SCHEDULE A
Facility and Unit Description
General
The Fertilizer Complex in .Auzew will incorporate a modem, reliable and integrated plant for producing at a nameplate capacity 2 x 2,200 MTPD ammonia and 3,450 MTPD granulated urea, complete with utilities and offsite necessary to provide the purpose of the Facility in accordance with the Facility Guarantees, the Facility is to be designed with on stream rate of 350 days per annum, Owner shall provide and be responsible for the Custody Gas Metering Station outside Battery Limit and Gas Reducing Station at the Plant Site in the time as per Schedule E and asindicated in the plot plan as per Schedule G - Site.
Facility
The Facility consist of Unit 1 and Unit 2
Unit 1
The Unit 1 consist of the following Process units, Offsite and Utilities units and common facilities to be able ta operate Ammonia Train land Urea plant and produce ammonia and urea.
3.1
Process unlts
101 102 103 104 105 106 107 108 109 110 111 180 182 040
Natural Gas Desulphurization and Compression Process Air Compression Steam Reforming and Waste Heat Recovery CO Conversion C02 Removal (aMDEA) Methanation incl. Flare Synthesis Gas Compression Ammonia Synthesis Refrigeration Ammonia Recovery Purge gas Recovery Condensate Stripper Deaerator and BFW Pumps Analyzer System Unit 1
5.5
2/6
(
SCHEDULE A
Facility and Unit Description
3.1.2
020
021 022
O .<..J
'1 ~
024
028
029
027
Urea Granulation
3.2
Unit
051
Description Ammonia Storage at Plant site Ammonia Storage at Port site Urea Bulk Storage Urea Bulk Handling and Loading
052
070
072
073
3/6
(
SCHEDULE A
Facility and Unit Description
3.2.2
Ut ility Units
The Utility Units within Unit l consist ofthe following Units: Unit
056
060
061 063 083 083 087 088 089 091 085 184 186 187
188
190 192 xxx
Desalination System Fire Fighting Unit 1 Electrical Power Generation A Instrument and Plant Air Distribution Inert Gas System Distribution Sea Water Cooling System Distribution Closed Loop Cooling System Distribution Demineralized Water Distribution Potable Water System Distribution Interconnection Piping between Ammonia 1 and Urea
3.3
Common facilities
The Common facilities within Unit 1 consist of:
Description Mercury Removal Reactor, Helium Removal Unit (no! yet part ofUhde scope) Instrument and Plant Air System Electrical Power Distribution (incl, Distribution ta Sea Water Intake and Ammonia Storage) Inert Gas System Demineralization and Condensate Polishing Potable Water System Seawater Intake System Automation and Control System Communication System Fire Alarm System & Gas Detection System
090 092
097
S5
4/6
SCHEDULEA
Facility and Unit Description
095
Air Conditioning for: Main Control Room incl. control room and instr. rack roorn Substation No . l incl. instr, rack room Substation No. 2 incl , instr, rack room Substation No. 5 Substation NH3 Storage Part No . 7 Substation No. 4
Main Control Room incl. control room and instr. rack room Substation No. 1 incl. instr, rack room Substation No. 2 incl. instr. rack room Substation No. 5 Substati.on NH3 Storage Part No. 7 Substation No. 4 Interconnecting Piping from plant site to ammonia tank at port site
xxx
xxx
Unit 2
The Unit 2 consists of the following Process units, Offsite & Utilities Units and Buildings:
4.1 4.1.1
205 206
207
208
209
210
211
280 282
040
516
(
SCHEDULEA
Facility an d Unit Description
4.2 4.2.1
056
083
085
087
j
088
091 284 286 287
288 290
292 096
060
061 063 095
xxx
6/6
(a)
the Owner shall operate the Common Faeilities; and the Procurement Supplier shall minimise the number and extent of shut downs of the Owner's Operation of Unit 1, the Common Facilities andlor Unit 2 (as the case may bel arising from the Work and, in relation to any necessary shutdowns:
(b)
(1)
(II)
(III)
(ii)
Neither jhe Owner nor the Procurement Supplier shall have any entit1ement to an adjustment of the Mechanical Completion Dates, the Provisional Acceptance Dates or the Contract Priee (including, in each case, pursuant to Clause Il) as a consequence of compliance with Clause 10.L4(i). From the issue of the Provisional Acceptance Certificate for Unit 1
(iii)
until the issue of the Demonstration Test Certificate, the Procurement Supplier shall provide up to 12 man-months of supervisory services in
relation to the operation ofthe Common Facilities: (a) at no extra cost to the Owner; for the comfort and advice of the Owner and without assumirg any responsibility therefrom; ineluding six (6) man-months of supervisory services related to seawater system; and
using personnel who are experts in utilities,
(b)
(c)
(d) 10.2
10.2.1 TransferofTitle
Title 10 an Supplies shall pass from the Procurement Supplier to the Owner upon the earlier of:
(1)
loading of such item of Supplies onto a vessel at the port of export or, if the Supplies are not transported by sea, taking over orthe Supplies by the carrier; or reeeipt of payment by the Procurement Supplier for sueh item of Supplies.
(ii)
f
69
Procurement Contract
v
11~
zt,/