Вы находитесь на странице: 1из 23

ANPQP Revision Version 2.

Feb 2011 ANPQP Maintenance Committee

Index
New Revision Summary New Revision Contents 1. Commonised Renault/Nissan Requirements 2. Reinforced Requirements for High Volume Parts 3. Standardisation of Requirements Deployed since V2.1 4. Removal of Duplicated Requirements 5. Other Changes
2

New Revision Summary


Main Request Collect all requirements deployed since V2.1 publication and incorporate into the new revision. Alliance Study and improve commonisation to support optimised joint procurement e.g. Alliance High Volume Parts. Implement changes in global supplier training. Nissan Incorporate new requirements for Important C to improve customer satisfaction. Incorporate reinforced requirements such as Examples of Process/Facility Site Changes to clarify change management requirements and reduce concerns caused by un-approved changes. Renault Reduce the number of ANPQP requirements and focus on the product and process conformity. Ensure consistency with the V3P milestones.
3

New Revision Summary


1. Commonised Renault/Nissan Requirements
Commonised Process Potential FMEA, Supplier Digital Test Report and Part Submission Warrant (PSW).

2. Reinforced Requirements for High Volume Parts


Reinforced Sub-Supplier Management and reviewed Change Management and Identification and Traceability to prevent an issue and/or contain it immediately.

New Revision Summary


3. Standardisation of Requirements Deployed since V2.1
Standardised Nissan unique requirements for Important C and reinforced requirements for change management through addition of Examples of Process/ Facility Site Changes. Incorporated Renault/Nissan requirements for Fault Tree Analysis (FTA).

4. Removal of Duplicated Requirements (Renault


Removed the Environmental outputs and the EDI requirements as they are not specific to a part but to a plant location.

5. Other Changes

Index
New Revision Summary New Revision Contents 1. Commonised Renault/Nissan Requirements 2. Reinforced Requirements for High Volume Parts 3. Standardisation of Requirements Deployed since V2.1 4. Removal of Duplicated Requirements 5. Other Changes
6

New Revision Contents


1. Commonised Renault/Nissan Requirements 1) Process Potential FMEA Activity 5.1
Merged the Renault Process AMDEC into the Process Potential FMEA.

2) Supplier Digital Test Report (Activity 6.1


Renault has commonised this requirement with Nissan to improve the robustness of design and minimise the risk of having to introduce late modifications.

3) Part Submission Warrant (PSW) Activity 7.1


Merged the Renault AFF into the Part Submission WarrantPSW in order to have a commonised PSW.

Index
New Revision Summary New Revision Contents 1. Commonised Renault/Nissan Requirements 2. Reinforced Requirements for High Volume Parts 3. Standardisation of Requirements Deployed since V2.1 4. Removal of Duplicated Requirements 5. Other Changes
8

New Revision Contents


2. Reinforced Requirements for High Volume Parts 1) Reinforced Sub-Supplier Management
Reinforced the Tier 1 responsibilities and Part Submission Warrant (PSW) approval timing for their bought out products. Reviewed the items covered in the CSCC*. Added the requirement for Sub-Supplier PSW or equivalent Renault
Activity 2.1 Format CSCC

Notes The Tier 1 supplier shall a system/procedure in place to select new suppliers and to evaluate current suppliers. Activity Phase 4 Approve sub-supplier Part Submission Warrant (PSW) or equivalent.

Reviewed the items covered by the CSCC and focus on features for Supplier, Manufacturing Process and Product.
Unique DCI

Added the requirement for Sub-supplier PSW or equivalent.

*) Component Supply Chain Chart


Note: Some details have been omitted for presentation purposes

New Revision Contents


2. Reinforced Requirements for High Volume Parts 2) Reinforced Change Management (Design Change)
Reviewed and commonised the definition.

Activity 9.1 (None) DCI Mechanism or structure Electrical function Material Dimensions or mass Other changes Mechanism or structure Electrical function Material (incl. supporting material such as grease, paint, welding rod etc. ) Dimensions or mass Sub-component layout Affecting homologation/safety/regulation

Note: Some details have been omitted for presentation purposes

10

New Revision Contents


2. Reinforced Requirements for High Volume Parts 3) Reinforced Change Management (Process Change)
Reviewed and reinforced the definition.
Activity 9.2 Activity 9.2 Example of Changes that require Renault/ Nissan authorization include (but are not limited to): All changes to or within a sub-supplier All Facility site transfers / relocations All changes affecting the process flow All changes relating to the addition, modification or replacement of existing equipment All changes relating to the manufacture or inspection of Special Characteristics or Key Features All changes relating to the manufacturing, inspection or control method used All changes relating to logistics or packaging
11

Examples of changes: Facility site transfer/relocation Change to a Sub-supplier Change within a Sub-supplier Upgrade or rearrangement of existing tooling or equipment Process related to a Special Characteristic or Key Feature Process related to new technology Control method used Process flow

Note: Some details have been omitted for presentation purposes

New Revision Contents


2. Reinforced Requirements for High Volume Parts 4) Reviewed Identification/Traceability Requirements
Combined existing Lot Control and Parts Labeling activities. Developed a common activity description to clarify the Tier 1 responsibility.
Activity 11.2

Activity Purpose: Renault/Nissan requires its suppliers to operate an effective identification and traceability system. Notes: The Tier 1 supplier shall; -manage traceability for all products & components. -deploy the requirements to their sub-suppliers. Requirements may be specified on the drawings and/or data notes. No particular requirements are specified, the supplier must comply with the requirements contained in the ISO/TS 16949 and within the relevant company specific requirements section.
12

Note: Some details have been omitted for presentation purposes

Index
New Revision Summary New Revision Contents 1. Commonised Renault/Nissan Requirements 2. Reinforced Requirements for High Volume Parts 3. Standardisation of Requirements Deployed since V2.1 4. Removal of Duplicated Requirements 5. Other Changes
13

New Revision Contents


3. Standardisation of Requirements Deployed since V2.1 1) Standardised Special Characteristics - Important C
Standardised previously deployed requirements to improve customer satisfaction by reduction of variation. Reviewed Important A and Important B definitions.
Nissan Specific Requirement - Activity. 4.5

Note: Some details have been omitted for presentation purposes

14

New Revision Contents


3. Standardisation of Requirements Deployed since V2.1 2) Standardized Example of Process/Facility Change
Incorporated a list of examples of changes requiring Nissan authorisation to reduce concerns caused by poor change management.
Example of "Process/Facility Site Change"
Applies to all Tier 1 suppliers and all Sub suppliers to Tier N. Important Note: Supplier shall review all changes by supplier internal cross functionally under Tier 1 responsibility. Object of Process Change 1st layer 2nd layer 3rd layer Machine Production site change Relocation/Move to a different site To another site owned by the parent company To a different company ( out sourced) Relocation/Move within the current site Layout Change Relocate production line (inc inspection process) Newly developed or Expansion to the current production line (inc inspection process) Process sequence (inc adding or eliminating process steps) Machine/Equipment on the production line change (inc inspection machine) Installing new equipment Addition or replacement of machine/equipment 4M Remark

Note: Some details have been omitted for presentation purposes

15

New Revision Contents


3. Standardisation of Requirements Deployed since V2.1 3) Standardised Fault Tree Analysis (FTA)
Identified the Renault/Nissan common minimum content requirements for Fault Tree Analysis and standardised the requirement in a newly developed Document Completion Instruction (DCI).

Note: Some details have been omitted for presentation purposes

16

Index
New Revision Summary New Revision Contents 1. Commonised Renault/Nissan Requirements 2. Reinforced Requirements for High Volume Parts 3. Standardisation of Requirements Deployed since V2.1 4. Removal of Duplicated Requirements 5. Other Changes
17

New Revision Contents


4. Removal of Duplicated Requirements 1) Removal of the EDI requirements from ANPQP
Removal of the Supplier EDI Agreement and EDI Submission Warrant outputs from the ANPQP standard because they are related to plant location and not to part, therefore are outside the scope of the ANPQP file. These requirements are already included in the Renault Suppliers Logistics Guidebook and are applicable.

2) Removal of the Environmental outputs from ANPQP


Removal of the Substances & Recycled or Renewable Materials , TDR and IMDS outputs from the ANPQP standard because they are outside the scope of the ANPQP file. These requirements are already included in the 00-10-415 standard and are applicable.

18

Index
New Revision Summary New Revision Contents 1. Commonised Renault/Nissan Requirements 2. Reinforced Requirements for High Volume Parts 3. Standardisation of Requirements Deployed since V2.1 4. Removal of Duplicated Requirements 5. Other Changes
19

New Revision Contents


5. Other Changes
1) Added a description for each Category to explain its purpose. 2) Moved one Activity - 1.2 Product Quality and Reliability Management from Category 3 to Category 1
ANPQP Phase Diagram
Element Activity 1. CONTRACT REVIEW 1.1 Product & Process Concept Study Renault Nissan Documents Name *DCI Format Example L

Newly added Category description appears when you click on each Category name. Product and Process Concept Proposal
Product Quality Targets Study Plan

2 2 (2) 2

1.2 Product Quality and Reliability Management

Renault Activity 1.2 moved from category 3 Product Reliability Targets Study Plan

Nissan

2. SUB-SUPPLIER MANAGEMENT
Component Supply Chain Chart (CSCC)

20

New Revision Contents


5. Other Changes
3) Changed the activity timings for Supplier Master Schedule and Special Characteristics and Key Features Diagram. 4) Changed the document submission level for Process Capability Study Results to reduce the supplier submission responsibilities.
3. PROJECT MANAGEMENT
Design Assurance Plan

Phase1

Phase2 3 1 3 2 1 2 2 1 2

Phase3

Phase4

Extended activity
Nissan Renault Nissan

3.2 Project Planning and Production Preparation Monitoring

Supplier Master Schedule (including Details)

4. PRODUCT DEVELOPMENT
Quality Function Deployment (QFD) HCPP Nissan

Phase1

Phase2 (2) (2) 2 (2) 2 2 (2) 2

Phase3

Phase4

Renault

Shortened activity
2 (2) (2) 2 (2) 2

4.1 Identification and Deployment of Special Characteristics and Key Features

Supplier Feasibility Commitment

Renault

Special Characteristics and Key Feature Diagram (SC & KFD)

Renault

Nissan

3 3

3 2

3 2

Process Capability Study Plan

5.4 Process Capability Study and Improvement

Renault Process Capability Study Results Nissan

(2) 3

(2) 2

2 2

(2) 3

(2) 2

2 2

(2)

Changed submission level


21

New Revision Contents


5. Other Changes
5) Updated the Other Supply Requirement and Glossary in the Alliance Supplier Guide (A.S.G.)
A.S.G

Updated requirement

Updated glossary

22

End of Slides

23

Вам также может понравиться