Академический Документы
Профессиональный Документы
Культура Документы
ROMVEC INDUSTRIE is a private construction erection / engineering company which has been active in the field of industrial systems since 1998. Mainly we activate in the field construction/erection/ repairing of thermo-energetical equipment. We design and construct, erect / install, commission & start up, maintain and repair domestic and industrial steam / water boilers, power steam boilers, steam and gas turbines, Combined Heat and Power units, steam/ hot water pipes, industrial pipe systems and upgrade process lines, heat distribution centres and industrial boiler houses. We carry out electrical works and execute industrial automatic control systems. The scope of our activities also includes servicing of boilers, burners and heating equipment. We are an ISCIR authorized company and we can provide RSVTI services.
SERVICES PROVIDED:
BOILER HOUSES INDIVIDUAL BOILER INSTALLATION STEAM / HOT WATER PIPE SYSTEMS PRESSURE VESSELS INSTALLATION AUTOMATION SYSTEMS FOR CONTROL & SURVEILLANCE Equipped with singke or more steam, hot water, warm water boilers (each up to 120t/h, 100 bar, 5400C steam and 100 Gcal /h, 25 bar, 2200C - hot / superheated water) steam, hot water, warm water (up to 525t/h, 196 bar, 5400C steam and 100 Gcal /h, 25 bar, 2200C - hot / superheated water) Steam pipes: pmax = 190 bar; Tmax = 540 C; max. = 800 mm Hot water pipes: pmax = 25 bar; Tmax = 200 C; max. = 1 500 mm Vmax = 100 m3; pmax = 100 bar; Temperature: - 50 C T + 440 C; Fluids = air, steam, water, hydrogen, oxygen, nitrogen, argon, CO2, LPG, acetylene, liquefyed chlorine or sulphur dioxide, other technical gases / liquids used in industrial processes Any type of automatic control & surveillance system for boilers, burners and process control / supervision including automation systems for boilers without constant human operator supervision. Including designs for upgrading, refurbishing and rehanilitation / modernization of the existing automation szstems. Remote operated control systems included Design any type of repairings, including equipment parts design for replacement up to complete equipment reconstruction; Steam boilers: Dmax= 525 t/h, pmax=196 bar; Tmax= 540 C Hot water boilers: Qmax = 100 Gcal/h, pmax = 25 bar; Tmax= 160 C; Steam pipes: pmax = 190 bar; Tmax = 540 C; max. = 800 mm; Hot water pipes: pmax= 25 bar; Tmax = 200 C; max. = 1 500 mm Pressure vessels: Vmax = 100 m3; pmax = 100 bar; Temperature: - 50 C T + 440 C Construction designs for boiler parts replacement as economizers, superheaters, shells, furnaces, plates and others and designs for self standing equipment as tanks, vessels, headers, manifolds, heat exchangers, air / flue gases duct and stacks and other industrial steel structures for temporary or permanent use
DESIGN
1 / 72
BOILERS, PRESSURE VESSELS, STEAM PIPES REPAIRS HEAT EXCHANGERS, PRESSURE VESSELS, TANKS, DUCTS AND STACKS AND STEEL CONSTRUCTIO N
PRESSURE VESSELS AND TANKS STEAM / HOT WATER PIPE SYSTEMS INDUSTRIAL PROCESS PIPE SYSTEMS DISTRICT HEATING EQUIPMENT AND PIPES
Steam / hot water / warm water boilers, thermal deaerators, fuel tanks, fuel gas preparation stations, heavy oil pressure and temperature rising units, pumps, compressors, chemical water treatment stations, steam desuperheating stations, condenstae recovery systems, steam pressure reducing stations, headers and manifolds and any type of thermomechanical auxiliary equipment from the boiler house plant up to 525t/h, 196 bar, 5400C steam and 100 Gcal /h, 25 bar, 2200C - hot / superheated water Vmax = 100 m3; pmax = 100 bar; Temperature: - 50 C T + 440 C; Fluids = air, steam, water, hydrogen, oxygen, nitrogen, argon, CO2, LPG, acetylene, liquefyed chlorine or sulphur dioxide, other technical gases / liquids used in industrial processes Steam pipes: pmax = 190 bar; Tmax = 540 C; max. = 800 mm Hot water pipes: pmax = 25 bar; Tmax = 200 C; max. = 1 500 mm Natural gaz pipes, industrial gases and liquids process pipes, including transport lines pipes
Warm water boilers: Qmin = 70Kw; Qmax=11 600 kW; pmax = 10 bar; Tmax = 110 C
Low pressure steam boilers: Dmax = 10 t/h, pmax = 0,5 bar; Tmax = 110 C
PROCUREMENT
HOUSES HEAT RECOVERY STEAM AND/ OR WATER BOILERS CO/TRI GENERATION UNITS STEAM BOILERS HOT WATER / WARM WATER BOILERS BURNERS AND BURNER SYSTEMS AUTOMATION SYSTEM COMPONENTS
installing on customers locations if requested Installation can be done, upon customers request, in containers. We can install HRBU up to 15 MW th. Ussually we install them in a combination with a 7 MW el gas turbine ROMVEC installs co / tri generation units with gas turbines up to 50 MW. Tipically instalations are made for 1,2 MW, 8 MW, 18 MW and 47 MW PUMPS GAS TURBINES COMPRESSORS STEAM TURBINES CHP UNITS CO / TRI GENERATION UNITS WATER TREATMENT STATIONS COMPRESSORS CONTAINER BOILER HOUSES Biogas CHP Container Units THERMOMECANIC AL AUXILIARY EQUIPMENT
3 / 72
ROMVEC assure procurement for all installation works hereabove specified as Romvec mainly execute turnkey projects. We build industrial boiler houses. We offer design works, supply, installation and start-up . Also ROMVEC offers a large range of afterworks maintenance services
4 / 72
steam, hot water, warm water (up to 525t/h, 196 bar, 5400C steam and 100 Gcal /h, 25 bar, 2200C - hot / superheated water) monobloc burners, multibloc burnes and complex burner installations which power steam / water boilers, kilns and ovens, diathermic oil burners, incinerators, dryers and any other domestic or industrial plant fuel operated. It starts up the integral technological system and performance tests are carried on Every installed unit, even if it is a containerized one, factory pretested
Every single equipment is Individually start up, tested for customer acceptance and handed over. For equipment which are from ISCIR domains, ISCIR running permits endorsment included.
MAINTENANC E / SERVICE
REPAIRING WORKS
ROMVEC assure maintenance and repairings works for every equipment and system listed above as possible to be designed, installed, erected, commissioned and started up
5 / 72