PLANNING OF UHV SYSTEMS WITH RESPECT TO INSULATION


COORDINATION
Hemang Tailor, Dr. A.R. Chudasama,
Dept. of Electrical Engg., Faculty of Technology & Engineering,
MAHARAJA SAYAJIRAO UNIVERSITY OF BARODA, Vadodara-390001
Email : hrtailor-eed@msubaroda.ac.in , archudasama@msubaroda.ac.in
Abstract:
When planning a new power system, in particular at a new voltage level, insulation coordination (IC) is one of
the most important subjects. The main task is the determination of stresses and the assessment of the strength
of the system and the equipment installed. The general procedure of IC is described in IEC 60071. However,
this standard does not give precise advice regarding new voltage levels at & above 1000 KV. However,
experience is available from former CIGRE work which also considered the 1000 kV voltage level. The
lightning and switching overvoltages are of particular interest regarding stresses. For determination of
overvoltages the well known models and methods from various CIGRE reports are applied & corresponding
examples and simulations will be presented. The overvoltages in UHV system like Temporary, Slow front, Fast
front & Very fast front overvoltages are considered & dielectric strength of insulation at operating voltage,
switching impulse, lightning impulse & very fast transient stress will be examined & basic design of Insulation
coordination for UHV (of & above 1000 KV) is suggested. In addition, special consideration is made on the
performance of SF6 insulating systems which will frequently be applied in the voltage range in question.

Keywords:

UHV system planning, insulation design, CIGRE experience
1. Introduction

In the years 1965 to approximately 1975 electricity consumption in the industrialized countries was remarkably
increasing with rates in the order of 10% per year which were comparable to those observed in China, India,
and other countries. During this period, several countries in Europe, America and the former Soviet Union were
seriously planning UHV systems with operating voltages of 1000 kV or more. Large UHV test laboratories were
erected worldwide to investigate the fundamental properties of UHV systems.

When reviewing the CIGRE publications of these years it becomes evident that the phenomena involved in
power transmission in UHV voltage level were the predominant work of the CIGRE Working Groups. The first
indication for a future UHV power transmission was already made during the CIGRE Session 1968 where L.O.
Barthold announced the Project UHV in the US with the objective to investigate UHV transmission with
voltages up to 1500 kV [1]. The five year project had the objective to study the performance of air insulation
under switching impulses, the pollution performance of insulators and conductor corona at power frequency
voltages.

Shortly later, European activities followed, in particular the erection of the first UHV indoor test facilities Les
Renardieres of EDF, France, where the physics of air discharge and UHV measuring techniques were
investigated by international co-operation groups. Further remarkable efforts in Italy, Germany and Canada
have to be mentioned.

Already in 1969 the IEC sent a letter to CIGRE with the question on future power systems voltages higher than
1000 kV and the possibility of standardization. The report of the CIGRE Ad Hoc Group has been published in
1972 [2]. The report concludes that the design of UHV systems would appear possible at least up to 1500 kV.
Reference is made to [3] which contain a list of references indicating the state of this time.

CIGRE Study Committee 33 System Overvoltages and Insulation Co-ordination was responsible for the
research regarding the overvoltages in the system and the development of statistical procedures for insulation
coordination. For this purpose various models for assessment of overvoltages created in the system were
developed [4]. When planning a new system, in particular at a new voltage level simulation methods are
valuable tools. It was also within the scope of this Study Committee to establish the dielectric strength of the air
insulation including that of polluted insulators and to develop suitable protective devices. The research
activities within this Study Committee in questions of UHV transmission provided sufficient knowledge on
overvoltages and insulation performance to design air insulation up to the operating voltages. This knowledge
is summarized in IEC 60071-2.

2

Although prototypes of UHV power transformers have been built and operated to obtain experience, the
knowledge of the behavior of the internal insulation is much less developed than that of air. Similar applies to
UHV gas-insulated substations (GIS), because in the early 1970s this type of substation was used only in the
lower voltage range. The performance of GIS at UHV voltages will shortly be mentioned in this report.

1.1. Literature Review

After getting registered for Doctoral degree under the topic of Analyzing Over Voltages by Frequency
Dependent Line Modeling for Designing Insulation Coordination of Ultra High Voltage AC System, many
papers on Ultra High Voltage AC system were referred to get knowledge about the recent happenings in the
field of UHV AC Transmission (1000 kv & above) around the world, which included CIGRE & IEC publication
papers. The next stage was about the study of possible overvoltage surges at related voltage level & the
requirements of Insulation Coordination were considered, for which studies were available at voltage levels
upto 765 kV ac. The references available from experimental tests published in CIGRE-IEC papers have
provided knowledge that has already there in the field, which were treated as base for designing Insulation
coordination & the Frequency dependent line modeling was selected as useful tool, for which experience from
related papers was reviewed & this present paper was finally proposed.
2. Overvoltages in UHV systems

Electrical equipment has to withstand different voltage stresses occurring in the network. Besides the
continuous power-frequency voltage temporary overvoltages and transient overvoltages have to be
considered. Representative maxima of amplitudes according to their time duration are given in Fig. 1.



Fig. 1: Representative maxima of amplitude of overvoltages Urp (per unit values)


2.1 Temporary overvoltages

Temporary overvoltages arise from single-phase earth-faults on the two unfaulted phases or from load
rejections on all three phases, if the load remaining on the generators is not sufficient to avoid over excitation.
Their duration is in the order of 1 s.

Temporary overvoltages represent stresses to the internal insulation, for example of transformers. In addition,
temporary overvoltages are the basis for the selection of the surge arrester ratings. From both points of view
low temporary overvoltages have to be aimed for. Per unit values of 1.3 or even less are considered suitable.

Temporary overvoltages may also occur due to resonance and ferro-resonance phenomena in particular when
energizing transformers via longer lines or de-energizing inductive voltage transformers [5]. These voltages
can last for more than 10 s. Therefore a sufficient damping of the oscillation has to be obtained.


3

2.2 Slow-front overvoltages

Slow-front overvoltages are of particular importance for UHV systems because of the saturation effect of the
switching impulse strength of the air insulation due to the enhanced leader propagation in air in the frequency
and voltage steepness range in question. Slow-front overvoltages of interest arise from

- Earth-fault initiation and earth-fault clearance
- Energiezation and re-energization of lines after faults.

For UHV systems overvoltages due to earth-fault initiation and clearance are of predominant importance.
Overvoltages due to earth-fault initiation occur on the unfaulted phases and may cause a subsequent failure on
these phases not necessarily on the same line. The consequence could be loss of two lines at one earth-fault.

Overvoltage due to fault clearing occurs on the faulted phase, when the faulted line is switched off. A
subsequent insulation failure may occur on the part of the system still in operation. Both types of overvoltages
should be carefully investigated for a given system, because they cannot be avoided by protection means. The
amplitudes of such overvoltages are proportional to the earth-fault factor and may reach 1.5 p.u for earth-fault
factors of 1.25 to 1.3.

Overvoltages due to energization and, in particular, re-energization of overhead lines after faults have to be
limited. Suitable means like pre-insertion resistors or point-of-wave switching are available. An especially
severe situation is obtained for three-phase re-energization due to the trapped charges remaining on the two
unfaulted phases, when the fault is cleared. There are two possibilities to avoid such trapped charges:

- Single-phase reclosing

Only the phase on which an earth-fault occurred is switched-off. As this phase is earthed by the fault, no
trapped charges will be present at re-energization.

However, during the fault an appreciable current will flow through the fault due to capacitive coupling from the
two sound phase conductors. This current may prevent the earth-fault from extinguishing resulting into an
unsuccessful reclosure. For estimation, if the secondary arc will be extinguished, simulations can be performed
using an arc model simulating the free in air burning arc and an adequate line model taking into account the
travelling wave and the damping phenomena of the line [6].

- Fast three-phase earthing of the overhead line

The trapped charges will be diverted to earth by the earthing switch. The switching sequence after earth fault
would be opening of the line breaker, closing of the earthing switch, opening of the earthing switch and closing
of the line breaker. It is evident that the fault clearing time will be long.

If one of the two methods or an alternative method is successful, the overvoltages due to line energization
should be limited to the overvoltage due to earth-fault initiation and clearing. Preinsertion resistors and point-of-
wave switching are most suitable to obtain overvoltages in the order 1,5 p.u.. Only specially designed surge
arresters [7] have protective levels in such low order, but the surge profile along the transmission line has to be
observed.

2.3 Fast-front overvoltages

Fast-front overvoltages are caused by
- Disconnector switching in substations
- Lightning strokes to overhead lines.

Disconnector switching in substations can have overvoltage amplitudes up to 2.5 p.u.. If metal-oxide surge
arresters are installed on the part of the substation switched-off by the disconnector the overvoltage will be
limited to the protective level of the arrester. If not, the insulation has to be designed for this value.

Lightning strokes hitting UHV transmission lines can generate overvoltages of several MV [8] depending on the
impinge surge and the height of the tower. Both shielding failures as well as back-flashovers have to be taken
into account. Methods for estimation of lightning performance of transmission lines are given in [9]. For
shielding analysis the leader propagation model and the electro-geometric model (EGM) are applied. For a first
estimation the simplified EGM seems to be sufficient. For determination of back-flashovers the tower surge
response and the earth electrode impulse response have to be considered. For simulation of the tower surge
impedance a wasted tower shape is assumed. The footing impedance can be simulated by a current
dependent resistance.
4


If the potentials at the tower exceed the line insulator strength a flashover occurs. The flashover voltage can be
derived from the voltage time curve using the equal area criterion or the leader development method. The
lightning current will be represented by a concave or a ramp wave form regarding the different steepnesses
and amplitudes for the first stroke and the subsequent strokes.

Due to these phenomena UHV transmission lines will have a very high lightning impulse flashover voltage of
several MV. Even if the overhead line shielding has been designed for small shielding failure rates high
lightning overvoltages will reach the substations and cause high overvoltages at the equipment. Protection by
surge arresters has to be designed as an economical optimum between the required lightning impulse
withstand voltage of the insulation and the number of surge arresters to be applied. For Lightning overvoltage
analysis of the substation adequate line modelling by frequency dependent models including corona damping
have to be used.

The analysis has also to regard the spatial dimensions of the substation and the location of the arresters to
obtain the correct overvoltage profile in the substation.

2.4 Very fast-front overvoltages

Very fast-front overvoltages are caused in SF6 gas insulated substations (GIS) in two ways [9]:

- Switching operations, mainly disconnector switching
- Line to enclosure breakdowns

During disconnector switching when switching short bus ducts at a residual DC voltage [10] of 1 pu the
following values will occur:

- 1.9 pu with large source side capacitance (about 23 nF), e. g. capacitive VTs (Fig. 2a)
- 1.5 pu with lower capacitances of some hundred pF, e. g. surge arresters (Fig. 2b)

For disconnector switching in connection with a capacitively graded multi-break circuit breaker under out of
phase conditions values of

- 2.02.2 pu may occur at which a high damping of the VFT component by the grading capacitor is to be
considered (Fig. 2c).



Fig. 2: Very fast front overvoltage during disconnector switching in GIS
a) With large source side capacitance (e. g. capacitive VT)
b) With lower source side capacitance (e. g. surge arrester)
c) With multi-break circuit breaker under out of phase conditions

Line to enclosure breakdowns primarily occur due to flashovers within the GIS and could lead to a subsequent
breakdown at defects. Since these flashovers are mainly caused by defects with a strongly inhomogeneous
field the voltage collapse results in a strong damping which is additionally enhanced by the fault arc. Therefore
no subsequent breakdown has to be expected, even if the breakdown voltage is only weakly reduced
compared to sound conditions.





3

3 Dielectric strength of insulation

3.1 Dielectric strength at operating voltage

It is evident that the dielectric strength at operating voltage has to be withstood by the equipment during its life.
Concerning the internal insulation of apparatus the experience of manufacturers based on the operation at
smaller voltage levels has to be extrapolated to the higher voltage levels in the UHV range.

UHV transmission is selected to transport power over long distances. The most expensive parts of this
transmission system, therefore, are the overhead lines which have to be designed for the economic optimum.

As far as insulation is concerned, insulator design according to the expected pollution level is a priority task.
Since long time the investigation of the pollution performance of insulators is a priority task of CIGRE.
Remarkable progress has been achieved, the results of which can be summarized as follows:

- The pollution withstand voltage of insulators is proportional to the specific creepage distance irrespective the
insulator length. The necessary creepage distance depends on the pollution severity as given in IEC 60071-2
or IEC 60815. It is, for example 20 mm/kV for medium pollution, where the value is referred to the highest
system voltage, usually equal to the highest voltage for equipment.

- The ratio of the creepage distance to the insulator length should not exceed 4, preferable 3.8.

Further guidance for selection and dimensioning of outdoor insulation is given in [11]. Composite insulators
with silicon rubber housings or sheds present advantages with regard to design and pollution performance.
They can supply the same creepage distance at shorter axial length compared to ceramics. As the material is
hydrophobic they can provide a better pollution behavior as long as the hydrophobicity is maintained.

3.2 Dielectric strength at switching impulses

The knowledge of CIGRE regarding the insulation withstand [12] is fully included in IEC 60071-2. The 50%
flashover voltage of the insulation depends on a number of parameters from which the most important ones
are:

- Gap distance
- Gap factor describing the gap geometry
- Time-to-crest of the switching impulse

Fig. 3 shows the dependency of the 50% switching impulse flashover voltage of a rod-plane gap on the gap
distance for the two parameters, the minimum value obtained for a specific time-to-crest and the standard
value obtained for the standard switching impulse 250/2500 s. For larger distances the two values deviate
and the difference can result in quite different distances. In insulation co-ordination the influence of the time-to-
crest has to be taken into account during the system analysis.


Fig. 3: 50% switching impulse flash-over voltage of a rod-plane gap dependent on the gap distance

For internal insulation the dielectric strength at switching impulses is usually of minor importance.


6

3.3 Dielectric strength at lightning impulses

For practically all insulation the lightning impulse withstand is proportional either to the dielectric field strength
(internal insulation) or to the distance (external insulation) and can be assessed with suitable accuracy in the
design stage. In case of standard impulses the strength can be taken from experimental information. Once the
gap factor of the arrangement under consideration is determined the flashover voltage can be derived from Fig.
4 and 5 [12].

For evaluation of non-standardized impulses suitable models have to be applied to predict the strength. Two
basic models are in use:

- The integration method which estimates the flashover voltage from the voltage time curve using the constant
area criterion
- The leader development method.

Fig. 4 : Average gradient E
50
= U
50
/ d of a rod-plane Fig. 5 : Average gradient E
50
related to E
50

gap in dependence of the gap clearance for standard rod-plane of a rod plane gap (Fig. 4) in
LI voltage dependence of the gap factor

3.4 Dielectric strength at very fast transient stress

The VFT stress is of special interest with regard to SF6 insulated systems. Under sound conditions the VFT
stress is covered by the withstand capability for standard LI voltage [13]. However, it has to be taken into
account when choosing a relatively low lightning withstand level (LIWL) the margin between VFTO and LIOV
becomes smaller. Fig 6 shows typical overvoltage probability densities along a 420 kV GIS [14]. The amplitude
is related to a LIWL of 1425 kV according to the relevant apparatus standard which corresponds to a ratio of
4.2 pu to the normal service voltage. The overvoltage due to disconnector switching (VFTO) shows a maximum
at 0.38 pu (related to the LIWL), whereas the maximum of the LIOV is at 0.65 pu. Assuming that the same
overvoltage probability density will occur in a UHV SF6 insulated system with a LIWL of 2550 kV, the VFTO
maximum will move to 0.52 pu (related to the LIWL) due to the smaller ratio between LIWL and normal service
voltage of 3.1 pu.

Furthermore, when selecting the insulation withstand level with respect to fast and very fast transient
overvoltage stresses further aspects should not be disregarded, e. g.:

- The absolute number of occurrence of overvoltage processes caused by disconnector switching during the
total lifetime of the equipment is in the range of some thousands up to ten thousand whereas the number of
overvoltage processes due to lightning is in the range of some tens up to a few hundred.

- Overvoltages due to disconnector switching cannot be limited by arresters, as they are internal overvoltages.
Nevertheless, a properly designed SF6 insulating system is able to withstand the transient and very fast
transient overvoltages. Special attention has to be paid for when defects are present in the insulation system
[14,15]. The field enhancement due to the defects gives considerably lower breakdown voltages. Failures even
occurred due to disconnector switching generated VFTO, often in the vicinity of the disconnector itself or at the
end of busbar sections.
7



Fig. 6 : Typical overvoltage probability due to VFTO and LIOV (related to LIWL) along a GIS station
1: VFTO probability related to LIWL of 4.2 pu 2 : VFTO probability related to LIWL of 3.1 pu


Fig. 7 gives an overview, how far the breakdown strength is reduced by fixed or moving particles [15]. In Fig. a,
the 10% breakdown field strength depending on the particle length is shown for a fixed particle stressed by
lightning, switching and AC voltage. Additionally different PD levels are given.




Fig. 7: 10% breakdown field strength and PD field strength for defects
a) Fixed particles b) Moving particles


The field strength related presentation is chosen to enable a more general assessment. The design field
strength differs between the various manufacturers, but as a rule field strengths of 140...180 kV/cm are taken
for LIWL, 110145 kV/cm for SIWL and 70115 kV/cm for PFWL. The field strength at normal service voltage
is in the range of 3045 kV/cm. The fixed particles are particularly critical at lightning overvoltage. The critical
particle length is millimeter range. At switching and power-frequency overvoltage the critical particle length is
distinctly larger. PD detection of the critical particles needs a rather high PD measuring sensitivity. Free moving
particles are in particular critical at power-frequency voltage. The critical particle length is in the range of some
millimeters. A measuring sensitivity of some pC is sufficient for a PD detection of critical particles at service
voltage.


8

4 Insulation co-ordination

Insulation co-ordination requires that the insulation withstands the voltage and overvoltage stresses in the
system with a sufficiently low failure probability. In order to fulfill this insulation requirement the following criteria
can approximately be applied (see IEC 60071-2):

- The co-ordination withstand voltage of the internal insulation (transformers, GIS) should be at least equal to
the maximum overvoltage of a given category.

- The co-ordination withstand voltage of the external insulation should have a sufficiently low risk of flashover,
which is for slow-front overvoltages assured, when the switching impulse withstand voltage is 1.05 times the
2% overvoltage value. The co-ordination withstand voltages are the voltages which the insulation has to
withstand in all service conditions. However, the equipment is tested in standard conditions and the difference
in dielectric strength arising from these conditions has to be taken into account by suitable factors:

- External insulation: Altitude correction up to 1000 m: Ka =1.13, Safety factor: Ks = 1.05
- Internal insulation: Safety factor: Ks = 1.15

When choosing the safety factor Ks for SF6 insulated systems to meet the co-ordination withstand voltage
further aspects have to be taken into consideration which are particularly important for fast front voltages. This
is the volume effect when determining Ks for complete substation derived from type testing on components or
single bays. Furthermore the impacts of smaller defects like particles which can occur during the service life
after commissioning and might decrease the insulation strength. The impact of the latter one might be reduced
by adequate monitoring and diagnostic techniques. Therefore for fast front overvoltages in SF6 insulated
systems Ks of at least 1.25 is recommended in [13]. This Ks factor should also be adopted for GIS in UHV
systems. How far this subject has also to be considered for power transformers is under investigation [16].


5 Basic design of external insulation

The required insulator length is determined by the specific creepage distance and the recommended maximum
ratio between creepage distance and length of 3.8. For vertical insulators these values are approximately equal
to the required distances. Fig. 8 shows these distances for the medium pollution levels (20 mm/kV) and heavy
pollution levels (25 mm/kV).



Fig. 8: Required clearances for vertical insulators concerning insulator pollution (blue) for medium and heavy
pollution and 2% value of slow-front overvoltages from 1.4 pu to 1.8 pu

As described in chapter 2.2 the required clearances to withstand slow-front overvoltages of a given pu value
increase more than proportional with the highest voltage for equipment. Fig. 8 shows these required distances
for three values 1.4 pu, 1.6 pu and 1.8 pu for the 2% value for these overvoltages.

For a 1100 kV UHV system operating in areas with medium pollution the reduction of slow-front overvoltages
down to 2% values of about 1.5 pu provides the optimum distance of about 5.5 m. If the system operates in
heavy polluted areas a reduction of slow-front overvoltages to about 1.7 pu is sufficient. The optimum
clearance is then about 7.2 m.
9


Concerning the insulation of open air substations the above statements fully apply. Concerning overhead lines
in heavy polluted areas the use of V-strings as insulators may provide advantages in the clearances, when the
slowfront overvoltages are reduced to 1.5 pu. A further reduction can only be obtained, when the overvoltages
due to fault initiation and clearing are lower than the 1.5 pu as estimated in chapter 2.2.


6 Conclusion

When planning a new power system, in particular in the UHV range, insulation coordination (IC) is one of the
most important subjects. The results have a strong impact on the reliability of the system and the economical
expenditure. The general procedure is given in IEC 60071. Additional information in particular with regard to
questions associated with a new voltage level can be taken from the CIGRE work. In the past, various CIGRE
working bodies were involved in this subject and a lot of basic knowledge was gained.

For determination of the relevant stresses by simulation and estimation methods as well as for assessment of
the dielectric strength reference can be made to various CIGRE publications [17], some of them are given in
the references. When designing a system in the UHV range transient stresses due slow, fast and very fast front
overvoltages are of special interest. With respect to external insulation particular regard has to be given to
switching overvoltages caused by single-phase auto-reclosing, to lightning overvoltages due to shielding
failures and back-flashovers. TOV due to resonances and ferro-resonances have to be considered thoroughly,
since they can last for more than 10 s and may lead to inadequate stress of arresters and transformers or
inductive VTs.

With respect to internal insulation, primarily SF6 gas insulation under sound but in particular with defects,
special attention has to be paid to VFTO and LIOV. A reduction of the insulation level may increase the risk of
breakdowns at disconnector switching and due to minor defects like particles in the insulation system.
Therefore a Ks factor of 1.25 with regard to fast front overvoltages is recommended for SF6 insulation. The
strength at operating voltage is essentially affected by the pollution withstand voltage of insulators. A ratio of
the creepage distance to the insulator length of 3.8 is recommended which can easily be achieved by
composite insulators due to their advantages under polluted conditions. A lot of information on pollution
performance as well as on selection and dimensioning of outdoor insulation is provided in different CIGRE
publications. Thus the experience collected by various CIGRE working bodies represents a reasonable basis
for planning and designing an UHV system.


References:

[1] L.O. Barthold e.a. Five year research program in Ultra-High Voltage (CIGRE Proceedings 1968, Report
42- 04).
[2] CIGRE brochure 32, 1972: Final report of the UHV ad hoc group.
[3] K.H. Weck Risk of Flashover caused by switching overvoltages in a complete UHV substation. CIGRE
Report 23-06, 1974.
[4] CIGRE brochure 39: Guidelines for representation of network elements when calculating transients.
[5] CIGRE WG C4.301: Study of resonance and ferro-resonance phenomena.
[6] E. Prikler e. a.: Influence of the secondary arc on the operation of single phase auto-reclosure of the 400
kV interconnection between Hungary and Croatia. CIGRE Symposium Transient Phenomena in Large
Electrical Power Systems. Zagreb, April 2007, Paper 0303.
[7] Goudarzi, A and H. Mohseni, 2004. Evaluation of mathematical models of metal oxide surge arrester for
energy absorption study. 39th International Universities Power Engineering Conference, Bristol, UK. pp:
211-214
[8] TNBR, 2008. Lightning Detection Network System Database.
[9] CIGRE brochure 63, 1991: Guidelines to procedures for estimating the lightning performance of
transmission lines.
[10] CIGRE WG 15.03: GIS insulation properties in case of VFT and DC stress. CIGRE Report 15-201, 1996.
[11] CIGRE WG C4.303: Outdoor Insulation in Polluted Conditions: Guidelines for selection and dimensioning.
Part 1: General principles and the a.c. case.
[12] CIGRE brochure 72, 1992: Guidelines for the evaluation of the dielectric strength of external insulation.
[13] CIGRE WG 33/13.09: Very fast transient phenomena associated with gas insulated substations. CIGRE
Report 33-13, 1988.
[14] CIGRE WG 33/23.12: Insulation co-ordination of GIS- Experience, on site tests and diagnostic techniques.
ELECTRA no.176, February 1998.


10

[15] CIGRE WG 15.03: Effects of particles on GIS insulation and the evaluation of relevant diagnostic tools.
CIGRE Report 15-103, 1994.
[16] CIGRE WG C4.30x: Insulation coordination related to internal insulation of oil filled equipment.
[17] C.Neumann, K.H. Weck; UHV systems with respect to insulation coordination based on CIGRE
experience. IEC/CIGRE UHV Symposium Beijing 18-21 July 2007.



About Author



Mr. Hemang R Tailor received his B.E. (Electrical) and M.E. (Electrical) from the M.S. University of Baroda in
1994 and 2004 respectively. He has total 2 years of industrial and 14 years of teaching experience. He is at
present working as Reader (Associate Professor) in Electrical Engineering Department at Faculty of
Technology & Engineering, The M. S. University of Baroda. He has presented 3 research papers at national
level conferences & attended 1 International conference.



Prof. (Dr.) A.R.Chudasama received his B.E.(Electrical), M.E.(Electrical) and Ph.D (Electrical Engg) from The
M.S.University of Baroda in 1979, 1987 & 2003 respectively. He has total 4 years of industrial experience in
India & North America. He has more than 27 years of experience as university academician. At present, he is
working as Professor in Electrical Engineering Department at Faculty of Technology & Engineering, The M. S.
University of Baroda. Dr. A.R.Chudasama has published and presented more than 40 research papers and
articles in various journals & conferences.