Duncan Technology
MOBILE MUD
FILTRATE
FILTRATE
CEMENT
FILTER CAKE
FORMATION
2009 Halliburton. All Right Reserved.
7
CASING
% Hole Circulating
Data Acquisition Formation PT: Pressure Transducer FM: Flowmeter DM: Densometer
60 40 0 2 4 6 8 10 12 14 Time (min)
10
60 40 0 2 4 6 8 10 12 14 Time (min)
11
Displacement
Static Time
2009 Halliburton. All Right Reserved.
12
Propiedades del lodo Propiedades Yield Point Plastic Viscosity Perdida de Fluido Res. Gel (10s/10Min)
2009 Halliburton. All Right Reserved.
13
Value
< 10 #/100 sqft < 20 cp < 15 cc/30 Flat Profile* (*2/3 not 2/10)
14
Centralizacin
La Centralizacin es crtica para un eficiente desplazamiento de lodo
15
Centralizacin
16.7 lb/gal Mud, 16.7 lb/gal Cement, 7 bpm
Standoff 17 35 60 72
2009 Halliburton. All Right Reserved.
16
Desplazamiento 45 77 88 97
Condicin de flujo
Flujo tapn
Laminar
Turbulento
17
Velocidad
12.0 lb/gal Non-Settling Mud, 16.8 lb/gal Cement
Rate (bpm) 1 4 7
2009 Halliburton. All Right Reserved.
18
Desplazamiento 48 75 98
110 100 90 80 70 60 50 30 50 70
19
90
110
130
150
Espaciadores y lavadores
Compatibilidad Separacin de los fluidos Desplazamiento del lodo Protege las formaciones Suspender los Solidos
20
Conclusiones
Acondicionamiento del lodo Mover el casing Centralizar Mximizar la velocidad Utilizar Espaciadores / lavadores