OVERVIEW OF OFFSHORE PLATFORM

Engineering Procurement Construction Installation & Commissioning


Presented by Mr. Therasap Rattanapat

World Primary Energy Demand

Concession in Thailand
-Bongkot Field Development (PTTEP) -Arthit Field Development (PTTEP) -Erawan Group -Nang Nuan -Tantawan -etc

Joint Development Area (JDA) Thailand / Malaysia

-Carigali - Triton Company Sdn.Bhd (CTOC) -Carigali PTTEPI Operating Company Sdn.Bhd (CPOC) -etc

PTT EXPLORATION AND PRODUCTION

Type of Offshore Structure

-Fixed Platform -Compliant Tower

Gravity Base Platform, Jacket Type Platform Compliant Piled Tower, Guyed Tower

-Tension Leg Platform -Floating Platform -Spar Semi-Submersible, Extendable Draft Platform, FSO, FPSO

Drilling Rig
Jack-Up

Tender Rig

Offshore Platform in Thailand


Fixed Platform, Jacket Type More economical Rich gas reserve- less storage requirement Expected long field life easy expansion Suitable for shallow water (The water Depth In Gulf of Thailand is 80m Approx.)

Field Development Organization

Field Development

Financing and Accounting

Legal and Contracting

HSE

Schedule and Planning

Exploration Drilling

Project Development

Operation

Major Modification

Abandonment

Conceptual Design

Detailed Design

Procurement

Fabrication

Load-out, Transportation, Installation

Hook-up & Commissioning

E : Engineering
Engineering Design Feasibility Study Conceptual Design FEED ( Front End Engineering Design) Detail Engineering HAZOP ENGINEERING

Process

Structure

Piping

Mechanical

Electrical

Instrument

Field Development Plan


Facilities for the first stage of the development
Central Processing Complex CPP QP, bridge connected to the CPP WP, bridge connected to the CPP FP/T, bridge connected to the CPP Five remote Wellheads Gas gathering pipelines connecting the remote wellhead platform A gas pipeline to export the gas A condensate line to export to Silver FSO

6 C ON DE

FP

NS AT

E L INE

42 GA E RT LIN S EXPO RISE KWIN TO EA R

FSO

WP3
14 E L IN 16 E L IN

WP4

E L IN 8 1

18

LIN

14

18

LIN

LIN

WP6 WP2

WP1 CPP
Field Development

QP

WP5

High-Pressure Flare (HP) Low-Pressure Flare (LP)

Riser Platform (RP)

Wellhead Platform (WP)

Processing Platform (PP)

Living Quarter Platform (LP)

Design condition
Reservoirs Characteristic of wave Direction of wind 100 years storm 30 years design life. 80 meters water depth No seismic.

CPP Facilities Design


Overall Processing facilities Receiving facilities Mercury removal facilities Gas processing facilities Condensate processing facilities Produced water treatment and pumping facilities

CPP Facilities Design


Topsides Layout
All high pressure gas handling equipment should be located on either the top or main deck and preferably be located at the west end of the platform All major rotating equipment including gas turbine driven Process Compressors and Main Power Generation Units shall be located on the top deck Two cranes shall be used, one probably located on the west side of the platform and the other crane on the opposite side (i.e east side) of the platform Boat landing facilities are not required on the CPP, only on the LQ and the DWP-1. However bumper bars are required to facilitate supply boat access for diesel fill Use of a single-level bridge access between LQ and CPP shall be used. The bridge will connect the main deck level of the CPP and the LQ.

CPP Facilities Design


Structure Design Fixed platform 8 legs 84 diameters piles Skirt pile (if 8 legs are inadequate) Topside - Float-over installation Jacket -Launching and crane assisted upending 20 years of sacrificial anodes

CPP Facilities Design


Gas
Metering Compression Pipeline

Wellhead

Glycol Contactor

Platform

Separator
Wellhead

Platform

Condensate Stabilization
Wellhead

Platform

FSO Water Treatment

QP Facilities Design
Diamond Living Quarters Building Designed for modular construction with maximaum capacity of 150 personnel A Helideck to land a Sikorsky S-61, S-76 or a Eurocopter EC155 helicopter Dining/mess facilities designed to accommodate 90 personnel at one serving A medical centre A gymnasium and outdoor recreation facilities (at roof level just below the Helideck). A TV/cinema/training room provided to accommodate 80 personnel

QP Facilities Design
TopsideLayout Three deck levels are envisaged which include a Main deck, a Mezzanine deck, and a Lower deck. The LQB shall be installed on the Main deck. The Central Control Room building will be installed on a cantilever on the QP. All other facilities shall be located either on the Mezzanine deck, Lower deck or in spaces available on the Main Deck. A single level bridge shall be used to connect the CPP to the LQ.

QP Facilities Design
Structure Design Fixed platform 4 legs Through-leg piles and grouted annuli Side-lifting and crane assisted upending 20 years of sacrificial anodes

FP/T Design
A flare tower, bridge connected to the CPP shall be provided. The tower will support the flare tips of the HP, LP and Acid Gas flare systems. Preliminary flare and dispersion studies have initially set the bridge length to be 120 m and tower height to be 25 m above the flare platform deck. Structure Design A 3 legged tripod structure Ungrouted leg piles 15 years of sacrificial anodes

WP Design
The function of the wellhead is to maintain surface control of the well. All actuated wellhead valves will be hydraulically operated. Wells will be drilled by tender rig. All of Christmas trees that be used in the project are dry type. Structure Design 4 legs with though leg piles Sided lifting and crane assisted upending 20 years of sacrificial anodes

3D Design

Approx Tonnage of Platform


Facilities CPP Jacket Topside QP Jacket Topside FP/T Jacket Topside Bridge (2 bridges) Wellhead ( 6 WH) Jacket Topside 800 1500 500 500 100 1000 1200 Approx. weight (Tons / Each) 6000 15000