Вы находитесь на странице: 1из 6

INSTALLATION ENGINEERING - MANHRS & COSTING S

S. No. 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.10 2 2.1 2.2 2.3 3 3.1 3.2 4 5 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 5.10 5.11 5.12 5.13 5.14 5.15 Description Pipelaying Pipelay analysis Transportation analysis Pipelaying procedure NDT Procedure Field joint coating procedure Abondonment & recovery procedure Buckle detection & prevention procedure Barge mooring analysis Line pipe stacking analysis Towing analysis Riser Davit Lift analysis Riser clamp installation procedure Riser Installation Procedure Spool/Subsea Tie-in Spool installation procedure Spool lifting analysis Crossing & Free span installation procedure Drawings Line pipe stacking & sea fastening Anchor Patterns Pipe lifting Typical Spool lifting & Installation drawings Typical Riser Lifting & Installation drawings Start up head Laydown head Emergency lay down head Contingency retrieval head Typical Bow string drawing Pipe abondonment & receovery drawings Pipeline initiation drawings Barge roller settings drawings Bucke detector drawing Towing arrangement drawing

5.16 5.17 5.18 5.19

Wet buckle & dry buckle drawings Typical Pipeline lifting drawing for Stack-on Riser Typical crossing drawing Typical free span drawing

INSTALLATION ENGINEERING - MANHRS & COSTING SHEET


Basis No. Of Deliverables No. Of manhrs

Size wise - 1 document No. Of cargo barges 1 1 1 1 1 No. Of barges No. Of trips No. Of towing arrangements

1 1 1

1 1 1 160

For each load out 1 anchor pattern per half km. + Inititation & laydown 1 1 1 For each size For each size For each size For each size 1 1 1 various for each size, concrete thcknes & depth Size wise No. Of towing arrangements

360

80 80 48 48 48 48 80

48

1 1 1 1

Unit Price (USD)

Total Cost (USD)