1.

High Security bollard M30


blocking element and cover plate galvanized and
underground casing galvanized
approx. 6 sec., lowering approx. 2 sec.
rising approx. 6 sec., lowering approx. 2 sec.
impact laoad 611kJ (15.000Ibs@30 mph)
certified according to ASTM F2656-07 M30, P1
bollard lid: red LED illumination, shining sideways and upwards
option: Heating
Remote operation:
the bollard remains in the actual position in case of power faillure
Option: the bollard lower in case of power faillure
2. control unit in control box (IP65) max. cable length of 50 m
for wall installation inside a building
230V, 50Hz, 800W
option: 2-channel loop detector ( twisted pair cable
max. cable length 25m from the control box to induction loop)
option: EFO 1,0-1,5 sec.
3. option: push button "EFO"
4. option: push button "rising-stop-lowering"
5. flex. conduit 45mm (by client)
(from bollard to control unit)
6. conduit NW 100 for drainage (by client)
foundation:
concrete min C25/30
The foundation is reinforced with steel bars
separate reinforcement plan.
The building ground for the foundation must allow
for a soil pressure of 200 kN/m and all
foundations must be erected frost-protected!
order number ____________ pos. ________
important:
filled out: date ____________ name ___________________
project: _________________________________
customer: _______________________________
W
e
i
t
e
r
g
a
b
e

s
o
w
i
e

V
e
r
v
i
e
l
f

l
t
i
g
u
n
g

d
i
e
s
e
s

D
o
k
u
m
e
n
t
s
,

V
e
r
w
e
r
t
u
n
g

u
n
d

M
i
t
t
e
i
l
u
n
g
s
e
i
n
e
s

n
h
a
l
t
s

s
i
n
d

v
e
r
b
o
t
e
n
,

s
o
w
e
i
t

n
i
c
h
t

a
u
s
d
r

c
k
l
i
c
h

g
e
s
t
a
t
t
e
t
.
Z
u
w
i
d
e
r
h
a
n
d
l
u
n
g
e
n

v
e
r
p
f
l
i
c
h
t
e
n

z
u

S
c
h
a
d
e
n
e
r
s
a
t
z
.

A
l
l
e

R
e
c
h
t
e

f

r

d
e
n

F
a
l
l

d
e
r
P
a
t
e
n
t
-
,

G
e
b
r
a
u
c
h
s
m
u
s
t
e
r
-

o
d
e
r

G
e
s
c
h
m
a
c
k
s
m
u
s
t
e
r
e
i
n
t
r
a
g
u
n
g

v
o
r
b
e
h
a
l
t
e
n
.
T
h
e

r
e
p
r
o
d
u
c
t
i
o
n
,

d
i
s
t
r
i
b
u
t
i
o
n

a
n
d

u
t
i
l
i
z
a
t
i
o
n

o
f

t
h
i
s

d
o
c
u
m
e
n
t

a
s

w
e
l
l

a
s

t
h
e
c
o
m
m
u
n
i
c
a
t
i
o
n

o
f

i
t
s

c
o
n
t
e
n
t
s

t
o

o
t
h
e
r
s

w
i
t
h
o
u
t

e
x
p
l
i
c
i
t

a
u
t
h
o
r
i
z
a
t
i
o
n

i
s
p
r
o
h
i
b
i
t
e
d
.
O
f
f
e
n
d
e
r
s

w
i
l
l

b
e

h
e
l
d

l
i
a
b
l
e

f
o
r

t
h
e

p
a
y
m
e
n
t

o
f

d
a
m
a
g
e
s
.

A
l
l

r
i
g
h
t
s
r
e
s
e
r
v
e
d

i
n

t
h
e

e
v
e
n
t

o
f

t
h
e

g
r
a
n
t

o
f

a

p
a
t
e
n
t
,

u
t
i
l
i
t
y

m
o
d
e
l

o
r

d
e
s
i
g
n
.
S
c
h
u
t
z
v
e
r
m
e
r
k

n
a
c
h

I
S
O
1
6
0
1
6

b
e
a
c
h
t
e
n
.
C
o
p
y
r
i
g
h
t

r
e
s
e
r
v
e
d
.
name
surfaces
engineer
overworked
replacement for:
original:
general tolerance:
date
last revision:
material
kg
weight
dimens.unit.
measure
replacement for Kifos no.
article code
drawing-no.
Z-
format
alterations
DIN
surface treatment
Crash rated bollard type M30
PPG M30 355/1000


Knauer 29.02.2012
DIN ISO 2768-mK
ISO 1302





1:30
1099303
mm
A3

Вам также может понравиться