Foreword
The OMU operating system is installed before the OMU is delivered BSC6900 commissioning is performed after the hardware is installed and before the services are provided. It aims to ensure that the BSC6900 can work normally through tasks such as equipment verification, BSC6900 board software and data file loading, interface verification, and service verification.
Page1
References
BSC6900 GSM Commissioning Guide BSC6900 Guide BSC6900 OMU Administration Guide
Page2
Objectives
Upon completion of this course you will be able to: course,
Describe BSC6900 commissioning procedure Outline OMU software functions Complete BSC6900 commissioning
Page3
Contents
1. 1 BSC6900 O&M System Introduction 2. BSC6900 Software Installation 3. BSC6900 Commissioning
Page4
Page5
Page6
Page7
Before an OMU is delivered, six IP addresses are configured. The default d f l IP addresses may not meet the requirement of onsite dd h i f i planning. All the OMU IP addresses need to be planned on site, and some of the IP addresses need to be re-set re set.
Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved. Page8
See Remarks
Page9
Page10
Commissioning IP address
NOTE: The LMT can access the OMU only through the external virtual IP addres
Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved. Page11
172.121.139.202/24
Hub
ETH2
ETH2
Page13
Contents
1. 1 BSC6900 O&M System Introduction 2. BSC6900 Software Installation 3. BSC6900 Commissioning
Page14
BSC6900 Software
LMT LMT Software Host Software Windows XP SP2 Java Environment Program File MPS/EPS
Data File OMU Server OMU Application Dopra Linux Mysql Database Patch File (optional)
Page15
OMU Software
The OMU software consist of multilevel service monitoring entities and service processes
Page16
See Remarks
Page17
Page18
Page19
Page20
Page21
Page23
Page24
Page25
Page26
See Remarks
Page27
Page28
Contents
1. 1 BSC6900 O&M System Introduction 2. BSC6900 Software Installation 3. BSC6900 Commissioning
Page29
Contents
3. BSC6900 Commissioning
3.1 BSC6900 Commissioning Introduction 3.2 3 2 BSC6900 C Commissioning P i i i Procedure d
Page30
Page31
Software preparation
BAM and LMT application software are ready License file is ready MML command script for initial configuration is ready
Page32
Page33
Contents
3. BSC6900 Commissioning
3.1 BSC6900 Commissioning Introduction 3.2 3 2 BSC6900 C Commissioning P i i i Procedure d
Page34
R emote operation
Log in to BS C6900 through LMT Update OMU Database Activate and Verify the License
Page35
Verify interfaces Remote operation based on local through LMT coopertation Verify GSM Inteface
Verify Interface Verify GSM services End the maintenance mode of NE Create scheduled task
Handle alarms
Page36
See Remarks
Page37
Page38
1. Logging in to the OMU g 2. Check the running status of the OMU process 3. Query the current version of the OMU application. 4. Change the external fixed/ virtual IP address 6. Change the name and set the th work mode of the OMU k d f th 7. Check the operating status of the OMU
Page40
Page41
Page42
Page43
Run the ./omutool extervip The external virtual IP address The subnet mask command to change the external virtual IP address and the subnet mask mask.
./omutool extervip 10.161.10.102 255.255.255.0
Page44
See Remarks
Page45
Change the name and set the work mode of the OMU
Run the ./omutool hostname OMU name command to change the name of the OMU.
For example, you can run the following command and then press Enter to change the OMU name to omu_123: ./omutool hostname omu_123.
Set the work mode of the OMU according to the number of OMUa boards that are configured.
If only one OMUa board i configured, run the ./omutool dualmode l OMU b d is fi d th / t ld l d single command to set the work mode to the single-server mode. If two OMUa boards (active and standby OMUa boards) are configured, run the ./omutool dualmode dual command to set the work mode to the dual-server mode.
Page46
Page47
Page49
Setting the Loading Mode (SET LODCTRL) Loading the MPS/EPS/TCS (RST SUBRACK) g Checking the consistency of the data and the version (ACT CRC & CMP BRDVER)
Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved. Page50
1. Verifying the Abis Interface 2. Verifying the A Interface 3. Verifying the 3 V if i th Gb Interface 4. Verifying the Ater Interface (O ti I t f (Optional) l) 5. Verifying the Pb Interface (Optional)
Page52
Page53
Page54
Verifying the User Plane on the A Interface (DSP ADJNODE & DSP IPPATH )
Page55
Page56
Verifying the status of the IP Route (DSP GBIPROUTE) Verifying the SIG BSSGP Virtual Connection (SIGBVC) status of the Network Service Entity (DSP SIGBVC & DSP PTPBVC)
To query the configuration of the NSE to be verified run the MML verified, command LST NSE
Page57
See Remarks
Page58
Page59
Page61
Feature services
The feature services consist of the inter-RAT handover, location service, and AMR service.
If the result of service verification cannot meet the expected results, start message tracing on the LMT over the Um, Abis, A, Gb, Pb, and Ater interfaces.
Page62
DCN
Page64
Page65
Thank you