Shutdown Work Report

SHUTDOWN WORK REPORT


(March 10th 12th, 2012)

Shutdown Work Activity: NO


1

TIME
March 10 , 2012 (09.00-17.00) March 10 , 2012 (08.00-12.00) March 10 , 2012 (09.00-17.00) March 12 , 2012 (09.00-15.00) March 12 , 2012 (09.00-12.00)
th th th th th

EQUIPMENT
TBFP & MBFP Piping (A-FW-0-TS-1000) BFPT A & B Control Valve 1, 2, 3, 4 (3BFT-HV010A & B) FA Administration Building HVAC (00AC-K036A/B/C/D), Central Control Room HVAC (00AC-001A/B) Condenser (3CO-H001) CCCW Heat Exchanger Strainer (3CW-S001A)

ACTIVITY
TBFP & MBFP Mechanical Seal System Inspection and Cleaning Magnetic Filter Regreasing lever and arm connection Inspection and Cleaning HVAC at Administration Building and Central Control Room Inspection and Cleaning Water Box A & B Inspection and Cleaning CCCW Heat Exchanger Strainer #3A

Page 1 of 8

Shutdown Work Report

1. TBFP & MBFP Mechanical Seal System Inspection and Cleaning Magnetic Filter Date Equipment Location Activity : March 10th, 2012 (09.00-17.00) : TBFP & MBFP : Ground Floor : Mechanical Seal System Inspection and Cleaning Magnetic Filter
Clean Magnetic Filter Element

Dirty Magnetic Filter Element

Cleaning Mech Seal Flushing Filter Element

Cleaning Mech Seal Flushing Filter Element

Page 2 of 8

Shutdown Work Report

2. Regreasing Lever and Arm Connection Date Equipment Location Activity : March 10th, 2012 (08.00-12.00) : BFPT A & B Control Valve 1, 2, 3, 4 (3BFT-HV010A & B) : Ground Floor : Regreasing Lever and Arm Connection
Cleaning Cleaning

Page 3 of 8

Shutdown Work Report

3. Inspection and Cleaning HVAC at Administration Building and Central Control Room Date : March 10th, 2012 (09.00-17.00) Equipment : FA Administration Building HVAC (00AC-K036A/B/C/D) ), Central Control Room HVAC (00AC-001A/B) Location : Administration Building and AC Room CCR Activity : Inspection and Cleaning HVAC
Cleaning FA Adm. Building HVAC Cleaning Line Pipe of CCR HVAC

Dirt Plug Removing of Tube Condenser HVAC

Page 4 of 8

Shutdown Work Report

Page 5 of 8

Shutdown Work Report

4. Inspection and Cleaning Water Box A & B Date Equipment Location Activity : March 12th, 2012 (09.00-15.00) : Condenser #3 (3CO-H001) : Underground Floor : Inspect and Clean Water Box A & B
Inspect and Clean Water Box & Tube Sheet

Open Manhole of Inlet Side of Water Box

Manhole Bolts are Cleaned and Molycote Applied

Foreign Material Removed from Water Box

Page 6 of 8

Shutdown Work Report

5. Inspection and Cleaning of CCCW Heat Exchanger Strainer Date Equipment Location Activity : March 12th, 2012 (09.00-12.00) : CCCW Heat Exchanger Strainer #3A (3CW-S001A) : Ground Floor : Inspect and Clean Strainer Internals
Strainer Removed and Cleaned

Strainer Cover Removed

Strainer Body Internal Cleaned

Strainer Cover and Upper Body Cleaned

Page 7 of 8

Shutdown Work Report

Cover O-ring Installed

Strainer Cover Re-assembled

Page 8 of 8