Used to determine the healthiness of the bushing insulation
Checking the operation of the buchholz relays and Pressure Relief Devices (PRD) Checking of the WTI & OTI alarms and trips Checking whether all the alarms are reported to HMI system Checking the operation of fire fighting deluge valve system
Converter Transformer
Converter Transformer
Converter Transformer
Overhauling of OLTC
Overhauling of OLTC
AC Filter
Maintenance of filter bay equipment includes
Testing of CT C & Tan Capacitance stack measurement and balancing if required Inspection of capacitor stack for oil leakage Associated breaker testing -Operation timings, alarm,
AC Filter
Circuit Breakers
Timing of Main & Auxiliary Contacts (Y)
Valve cooling
Valve Cooling
Cleaning of Filters (SOS)
Testing of Related Protection System (Y) Maintenance of Pumps (3M)
Auxiliary System
systems
LT system Relay testing & LT breaker
maintenance