BSC6900 GO Installation & Commissioning

www.huawei.com

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Foreword
The OMU operating system is installed before the OMU is delivered BSC6900 commissioning is performed after the hardware is installed and before the services are provided. It aims to ensure that the BSC6900 can work normally through tasks such as equipment verification, BSC6900 board software and data file loading, interface verification, and service verification.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page1

References
BSC6900 GSM Commissioning Guide BSC6900 Guide BSC6900 OMU Administration Guide

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page2

Objectives
Upon completion of this course you will be able to: course,
Describe BSC6900 commissioning procedure Outline OMU software functions Complete BSC6900 commissioning

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page3

Contents
1. 1 BSC6900 O&M System Introduction 2. BSC6900 Software Installation 3. BSC6900 Commissioning

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page4

BSC6900 O&M Subsystem


Component
LMT OMUa boards SCUa boards OM modules on other boards

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page5

BSC6900 O&M Subsystem


BSC6900 O&M system adopts server and client mode
OMU as a server LMT as a client

EMS (Element Management System) system g y y


iManager M2000 works for integrated O&M

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page6

OMU Ethernet Adapter Configuration


An OMU board is configured with six Ethernet adapters in total. total
ETH0 and ETH1(bond1/bond1:0 ) ETH2: ETH2 (bond2) ETH3-UPDATE (bond3) ETH4 SCU7 ETH4-SCU7 and ETH5-SCU6 ETH5 SCU6 (bond0 (vlan1/vlan1:0))

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page7

Definitions of IP addresses of the OMU


The OMU IP addresses include:
External fixed IP addresses Internal fixed IP addresses External virtual IP addresses Internal virtual IP addresses Debugging IP address. Backup channel IP address of the active and standby OMUs. (Optional)

Before an OMU is delivered, six IP addresses are configured. The default d f l IP addresses may not meet the requirement of onsite dd h i f i planning. All the OMU IP addresses need to be planned on site, and some of the IP addresses need to be re-set re set.
Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved. Page8

See Remarks

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page9

OMU IP Address Planning


IP Address Internal fixed IP address dd Planning Principle The preset IP addresses of the internal Ethernet adapters are: Active BAM: 80.168.3.50 (255.0.0.0) Standby BAM: 80.168.3.60 (255.0.0.0) External fixed IP address The preset IP addresses of the external Ethernet adapters are: Active BAM: 172.121.139.201 (255.255.255.0) Standby BAM: 172.121.139.202 (255.255.255.0) The settings can be reconfigured on site based on the actual networking topology

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page10

OMU IP Address Planning


IP Address Planning Principle Internal/External The virtual IP address is set in the same subnet with the virtual IP address Backup channel IP addresses internal/ external fixed IP addresses of the active and standby BAMs The preset backup channel IP addresses of the active and standby BAMs are: Active BAM: 192.168.3.50 (255.255.255.0) Standby BAM: 192.168.3.60 (255.255.255.0) The Th IP address should not be changed dd h ld t b h d The preset commissioning IP addresses are: Active BAM: 192.168.6.50 (255.255.255.0) Standby BAM: 192.168.6.60 (255.255.255.0) The IP address should not be changed.

Commissioning IP address

NOTE: The LMT can access the OMU only through the external virtual IP addres
Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved. Page11

OMU Internal Network IP Address Planning


Virtual IP Active OMUa Standby OMUa 80.168.3.40/8 80.168.3.50/8 ETH4-SCU7 ETH5-SCU6 192.168.3.50/24 Intel Ethernet adapters ETH3 ETH3UPDATE Dedicated backup b k channel Intel Ethernet adapters ETH3UPDATE SCUa SCUa Internal network segment ETH4-SCU7 ETH5-SCU6 192.168.3.60/24 80.168.3.60/8

Backboard BSC6900 FAM


Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved. Page12

OMU External Network IP Address Planning


Active OMUa Standby OMUa Virtual IP 172.121.139.200/24

172.121.139.201/24 External network Segment GE adapter ETH0 ETH1 ETH0 ETH1

172.121.139.202/24

Hub

Commissioning Ethernet adapter 192.168.6.50/24

ETH2

ETH2

LMT/ M2000 192.168.6.60/24

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page13

Contents
1. 1 BSC6900 O&M System Introduction 2. BSC6900 Software Installation 3. BSC6900 Commissioning

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page14

BSC6900 Software
LMT LMT Software Host Software Windows XP SP2 Java Environment Program File MPS/EPS

Data File OMU Server OMU Application Dopra Linux Mysql Database Patch File (optional)

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page15

OMU Software
The OMU software consist of multilevel service monitoring entities and service processes

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page16

See Remarks

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page17

OMU Software Installation Procedure


Obtain the Installation Information on the OMU Logging In to the OMU Uploading the OMU Application Installation Package to the OMU Installing the OMU Application in the Active Workspace Checking the Installation Directory of the OMU g y Applications
Checking the Status of omud Process g

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page18

Obtain the Installation Information on the OMU


Before the installation, obtain the following information from Data Sheet of BAM Software Installation
Password of the operating system administrator Fixed IP address of the external network, virtual IP address of the external network, or debugging IP address of the OMU.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page19

Logging In to the OMU


On the computer run the SSH terminal, PuTTY Enter the IP address of the OMU Log in to the OMU as user root

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page20

Uploading the OMU Application Installation Package to the OMU


Decompress the BSC6900 version software package t th D th i ft k to the local drive D Log in to the OMU through the psftp software
Run the lcd D:\ to set the local directory Run the mkdir /mbsc/upgrade to create the target directory Run the cd /mbsc/upgrade to go to the target directory Run the put -r V900R011C00 to upload the OMU application installation packet to the OMU After the loading is complete, enter the exit command to exist the psftp software

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page21

Installing the OMU Application in the Active Workarea


Assume that the OMU application installation package pp p g install_bam.sh is saved in /mbsc/upgrade/V900R011C00/install/setup.
On the PuTTY terminal, run the following commands
cd /mbsc/upgrade/V900R011C00/install/setup chmod +x ./install_bam.sh ./install_bam.sh
Enter the run mode Setting the office name Setting the language Setting the admin/FTP password Setting the external virtual IP address Setting the OMU system type
Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved. Page22

Installing the OMU Application in the Active Workarea


Setting the run mode of product

Setting the office name

Setting the language

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page23

Installing the OMU Application in the Active Workarea


Setting the admin/FTP password

Setting the external virtual IP address

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page24

Installing the OMU Application in the Active Workarea


Setting the OMU system type

Confirming the installation

Enter Y to install the OMU applications applications.


When the message"Install OMU succeed!" is displayed, you can i f that the OMU applications are successfully infer h h li i f ll installed.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page25

Checking the Installation Directory of the OMU Applications


The version a and version b version_a version_b folders save active/standby OMU workspace files.
Log in to the OMU by PuTTY Run the cd /mbsc/bam Check whether the OMU installation directory

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page26

See Remarks

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page27

Checking the Status of omud Process


Log in to the OMU by PuTTY Run the /etc/rc.d/omud status
The returned information is running, it means the omud is working normally The returned information is unused, run the /etc/rc.d/omud start command to start the omud The returned information is neither running nor unused, reinstall the OMU application in the active workspace

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page28

Contents
1. 1 BSC6900 O&M System Introduction 2. BSC6900 Software Installation 3. BSC6900 Commissioning

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page29

Contents
3. BSC6900 Commissioning
3.1 BSC6900 Commissioning Introduction 3.2 3 2 BSC6900 C Commissioning P i i i Procedure d

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page30

Introduction to BSC6900 Commissioning


Definition of BSC6900 Commissioning
The commissioning of equipment, BSC6900 board software and data file l di , i t f ft d d t fil loading interfaces verification , and services verification after hardware installation i t ll ti To ensures that the BSC6900 works properly as designed

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page31

Preparation For BSC6900 Commissioning


Preparation For BSC6900 Commissioning p g
Verify hardware status
BSC6900 hardware is installed and passed the hardware installation check and powering-on check OMU is configured before delivery LMT PC meets the configuration requirements

Software preparation
BAM and LMT application software are ready License file is ready MML command script for initial configuration is ready

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page32

Preparation For BSC6900 Commissioning (Cont.)


Verify commissioning network status
At least one BTS are connected to the local BSC6900. The BTS should have passed commissioning and can provide basic functions At least one set of Core Network (CN) equipment is connected to the local BSC6900. The CN equipment should have passed the commissioning and can provide b i f i i i d id basic functions ti The MSs are ready for test and are registered in the HLR

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page33

Contents
3. BSC6900 Commissioning
3.1 BSC6900 Commissioning Introduction 3.2 3 2 BSC6900 C Commissioning P i i i Procedure d

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page34

BSC6900 Commissioning Procedure


Commissioing P C i i i Prerequsites it Local operation Check hardware operating S tatus R emote operation Load C6900 B d L d BS Board S oftware and Data files Local operation Verify OMU y Locally Connect BS C6900 to M2000

R emote operation Verify OMU y based on local through US Disk B coopertation

R emote operation

Log in to BS C6900 through LMT Update OMU Database Activate and Verify the License

Continued in the next page

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page35

BSC6900 Commissioning Procedure (Cont.)


Remote operation

Verify i t f V if interfaces through M2000 Set NE to be in maintenance mode

Verify interfaces Remote operation based on local through LMT coopertation Verify GSM Inteface

Verify Interface Verify GSM services End the maintenance mode of NE Create scheduled task

Handle alarms

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page36

See Remarks

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page37

Checking the Operating Status of the Hardware


Before verifying the equipment ensure that the cabinet is equipment, powered on and operates normally
Checklist of the power supply to the cabinet components
Component Board Normal LED Status The green RUN LED on the board panel flashes every other second. g p y The green STATUS LED on the panel of the fan box flashes every Fan box other second after the subrack and independent fan subrack are powered on. Power distribution The green RUN LED on the board panel flashes every other second monitoring board and the ALM LED is also OFF.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page38

Main Steps of Commissioning


Verifying the OMU Activating and Verifying the License Loading h L di the BSC6900 Board Software and Data Files B dS f dD Fil Verifying the Interfaces Handling the Alarms Verifying the Services Connecting the BSC6900 to the M2000 Creating Scheduled Tasks
Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved. Page39

1. Logging in to the OMU g 2. Check the running status of the OMU process 3. Query the current version of the OMU application. 4. Change the external fixed/ virtual IP address 6. Change the name and set the th work mode of the OMU k d f th 7. Check the operating status of the OMU

Logging In to the OMU


On the computer run the SSH terminal, PuTTY Enter the IP address of the OMU Log in to the OMU as user root

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page40

Check the running status


Run the /etc/rc d/omud status command to check the /etc/rc.d/omud running status of the OMU process.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page41

Query the current version of the OMU application


Run the cd /mbsc/upgrade command to switch to the h d b d d i h h OMU installation directory, and then run the ls command to query the current version of the OMU application.
If the version of the OMU application is different from that pp required by the operator, Uninstalling the OMU application y firstly , and then install the OMU application in the active workspace

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page42

Querying the Network Configuration of the OMU Ethernet Adapters


Querying the external fixed IP address: ifconfig bond1 Querying the external virtual IP address: ifconfig bond1:0 Querying the internal fixed IP address: ifconfig vlan1 Querying the internal virtual IP address: ifconfig vlan1:0 Querying the debugging IP address: ifconfig bond2 Querying the IP address for the backup channel between y g the active OMU and the standby OMU: ifconfig bond3

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page43

Change the external IP address


Run the cd /mbsc/bam/version_a/bin/bam command to switch to the directory where the omutool program locates. Run the ./omutool command to start omutool. Run the ./omutool extercard The external fixed IP address The subnet mask The gateway IP address command to change the external fixed IP address and the subnet mask.
./omutool extercard 10.161.10.100 255.255.255.0 10.161.10.1

Run the ./omutool extervip The external virtual IP address The subnet mask command to change the external virtual IP address and the subnet mask mask.
./omutool extervip 10.161.10.102 255.255.255.0

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page44

See Remarks

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page45

Change the name and set the work mode of the OMU
Run the ./omutool hostname OMU name command to change the name of the OMU.
For example, you can run the following command and then press Enter to change the OMU name to omu_123: ./omutool hostname omu_123.

Set the work mode of the OMU according to the number of OMUa boards that are configured.
If only one OMUa board i configured, run the ./omutool dualmode l OMU b d is fi d th / t ld l d single command to set the work mode to the single-server mode. If two OMUa boards (active and standby OMUa boards) are configured, run the ./omutool dualmode dual command to set the work mode to the dual-server mode.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page46

Check the operating status of the OMU


Run the /etc/rc d/omud start /etc/rc.d/omud command to start the OMU application. pp Run the ps -afx command to check the operating status of p g the OMU.
You can infer that the OMU is in normal state if all OMU processes exist in the OMU active workspace directory/mbsc/bam/version_a/ bin/bam/monitor.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page47

BSC6900 Commissioning ProcedureOMU Locally Verifying the


Activating and Verifying the License Loading h L di the BSC6900 Board Software and Data Files B dS f dD Fil Verifying the Interfaces Handling the Alarms Verifying the Services Connecting the BSC6900 to the M2000 Creating Scheduled Tasks
Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved. Page48

Activating and Verifying the License


Activating and Verifying the License
Downloading license to OMU active workspace directory /ftp/license (DLD LICENSE) /ft /li Querying the detail information of the license file (LST LICENSE) Activating the license file (ACT LICENSE) Checking the license consistency between host and OMU ( (CMP LICENSE) )

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page49

Loading the BSC6900 Board Software and Data Files


Loading the BSC6900 Board Software and Data Files
Generating the Data File
Clear th d t in th BAM d t b Cl the data i the database (RST DATA) Generate the data file in ineffective state
SET CFGDATAINEFFECTIVE Batch Commands FMT DATA

Setting the Loading Mode (SET LODCTRL) Loading the MPS/EPS/TCS (RST SUBRACK) g Checking the consistency of the data and the version (ACT CRC & CMP BRDVER)
Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved. Page50

BSC6900 Commissioning ProcedureOMU Locally Verifying the


Activating and Verifying the License Loading h L di the BSC6900 Board Software and Data Files B dS f dD Fil Verifying the Interfaces Handling the Alarms Verifying the Services Connecting the BSC6900 to the M2000 Creating Scheduled Tasks
Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved. Page51

1. Verifying the Abis Interface 2. Verifying the A Interface 3. Verifying the 3 V if i th Gb Interface 4. Verifying the Ater Interface (O ti I t f (Optional) l) 5. Verifying the Pb Interface (Optional)

Verifying the Abis Interface


Verifying the Abis interface (Abis over TDM)
Verifying Physical Links at the BSC (DSP E1T1 & DSP OPT) Verifying the Control Plane on the Abis Interface (DSP LAPDLNK ) Verifying he timeslot status of the Abis interface (DSP ABISTS)
To query the Subrack No., Slot No., and Port No. of the timeslots to be verified, run the MML command (LST BTSCONNECT)

Verifying the Status of Cells and Channels (DSP BTSSTAT)

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page52

Verifying the Abis Interface


Verifying the Abis interface (Abis over IP)
Verifying Physical Links at the BSC (DSP ETHPORT ) Verifying the Control Plane on the Abis Interface (DSP LAPDLNK ) Verifying the User Plane on the Abis Interface (DSP ADJNODE & DSP IPPATH) Verifying the Status of the Cells and Channels (DSP BTSSTAT)

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page53

Verifying the A Interface


Verifying the A interface (A over TDM)
Verifying Physical Links at the BSC (DSP E1T1 & DSP OPT) Verifying th C t l Plane on the A Interface V if i the Control Pl th I t f
DSP N7DPC DSP MTP3LNK DSP MTP2LNK

Verifying the User Plane on the A Interface (DSP ACIC)


To query the OPC Index and DPC Group Index of the E1/T1 to be verified on the A interface, run the MML command LST AE1T1.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page54

Verifying the A Interface


Verifying the A interface (A over IP)
Verifying Physical Links at the BSC (DSP ETHPORT ) Verifying the Control Plane on the A Interface
DSP N7DPC DSP M3LKS DSP SCTPLNK

Verifying the User Plane on the A Interface (DSP ADJNODE & DSP IPPATH )

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page55

Verifying the Gb Interface


Verifying the Gb interface (Gb over FR)
Verifying the status of the Bearer Channel (DSP BC) Verifying the status of the Network Service Virtual Connection (DSP NSVC) Verifying the SIG BSSGP Virtual Connection (SIGBVC) status of the Network Service Entity (DSP SIGBVC & DSP PTPBVC)
To query the configuration of the NSE to be verified, run the MML command LST NSE

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page56

Verifying the Gb Interface


Verifying the Gb interface (Gb over IP)
Verifying the status of the Network Service Virtual Link (DSP NSVL)
To query the configuration of the local or remote NSVL to be verified, run the MML command LST NSVLLOCAL or LST NSVLREMOTE.

Verifying the status of the IP Route (DSP GBIPROUTE) Verifying the SIG BSSGP Virtual Connection (SIGBVC) status of the Network Service Entity (DSP SIGBVC & DSP PTPBVC)
To query the configuration of the NSE to be verified run the MML verified, command LST NSE

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page57

See Remarks

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page58

Verifying the Ater and Pb Interface (Optional)


Verifying Physical Links at the BSC (DSP E1T1 & DSP OPT) Verifying the Ater Interface
Verifying the Status of Timeslots on the Ater interface. (DSP ATERTS) If the TCS is configured remotely, run the MML command DSP ATERSL to query whether the Ater signaling link is normal.

Verifying the Pb Interface


Verifying the LAPD link on the Pb interface (DSP LAPDLNK) Verifying the status of the circuit on the Pb interface (DSP PBCIC)

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page59

BSC6900 Commissioning ProcedureOMU Locally Verifying the


Activating and Verifying the License Loading h L di the BSC6900 Board Software and Data Files B dS f dD Fil Verifying the Interfaces Handling the Alarms Verifying the Services Connecting the BSC6900 to the M2000 Creating Scheduled Tasks
Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved. Page60

Verifying the GSM Services

Handling the Alarms Generated During the Commissioning


Handling Alarms During Commissioning
Checking alarm on the LMT Handling the Alarms by LMT online help

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page61

Verifying the GSM Services


To be sure BSC can provide services defined in license file
Basic services
The basic services consist of speech service and data service.

Feature services
The feature services consist of the inter-RAT handover, location service, and AMR service.

If the result of service verification cannot meet the expected results, start message tracing on the LMT over the Um, Abis, A, Gb, Pb, and Ater interfaces.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page62

BSC6900 Commissioning ProcedureOMU Locally Verifying the


Activating and Verifying the License Loading h L di the BSC6900 Board Software and Data Files B dS f dD Fil Verifying the Interfaces Handling the Alarms Verifying the Services Connecting the BSC6900 to the M2000 Creating Scheduled Tasks
Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved. Page63

Connecting the BSC6900 to the M2000


Connect the BSC6900 to the OM network Configure the IP route from the BSC6900 to the M2000
ADD OMUIPRT ADD EMSIP

Create the BSC6900 on the M2000


iManagerTM M2000

DCN

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page64

Creating Scheduled Tasks


Scheduled tasks for backing up system data
ADD SCHTSK ADD SUBTSK

Scheduled tasks for backing up logs g p g


ADD SCHTSK ADD SUBTSK