Table of Contents
1.1 Onsite Hardware Installation............................................................................... 3
1.1
1) Introduction
This document describes the TableTop Media Restaurant Level network equipment, the installation requirements and process. The wireless access point cabling and installation must be complete prior to the installation of this equipment.
2) Equipment to Install
DMS Device management Server Aruba 650 Wireless controller UPS Uninterruptible Power Supply Patch Cables
One electrical power outlet will be required for UPS o This may require that an existing outlet be utilized. If this is the case then a power strip can be used to expand the power outlet. One RED patch cable will be installed from the Aruba 650 Wireless Controller to Applebees POS Switch.
3
The preferential orientation of the equipment is: o The UPS vertical with the front voltage indicator panel viewable. Second choice would be horizontal with front voltage indicator panel viewable Final choice would be horizontal with top viewable o The DMS horizontal with the front viewable. Ensure the ventilation is on top. Second choice would be horizontal with front facing to the left (this will keep the power button closest to the front facing side) Final choice would be Vertical with front viewable o The Aruba 650 Controller horizontal on top of the DMS with the front viewable Second choice would be horizontal to the right of the DMS with the front viewable. Final choice would be vertical between the DMS and UPS with the front viewable.
4) Equipment
Equipment will be shipped to the store to arrive two days prior to the scheduled installation. Box with: o UPS Box with: o DMS Device management server o Aruba 650 Wireless Controller o Two(2) power cords. o Power Strip o Extension Cord o Patch Cables Four(4) seven foot green One(1) ten foot blue One(1) twenty-five foot blue One(1) seven foot black One(1) ten foot red One(1) twenty five foot red One(1) seven foot orange One(1) three foot orange One(1) seven foot white One(1) seven foot yellow o One(1) USB Cable o One(1) Serial to RJ45 adapter o 5 or 8 port Gigabit Switch Box(s) with: o Battery Charger(s) up to two per box o Battery Charger feet Two feet with 8 screws for one of the chargers
4
5) Installation Steps
Identify Equipment installation location and orientation Clear and clean location. Ensure there is adequate ventilation Identify electrical power outlet Identify ERJ Chilis Cicso Rotuer and port for TableTop connectivity. Remove all equipment from packaging. Connect Serial to RJ45 adapter to DMS. Tighten two thumb screws until Snug. (these pictures need to be updated with new label indincating that the white patch cable is placed into the ALT NIC port instead of how noted here as do not use.)
Pic 1 - Rear of DMS ports with label Pic 2 - Rear of DMS with Serial adapter Pic 3 - Full rear view of DMS with Serial adapter
o o o o
Install the USB cable in the USB slot just to the left of the Serial Adapter Install the 7 foot orange cable into port 3 of the 5 Port Gigabit Switch Install the 7 foot white cable into port 1 of the 5 Port Gigabit Switch Install the 3 foot Orange patch cable from the Aruba 650 Controller into port 5 of the 5 Port Gigabit Switch
o o o o o o o
Install the 7 foot Orange patch cable from port 3 in the 5 Port Gigabit Swith in NIC 2 on the DMS Install the Yellow patch cable in the Serial to RJ5 Adapter Install the Black patch cable in NIC 1 Install the White patch cable from the 5 Port Gigabit Switch in ALT NIC Install the power cable in the DMS Install the power cord in the 5 Port Gigabit Switch
o Turn on the UPS. You will need to hold the power button down until the blue UPS Indicator panel display illuminates. It will display the voltage. It should be between 114 to 120. It may fluctuate in this range. If it is consistently below 114, please locate a different power source for the UPS.
Pic 8 - UPS installed in preferred Vertical orientation. Laying down in a horizontal position may be required.
Run and connect the RED customer cable from the Aruba 650 Controller to an open port on Applebees POS Switch. Ensure the cable is labeled on the customer side with TableTop Run and connect the BLUE customer cable from the Aruba 650 Controller to the ????????? Applebees Bordband Router. Ensure the cable is labeled on the customer side with TableTop
Plug the four(4) green cables into the Wireless Access Point patch panel. Ensure that the cables are connected as follows: o Port 0 on Aruba 650 Controller to Port 1 on the Access Point patch panel. o Port 1 on Aruba 650 Controller to Port 2 on the Access Point patch panel o Port 2 on Aruba 650 Controller to Port 3 on the Access Point patch panel o Port 3 on Aruba 650 Controller to Port 4 on the Access Point patch panel Verify Port Connectivity. Port 0 through 7 on the Aruba Controller should have two Green Lights on each port. This could take up to 10 minutes for the controller to completely boot and individual port lights to come on. Tie wrap all cables to ensure a clean and neat environment. Tie wrapping cables should ensure that they will not become tangled with other cables. Again; all cables: o UPS Power Cord o DMS Power Cord o Aruba 650 Power Cord o USB from DMS to UPS cable o All Cables from Aruba 650 to DMS o All Cables from Aruba 650 to Wireless Access Point Patch Panel. These should be individually tie wrapped o Red Patch cable from Aruba 650 to customer POS switch/router. Ensure this cable is secured and neat all the way from the controller to the POS switch/router. This may require tie wraps and tie wrap mounts all along the path from the Aruba 650 Controller to the POS switch/router Ensure all the equipment is now properly arranged and in its final position. Installation should be impeccable.
9
Ensure ALL tie wrap ends have been trimmed. Ensure All trimmed tie wrap ends have been picked up from work area and properly disposed of. Ensure any other trash (tie wraps, packaging, labels, stickers, etc.) have been collected and properly disposed of. Verify that each access points proper individual lights have activated.
Required Photos The following photos will be required: - UPS power plug plugged into power outlet with proper label
Rear of UPS with all three power connections plugged into BATTERY BACKUP Outlets (outlets with white border) and the USB cable connected. o DMS power cable o Aruba 650 Power Cable o Gigabit power adapter o USB Cable to DMS
10
UPS in its final installation location, TableTop UPS label and front voltage indicator light on and visible
Front of Aruba 650 Controller powered on with all cables attached. Indicator lights will be visible to ensure all equipment is connected and functional.
11
DMS and Aruba 650 Controller front view in final installation postion
Wireless Access Point patch panel with all four(4) green cables plugged in. Access Point Panel will be labeled with corresponding port number and TableTop Access Points. Access Point Panel labels will be visible in the photo.
RED Patch cable labeled and plugged into the Customer POS Switch/Router
BLUE Patch cable labeled and plugged into the Customer Switch/Router (10/21/11 Note: We have yet to complete this process at Applebees so do not have a sample photo available.)
12
Full shot of the UPS/DMS/Aruba 650 Wireless Controller and Access Point Patch Panel
Full shot of Equipment location in office (for Help Desk support staff to have a visual of the layout of the office and the location of the TTM Equipment in relationship to the office door and other office equipment such as the customer Terminal/keyboard/mouse location.)
Full shot of Equipment location in office taken from the office door Same Picture as photo above.