Вы находитесь на странице: 1из 3

CALCULATION SHEET

Created by: Calculation title:

KISHANGANGA HEP (330MW)


Date: Verified by:

MM 27-Sep-12 MM 27-Sep-12

Project code: Serial no: Sheet no: Revision:

WHKGHE

Subject:

Load Calculation
Date:

References/results

Width of Spillway (B) = Base Width = Base level at heel = Analysis performed at level = Horizontal seismic coeff = Vertical seismic coeff = U/S apron contraction joint from dam axis = Full reservior level = High flood level = Tail water at normal operating = Tail water at high flood = Crest level of spillway = Top of bridge = 1. Dead Load Weight (kN) 20721.8 C.G X (m) 22.0 Y (m) 13.0

36 48 2362.5 2362.5 0.289 0.193 12 2390 2393.6 2362 2368 2370 2395

m m m m

m m m m m m m

Moment about U/S contraction joint Mh (kN.m) Mv (kN.m) 455880.6 269384.0

2. Reservior and Tail water Load


Upstream Side (Gate close + Normal condition)

Water level at PMF (HFL) = Top level of dam block = Base level (h2) = Depth of water above base H =(PMF - h2) = Unit weight of water () = Horizontal force Pw = **H2 = C.G of force from base level = (*H) =
Upstream Side (2 gate open + High flood)

2390 2395 2362.5 27.5 9.81 3709.4 9.17 2390 2379.5 10.5 2362.5 27.5 15 21 55641.1 11356.3 315.45 9.17 20.50

m m m m kN/m3 kN m m m m m m m m kN kN kN kN m m
GATE PIER BREAST WALL

Water level at PMF = Bottom lvl of breast wall = Water height acting on breast wall h1 = Base level (h2) = Depth of water above base H =(PMF - h2) = Total thickness of all pier T1 = (2*3 + 6 +3) = Total thickness of Breast wall T2 = Total water force on pier P1 =( **H * T1) = Total force on breast wall P2 = **h12*T1 = Water force per meter from wall =(P2/B) = C.G of force for pier = (*H) = C.G of force for breast wall = (*h1 + (H-h1)) =
2

2390 2379.5

Water force per meter from pier =(P1/B) = 1545.58594

2362.5

CALCULATION SHEET
Created by: Calculation title:

KISHANGANGA HEP (330MW)


Date: Verified by:

MM 27-Sep-12 MM 27-Sep-12

Project code: Serial no: Sheet no: Revision:

WHKGHE

Subject:

Load Calculation
Date:

References/results

A. Vertical water force (U/S contraction joint to spillway axis)

Water level at PMF = Top of concrete surface = width of water length B1 = Water height H2 = Width of overflow section B2 = Weight per unit meter run = C.G of force = (0.5*B1) =

2390 2368 12 22 27 1942.38 6.00

m m m m m kN kN m From upstream contraction joint

27m

Total weight of standing water =(B1*B2*H2*) = 69925.68

12m

22m

B. Vertical water force (Spillway axis to radial gate)

Area (From CAD) = Total width = Total weight of water W = Weight per unit meter of spillway (W/B) = C.G =
D/S water forces

65.3 21 13452.5 373.7 17

m2 m kN kN m From U/S contraction joint

NO horizontal water pressure from tail water has been considered as this will increase the stability

Summary of water pressure


Normal Operating Item Gate close + Normal Vertical water (A) Vertical water (B) High Flood condition Item Force on pier Force on breast wall Vertical water (A) Load (kN) 1545.6 315.45 1942.4 c.g (x) c.g (y) 9.17 20.50 Mh (kN.m) 14167.9 6466.8 Mv (kN.m) Load (kN) 3709.4 1942.38 373.7 c.g (x) 6.00 17 c.g (y) 9.17 Mh (kN.m) 34002.9 Mv (kN.m) 11654.28 6353

6.00

11654

3. Uplift water force (Drain operative)


Normal operating condition

b
2390 2362.5 27.5 2364 1.5 12 36 10.17 8.67 3.0 2360.0 m m m m m m m m m m m
Stretch Force/m (kN) 2217.06 2060.1 73.575

a h

U/S water level = Foundation level = U/S water Head (H) = Tail water level = Tail water head (h)= b= a= h+(H-h)/3 = (H-h)/3 = Average base width of key = Bottom level of key =

H h+(H-h)/3

Uplift force and moment on u/s contraction joint

c.g from u/s contraction

Moment (kN.m)

b a Key portion

5.08 25.54 12.00

11261.88 52620.84 882.9

CALCULATION SHEET
Created by: Calculation title:

KISHANGANGA HEP (330MW)


Date: Verified by:

MM 27-Sep-12 MM 27-Sep-12

Project code: Serial no: Sheet no: Revision:

WHKGHE

Subject:

Load Calculation
Date:

References/results

High flood + 2 gates open

b
2393.6 2362.5 31.1 2368 5.5 12 36 14.03 8.53 3.0 2360.0 m m m m m m m m m m m
Stretch Force/m (kN) 2656.548 3449.196 73.575

a h

U/S water level = Foundation level = U/S water Head (H) = Tail water level = Tail water head (h)= b= a= h+(H-h)/3 = (H-h)/3 = Average base width of key = Bottom level of key =

H h+(H-h)/3

Uplift force and moment on u/s contraction joint

c.g from u/s contraction

Moment (kN.m)

b a Key portion

5.24 27.38 12.00

13930.2 94434.984 882.9

Вам также может понравиться