Вы находитесь на странице: 1из 4

ENGINEERING CO-ORDINATION MEMORANDUM

Documentation Type: Title:

Code : GD153786 Rev: 2 Date: DD/MM/YY2 Approval process: Prepared: Verified: Approved: Pg. 1 of 4

Electronic: PDM Flow

DTD - Design
Deliverable:

D07

FOUNDATION G58 IIIB T65 & G97/ T90 IN JATH MAHARASHTRA WIND FARM

NSB IDIEGO ISL

The present document, its content, its annexes and/or amendments (the Document) has been drawn up by GAMESA CORPORACIN TECNOLGICA, S.A. (Gamesa) for information purposes only, and contains private and confidential information regarding Gamesa and its subsidiaries (the Company), directed exclusively to its addressee. Therefore it must not be disclosed, published or distributed, partially or totally, without the prior written consent of Gamesa, and in any case expressly indicating the fact that Gamesa is the owner of all the intellectual property. All the content of the Document, whether it is texts, images, brands, trademarks, combination of colours or any other element, its structure and design, the selection and way of presenting the information, are protected by intellectual and industrial property rights owned by Gamesa, that the addressee of the Document must respect. In particular (notwithstanding the general confidentiality obligation), the addressee shall not reproduce (except for private use), copy, transform, distribute or publish to any other third party, any of the information, totally or partially.

INDEX 1 2 3 4 5 SCOPE2 REFERENCES.. 2 MATERIALS. 2 LOADS ..2 REMARKS.3 5.1 GENERAL 3 6 COMMENTS..4 7 CONCLUSIONS4

RECORD OF CHANGES
Rev. 0 1 2 Fecha 17/07/2012 13/08/2012 17/09/2012 Autor NSB NSB NSB Initial version Revised version Revised version Descripcin

Code:

Rev: 1 Pg. 2 of 4

ENGINEERING COORDINATION MEMORANDUM


Date: 17/07/2012

Title:

FOUNDATION G58 IIIB T65 & G97/ T90 IN JATH MAHARASHTRA WIND FARM

1 SCOPE
The scope of this document is the foundation for G58 IIIB T65m & G97/ T90 wind turbines in Jath, Maharashtra Wind farm. 2 REFERENCES

[1] Interface. a) G58 T65 IIIB: Welded section: C260300 b) G97/ T90: Welded section: GP111401 [2] Foundation loads. a) G58T65 IIIB: GD062064 b) G97/ T90: GD051056 [3] Foundation drawing: a) G58 T65 IIIB: C260289 b) G97/ T90: GP114050 Embed foundation c) G97/ T90: GD131057 Anchor bolt foundation d) GP200967/ GP204579 - Anchor bolt foundation with bottom flange GP144145 instead of GP200966 ( for 36 locations only)

[4] Eurocode 2: Design of concrete structures. Part 1-1: General rules and rules for buildings UNE ENV 19921-1: 1991. [5] European Standard DIN EN 206-1. Part 1: Specification, performance, production and conformity. July 2001 [6] Execution control : a) b) c) d) EQ209006 MEDICION NIVELACION EN CAMPO DE VIROLAS DE CIMENTACION EA269001 EXECUTION AND QUALITY CONTROL FOR FOUNDATIONS 9890301 INSTRUC. DE EJECUCION ENSAYOS CARACTERIZ. DE UN PARQUE FT000110 INSTAL. PUESTA TIERRA RECOMENDADA AEROGENERADORES GE

3 MATERIALS
The materials used for this verification are presented below Steel: fyk 500 MPa Concrete: C30/37 according to ref[5]. Cleaning Concrete: C20/25 according to ref[5].

4 LOADS
Loading class verified as per SAR- GD131059, GD141183.Loads applied in the analysis as per document ref [2], a) Extreme Loads b) Fatigue Loads c) Loads for Gap verification.

Code:

Rev: 1 Pg. 3 of 4

ENGINEERING COORDINATION MEMORANDUM


Date: 17/07/2012

Title:

FOUNDATION G58 IIIB T65 & G97/ T90 IN JATH MAHARASHTRA WIND FARM

5 REMARKS
The points studied and results obtained in the verification are:

Stability verification Overturning Sliding OK OK

Structural Verification Primary Reinforcements Upper Reinforcement Lower Reinforcement Star reinforcement Secondary Reinforcements Skin Rods Shear verification Shear reinforcement Interface Verification Pulling out Concrete compression below the lower flange Vertical Pedestal Rods Horizontal Pedestal Rods Chair Rods OK OK OK OK OK OK OK OK OK OK

5.1

GENERAL

Due to possible problems with the foundation execution,it is recommended to be careful while filling the concrete, especially in zones with high reinforcement density.

Code:

Rev: 1 Pg. 4 of 4

ENGINEERING COORDINATION MEMORANDUM


Date: 17/07/2012

Title:

FOUNDATION G58 IIIB T65 & G97/ T90 IN JATH MAHARASHTRA WIND FARM

The anchorage length recommended by Gamesa is: 1 BAR Bars diameter (mm) 12 16 20 25 32 Position I (cm) 30 40 52 81 133 Position II (cm) 43 57 73 114 186 2 BARS Position I (cm) 39 52 68 106 173 Position II (cm) 56 74 95 148 242

6 COMMENTS:
G58 T65 IIIB: ref.[3].a - C260289 This document is applicable for locations GJ-47N, GJN-09N, GJN- 01N, GJN-9N1, GJN-35, GJN-39, GJN-40, GJN-42N, GJN-46, GJ-43N, GJ-33, GJ-41N, GJ-30N, GJ -31N, GJ-25, GJ-26, GJ-101, GJ -13, GJ-01A, GJ-02A, GJ-09N1, GJ-49, GJ 50 , GJB 10, GJB 16, GJ28A, GJ38N, GJ45N, GJ44N, GJB 20 of Jath, Maharashtra wind farm. G97 T90 Welded Section / Foundation Ring: ref.[3].b - GP114050 This document is applicable for locations GJI 18N, GJII-10, GJI-87, GJI-88N, GJII58, GJI90N, GJI86 , of Jath, Maharashtra wind farm. Re-engineering work has been carried out in location GJI 18N. G97 T90- Anchor Bolt Foundation: ref.[3].c - GD131057 This document is applicable for location GJI 19N Jath, Maharashtra wind farm. G97 T90- Anchor Bolt Foundation: ref.[3].d - GP200967 / GP204579 - (Anchor bolt foundation with bottom flange GP144145 instead of GP200966 for 36 locations) This document is applicable for locations GJI 17N, GJI 20N, GJI 16N, GJII 72, GJII 77N, GJI 84, GJII 76N, GJI 81, GJII 34N, GJI 20, GJII 07 of Jath, Maharashtra wind farm. Re-engineering work has been carried out in location GJI 17N and GJII 34N. For locations GJI-21, GJI-40N, GJI-49, GJI -50, GJI -30N, GJI 44 Due to poor soil condition Pile foundation to be adopted and design is under progress. The geo-technical reports for the above mentioned locations are obtained from Velciti Consulting Engineers, Chennai.

7 CONCLUSIONS:
The foundation proposed in ref.[3] is considered suitable. Note: Any change/ modification of the documents listed in item 2 will deem this document invalid.