Month : ____________
Description General Execute DISPALARM; to enlist the ongoing alarms and faults. Execute DISPINDIC; to enlist the recent ongoing maintenance activities in the switch. Execute DISPLNLCKOUT: LNTYPE=SUB, DN=X; to enlist the Blocked Permanent (BPRM) subscribers. Check the Power supply status i.e. readings on the Rectifiers, Batteries and ensure operational status of Diesel Generator Set. Check the environmental parameters of the Switch Room i.e. Humidity, Temperature and Cleanliness. Core EWSD Are both MDD's active? Is there abnormal rise in CP Load? Is the X.25 Link for Net Manager active? Are both OMT's active? Enviromental Are the installed Indoor and Outdoor units operational? Is the Switch Room temperature maintained between 18 to 21C? Is the Switch Room temperature record maintained on daily basis? Is the Switch room floor cleaned daily? Is the enterance in switch room with shoes strictly prohibited? Is the storage or eating of edible items strictly prohibited in the switch room? Are any insects or small animals seen in the switch room?
1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd 23rd 24th 25th 26th 27th 28th 29th 30th 31st
Temperature
S.No Task/Activity 1 Is the Switch Room temperature maintained between 18 to 21C? 2 Is the Switch Room temperature record maintained on daily basis?
Cleanliness
S.No Task/Activity 1 Is the Switch room floor cleaned daily? 2 Is there a shoe rack present outside the switch room? 3 Is the enterance in switch room with shoes strictly prohibited? 4 5 Is the storage or eating of edible items strictly prohibited in the switch room? Are any insects or small animals seen in the switch room?
Civil Works
S.No Task/Activity 1 Are all doors related to the switch room properly labelled? Is there any type of water leakage, seepage or cracks in the switch room floor, 2 walls or ceiling? 3 Is the condition of plaster satisfactory? 4 Are the fire fighting arrangements proper? Are there any holes in the building which cause the enterance of insects and 5 small animals?
Remarks
Remarks
Remarks
Remarks
History Files
S.No Task/Activity Are the History files saved on regular intervals? 1 Is the History files backup M.O.Disk administered properly? 2 Time Schedule Weekly Monthly
Billing Files
S.No Task/Activity Are the Billing Files saved on regular intervals? 1 Are the billing files backup kept on MDD's for last 12 months? 2 Are the billing files backup M.O.Disk administered properly? 3 Time Schedule Weekly Monthly Monthly
Database
S.No Task/Activity 1 Is the ODAGEN due for any software module? 2 Does the excessive database exist of any type? 3 Does the testing database cancelled when testing is over? Is the new routing and zoning database created according to predefined ORIG1, 4 ORIG2 and Zone values? Time Schedule Monthly Monthly Monthly Weekly
Password Management
S.No Task/Activity 1 Are the User ID's adminisitered by the concerned D.E.? 2 Are there any excessive User ID's? Is the record maintained for the use of Passwords by persons other than 3 authorized? Time Schedule Monthly Monthly Monthly
Remarks
Remarks
Remarks
Remarks
MDF
S.No 1 2 3 4
LTG
S.No 1 2 3 4 5 6 7
DDF
S.No Task/Activity 1 Are the DDF modules labelled with the Equipment number? 2 Are there extra,unnecessary or leftover cables on the DDF? 3 Is the DDF equipment connected with the earthing point?
Remarks
Remarks
Remarks
Task/Activity Are all TSG's and SSG's Active from both control sides? 1 Are all SN back plane cables labelled? 2 Are all SN racks connected with the Earthing plates? 3 CCNC S.No Task/Activity 1 Are the all CCNC units active from both control sides? 2 Are all CCNC racks connected with the Earthing plates? CCG S.No 1 2 3 MB Task/Activity Is the CCG Rack labelled with the DIU numbers for reference frequencies? Are both CCG's in active state? Are both CCG's in Synchronous mode 4?
Remarks
Remarks
Remarks
S.No Task/Activity 1 Is MB active from both control sides? CP113 & Peripheries S.No 1 2 3 4 5 6 7 8 9 Task/Activity Are both BAP (Basic Processors) active? Are all IOP's (Input/Output Processors) active? Are both MDD's active? Is the M.O. Drive active? Is there abnormal rise in CP Load? Is the X.25 Link for Net Manager active? Are both OMT's active? Is only the authorized software installed on the OMT PC? What is the status of Annoucment Machine?
Remarks
Remarks
Daily
Daily
4 5 6 7
Weekly
9 10 11 12 13 14 15