Академический Документы
Профессиональный Документы
Культура Документы
By Joe Eichholz
Table of Contents
I checked and re checked all wires before mounting external parts. If you go to the final wiring section, you will also find pictures of my rigging of these parts. I could have done it many different ways, but this is what I chose at this time. It took me about 3 hours of procrastination to finally assemble it all. You know how it is on a project, once you are ready with all your parts, your mind starts giving you a million ways of doing something. And, at last you just pick a way and go with it. Once I got it all together, I connected my air tank hose and put the pressure setting at 28 for a safe point to start. I fired it up and BAM - that baby didnt need any more adjusting. It was cutting! You can imagine all the relief and pride I felt when the Plasanator started kicking ass. Yea, I said it Kicking Ass Baby. Oops Wife just told me I need to stop, hee hee and for all you creators ah ah ah ahhhhhh. I hope you enjoyed riding along with me in my journey. Take care and be safe. The Plasmaman
Introduction
Parts Pictorial
Slides 13/14
Slides 26-30
120 Volt Power Lead to Relays For Air Solenoid & Arc Start Slides 36-38
page 1
page 2
Final wiring of External Mounted Parts, like the Head, Water Heater Element, Air Solenoid & Air Regulator & Work Clamp
Slides 43-47
HomemadeTerminal