Вы находитесь на странице: 1из 4

BFM 4703 Computer-controlled of Manufacturing System

Minute of Meeting (MOM) Date: 28/09/2012

Company Name: STARK ENTERPRISE

Roles Project Leader Programmer Mechanical Engineer Electronics Engineer Procurement Engineer

ID FB09011 FB09019 FB10056 FB09055 Fb09004

NAME Ho Siang Ven Liew Kean Teong Ong Rong San Edzamila binti Dzaidi Zahidah binti Ansari

SIGNATURES

ATTENDANCE

Name

Position

Present/Absent/ Excused

Ho Siang Ven Liew Kean Teong Ong Rong San Zahidah binti Ansari Edzamila binti Dzaidi

Project Leader Programmer Mechanical Engineer Electronics Engineer Procurement Engineer

Present Present Present Present Absent (MC)

MEETING LOCATION

Building: Student Activity Center Conference Room: New Cafe

MEETING START
Meeting Schedule Start: 15:00 Meeting Actual Start: 15:03

MEETING END Meeting schedule end: 17:00


Meeting Actual End: 17:15

OBJECTIVE To design and build a prototype of a computer controlled sheet plastic (Styrofoam) Hot Wire Cutting Machine by 31st December 2012 with the cost under RM1000.

AGENDA Discussed about the descriptions of the Sheet Plastic (Styrofoam) Hot Wire Cutting Machine project. The details regarding the descriptions are shown as below:

-Project Descriptions (STEPS)

1. Brainstorm about the topics of the project to be worked on. 2. Search for the related information of each brainstormed ideas via internet. 3. Shortlist the ideas and the final topics selected Sheet Plastic (Styrofoam) Hot Wire Cutting Machine. 4. Briefly discuss on the design as well as the specifications of the selected machine. 5. Draft the manufacturing process of the machine by using flow chart and block diagram. 6. Discuss about the interfacing between hardware and software of the machine. 7. Draft pseudocode for the programming coding to test for its functionality. 8. Fabricate the machine setup at the same time develop the coding for graphical user interface (GUI) purpose. 9. Perform engineering run on the machine in order to ensure adequate process flow. 10. Present the completed project to customer/ lecturer and prepare for Q&A sessions. 11. Complete all relevant documentations regarding the project. 12. Submission of report as well as the project information (if necessary) to lecturer.

Brainstormed about the schematic drawing with the rough design of the project. An attachment of the design is being attached at the end of this MOM.

POST MEETING ACTION ITEMS


No 1 Action Search for related information online regarding project. 2 Define mechanical specifications of the project. 3 Define electrical specifications of the project. 4 5 Define detailed machine specifications Define software specifications of the project. Ms. Ho Mr. Liew 1/10/2012 1/10/2012 Ms. Edzamila 1/10/2012 Ms. Zahidah 1/10/2012 Assigned To Mr. Ong Deadline 1/10/2012

DECISIONS MADE
The programming language has been decided as C and Matlab. Visual Basic will be used as the GUI interface for the project. The types of motor that is going to be used in the project will be DC motor.

NEXT MEETING
Next Meeting: FKP DK4 12/10/2012 15:00