Вы находитесь на странице: 1из 2

WEATHERFORD AEROSPACE, INC.

PROCESS (TURTLE) DIAGRAM

DOCUMENT NO.: IA - 003 REVISION LEVEL: B REVISION DATE: 03/26/2012

PROCE SS:
1. INPUTS (List of Things Coming Into the Process)

2. OUTPUTS (Outcome or Result of Process)

3. WHAT (Materials & Equipment)

4. WHO (Competence, Skills, Training)

5. HOW (Support Processes, Procedures & Methods)

6. METRICS (Performance Indicators)

-1-

WEATHERFORD AEROSPACE, INC. PROCESS (TURTLE) DIAGRAM

DOCUMENT NO.: IA - 003 REVISION LEVEL: B REVISION DATE: 03/26/2012

FORM INSTRUCTIONS TURTLE DIAGRAM 3 4

PROCESS: Identify the applicable process. 1. INPUTS: List those things coming into the process, which are transformed into outputs. 2. OUTPUTS: Identify what has changed and results from the process. 3. WHAT: Identify all known equipment and material necessary for effective processing of inputs into outputs. 4. WHO: Identify the title of the personnel responsible for the process, the competency requirements, and the training requirements referenced to achieve competency. 5. HOW: Identify the procedures, instructions, manuals, other methods employed to direct the process. 6. METRICS: Identify the records necessary to provide evidence of successful process control and product realization, and where possible the criteria that must be met to achieve acceptable outputs.

-2-

Вам также может понравиться